Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method Download PDF

Info

Publication number
CN107034894A
CN107034894A CN201710171396.XA CN201710171396A CN107034894A CN 107034894 A CN107034894 A CN 107034894A CN 201710171396 A CN201710171396 A CN 201710171396A CN 107034894 A CN107034894 A CN 107034894A
Authority
CN
China
Prior art keywords
foundation pit
supporting structure
pit supporting
pattern foundation
prefabricated pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710171396.XA
Other languages
Chinese (zh)
Inventor
霍炳旭
李浩波
杨宏亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Great Power Anchor Technology Co Ltd
Original Assignee
Hangzhou Great Power Anchor Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Great Power Anchor Technology Co Ltd filed Critical Hangzhou Great Power Anchor Technology Co Ltd
Priority to CN201710171396.XA priority Critical patent/CN107034894A/en
Publication of CN107034894A publication Critical patent/CN107034894A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method.The pattern foundation pit supporting structure prefabricated pile cross section is T-shaped, the T-shaped top of pattern foundation pit supporting structure prefabricated pile and T-shaped bottom are vertically arranged with prestressing force beam hole, the prestressing force beam hole wears prestressing tendon, the pattern foundation pit supporting structure prefabricated pile also includes joint, construction muscle and stirrup, the joint is located at the two ends of pattern foundation pit supporting structure prefabricated pile, the construction flaccidity of tendon and muscle is to being arranged in pattern foundation pit supporting structure prefabricated pile, and the stirrup is laterally arranged in pattern foundation pit supporting structure prefabricated pile.Present invention construction is simple, low cost;Deep pit monitor is stable, and its pattern foundation pit supporting structure prefabricated pile not only has rigidity but also flexible, it may have very strong bending resistance, shear resistance.Therefore, pattern foundation pit supporting structure prefabricated pile cost performance of the present invention is high, is easy to construct and safeguards, deep pit monitor is stable, and service life is long.

Description

Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof And construction method
Technical field
The present invention relates to a kind of pattern foundation pit supporting structure prefabricated pile, i.e. PRP, more particularly to a kind of post-tensioned prestressed tension beam is recyclable Formula pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method.
Background technology
Prior art prefabricated pile includes following two stakes and its construction method:
One kind is SMW(Soil Mixing Wall)Engineering method stake, refers to fountain type drilling mixer at the scene to certain depth Drilling is carried out, while spraying cement system's hardening agent at drill bit and being mixed repeatedly with foundation soil, between each construction cell Then take overlapping lapping construction, then soil cement mixture do not tie it is hard before insertion steel or steel plate as its stress reinforcing material, extremely Cement knot is hard, forms underground wall body.There is following defect in this method:
1st, construction costs is high:It is to belong to lease property, cost performance is higher over a period to come, but exceedes after leasing period, its foundation ditch Engineering support infrastructure cost will progressively increase day by day.
2nd, rigidity is low:Bending resistance square is small, anti-shearing small, and base pit stability is poor.
Another method is concrete drilling bored concrete pile:Refer to pass through machine drilling, steel pipe soil compaction or people in engineering site Power the means such as excavates and forms stake holes in foundation soil, and places in it steel reinforcement cage, concrete perfusion and the stake made.This method There is following defect:
1st, cost is high:Construction costs is high, cost performance is low
2nd, it is long in time limit:Construction period is longer, has a strong impact on engineering total lever factor.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure Prefabricated pile.Therefore, the present invention provides following technical scheme:
Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile, it is characterised in that the pattern foundation pit supporting structure prefabricated pile is horizontal Section is T-shaped, and the T-shaped top of pattern foundation pit supporting structure prefabricated pile and T-shaped bottom are vertically arranged with prestressing force beam hole, described Prestressing force beam hole wears prestressing tendon, and the pattern foundation pit supporting structure prefabricated pile also includes joint, construction muscle and stirrup, and the joint is located at The two ends of pattern foundation pit supporting structure prefabricated pile, the construction flaccidity of tendon and muscle is to being arranged in pattern foundation pit supporting structure prefabricated pile, and the stirrup is laterally arranged in In pattern foundation pit supporting structure prefabricated pile, longitudinal two ends of the pattern foundation pit supporting structure prefabricated pile are provided with stake end butt junction location pin and positioning hole, described Longitudinal two ends of pattern foundation pit supporting structure prefabricated pile are provided with component hoisting ring or lifting eye, and the pile body side is provided with spacing neck.Foundation ditch Supporting prefabricated pile reasonable in design, the arrangement in length and breadth of prestressing tendon, construction muscle and stirrup causes its rigidity big, bending resistance, shearing resistance Property is greatly improved.
