[go: up one dir, main page]

CN107092998A - Resource allocation methods and device - Google Patents

Resource allocation methods and device Download PDF

Info

Publication number
CN107092998A
CN107092998A CN201610698277.5A CN201610698277A CN107092998A CN 107092998 A CN107092998 A CN 107092998A CN 201610698277 A CN201610698277 A CN 201610698277A CN 107092998 A CN107092998 A CN 107092998A
Authority
CN
China
Prior art keywords
target
resource
sendout
adjusted
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610698277.5A
Other languages
Chinese (zh)
Other versions
CN107092998B (en
Inventor
徐明泉
崔代锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Xiaodu Information Technology Co Ltd
Original Assignee
Beijing Xiaodu Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Xiaodu Information Technology Co Ltd filed Critical Beijing Xiaodu Information Technology Co Ltd
Priority to CN201610698277.5A priority Critical patent/CN107092998B/en
Publication of CN107092998A publication Critical patent/CN107092998A/en
Application granted granted Critical
Publication of CN107092998B publication Critical patent/CN107092998B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Accounting & Taxation (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Finance (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application discloses resource allocation methods and device, methods described includes:Determine the change in resources contributive rate of target to be adjusted;Determine that first resource of the target to be adjusted within the target adjustment cycle distributes adjustment amount according to the change in resources contributive rate;Adjustment amount is distributed according to the Current resource sendout of the target to be adjusted and the first resource, it is determined that distributing to the target resource sendout of the target to be adjusted within the target adjustment cycle.The method and device provided using the application, can be according to the change in resources contributive rate of trade company, subsidy amount of the trade company in target period is adjusted, larger trade company is influenceed to provide more subsidy by subsidy amount so as to be embodied as trading volume, and influenceed less trade company to provide less subsidy by subsidy amount for trading volume, subsidy is played due effect.

