CN107059525A CN201710277749.4A CN201710277749A CN107059525A CN 107059525 A CN107059525 A CN 107059525A CN 201710277749 A CN201710277749 A CN 201710277749A CN 107059525 A CN107059525 A CN 107059525A
Authority
CN
China
Prior art keywords
water
permeable brick
permeable
bracket
municipal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710277749.4A
Other languages
Chinese (zh)
Inventor
易会丰
倪兴隆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huading Municipal Construction Co Ltd
Original Assignee
Zhejiang Huading Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Huading Municipal Construction Co Ltd filed Critical Zhejiang Huading Municipal Construction Co Ltd
Priority to CN201710277749.4A priority Critical patent/CN107059525A/en
Publication of CN107059525A publication Critical patent/CN107059525A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/04Pavings made of prefabricated single units made of bricks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/001Pavings made of prefabricated single units on prefabricated supporting structures or prefabricated foundation elements except coverings made of layers of similar elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/003Pavings made of prefabricated single units characterised by material or composition used for beds or joints; characterised by the way of laying

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses the municipal permeable road structure of one kind and its construction technology, the road structure is respectively from bottom to top crushed rock base course, sand bedding course, permeable brick layer;Provided with support layer between the sand bedding course and permeable brick layer;Layer is relied on to be spliced by some brackets, bracket is bottom engraved structure, bracket includes the cavity for fixing water-permeable brick and the stitching section for splicing with adjacent brackets;Connecting sewing between adjacent water-permeable brick is provided with concrete dense sealing, and concrete dense sealing covers bracket.The structure has stability high, is hardly damaged, the characteristics of service life is long.