On the basis of using above-mentioned technical proposal, the present invention can also be using technical scheme further below:
Pile grouting is provided with below the T-shaped top of pattern foundation pit supporting structure prefabricated pile, and the superposed prestressing force beam hole Grouting behind shaft or drift lining body is filled with hole, the pile grouting hole, integrally-built elasticity is added, and can preferably have and expand with heat and contract with cold Control characteristic.
Prestressing tendon end is provided with prestressing tendon retracting device, and the prestressing tendon retracting device is pre- including being respectively arranged at The first prestressing tendon trap and the second prestressing tendon trap at stress beam two ends, facilitate prestressing tendon recovery, detection and Change.
It is provided with outside prestressing tendon outside prestressing tendon sleeve pipe, the prestressing tendon sleeve pipe and is provided with stress beam locking piece, The setting of sleeve pipe make it that the prestressing tendon in each hole is more accurately installed, and by the lock fit of locking piece, makes Obtain position needed for the holding that multiple prestressing tendons can be consolidated in the space in hole.
The joint is provided with reinforcement and reinforced pipe.
Longitudinal two ends of the pattern foundation pit supporting structure prefabricated pile are provided with stake end butt junction location pin and positioning hole, and the pattern foundation pit supporting structure is pre- Longitudinal two ends of stake processed are provided with component hoisting ring or lifting eye.
Grouting behind shaft or drift lining body is filled with the prestressing force beam hole, the formation one that each part can be consolidated.
Present invention additionally comprises the preparation method of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile, including with Lower step:
1st, compacting, with flattening pattern foundation pit supporting structure prefabricated pile fabricating yard platform;
2nd, laying pattern foundation pit supporting structure prefabricated pile end template is carried out using integrated form template;
3rd, pattern foundation pit supporting structure prefabricated pile reinforcing bar colligation is carried out;
The 4th, pattern foundation pit supporting structure prefabricated pile built-in fitting and support are installed;
5th, the integrated template encapsulation of pile body both sides;
6th, pattern foundation pit supporting structure prefabricated pile concrete placings shape;
7th, the prefabricated pile body of pattern foundation pit supporting structure is steam-cured:
7.1st, it is synchronous to make the steam-cured test block of concrete;
7.2nd, the steam-cured test block pressure testing of concrete:
7.2.1 the steam-cured test block of concrete, is detected by pressure testing, it is qualified to determine whether;
7.2.2 the sampling observation of pattern foundation pit supporting structure prefabricated pile batch and static load test, are carried out;
If the 8, the steam-cured test block of concrete and sampling static load Two indices are qualified after tested, come into operation, if unqualified, carry out structure benefit Come into operation, or scrap after strong;
9th, pattern foundation pit supporting structure prefabricated pile prestressing force beam hole inner hole wall is cleared up, it is ensured that unobstructed in prestressing force beam hole;
10th, the lashing prestressing tendon in prestressing force beam hole;
11st, carry out pattern foundation pit supporting structure prefabricated pile and lay construction;
12nd, prestressing tendon tensioning;
12.1st, calculated prestressing force tensioning value;
13rd, sealing off and covering anchorage;
14th, slip casting in prestressing force beam hole;
14.1st, slip casting is cement mortar;
15th, make and form pattern foundation pit supporting structure prefabricated pile.
This construction method is possible in use, by pattern foundation pit supporting structure prefabricated pile and Soil-cement water curtain wall and mixed Solidifying soil inner support beam structure cooperatively forms overall foundation pit support system;Or with Soil-cement water curtain wall and oblique pull anchor Cable Structure cooperatively forms overall foundation pit support system.Integral construction is convenient, easy to operate and precision is high, forms firm , efficient foundation pit support system.