Description

Resource allocation methods and device
Technical field
The application is related to field of information processing, more particularly to resource allocation methods and device.
Background technology
With all kinds of electric business platforms such as B2C (Business to Customer) and O2O (Online to Offline) Fast development, increasing trade company begins through electric business platform with customer and is traded.Electric business platform can be trade company or customer Offer can lift all kinds of resources of trading volume, such as fund subsidy, item dispenser service, further to lift trade company and customer Begin through the enthusiasm that electric business platform is traded.
Applicant has found that the enthusiasm that trade company is traded with customer by electric business platform can be by handing over by studying Easily amount is embodied, and trading volume is more high, illustrates that trade company and the enthusiasm that customer is traded by electric business platform are higher.And hand over Positive correlation between the resource allocation that usual and counterparty (including trade company or customer) is obtained easily is measured, wherein the counterparty can With including trade company or customer.The resource that electric business platform distributes to counterparty's offer is more, and the trading volume of counterparty also can be more.
But it is different according to the type of counterparty, same resource allocation is to produced by the trading volume of different counterparties Influence is also differed.If for example, certain trade company provides cost sensitive commodity or service, then few for the distribution of such trade company Amount subsidy, it is possible to significantly lift the trading volume of the trade company;But if the trade company provides non-cost sensitive commodity Or service, then the even subsidy more to such transaction allocation, the trading volume lifting of such transaction also can be than relatively limited.
Because the total resources that electric business platform can distribute to each counterparty is usually constructed with certain limit, and it is flat by electric business The counterparty that platform is traded would generally be large number of.Therefore available resource-constrained merchandise trade company or customer quantity it is numerous In the case of, how resource allocation is carried out between numerous counterparties, can just resource is fully utilized, lift whole electric business Platform trading volume, just turns into the urgently technical issues that need to address.
The content of the invention
The application puies forward embodiment and has supplied resource allocation methods and device, to lift the utilization ratio of resource.
In a first aspect, the embodiment of the present application provides a kind of resource allocation methods, including:Determine the resource of target to be adjusted Change contributive rate, the change in resources contributive rate refers between the resource allocation variable quantity of target to be adjusted and output variable quantity Ratio;Determine that first resource of the target to be adjusted within the target adjustment cycle is distributed according to the change in resources contributive rate to adjust Whole amount;Adjustment amount is distributed according to the Current resource sendout of the target to be adjusted and the first resource, it is determined that being adjusted in target The target resource sendout of the target to be adjusted is distributed in complete cycle.
Optionally, the change in resources contributive rate for determining target to be adjusted includes:Calculating states target to be adjusted first In the adjustment cycle between the first resource sendout obtained and the Secondary resource sendout obtained within the second adjustment cycle Resource allocation variable quantity calculate the first quantum of output of the target to be adjusted within the first adjustment cycle with the second adjustment week The output variable quantity between the second quantum of output in phase;Calculate the change in resources contributive rate and refer to the resource allocation variable quantity Ratio between the output variable quantity as the target to be adjusted change in resources contributive rate.
Optionally, the Current resource sendout according to the target to be adjusted is distributed with the first resource and adjusted Amount, it is determined that the target resource sendout of the target to be adjusted is distributed within the target adjustment cycle to be included:By the current money Source sendout is used as the target resource sendout with first resource distribution adjustment amount sum.
Optionally, adjustment amount is distributed in the Current resource sendout according to the target to be adjusted and the first resource, It is determined that before the target resource sendout for distributing to the target to be adjusted within the target adjustment cycle, in addition to:Obtain second Resource allocation adjustment amount;The Current resource sendout according to the target to be adjusted is distributed with the first resource and adjusted Amount, it is determined that the target resource sendout of the target to be adjusted is distributed within the target adjustment cycle to be included:Calculate alternative resource Sendout, the alternative resource sendout refers to that the Secondary resource sendout distributes adjustment amount and second with the first resource Resource allocation adjustment amount sum;The target resource sendout is determined according to the alternative resource sendout.
Optionally, obtaining Secondary resource distribution adjustment amount includes:Obtain the target to be adjusted in the current adjustment cycle Interior predetermined quantum of output and actual output amount;The irrelevance between the actual output amount and the predetermined quantum of output is calculated, its In, the irrelevance refers to the ratio between deviation value and the predetermined quantum of output, and the deviation value refers to the actual output Difference between amount and the predetermined quantum of output;Obtain Secondary resource distribution adjustment amount corresponding with the irrelevance.
Optionally, the target resource sendout bag for determining to distribute to the target to be adjusted within the target adjustment cycle Include:Determine the target scoring of the target to be adjusted;Obtain the resource allocation limits corresponding with target scoring; When the alternative resource sendout is in the resource allocation limits, the alternative resource sendout is regard as the mesh Mark resource allocation;Or, when the alternative resource sendout is less than the lower limit of the resource allocation limits, by institute The lower limit of resource allocation limits is stated as the target resource sendout;Or, when the alternative resource sendout is high When the upper limit of the resource allocation limits, the upper limit of the resource allocation limits is provided as the target Source sendout.
Optionally, methods described also includes:The target resource sendout is distributed into the target to be adjusted described Task in the target adjustment cycle.
Optionally, it is described that the target resource sendout is distributed into the target to be adjusted in the target adjustment cycle Interior task includes:Estimate the task quantity in the target adjustment cycle;Determine each in the target adjustment cycle The resource allocation of business, the resource allocation of the task refers to the ratio of the target resource sendout and the task quantity Rate.
Optionally, it is described that the target resource sendout is distributed into the target to be adjusted in the target adjustment cycle Interior task includes:Obtain the historic task of the target predetermined quantity to be adjusted;According to the resource consumption of the historic task Amount determines that at least two consumed resources are interval;Determine to distribute to each consumed resource area in the target resource sendout The total resources sendout of interior task;Estimate the number of tasks in each described consumed resource interval in the target adjustment cycle Amount;Determine the resource allocation of each task in the target adjustment cycle, the resource allocation of the task refers to described The total resources sendout of the task task quantity interval with the consumed resource is total in the affiliated consumed resource of task is interval With.
Second aspect, this application provides a kind of resource allocation device, including:Contributive rate determining unit, for determining to treat Adjust the change in resources contributive rate of target;Adjustment amount determining unit, for being treated according to change in resources contributive rate determination Adjust first resource distribution adjustment amount of the target within the target adjustment cycle;Sendout determining unit, for waiting to adjust according to The Current resource sendout of whole target distributes adjustment amount with the first resource, it is determined that being distributed within the target adjustment cycle described The target resource sendout of target to be adjusted.