Description

A kind of municipal permeable road structure and its construction technology
Technical field
The present invention relates to urban road construction field, more specifically it is related to a kind of municipal permeable road structure and its applied Work technique.
Background technology
Permeable road is increasingly subject to people's particularly industry as a kind of new environment-friendly type, ecotypic road category Concern.Permeable road can make rainwater rapidly permeate into earth's surface, effectively recharge of groundwater, alleviate urban heat land effect, Ke Yiping Weigh urban ecological system.Pervious surface can also penetrating " ground vapour ", make ground cool in summer and warm in winter, rainy season is permeable, winter snow melting, Ke Yizeng Plus the comfort level of urban residence.Further, since pervious surface hole is more, surface area is big, there is stronger absorption affinity to dust, can Dust pollution is reduced, noise can be also reduced.
Water-permeable brick is as the highly important environment-friendly materials of permeable road pavement, it is possible to be artificially laid in it is variously-shaped, And multiple color is fired into, have sight concurrently in urban road construction.
But the construction of porous pavement is different from ordinary road, and in order to keep the seepage of water on road surface, the tack coat of water-permeable brick is not Concrete can be used, otherwise can stop and be oozed under rainwater;Existing water-permeable brick, which is mainly, mats formation on sand bedding course, and rubber is used during tile work Glue hammer is gently beaten out.But because globality is not high between water-permeable brick, and the stability of sand bedding course can not be compared with concrete;On road In face sedimentation and vehicle roller compaction process, often there is phenomenon of rupture in water-permeable brick, and service life is relatively low, and maintenance cost is higher.
The content of the invention
In view of the deficienciess of the prior art, the first object of the present invention is to provide a kind of municipal permeable road structure, It is high with structural stability, it is hardly damaged, the characteristics of service life is long.
To achieve the above object, the invention provides following technical scheme:A kind of municipal permeable road structure, from bottom to top Respectively crushed rock base course, sand bedding course, permeable brick layer;Provided with support layer between the sand bedding course and permeable brick layer;If rely on layer by Dry care frame is spliced, bracket be bottom engraved structure, bracket include be used for fix water-permeable brick cavity and for it is adjacent The stitching section of bracket splicing;Connecting sewing between adjacent water-permeable brick is provided with concrete dense sealing, and concrete dense sealing hides bracket Lid.
By using above-mentioned technical proposal, the bracket of adjacent water-permeable brick is sequentially connected, and water-permeable brick is fixed in bracket, is led to Cross bracket and cause numerous water-permeable brick formation globality structures so that water-permeable brick has higher stability and structural strength, is difficult Destroyed by local sedimentation and external force effect, improve service life.Between adjacent water-permeable brick and bracket passes through concrete Sealant is mutually bonded so that water-permeable brick is difficult to be upturned, and improves the flatness and bonding strength on water-permeable brick surface.Support It is engraved structure below frame, the water permeability of water-permeable brick is not influenceed.
The present invention is further arranged to:The stitching section is the side wall of cavity, and the side wall of cavity is provided with to be connected for bolt The mounting hole connect.
By using above-mentioned technical proposal, adjacent brackets are bolted in the side wall of cavity, and the disguise of connection is high, Only take out after water-permeable brick, mounting hole just can be exposed so that the connection between bracket is not easily susceptible to artificial destruction, service life It is long.
The present invention is further arranged to:Also include being used to limit the position limiting structure that water-permeable brick is upwardly separated from cavity.
By using above-mentioned technical proposal, position limiting structure can limit water-permeable brick and be upturned, and not only water-permeable brick be formed Pavement structure it is more smooth, while more preferable fixation can be played to water-permeable brick so that water-permeable brick is hardly damaged.
The present invention is further arranged to:The position limiting structure includes being arranged on water-permeable brick and corresponding with mounting hole spacing Hole, described two stitching sections of bolt connection are simultaneously inserted in spacing hole.
By using above-mentioned technical proposal, after bolt passes through two stitching sections in insertion spacing hole, it can not only realize The connection of two stitching sections, while position-limiting action can be played to water-permeable brick.
The present invention is further arranged to:The position limiting structure includes being arranged on the low edge on water-permeable brick upper side edge edge;Concrete Sealant extends to low along upper.
By using above-mentioned technical proposal, low edge is set on prefabricated water-permeable brick upper side edge edge so that in placing concrete During sealant, concrete dense sealing extend directly to it is low low edge is filled up along upper, the characteristics of with convenient construction.
The present invention is further arranged to:The upper surface of the stitching section is provided with the fill orifice extended downwardly.
By using above-mentioned technical proposal, during placing concrete sealant, cement mortar can be injected in fill orifice so that phase Adjacent bracket plays more close connection by concrete dense sealing.
The present invention is further arranged to:The bracket and bolt are Engineering Plastics Parts.
By using above-mentioned technical proposal, engineering plastics have high intensity, high life and stable chemical property, bracket Have service life long using engineering plastics material with bolt, the characteristics of being hardly damaged.
Another object of the present invention is to provide a kind of construction technology of municipal permeable road, comprise the following steps:
Step one, roadbed, and tamping road bed bottom solum are excavated;
Step 2, lays crushed rock base course, crushed rock base course laying depth is 60-200cm, and is tamped;
Step 3, lays sand bedding course, sand bedding course laying depth is 30-50cm, and is tamped;
Step 4, water-permeable brick of mating formation, pavement process includes being embedded in water-permeable brick in prefabricated bracket, and bracket is layed in into sand bedding course In;When mating formation next piece of water-permeable brick, first pass through bolt and fix two adjacent brackets, then next piece of water-permeable brick is embedded in bracket In;
In step 5, after the completion of water-permeable brick is mated formation, casting cement mortar at the connecting sewing formed between adjacent water-permeable brick, and hide Cover bracket, bonds adjacent water-permeable brick and bracket formation concrete dense sealing after cement mortar solidification.
By using above-mentioned technical proposal so that have between the water-permeable brick for the permeable road that construction is completed preferably overall Property, stability;The overall structural strength of permeable road is improved, and evenness of road surface is hardly damaged, with higher use Life-span.
In summary, it is high the invention provides a kind of structural stability, it is hardly damaged, the municipal permeable road of service life length Line structure and corresponding construction technology.
Brief description of the drawings
Fig. 1 is the schematic cross-sectional view of embodiment one;
Fig. 2 is water-permeable brick and the exploded perspective view of bracket engagement relation in embodiment one;
Fig. 3 is the enlarged diagram at A in Fig. 1;
Fig. 4 is the schematic cross-sectional view of embodiment two;
Fig. 5 is the enlarged diagram at B in Fig. 4.
Description of reference numerals:1st, crushed rock base course;2nd, sand bedding course;3rd, layer is relied on;4th, permeable brick layer;5th, water-permeable brick;6th, coagulation Native sealant;7th, bracket;8th, cavity;9th, through hole;10th, screwed hole;11st, counterbore;12nd, bolt;13rd, low edge;14th, fill orifice;15、 Spacing hole.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment one,
A kind of municipal permeable road structure, as shown in figure 1, including crushed rock base course 1 thick 70cm, 30cm thick sand bedding course 2 and The support layer 3 being paved on sand bedding course 2 and the permeable brick layer 4 being made up of water-permeable brick 5.
As shown in Figure 1, 2, layer 3 is relied on to be made up of the splicing of numerous brackets 7, each bracket 7 is used to install one piece of water-permeable brick 5. Bracket 7 is rectangular configuration, including for accommodating the cavity 8 of water-permeable brick 5;The generally rectangular configuration of water-permeable brick 5, water-permeable brick 5 it is upper Side is low concordant with the upper surface of the side wall of cavity 8 along 13 when water-permeable brick 5 is installed on cavity 8 along provided with low along 13.The side wall of cavity 8 Upper surface be provided with the fill orifice 14 that extends downwardly, the bottom of cavity 8 is then engraved structure.
As shown in Fig. 2 the side wall of cavity 8 be provided with mounting hole, mounting hole include be disposed therein a long side wall and Screwed hole 10 on one broadside side wall;And it is arranged on the through hole 9 on other long side wall and other broadside side wall, through hole 9 edge is provided with counterbore 11 in the inner side of cavity 8.When splicing adjacent brackets 7, two brackets 7 are attached to one piece so that a support The through hole 9 of frame 7 is corresponding with the screwed hole 10 of another bracket 7, is connected by bolt 12 from the inner side of a bracket 7 through the screw thread of through hole 9 In the screwed hole 10 for being connected to another bracket 7, the fixation of two brackets 7 is realized.Bolt 12 is hexagon socket head cap screw, and its head can be accommodated Enter in counterbore 11.Wherein bracket 7 and bolt 12 are engineering plastics prefabricated component.
As shown in figure 3, concrete dense sealing 6 is provided with the connecting sewing formed between adjacent water-permeable brick 5, concrete sealing Layer 6 is poured by cement mortar and formed, and wherein cement mortar fills fill orifice 14 and covered to low along along 13, and with water-permeable brick 5 Upper surface is concordant.
The construction technology of the municipal permeable road structure is as follows:
Step one, roadbed, and tamping road bed bottom solum are excavated;
Step 2, lays crushed rock base course 1, the laying depth of crushed rock base course 1 is 70cm, and is tamped;
Step 3, lays sand bedding course 2, the laying depth of sand bedding course 2 is 30cm, and is tamped;
Step 4, water-permeable brick 5 of mating formation, pavement process includes being embedded in water-permeable brick 5 in prefabricated bracket 7, and bracket 7 is layed in into sand In bed course 2;When mating formation next piece of water-permeable brick 5, first pass through bolt 12 and fix two adjacent brackets 7, then it is permeable by next piece In the insertion bracket 7 of brick 5;
In step 5, after the completion of water-permeable brick 5 is mated formation, casting cement mortar at the connecting sewing formed between adjacent water-permeable brick 5, and Bracket 7 is covered, adjacent water-permeable brick 5 and bracket 7 formation concrete dense sealing 6 is bonded after cement mortar solidification.
Embodiment two, a kind of municipal permeable road structure, as shown in Figure 4,5, the difference with embodiment one is, water-permeable brick 5 be rectangular parallelepiped structure, and the position of correspondence mounting hole is provided with spacing hole 15, and bolt 12 is lengthens money, and bolt 12 fixes adjacent support During frame 7, with the formation position limiting structure of water-permeable brick 5 in the insertion spacing hole 15 of bolt 12.
Its construction technology is identical with embodiment one, therefore seldom repeats.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, all design structures in the present invention Within think of, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (8)