Present invention additionally comprises the construction method of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile:It is described to apply Work method is that post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile is inserted to the gear formed in cement earth mixtures Cob wall, as PRPCW engineering methods, comprise the following steps:
1st, rig drilling, stirring pore-forming:
1.1st, stake site is determined;
1.2nd, high-pressure injection pump churning;
1.2.1, configuration cement mortar;
1.2.2 grouting pump churning pressure, is set;
1.3rd, air pump charged air pressure is set, gases at high pressure are formed;
2nd, the aperture of measurement cement earth mixtures mixing pile pore-forming, hole depth;
3rd, Soil-cement pile or wall:
Churning by rig and water under high pressure mud, gases at high pressure to hole wall surrounding soil is cut, stirring, and formation is mixed by soil cement The cement earth mixtures mixing pile body of compound, is set gradually to form foundation ditch ground by multiple cement earth mixtures mixing pile bodies Enclosure wall;
4th, pattern foundation pit supporting structure prefabricated pile is laid;
5th, pattern foundation pit supporting structure prefabricated pile prestressing force beam hole inner hole wall is cleared up, is made unobstructed in prestressing force beam hole;
6th, prestressing tendon is worn:
7th, measurement verification pattern foundation pit supporting structure prefabricated pile has assigned length and perpendicularity;
8th, pattern foundation pit supporting structure prefabricated pile pile grouting;
9th, the post-stretching of pattern foundation pit supporting structure prefabricated pile is locked, i.e., apply prestressing force to pattern foundation pit supporting structure prefabricated pile:
9.1st, test is with age Soil-cement mixture pressure testing bulk strength;
9.1.1, Soil-cement Wall/stake for test block test failure carries out reinforcement or complement soil stirs wall/stake again;
9.2nd, calculated prestressing force tensioning value and record;
10th, slip casting in post-stress beam hole;
11st, construction of prefabricated piles is finished.
12nd, stake internal stress Shu Huishou:
12.1st, after after the completion of power transmission belt construction on the outside of shear wall or after the peripheral backfilling of earthwork of foundation ditch, the recovery anchor of prefabricated pile upper end Has prestressing force in device unblock, slow release stake.
12.2nd, steel strand wires or deformed bar in PRP are reclaimed
12.3rd, stress Shu Huishou is finished.
It is described to apply present invention additionally comprises the construction method of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile Work method is the retaining wall of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile combination high-pressure rotary jet grouting pile formation, i.e., PRPJW engineering methods, comprise the following steps:
1st, excavate rig drilling, excavate pore-forming:
1.1st, unwrapping wire determines stake site;
1.2nd, rig is excavated in place;
1.3rd, the aperture of measurement pore-forming, hole depth:
2nd, pattern foundation pit supporting structure prefabricated pile is laid:
3rd, prestressing tendon is worn:
3.1st, pattern foundation pit supporting structure prefabricated pile prestressing force beam hole inner hole wall is cleared up, is made unobstructed in prestressing force beam hole;
5th, pattern foundation pit supporting structure prefabricated pile pile grouting, the slurry is cement mortar or cement mortar or pea gravel concreten:
Mud soil in pile grouting, former excavated hole is carried out by injected hole reserved before in pattern foundation pit supporting structure prefabricated pile to be replaced as Concrete bodies or body or cement slurry sets body, make concrete bodies or body or cement slurry sets body and pattern foundation pit supporting structure prefabricated It is overall that stake forms a firm stress;
5.1st, cement mortar is configured;
6th, pattern foundation pit supporting structure prefabricated pile waterproof between piles stake/wall rotary-spraying construction:
High-pressure spiral jetting diaphragm stake is located between two pattern foundation pit supporting structure prefabricated piles, passes through rig and water under high pressure mud, gases at high pressure device to hole Wall surrounding soil churning cutting, stirring, formed cement earth mixtures high-pressure rotary-spray pile body, by multiple high-pressure rotary-spray pile bodies according to Secondary set forms a closed foundation pit waterproof curtain wall(Retaining wall);
7th, the post-stretching of pattern foundation pit supporting structure prefabricated pile is locked, i.e., apply prestressing force to pattern foundation pit supporting structure prefabricated pile:
7.1, test with age high-pressure rotary jet grouting pile pressure testing bulk strength;
7.1.1, for test block test failure, the high-pressure rotary-spray wall of reply correspondence section(Stake)Carry out reinforcement or again complement;
7.2nd, stretching machine prepares in place;
7.2.1, calculated prestressing force tensioning value;
7.2.2, check and record the prestressed stretch-draw lock value of single pile application;
8th, slip casting in post-stress beam hole;
9th, construction of prefabricated piles is finished.