Optionally, the contributive rate determining unit includes:Change in resources amount computation subunit, mesh to be adjusted is stated for calculating It is marked on the first resource sendout obtained in the first adjustment cycle and the Secondary resource obtained within the second adjustment cycle point Resource allocation variable quantity between dosage;Output variable quantity computation subunit, is adjusted for calculating the target to be adjusted first Output variable quantity between the first quantum of output in complete cycle and the second quantum of output within the second adjustment cycle;Contributive rate is calculated Subelement, refers to ratio between the resource allocation variable quantity and the output variable quantity for calculating the change in resources contributive rate Rate as the target to be adjusted change in resources contributive rate.
Optionally, the sendout determining unit, specifically for by the Current resource sendout and the first resource Distribution adjustment amount sum is used as the target resource sendout.
Optionally, the adjustment amount determining unit, is additionally operable to obtain Secondary resource distribution adjustment amount;The sendout is determined Unit, including:Alternative sendout computation subunit, for calculating alternative resource sendout, the alternative resource sendout refers to The Secondary resource sendout distributes adjustment amount and Secondary resource distribution adjustment amount sum with the first resource;Actual sendout Determination subelement, for determining the target resource sendout according to the alternative resource sendout.
Optionally, the adjustment amount determining unit includes:Completion situation obtains subelement, for obtaining the mesh to be adjusted Predetermined quantum of output of the target within the current adjustment cycle and actual output amount;Irrelevance computation subunit, for calculating the reality Irrelevance between border quantum of output and the predetermined quantum of output, wherein, the irrelevance refers to deviation value and the predetermined output Ratio between amount, the deviation value refers to the difference between the actual output amount and the predetermined quantum of output;Adjustment amount is obtained Subelement is taken, for obtaining Secondary resource distribution adjustment amount corresponding with the irrelevance.
Optionally, the sendout determining unit includes:Target scoring determination subelement, for determining the mesh to be adjusted Target target scores;Limits determination subelement, for obtaining the resource allocation limit corresponding with target scoring Scope;Target resource sendout determination subelement, for when the alternative resource sendout is in the resource allocation limit model When enclosing, the alternative resource sendout is regard as the target resource sendout;Or, when the alternative resource sendout is less than During the lower limit of the resource allocation limits, the lower limit of the resource allocation limits is regard as the target resource Sendout;Or, when the alternative resource sendout is higher than the upper limit of the resource allocation limits, by the resource The upper limit of sendout limits is used as the target resource sendout.
Optionally, described device also includes:Allocation unit, described waits to adjust for the target resource sendout to be distributed to Task of the whole target within the target adjustment cycle.
Optionally, the allocation unit includes:Subelement is estimated, for estimating the number of tasks in the target adjustment cycle Amount;Distribute subelement, the resource allocation for determining each task in the target adjustment cycle, the resource of the task Sendout refers to the ratio of the target resource sendout and the task quantity.
Optionally, the distribution subelement includes:Historic task obtains subelement, pre- for obtaining the target to be adjusted The historic task of fixed number amount;Interval determination subelement, for determining at least two according to the consumed resource of the historic task Consumed resource is interval;Total amount determination subelement is distributed, for determining to distribute to each money in the target resource sendout The total resources sendout of task in source consumption is interval;Task quantity estimates subelement, every in the target adjustment cycle for estimating Task quantity in one consumed resource interval;Task resource sendout determination subelement, for determining the target The resource allocation of each task in the adjustment cycle, the resource allocation of the task refers to the affiliated resource consumption of the task The summation of the total resources sendout of the task task quantity interval with the consumed resource in amount is interval.
, can be according to the change in resources contributive rate for adjusting target, to adjustment using the technical scheme of herein described offer Subsidy amount of the target in target period is adjusted, it is possible to achieve for the higher adjustment Target Assignment of change in resources contributive rate compared with Many subsidies, are the less subsidy of the relatively low adjustment Target Assignment of change in resources contributive rate, so as to be embodied as trading volume by Subsidy amount influences larger adjustment target to provide more subsidy, is influenceed less adjustment target to provide by subsidy amount for trading volume Less subsidy, enables subsidy to play due effect.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the application, letter will be made to the required accompanying drawing used in embodiment below Singly introduce, it should be apparent that, for those of ordinary skills, without having to pay creative labor, Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the schematic flow sheet of the application resource allocation methods one embodiment;
Fig. 2 is the probability density distribution scope schematic diagram of the application change in resources contributive rate;
Fig. 3 is the application probability density distribution interval division schematic diagram;
Fig. 4 is the structural representation of another embodiment of the application resource allocation methods;
Fig. 5 is the structural representation of the application resource allocation device one embodiment.
Embodiment
In different system platforms, adjustment target, resource, task and the indicated content of quantum of output difference can respectively not It is identical.For example, in electric business platform, the adjustment target can refer to the counterparty being traded by the electric business platform, That is trade company or customer;The resource can then refer to the subsidy amount of money or free delivery service number of times, and the task can then refer to Order, the quantum of output can then refer to trading volume.For ease of description, following embodiments are only said by taking electric business platform as an example It is bright, it is not intended that the present invention is only used for electric business platform.
In electric business platform, server periodically can be generally adjusted to the resource allocation of each adjustment target. The adjustment cycle being related to due to the application is multiple, for ease of description, be respectively adopted in subsequent embodiment the first adjustment cycle, Second adjustment cycle and target adjustment cycle etc. make a distinction to the different adjustment cycles.Wherein, the first adjustment cycle can be An adjustment cycle, the second adjustment cycle before the second adjustment cycle can be a tune before the target adjustment cycle Complete cycle.Under normal circumstances, the first adjustment cycle, the second adjustment cycle and target adjustment cycle can be continuous for three The adjustment cycle.According to the difference of adjustment target type, the length in the adjustment cycle can also be different.For example, when described When to adjust target be the trade company in electric business platform, the length in the adjustment cycle can be 1 day.
The trading volume of trade company can refer to the quantity on order that trade company completed within a certain period of time or total amount of the orders etc., at this In application, the trading volume of trade company can be within an adjustment cycle, quantity on order or total amount of the orders that trade company is completed.
It is the flow chart of the application resource allocation methods one embodiment referring to Fig. 1, this method comprises the following steps:
Step 101, the change in resources contributive rate of target to be adjusted is determined, the change in resources contributive rate is target to be adjusted Resource allocation variable quantity and output variable quantity between ratio.
Server obtains first resource sendout and Secondary resource sendout first, wherein, the first resource sendout The resource allocation obtained by target to be adjusted within the first adjustment cycle, the Secondary resource sendout is described to be adjusted The resource allocation that target is obtained within the second adjustment cycle.For example, in electric business platform, the target to be adjusted can be Any trade company being traded by the electric business platform, the first resource sendout can be the trade company in the first adjustment week The quantity of the subsidy obtained in phase, the Secondary resource sendout can the trade company obtained within the second adjustment cycle The quantity of subsidy.
After first resource sendout and Secondary resource sendout is got, server can calculate first resource distribution Resource allocation difference between amount and Secondary resource sendout.Due to first resource sendout possibly more than, be equal to or less than Secondary resource sendout, therefore the resource allocation difference can be on the occasion of can also be negative value or 0.