1. a kind of municipal permeable road structure, from bottom to top respectively crushed rock base course(1), sand bedding course(2), permeable brick layer(4);Its It is characterised by:The sand bedding course(2)With permeable brick layer(4)Between provided with rely on layer(3);Rely on layer(3)By some brackets(7)Spell Connect and form, bracket(7)For bottom engraved structure, bracket(7)Including for fixing water-permeable brick(5)Cavity(8)And for Adjacent brackets(7)The stitching section of splicing;Adjacent water-permeable brick(5)Between connecting sewing be provided with concrete dense sealing(6), concrete dense Sealing(6)By bracket(7)Cover.
2. municipal permeable road structure according to claim 1, it is characterised in that:The stitching section is cavity(8)Side Wall, cavity(8)Side wall provided with supplying bolt(12)The mounting hole being attached.
3. municipal permeable road structure according to claim 2, it is characterised in that:Also include being used to limit water-permeable brick(5) It is upwardly separated from cavity(8)Position limiting structure.
4. municipal permeable road structure according to claim 3, it is characterised in that:The position limiting structure includes being arranged on Water brick(5)Spacing hole upper and corresponding with mounting hole(15), the bolt(12)Spacing hole is simultaneously inserted in two stitching sections of connection (15)In.
5. municipal permeable road structure according to claim 3, it is characterised in that:The position limiting structure includes being arranged on Water brick(5)The low edge on upper side edge edge(13);Concrete dense sealing(6)Extend to low edge(13)On.
6. municipal permeable road structure according to claim 1, it is characterised in that:The upper surface of the stitching section be provided with to The fill orifice of lower extension(14).
7. municipal permeable road structure according to claim 2, it is characterised in that:The bracket(7)And bolt(12) For Engineering Plastics Parts.
8. a kind of construction technology of municipal permeable road, it is characterised in that:Comprise the following steps:
Step one, roadbed, and tamping road bed bottom solum are excavated;
Step 2, lays crushed rock base course(1), crushed rock base course(1)Laying depth is 60-200cm, and is tamped;
Step 3, lays sand bedding course(2), sand bedding course(2)Laying depth is 30-50cm, and is tamped;
Step 4, water-permeable brick of mating formation(5), pavement process includes water-permeable brick(5)Embedded prefabricated bracket(7)In, by bracket(7) It is layed in sand bedding course(2)In;In next piece of water-permeable brick of mating formation(5)When, first pass through bolt(12)Fixed two adjacent brackets (7), then by next piece of water-permeable brick(5)Embedded bracket(7)In;
In step 5, water-permeable brick(5)After the completion of mating formation, in adjacent water-permeable brick(5)Between watering pours water silt particle at the connecting sewing that is formed Slurry, and cover bracket(7), adjacent water-permeable brick is bonded after cement mortar solidification(5)And bracket(7)Form concrete dense sealing (6).
CN201710277749.4A 2017-04-25 2017-04-25 A kind of municipal permeable road structure and its construction technology Pending CN107059525A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710277749.4A CN107059525A (en) 2017-04-25 2017-04-25 A kind of municipal permeable road structure and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710277749.4A CN107059525A (en) 2017-04-25 2017-04-25 A kind of municipal permeable road structure and its construction technology