10th, stake internal stress Shu Huishou:
10.1st, after after the completion of power transmission belt construction on the outside of shear wall or after the peripheral backfilling of earthwork of foundation ditch, the recovery anchor of prefabricated pile upper end Has prestressing force in device unblock, slow release stake.
10.2nd, steel strand wires or deformed bar in PRP are reclaimed
10.3rd, stress Shu Huishou is finished.
This construction method is possible in use, to prop up in pattern foundation pit supporting structure prefabricated pile and high-pressure rotary jet grouting pile and concrete The pattern foundation pit supporting structure curtain system that support girder construction is collectively forming, or be collectively forming with high-pressure rotary jet grouting pile and oblique pull anchor cable structure 19 Pattern foundation pit supporting structure curtain system.Integral construction is convenient, easy to operate and precision is high, forms firm, efficient pattern foundation pit supporting structure system System.And the stress beam of pattern foundation pit supporting structure prefabricated pile is recyclable, after load is released, can quickly it reclaim, it is cost-effective, improve The efficiency of construction.
Due to using technical scheme, beneficial effects of the present invention are:Present invention construction is simple, low cost, base Hole is stable, and its pattern foundation pit supporting structure prefabricated pile not only has rigidity but also flexible, it may have very strong bending resistance, shear resistance, therefore, of the invention Pattern foundation pit supporting structure prefabricated pile cost performance is high, is easy to construct and safeguards, and service life is long.
Stress beam of the present invention is recyclable, cost-effective and be convenient for changing, safeguard.
Brief description of the drawings
Fig. 1 is a kind of pattern foundation pit supporting structure prefabricated pile sectional view that the present invention is provided.
Fig. 2 is a kind of pattern foundation pit supporting structure prefabricated pile working load state sectional view that the present invention is provided.
Fig. 3 is that a kind of pattern foundation pit supporting structure prefabricated pile that the present invention is provided releases use state sectional view.
Fig. 4 is the sectional view at A-A in Fig. 1.
Fig. 5 is the sectional view at B-B in Fig. 2.
Fig. 6 is the sectional view at C-C in Fig. 3.
The pattern foundation pit supporting structure prefabricated pile that Fig. 7 present invention is provided and Soil-cement water curtain wall and concrete inner support beam structure The foundation pit support system being collectively forming.
The pattern foundation pit supporting structure prefabricated pile that Fig. 8 present invention is provided and Soil-cement water curtain wall and the common shape of oblique pull anchor cable structure Into foundation pit support system.
The pattern foundation pit supporting structure prefabricated pile that Fig. 9 present invention is provided is collectively forming with high-pressure rotary jet grouting pile and concrete inner support beam structure Pattern foundation pit supporting structure curtain system.
The base that the pattern foundation pit supporting structure prefabricated pile that Figure 10 present invention is provided is collectively forming with high-pressure rotary jet grouting pile and oblique pull anchor cable structure Cheat supporting curtain system.