In addition to the first resource sendout is obtained with Secondary resource sendout, server also needs to obtain the first output Amount and the second quantum of output, and determine the quantum of output difference between the first quantum of output and the second quantum of output.Wherein, first output The total yield output within the first adjustment cycle for the target to be adjusted is measured, second quantum of output is that the target to be adjusted exists Total yield output in second adjustment cycle.For example, in electric business platform, first quantum of output can be the trade company first Trading volume in the adjustment cycle;Second quantum of output can be trading volume of the trade company within the second adjustment cycle.It is described Total yield output can be order total amount in the adjustment cycle or can also be that flowing water total amount in the adjustment cycle is represented, the production Output difference can be on the occasion of can also be negative value or 0.
After resource allocation difference and quantum of output difference are determined, the resource point of the target to be adjusted can be calculated With change contributive rate.Wherein, the resource allocation change contributive rate is the quantum of output difference and the resource allocation difference Between ratio, for quantify embody resource allocation change to target quantum of output to be adjusted change influence.
Step 102, of the target to be adjusted within the target adjustment cycle is determined according to the change in resources contributive rate One resource allocation adjustment amount.
Because resource allocation change contributive rate can quantify to embody resource allocation change to target output to be adjusted The influence of change is measured, resource allocation change contributive rate is higher, illustrates that the influence that subsidy changes to target quantum of output to be adjusted is bigger, And resource allocation change contributive rate is lower, illustrate that the influence that subsidy changes to target quantum of output to be adjusted is smaller.Therefore can root Change contributive rate according to the resource allocation and determine that the target to be adjusted subsidizes adjustment amount the first of the target adjustment cycle, so that Subsidy can be made, which to be more effectively adjusted to, can most lift the target of quantum of output.
It is common, corresponding resource adjustment amount, resource allocation can be set for each resource allocation change contributive rate in advance Change contributive rate is higher, and resource adjustment amount is also higher.After the resource allocation change contributive rate of the target to be adjusted is determined, The resource adjustment amount corresponding to the resource allocation change contributive rate of the target to be adjusted can be regard as first adjustment amount.
Because the targeted species being traded on same electric business platform are numerous and heterogeneous, and different target Also it is different, can be by the electric business platform in order to realize that the more targeted subsidy to target is adjusted All targets be divided into some target groups according to predetermined dimension.For example, the business of same class commodity or service will can be provided Family is divided into a packet, and the trade company in same commercial circle can also be either divided into a target group or also may be used So that a target group will be divided into using the customer of same means of distribution.
When calculating first resource sendout, the target group belonging to the target to be adjusted can be determined first;Then count Calculate the probability density distribution scope of each target resource distribution change contributive rate in the target group;By the probability density distribution Scope divides at least three distributed areas, wherein, each one default resource allocation of the distributed area correspondence;Determine again Distributed area belonging to the resource allocation change contributive rate of the target to be adjusted;And by the resource allocation of the target to be adjusted Change the default resource allocation corresponding to the distributed area belonging to contributive rate as the described first subsidy adjustment amount.
The calculation and the target to be adjusted of the resource allocation change contributive rate of other targets in the target group The calculation of resource allocation change contributive rate is identical, just repeats no more herein.Each target resource point in the target group After all being determined with change contributive rate, the probability that can calculate each target resource distribution change contributive rate in the target group is close Spend distribution.
The probability density distribution mainly may be referred to the normal distribution after taking the logarithm and distribution of mean value, it is generally the case that The probability density distribution curve can with as shown in Fig. 2 wherein, the abscissa for target resource allocation change contributive rate, Ordinate is the quantity of target.It is can be seen that by the probability density distribution curve in the target group, most of target Resource allocation change contributive rate be all distributed in certain scope, only the quantum of output change of sub-fraction target is by resource point Dosage change influence very greatly, and separately have sub-fraction target quantum of output change changed by resource allocation influenceed compared with It is small.
Therefore after probability density distribution scope determination, the probability density distribution scope can be divided at least Target quantum of output in three distributed areas, each distributed area is influenceed roughly the same by resource allocation, i.e. each Target resource distribution change contributive rate in the distributed area is within an interval.
The dividing mode of the distributed area can have a variety of.For example, probability density distribution can be determined most as shown in Figure 3 Corresponding resource allocation change contributive rate is as a reference value M during high level, and determines a value range δ, then by the probability First distributed area of the Density Distribution scope division less than M- δ, the second distributed area between M- δ to M+ δ, and more than M+ δ the 3rd distributed area these three distributed areas, each of which distributed area one default resource allocation of correspondence.With the 3rd The corresponding default resource allocation of distributed area is more than the default resource allocation corresponding with the second distributed area;With second point The interval corresponding default resource allocation of cloth is more than the default resource allocation corresponding with the first distributed area.If to be adjusted The resource allocation change contributive rate of target is located at the first distributed area, then can be by the default money corresponding to the first distributed area Source sendout is used as the first resource sendout.If the resource allocation change contributive rate of target to be adjusted is located at the second distribution It is interval, then adjustment patch amount can be mended using the default resource allocation corresponding to the second distributed area as described first.
First subsidy adjustment amount is determined using such a mode, can both make the first subsidy adjustment amount more targeted, also may be used So that the determination process of the first subsidy adjustment amount is more simple.Herein it should be noted that being a variety of of distributed area above One kind in optional dividing mode, above-mentioned example does not represent the restriction to the application.
Step 103, adjustment amount is distributed according to the Current resource sendout of the target to be adjusted and the first resource, really It is scheduled on the target resource sendout that the target to be adjusted is distributed in the target adjustment cycle.
, can be by the Secondary resource sendout and institute after Secondary resource sendout and the first subsidy adjustment amount are all determined The first subsidy adjustment amount sum is stated as the target resource sendout, and be according to target resource sendout in target period The Target Assignment subsidy.
The scheme provided using the present embodiment, can change contributive rate, to target in mesh according to the resource allocation of target Resource allocation in the mark cycle is adjusted, so as to be embodied as the resource allocation higher Target Assignment of change contributive rate compared with Many subsidies, are the relatively low less subsidy of Target Assignment of resource allocation change contributive rate, so as to be embodied as quantum of output by Resource allocation influences larger target to provide more subsidy, and is that quantum of output is influenceed less target to carry by resource allocation For less subsidy, subsidy is set to play due effect.