Publications (1)

Publication Number Publication Date
CN107059525A true CN107059525A (en) 2017-08-18

Family

ID=59604341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710277749.4A Pending CN107059525A (en) 2017-04-25 2017-04-25 A kind of municipal permeable road structure and its construction technology

Country Status (1)

Country Link
CN (1) CN107059525A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137676A (en) * 2018-10-26 2019-01-04 苏州同尚工程设计咨询有限公司 A kind of pavement pavement structure and its implementation method
CN110924263A (en) * 2019-12-16 2020-03-27 长安大学 A kind of permeable ecological brick fixing device and laying method
CN111691260A (en) * 2019-03-14 2020-09-22 湖北工业大学 Electric heating ice melting structure for brick paving sidewalk and construction method thereof
CN111945500A (en) * 2020-08-19 2020-11-17 福建省燕城建设工程有限公司 Sponge urban rainwater recycle system
CN112080974A (en) * 2020-09-22 2020-12-15 广东筑兴建设工程有限公司 Be applied to road surface structure that old road of urban road maintained and reformed transform
CN112211056A (en) * 2020-10-20 2021-01-12 福建中设工程咨询有限公司 Municipal road paving structure and paving method thereof
CN112227131A (en) * 2020-10-10 2021-01-15 洪江区方元源新型墙材有限公司 Pavement paving method of water permeable bricks
CN112942006A (en) * 2021-01-27 2021-06-11 北京嘉顺市政公用工程有限公司 Module is assembled to town road
CN113529524A (en) * 2021-06-28 2021-10-22 胡玉凤 High-strength porous water permeable brick
CN113605166A (en) * 2021-08-09 2021-11-05 广东旺标建设工程有限公司 Pressure-resistant pedestrian blind sidewalk and paving method thereof
CN114508021A (en) * 2022-01-25 2022-05-17 杭州华聚环境建设有限公司 Pedestrian road and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1403655A (en) * 2001-08-30 2003-03-19 梁荣奉 Combined face tile block and its constraction method
KR20070078835A (en) * 2007-07-12 2007-08-02 김진완 Prefab Packing Block Set
CN102433819A (en) * 2011-10-10 2012-05-02 苏鸣 Semi-flexible structure permeable street and pavement method thereof
KR101231177B1 (en) * 2011-03-30 2013-02-07 최강진 Subsidence prevent structure of footway
CN202989721U (en) * 2012-11-21 2013-06-12 浙江国丰集团有限公司 Cement pavement structure
CN103276651A (en) * 2013-05-06 2013-09-04 清华大学 No-cutting-seam cement concrete pavement structure and construction method thereof
CN204097828U (en) * 2014-07-17 2015-01-14 吉林省华一公路建设集团有限责任公司 A kind of novel concrete road surface
WO2016107621A1 (en) * 2014-12-28 2016-07-07 PURUS PLASTICS GmbH Water-permeable ground grid for pavings