Due in actual use, being that trade company's distribution subsidy purpose to be reached is to make the trading volume of trade company, invest back Report rate etc. reaches target.Therefore, can be with addition to being adjusted according to change in resources contributive rate for the subsidy of target to be adjusted The subsidy for target to be adjusted is adjusted according to performance etc. of subsidy target, wherein, the subsidy target refers to pair The trade company to be adjusted is subsidized the target to be reached.Therefore, as shown in figure 4, in another embodiment, except the step Rapid 101 and the step 102 outside can also include::
Step 104, the predetermined quantum of output and the actual output amount within the second adjustment cycle of the target to be adjusted are obtained.
Wherein, it can be quantum of output that the output goal, which can be measured,;Can also be between quantum of output and resource allocation Ratio, i.e. rate of return on investment.For example, in electric business platform, when trading volume is rate of return on investment, the predetermined quantum of output is pre- Determine rate of return on investment, the actual output amount is actual investment return rate.
Step 105, the deviation scope between the actual output amount and the predetermined quantum of output is calculated.
Wherein, the scope that deviates is deviation value and the ratio preset between predetermined quantum of output, and the deviation value is Difference between the actual output amount and the predetermined quantum of output.Because the actual output amount is likely larger than, is less than or waited In the predetermined quantum of output.Therefore, the deviation value may be on the occasion of, negative value or 0;Accordingly, the deviation scope can also For on the occasion of, negative value or 0.
It is in electric business platform exemplified by the trading volume of target by the output goal, if default pre arranged trading amount is 5000 Member, and real trade amount be 3000 yuan, then it is described deviation scope be (3000-5000)/5000, i.e., it is described deviation scope for- 0.4;If default pre arranged trading amount is 5000 yuan, and real trade amount is 6000 yuan, then the deviation scope is (6000- 5000)/5000, i.e., described deviation scope is 0.2.
Step 106, Secondary resource adjustment amount corresponding with the deviation scope is obtained.
Different resource adjustment amounts can be correspondingly arranged for different deviation scopes in advance, in the inclined of the target to be adjusted After being determined from scope, Secondary resource adjustment amount corresponding with the deviation scope of the target to be adjusted can be obtained.
Due to deviateing the Range Representation performance level of output goal, thus when the deviation scope be on the occasion of when, explanation Excess is completed output goal, therefore can suitably reduce the resource allocation of the target to be adjusted, and the Secondary resource is adjusted Whole amount is negative value;When the deviation scope is negative value, illustrate that output goal is not yet completed, therefore can suitably increase this to treat Adjust target resource allocation, the Secondary resource adjustment amount be on the occasion of;When the deviation scope is 0, second money Source adjustment amount can also be then 0.
The Secondary resource adjustment amount absolute value then can be with the absolute value positive correlation for deviateing scope, i.e. deviates model The absolute value enclosed is smaller, then the absolute value of Secondary resource adjustment amount is just also smaller;The absolute value for deviateing scope is bigger, then the The absolute value of two resource adjustment amounts is just also bigger;When it is described deviation scope be on the occasion of when, the deviation scope more it is big then second money Source adjustment amount is smaller, when and it is described deviation scope be negative value when, the smaller then Secondary resource adjustment amount of deviation scope is bigger.
For example, when the deviation scope is 1, the Secondary resource adjustment amount can be -2;When the deviation scope is When 0.5, the Secondary resource adjustment amount can be -1;When the deviation scope is -0.5, the Secondary resource adjustment amount can Think 1;When the deviation scope is -1, the Secondary resource adjustment amount can be 2.
Step 107, using Secondary resource sendout and the first resource adjustment amount and Secondary resource adjustment amount sum as The target resource sendout.
After the determination of Secondary resource adjustment amount, then can by Secondary resource sendout and the first resource adjustment amount and Secondary resource adjustment amount sum is used as the target resource sendout.
The scheme provided using the present embodiment, except can realize that situation treats tune according to the output goal of target to be adjusted The resource of whole target is further adjusted, so as to promote to adjust target described in realization of goal to be adjusted.
Herein it should be noted that in addition to first resource adjustment amount and Secondary resource adjustment amount, server can also be adopted More kinds of resource adjustment amounts are determined with other rules.For example, in electric business platform, a certain amount of volume can be distributed for high-quality trade company Fixed subsidy, is used as information resources adjustment amount etc..When resource adjustment amount has a variety of, server can by Secondary resource sendout with Each resource adjustment amount sum is used as the target resource sendout.
If directly using Secondary resource sendout and each resource adjustment amount sum as the target resource sendout, that When the species of resource adjustment amount is more, it is likely that target resource sendout can be caused excessive or too small.To avoid target from providing Source sendout is excessive or too small, and alternative resource amount can be calculated first;Then target resource point is determined further according to alternative resource amount Dosage.Wherein, the target resource sendout is Secondary resource sendout and each resource adjustment amount sum, for example, described standby It can be the Secondary resource sendout and the first resource adjustment amount and Secondary resource adjustment amount sum to select stock number;Or The alternative resource amount can be the Secondary resource sendout and the first resource adjustment amount sum.
Can be goal-setting to be adjusted in advance when determining the target resource sendout according to the alternative resource amount One stock number limits, then determines the relation between the target resource sendout and the stock number limits The target resource sendout.For example, when the alternative resource amount is in the stock number limits, by the alternative resource Amount is used as the target resource sendout;When the alternative resource amount is less than the lower limit of the stock number limits, by institute The lower limit of stock number limits is stated as the target resource sendout;When the alternative resource amount is limited higher than the stock number When spending the upper limit of scope, the upper limit of the stock number limits is regard as the target resource sendout.
Wherein, the stock number limits of different targets to be adjusted can also be different, the stock number of target to be adjusted Limits can be determined according to scoring ranking of the target to be adjusted in its said target group.The target to be adjusted is commented Point ranking refers to the target ranking of the target scoring of the target to be adjusted in the target scoring of the target group each target.
For example, the 10% minimum target of ranking that scored in the target group, the minimum of its resource limit can be 0, and Peak be the target within the second adjustment cycle total amount of the orders 10%;The 60% of scoring top ranked in the target group Target, the minimum of its resource limit can be 0, and peak is target total amount of the orders within the second adjustment cycle 40%;The minimum of the resource limit of other targets can be 0, and peak can according to linearly with this from second adjustment the cycle The 10% of interior total amount of the orders rises to 40%.
The target scoring refers to the overall score as obtained by the scoring of each dimensions of integration objective.For example, in electricity In business's platform, the dimension can include order unit price, purchase rate, order conversion ratio, rate of return on investment, target importance etc. are tieed up again Degree.Target can have a score in each dimension, and be the target scoring in the summation of each score.For example, If order unit price is scored at 2, again purchase rate be scored at 1, order conversion ratio and be scored at 1, rate of return on investment and be scored at 1, target weight Spend and be scored at 2.The target of so target is commented as 7.Can also be the score of each dimension when calculating the target scoring Certain weight is set, and target scoring is the score of each dimension and the sum of products of weight.
Using this implementation, the stock number for Target Assignment to be adjusted can be limited by stock number limits It is fixed, so as to avoid as the excessive or very few stock number of Target Assignment to be adjusted.
Due to the summation that target resource sendout is the stock number that the target to be adjusted is distributed in the target adjustment cycle, And wherein in the target adjustment cycle, the quantity on order of the target to be adjusted generally has multiple, therefore also need to using certain Allocation rule by the target resource sendout distribute in the target adjustment cycle each transaction.
When the trading volume refers to that the order amount of money of quantity on order in the target adjustment cycle or the target to be adjusted is equal When all equal, the quantity on order in the target adjustment cycle can be estimated, then by target resource sendout mean allocation extremely Each order in target period.
When the trading volume refers to the streamflow in the target adjustment cycle, because the order amount of money of each order may not Together, thus can be different to the order amount of money order different stock numbers are provided, ordered in order to lift being averaged for target to be adjusted Single amount of money.Therefore, server can obtain the History Order of the target predetermined quantity to be adjusted;According to the History Order Order price determines that at least two orders unit price is interval;Determine to distribute to each order unit price interval in the target resource value The total resources of interior order;Estimate the quantity on order in each described order unit price interval in the target adjustment cycle;Determine institute The stock number of each order in the target adjustment cycle is stated, the stock number of the order is interval for the affiliated order unit price of the order The summation of the total resources of the interior order quantity on order interval with order unit price.
Wherein, the quantity of the History Order can be set as needed, can be under normal circumstances the second adjustment cycle Interior quantity on order.The monovalent interval of the order can be determined according to the order price distribution of the History Order.For example, in electricity In business's platform, the monovalent interval of the order can be presented as completely derogatory ladder.For example, can monovalent interval can be less than 25 yuan, 25 to 50 yuan, and 50 yuan of three above order unit price intervals, it is Order splitting so as to the difference according to order transaction amount Different resource.
Referring to the structural representation that Fig. 5 is the application resource allocation device one embodiment.The resource allocation device bag Include:Contributive rate determining unit 501, adjustment amount determining unit 502, and sendout determining unit 503.
Wherein, contributive rate determining unit 501, the change in resources contributive rate for determining target to be adjusted;Adjustment amount is determined Unit 502, for determining first money of the target to be adjusted within the target adjustment cycle according to the change in resources contributive rate Adjustment amount is distributed in source;Sendout determining unit 503, for the Current resource sendout according to the target to be adjusted and described the One resource allocation adjustment amount, it is determined that distributing to the target resource sendout of the target to be adjusted within the target adjustment cycle.
Optionally, the contributive rate determining unit 501 includes:Change in resources amount computation subunit, waits to adjust for calculating to state The first resource sendout that whole target is obtained within the first adjustment cycle and the second money obtained within the second adjustment cycle Resource allocation variable quantity between the sendout of source;Output variable quantity computation subunit, for calculating the target to be adjusted Output variable quantity between the first quantum of output in one adjustment cycle and the second quantum of output within the second adjustment cycle;Contributive rate Computation subunit, refers between the resource allocation variable quantity and the output variable quantity for calculating the change in resources contributive rate Ratio as the target to be adjusted change in resources contributive rate.
Optionally, the sendout determining unit 503, specifically for the Current resource sendout is provided with described first Source distribution adjustment amount sum is used as the target resource sendout.
Optionally, the adjustment amount determining unit 502, is additionally operable to obtain Secondary resource distribution adjustment amount;The sendout Determining unit 503, including:Alternative sendout computation subunit, for calculating alternative resource sendout, the alternative resource distribution Amount refers to that the Secondary resource sendout distributes adjustment amount and Secondary resource distribution adjustment amount sum with the first resource;It is actual Sendout determination subelement, for determining the target resource sendout according to the alternative resource sendout.
Optionally, the adjustment amount determining unit 502 includes:Completion situation obtains subelement, described waits to adjust for obtaining The predetermined quantum of output and actual output amount within the current adjustment cycle of whole target;Irrelevance computation subunit, for calculating The irrelevance between actual output amount and the predetermined quantum of output is stated, wherein, the irrelevance refers to that deviation value makes a reservation for described Ratio between quantum of output, the deviation value refers to the difference between the actual output amount and the predetermined quantum of output;Adjustment Amount obtains subelement, for obtaining Secondary resource distribution adjustment amount corresponding with the irrelevance.
Optionally, described device also includes:The sendout determining unit 503 includes:Target scoring determination subelement, is used In it is determined that the target scoring of the target to be adjusted;Limits determination subelement, it is relative with target scoring for obtaining The resource allocation limits answered;Target resource sendout determination subelement, for when the alternative resource sendout is in institute When stating resource allocation limits, the alternative resource sendout is regard as the target resource sendout;Or, when described When alternative resource sendout is less than the lower limit of the resource allocation limits, by under the resource allocation limits Limit is used as the target resource sendout;Or, when the alternative resource sendout is higher than the resource allocation limits The upper limit when, regard the upper limit of the resource allocation limits as the target resource sendout.
Optionally, the allocation unit includes:Described device also includes:Allocation unit, for the target resource to be divided Dosage distributes to task of the target to be adjusted within the target adjustment cycle.
Optionally, the allocation unit includes:Subelement is estimated, for estimating the number of tasks in the target adjustment cycle Amount;Distribute subelement, the resource allocation for determining each task in the target adjustment cycle, the resource of the task Sendout refers to the ratio of the target resource sendout and the task quantity.
Optionally, the distribution subelement includes:Historic task obtains subelement, pre- for obtaining the target to be adjusted The historic task of fixed number amount;Interval determination subelement, for determining at least two according to the consumed resource of the historic task Consumed resource is interval;Total amount determination subelement is distributed, for determining to distribute to each money in the target resource sendout The total resources sendout of task in source consumption is interval;Task quantity estimates subelement, every in the target adjustment cycle for estimating Task quantity in one consumed resource interval;Task resource sendout determination subelement, for determining the target The resource allocation of each task in the adjustment cycle, the resource allocation of the task refers to the affiliated resource consumption of the task The summation of the total resources sendout of the task task quantity interval with the consumed resource in amount is interval.
In the specific implementation, the present invention also provides a kind of computer-readable storage medium, wherein, the computer-readable storage medium can be stored There is program, the program may include the part or all of step in each embodiment for the method for calling that the present invention is provided when performing.Institute The storage medium stated can be magnetic disc, CD, read-only memory (English:Read-only memory, referred to as:ROM) or with Machine storage memory (English:Random access memory, referred to as:RAM) etc..
It is required that those skilled in the art can be understood that the technology in the embodiment of the present invention can add by software The mode of general hardware platform realize.Understood based on such, the technical scheme in the embodiment of the present invention substantially or Say that the part contributed to prior art can be embodied in the form of software product, the computer software product can be deposited Storage is in storage medium, such as ROM/RAM, magnetic disc, CD, including some instructions are to cause a computer equipment (can be with It is personal computer, server, or network equipment etc.) perform some part institutes of each of the invention embodiment or embodiment The method stated.
Between the embodiment of each in this specification identical similar part mutually referring to.Implement especially for device For example, because it is substantially similar to embodiment of the method, so description is fairly simple, related part is referring in embodiment of the method Explanation.
Invention described above embodiment is not intended to limit the scope of the present invention..