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1403655A (en) * 2001-08-30 2003-03-19 梁荣奉 Combined face tile block and its constraction method
KR20070078835A (en) * 2007-07-12 2007-08-02 김진완 Prefab Packing Block Set
KR101231177B1 (en) * 2011-03-30 2013-02-07 최강진 Subsidence prevent structure of footway
CN102433819A (en) * 2011-10-10 2012-05-02 苏鸣 Semi-flexible structure permeable street and pavement method thereof
CN202989721U (en) * 2012-11-21 2013-06-12 浙江国丰集团有限公司 Cement pavement structure
CN103276651A (en) * 2013-05-06 2013-09-04 清华大学 No-cutting-seam cement concrete pavement structure and construction method thereof
CN204097828U (en) * 2014-07-17 2015-01-14 吉林省华一公路建设集团有限责任公司 A kind of novel concrete road surface
WO2016107621A1 (en) * 2014-12-28 2016-07-07 PURUS PLASTICS GmbH Water-permeable ground grid for pavings

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137676A (en) * 2018-10-26 2019-01-04 苏州同尚工程设计咨询有限公司 A kind of pavement pavement structure and its implementation method
CN111691260A (en) * 2019-03-14 2020-09-22 湖北工业大学 Electric heating ice melting structure for brick paving sidewalk and construction method thereof
CN110924263A (en) * 2019-12-16 2020-03-27 长安大学 A kind of permeable ecological brick fixing device and laying method
CN111945500A (en) * 2020-08-19 2020-11-17 福建省燕城建设工程有限公司 Sponge urban rainwater recycle system
CN112080974A (en) * 2020-09-22 2020-12-15 广东筑兴建设工程有限公司 Be applied to road surface structure that old road of urban road maintained and reformed transform
CN112227131A (en) * 2020-10-10 2021-01-15 洪江区方元源新型墙材有限公司 Pavement paving method of water permeable bricks
CN112211056A (en) * 2020-10-20 2021-01-12 福建中设工程咨询有限公司 Municipal road paving structure and paving method thereof
CN112211056B (en) * 2020-10-20 2021-12-07 福建中设工程咨询有限公司 Municipal road paving structure and paving method thereof
CN112942006A (en) * 2021-01-27 2021-06-11 北京嘉顺市政公用工程有限公司 Module is assembled to town road
CN112942006B (en) * 2021-01-27 2021-11-09 北京嘉顺市政公用工程有限公司 Module is assembled to town road
CN113529524A (en) * 2021-06-28 2021-10-22 胡玉凤 High-strength porous water permeable brick
CN113605166A (en) * 2021-08-09 2021-11-05 广东旺标建设工程有限公司 Pressure-resistant pedestrian blind sidewalk and paving method thereof
CN114508021A (en) * 2022-01-25 2022-05-17 杭州华聚环境建设有限公司 Pedestrian road and construction method thereof

Similar Documents

Publication Publication Date Title
CN107059525A (en) A kind of municipal permeable road structure and its construction technology
KR100778045B1 (en) Block with drainage and ventilation function, its manufacturing method and block multi-layer paving method using the same
CN107386047B (en) Water permeable brick pavement structure and construction method thereof
CN103669145A (en) Pavement method of permeable pavement structure
CN110284389B (en) Asphalt pavement and construction method thereof
CN206256334U (en) A kind of novel environment friendly paving structure
CA2979084A1 (en) Hard road construction method for natural groundwater recharge
CN208649826U (en) The pervious asphalt road of Collapsible Loess District
KR20190006233A (en) Construction method of water-permeable pavement with excellent properties of stability, economy and conduct ability for pavement and road
CN206189231U (en) Gardens permeable pavement structure
CN104594155A (en) Permeable pavement laying method
CN205741809U (en) The permeable road structure of a kind of footpath and water-permeable brick
CN105421183B (en) Ecological glue builds permeable terrace and preparation method thereof
KR100764811B1 (en) Packaging material using waste wood fiber and its construction method
CN206721596U (en) A kind of pavement structure of permeable road
RU84857U1 (en) HIGHWAY
CN104894942B (en) The recyclable combination construction sidewalk of drainage type
CN208668211U (en) A kind of people's row porous pavement
CN103015289A (en) Environment-friendly permeable and air-exhausting artificial sports ground and construction method of supporting and curing permeable layer thereof
CN201770925U (en) Highway leaching well
JP2000110334A (en) Permeable block and its manufacture
CN106996063A (en) A kind of pavement structure of permeable road
CN2534222Y (en) Cement broken stone porous paving tiles
CN207176423U (en) A kind of garden landscape paving structure
CN208250846U (en) Surface drainage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818