Claims (18)

1. a kind of resource allocation methods, it is characterised in that methods described includes:
Determine the change in resources contributive rate of target to be adjusted;
Determine that first resource of the target to be adjusted within the target adjustment cycle is distributed according to the change in resources contributive rate to adjust Whole amount;
Adjustment amount is distributed according to the Current resource sendout of the target to be adjusted and the first resource, it is determined that in target adjustment The target resource sendout of the target to be adjusted is distributed in cycle.
2. the method as described in claim 1, it is characterised in that the change in resources contributive rate bag of the determination target to be adjusted Include:
Calculate state first resource sendout that target to be adjusted obtained within the first adjustment cycle with the second adjustment cycle Resource allocation variable quantity between the Secondary resource sendout obtained;
Calculate first quantum of output of the target to be adjusted within the first adjustment cycle and the second production within the second adjustment cycle Output variable quantity between output;
Calculate the change in resources contributive rate and refer to ratio conduct between the resource allocation variable quantity and the output variable quantity The change in resources contributive rate of the target to be adjusted.
3. method as claimed in claim 1 or 2, it is characterised in that the Current resource according to the target to be adjusted point Dosage distributes adjustment amount with the first resource, it is determined that distributing to the target money of the target to be adjusted within the target adjustment cycle Source sendout includes:
It regard the Current resource sendout and first resource distribution adjustment amount sum as the target resource sendout.
4. method as claimed in claim 1 or 2, it is characterised in that distributed according to the Current resource of the target to be adjusted Amount distributes adjustment amount with the first resource, it is determined that distributing to the target resource of the target to be adjusted within the target adjustment cycle Before sendout, in addition to:
Obtain Secondary resource distribution adjustment amount;
The Current resource sendout according to the target to be adjusted distributes adjustment amount with the first resource, it is determined that in target The target resource sendout of the target to be adjusted is distributed in the adjustment cycle to be included:
Alternative resource sendout is calculated, the alternative resource sendout refers to the Secondary resource sendout and the first resource Distribute adjustment amount and Secondary resource distribution adjustment amount sum;
The target resource sendout is determined according to the alternative resource sendout.
5. method as claimed in claim 4, it is characterised in that obtaining Secondary resource distribution adjustment amount includes:
Obtain the predetermined quantum of output and actual output amount within the current adjustment cycle of the target to be adjusted;
The irrelevance between the actual output amount and the predetermined quantum of output is calculated, wherein, the irrelevance refers to deviation value With the ratio between the predetermined quantum of output, the deviation value refers between the actual output amount and the predetermined quantum of output Difference;
Obtain Secondary resource distribution adjustment amount corresponding with the irrelevance.
6. method as claimed in claim 4, it is characterised in that the determination is distributed within the target adjustment cycle described to be waited to adjust The target resource sendout of whole target includes:
Determine the target scoring of the target to be adjusted;
Obtain the resource allocation limits corresponding with target scoring;
When the alternative resource sendout is in the resource allocation limits, the alternative resource sendout is regard as institute State target resource sendout;
Or, when the alternative resource sendout is less than the lower limit of the resource allocation limits, by the resource point The lower limit of dosage limits is used as the target resource sendout;
Or, when the alternative resource sendout is higher than the upper limit of the resource allocation limits, by the resource point The upper limit of dosage limits is used as the target resource sendout.
7. the method as described in claim 1, it is characterised in that methods described also includes:
The target resource sendout is distributed into task of the target to be adjusted within the target adjustment cycle.
8. method as claimed in claim 7, it is characterised in that described distribute to the target resource sendout described waits to adjust Task of the whole target within the target adjustment cycle includes:
Estimate the task quantity in the target adjustment cycle;
Determine the resource allocation of each task in the target adjustment cycle, the resource allocation of the task refers to described The ratio of target resource sendout and the task quantity.
9. method as claimed in claim 7, it is characterised in that described distribute to the target resource sendout described waits to adjust Task of the whole target within the target adjustment cycle includes:
Obtain the historic task of the target predetermined quantity to be adjusted;
Determine that at least two consumed resources are interval according to the consumed resource of the historic task;
Determine to distribute in the target resource sendout each consumed resource it is interval in task total resources sendout;
Estimate the task quantity in each described consumed resource interval in the target adjustment cycle;
Determine the resource allocation of each task in the target adjustment cycle, the resource allocation of the task refers to described The total resources sendout of the task task quantity interval with the consumed resource is total in the affiliated consumed resource of task is interval With.
10. a kind of resource allocation device, it is characterised in that described device includes:
Contributive rate determining unit, the change in resources contributive rate for determining target to be adjusted;
Adjustment amount determining unit, for determining the target to be adjusted in the target adjustment cycle according to the change in resources contributive rate Interior first resource distribution adjustment amount;
Sendout determining unit, distributes for the Current resource sendout according to the target to be adjusted and the first resource and adjusts Whole amount, it is determined that distributing to the target resource sendout of the target to be adjusted within the target adjustment cycle.
11. device as claimed in claim 10, it is characterised in that the contributive rate determining unit includes:
Change in resources amount computation subunit, the first resource that target to be adjusted is obtained within the first adjustment cycle is stated for calculating Resource allocation variable quantity between sendout and the Secondary resource sendout obtained within the second adjustment cycle;
Output variable quantity computation subunit, for calculate first quantum of output of the target to be adjusted within the first adjustment cycle with The output variable quantity between the second quantum of output within the second adjustment cycle;
Contributive rate computation subunit, refers to the resource allocation variable quantity and the production for calculating the change in resources contributive rate The ratio gone out between variable quantity as the target to be adjusted change in resources contributive rate.
12. the device as described in claim 10 or 11, it is characterised in that
The sendout determining unit, specifically for by the Current resource sendout and the first resource distribute adjustment amount it Be used as the target resource sendout.
13. the device as described in claim 10 or 11, it is characterised in that
The adjustment amount determining unit, is additionally operable to obtain Secondary resource distribution adjustment amount;
The sendout determining unit, including:
Alternative sendout computation subunit, for calculating alternative resource sendout, the alternative resource sendout refers to described the Two resource allocations distribute adjustment amount and Secondary resource distribution adjustment amount sum with the first resource;
Actual sendout determination subelement, for determining the target resource sendout according to the alternative resource sendout.
14. device as claimed in claim 13, it is characterised in that the adjustment amount determining unit includes:
Completion situation obtains subelement, for obtain the predetermined quantum of output within the current adjustment cycle of the target to be adjusted with Actual output amount;
Irrelevance computation subunit, for calculating the irrelevance between the actual output amount and the predetermined quantum of output, wherein, The irrelevance refers to the ratio between deviation value and the predetermined quantum of output, the deviation value refer to the actual output amount with Difference between the predetermined quantum of output;
Adjustment amount obtains subelement, for obtaining Secondary resource distribution adjustment amount corresponding with the irrelevance.
15. device as claimed in claim 13, it is characterised in that the sendout determining unit includes:
Target scoring determination subelement, for determining that the target of the target to be adjusted scores;
Limits determination subelement, for obtaining the resource allocation limits corresponding with target scoring;
Target resource sendout determination subelement, for when the alternative resource sendout is in the resource allocation limits When, it regard the alternative resource sendout as the target resource sendout;Or, when the alternative resource sendout is less than institute When stating the lower limit of resource allocation limits, the lower limit of the resource allocation limits is regard as the target resource point Dosage;Or, when the alternative resource sendout is higher than the upper limit of the resource allocation limits, by the resource point The upper limit of dosage limits is used as the target resource sendout.
16. the device as described in any one of claim 10, it is characterised in that described device also includes:
Allocation unit, for the target resource sendout to be distributed into the target to be adjusted within the target adjustment cycle Task.
17. device as claimed in claim 16, it is characterised in that the allocation unit includes:
Subelement is estimated, for estimating the task quantity in the target adjustment cycle;
Distribute subelement, the resource allocation for determining each task in the target adjustment cycle, the money of the task Source sendout refers to the ratio of the target resource sendout and the task quantity.
18. device as claimed in claim 17, it is characterised in that the distribution subelement includes:
Historic task obtains subelement, the historic task for obtaining the target predetermined quantity to be adjusted;
Interval determination subelement, for determining at least two consumed resource areas according to the consumed resource of the historic task Between;
Total amount determination subelement is distributed, for determining to distribute to each consumed resource interval in the target resource sendout The total resources sendout of interior task;
Task quantity estimates subelement, for estimating the task in the target adjustment cycle in each described consumed resource interval Quantity;
Task resource sendout determination subelement, the resource allocation for determining each task in the target adjustment cycle Amount, the resource allocation of the task refers to total resources sendout and the institute of the interval interior task of the affiliated consumed resource of the task State the summation of the interval task quantity of consumed resource.
CN201610698277.5A 2016-08-19 2016-08-19 Resource allocation method and device Expired - Fee Related CN107092998B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610698277.5A CN107092998B (en) 2016-08-19 2016-08-19 Resource allocation method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610698277.5A CN107092998B (en) 2016-08-19 2016-08-19 Resource allocation method and device

Publications (2)

Publication Number Publication Date
CN107092998A true CN107092998A (en) 2017-08-25
CN107092998B CN107092998B (en) 2021-06-25

Family

ID=59646023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610698277.5A Expired - Fee Related CN107092998B (en) 2016-08-19 2016-08-19 Resource allocation method and device

Country Status (1)

Country Link
CN (1) CN107092998B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109377262A (en) * 2018-09-20 2019-02-22 北京三快在线科技有限公司 A service fee pricing method and device
CN110175860A (en) * 2019-04-09 2019-08-27 阿里巴巴集团控股有限公司 Virtual resource allocation method and device
CN111047123A (en) * 2018-10-11 2020-04-21 北京嘀嘀无限科技发展有限公司 Resource allocation method, system, electronic equipment and computer storage medium
CN111047124A (en) * 2018-10-11 2020-04-21 北京嘀嘀无限科技发展有限公司 Resource allocation method, system, electronic equipment and computer storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040138953A1 (en) * 2002-07-23 2004-07-15 Van Luchene Andrew S. Method and apparatus for offering coupons during a transaction
CN101241582A (en) * 2008-03-07 2008-08-13 杨国良 Network commerce mode system and method for accomplishing network user behavior converting to commodity value
CN102122381A (en) * 2011-02-15 2011-07-13 詹博凯 Method and system for generating chain transaction
CN104574103A (en) * 2014-12-28 2015-04-29 苏州亚安智能科技有限公司 Electronic service platform with automatic demand screening function
WO2016032030A1 (en) * 2014-08-29 2016-03-03 주식회사 프리캣 System and method for using discount rate raffle coupon
CN105678554A (en) * 2015-12-30 2016-06-15 厦门速卖通网络科技有限公司 Setting method based on mobile Internet business mode
CN105764150A (en) * 2016-04-01 2016-07-13 京信通信系统(广州)有限公司 Method and device for allocating resources

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040138953A1 (en) * 2002-07-23 2004-07-15 Van Luchene Andrew S. Method and apparatus for offering coupons during a transaction
CN101241582A (en) * 2008-03-07 2008-08-13 杨国良 Network commerce mode system and method for accomplishing network user behavior converting to commodity value
CN102122381A (en) * 2011-02-15 2011-07-13 詹博凯 Method and system for generating chain transaction
WO2016032030A1 (en) * 2014-08-29 2016-03-03 주식회사 프리캣 System and method for using discount rate raffle coupon
CN104574103A (en) * 2014-12-28 2015-04-29 苏州亚安智能科技有限公司 Electronic service platform with automatic demand screening function
CN105678554A (en) * 2015-12-30 2016-06-15 厦门速卖通网络科技有限公司 Setting method based on mobile Internet business mode
CN105764150A (en) * 2016-04-01 2016-07-13 京信通信系统(广州)有限公司 Method and device for allocating resources

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JUAN J. S´NCHEZ-SILOS: "An NFC-Based Solution for Discount and Loyalty Mobile Coupons", 《2012 4TH INTERNATIONAL WORKSHOP ON NEAR FIELD COMMUNICATION》 *
武佳倩: "基于Agent的碳交易机制设计对经济与环境影响研究", 《中国优秀硕士学位论文全文数据库(工程科技I辑)》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109377262A (en) * 2018-09-20 2019-02-22 北京三快在线科技有限公司 A service fee pricing method and device
CN111047123A (en) * 2018-10-11 2020-04-21 北京嘀嘀无限科技发展有限公司 Resource allocation method, system, electronic equipment and computer storage medium
CN111047124A (en) * 2018-10-11 2020-04-21 北京嘀嘀无限科技发展有限公司 Resource allocation method, system, electronic equipment and computer storage medium
CN110175860A (en) * 2019-04-09 2019-08-27 阿里巴巴集团控股有限公司 Virtual resource allocation method and device
CN110175860B (en) * 2019-04-09 2023-06-23 创新先进技术有限公司 Virtual resource allocation method and device

Also Published As

Publication number Publication date
CN107092998B (en) 2021-06-25

Similar Documents

Publication Publication Date Title
JP5875971B2 (en) Electricity trading system, market-based service system
CN109472443A (en) A kind of commodity stocks auto-allocation method and platform
CN108665170A (en) Order allocation method and device
CN107092998A (en) Resource allocation methods and device
CN108335182B (en) Cloud platform Web service transaction system and method based on bilateral auction mechanism
RU2012142057A (en) SYSTEMS AND METHODS FOR AUCTIONAL SALE OF ASSETS OF WIRELESS DEVICES AND PROVISION OF WIRELESS DEVICES WITH AN OPTION OF SELECTING THE DISTRIBUTION OF ASSETS
WO2008116026A1 (en) Automatically prescribing total budget for marketing and sales resources and allocation across spending categories
CN112422696B (en) Content resource pushing determination method and related device
CN108876472A (en) A kind of information distribution method and device
CN105069650A (en) Commodity price adjusting method and system
CN107093081A (en) Service strategy formulating method and device
CN108712480A (en) Non- IT resource allocation methods in data center and system
CN114583708A (en) Virtual power plant day-ahead accurate peak clipping method, system, equipment and storage medium
Wang et al. Resource allocation in cloud environment: a model based on double multi-attribute auction mechanism
Li et al. Double Auction‐Based Two‐Level Resource Allocation Mechanism for Computation Offloading in Mobile Blockchain Application
CN104168570A (en) Dynamic bidirectional frequency spectrum auction method based on authenticity of interference information
CN118644318A (en) A method and system for actively recommending instant retail products, and a storage medium
CN109377273B (en) Advertisement putting method and device and computer readable storage medium
CN115619151A (en) User side-based load aggregator resource optimization control method and device
CN114677194A (en) Traffic steering service processing method, device and electronic device
Li et al. Resource allocation for mobile blockchain: A hierarchical combinatorial auction approach
CN113610579A (en) Customer load prediction method and device for electricity selling company
CN112116370A (en) Method and device for determining value attribute of object, storage medium and processor
Khafri et al. Demand response based model for optimal decision making for distribution networks
CN115860342A (en) Method and device for adjusting estimated delivery time, electronic device and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Building N3, building 12, No. 27, Jiancai Chengzhong Road, Haidian District, Beijing 100086

Applicant after: Beijing Xingxuan Technology Co.,Ltd.

Address before: 100085 Beijing, Haidian District on the road to the information on the ground floor of the 1 to the 3 floor of the 2 floor, room 11, 202

Applicant before: Beijing Xiaodu Information Technology Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210625

CF01 Termination of patent right due to non-payment of annual fee