Embodiment
As shown in Fig. 1 ~ 7, post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile 12, the pattern foundation pit supporting structure is pre- Stake cross section processed is T-shaped, and the pattern foundation pit supporting structure prefabricated pile 12T fonts top and T-shaped bottom are vertically arranged with prestressing force Beam hole 8, the prestressing force beam hole wears prestressing tendon 6, and the pattern foundation pit supporting structure prefabricated pile 12 also includes joint 1, construction muscle 3 and hoop Muscle 4, the joint 1 is located at the two ends of pattern foundation pit supporting structure prefabricated pile 12, and the construction flaccidity of tendon and muscle 3 is to being arranged in pattern foundation pit supporting structure prefabricated pile 12 Interior, the stirrup 4 is laterally arranged in pattern foundation pit supporting structure prefabricated pile 12.Longitudinal two ends of the pattern foundation pit supporting structure prefabricated pile are provided with stake end Butt junction location pin and positioning hole, longitudinal two ends of the pattern foundation pit supporting structure prefabricated pile are provided with component hoisting ring or lifting eye, the stake Body side is provided with neck 14.
The pattern foundation pit supporting structure prefabricated pile 12T fonts top, and the lower section of the superposed prestressing force beam hole 8 is provided with stake Bottom injected hole 15.
The end of prestressing tendon 6 is provided with prestressing tendon retracting device, and the prestressing tendon retracting device includes being respectively arranged at The first prestressing tendon trap 5 and the second prestressing tendon trap 11 at prestressing tendon two ends.
It is provided with outside prestressing tendon 6 outside prestressing tendon sleeve pipe 7, the prestressing tendon sleeve pipe 7 and is provided with stress Shu Suoding Part 10.
The joint 1 is provided with reinforcement 2.
It is filled with the pile grouting hole 15 in grouting behind shaft or drift lining body 16, the prestressing force beam hole 8 of bottom and is filled with grouting behind shaft or drift lining body 17,6 are filled with grouting behind shaft or drift lining body 13 in the prestressing force beam hole on top
The pattern foundation pit supporting structure prefabricated pile pour concrete precast construction 9, the periphery of concrete precast construction 9 forms neck 14.
The preparation method of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile, comprises the following steps:
1st, compacting, with flattening pattern foundation pit supporting structure prefabricated pile fabricating yard platform;
2nd, laying pattern foundation pit supporting structure prefabricated pile end template is carried out using integrated form template;
3rd, pattern foundation pit supporting structure prefabricated pile reinforcing bar colligation is carried out:
3.1st, raw material of reinforcement rebar prepares;
3.2nd, apply for checking and examination, censorship;
3.3rd, reinforcing bar setting-out, processing, making.
The 4th, pattern foundation pit supporting structure prefabricated pile built-in fitting and support are installed;
5th, the integrated template encapsulation of pile body both sides;
6th, pattern foundation pit supporting structure prefabricated pile concrete placings shape;
6.1st, sandstone, cement censorship, apply for checking and examination;
6.2nd, concrete proportioning is calculated;
6.3rd, concrete stirring, transport, pumping.
7th, the prefabricated pile body of pattern foundation pit supporting structure is steam-cured:
7.1st, it is synchronous to make the steam-cured test block of concrete;
7.2nd, the steam-cured test block pressure testing of concrete:
7.2.1 the steam-cured test block of concrete, is detected by pressure testing, it is qualified to determine whether;
7.2.2 the sampling observation of pattern foundation pit supporting structure prefabricated pile batch and static load test, are carried out;
If the 8, the steam-cured test block of concrete and sampling static load Two indices are qualified after tested, come into operation, if unqualified, carry out structure benefit Come into operation, or scrap after strong;
9th, pattern foundation pit supporting structure prefabricated pile prestressing force beam hole inner hole wall is cleared up, it is ensured that unobstructed in prestressing force beam hole;
10th, the lashing prestressing tendon in prestressing force beam hole;
11st, carry out pattern foundation pit supporting structure prefabricated pile and lay construction;
12nd, prestressing tendon tensioning;
12.1st, calculated prestressing force tensioning value;
13rd, sealing off and covering anchorage;
14th, slip casting in prestressing force beam hole;
14.1st, slip casting is cement mortar;
15th, make and form pattern foundation pit supporting structure prefabricated pile.
The construction method of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile:The construction method is will be pre- The retaining wall formed in stress posttension tension beam recoverable pattern foundation pit supporting structure prefabricated pile insertion cement earth mixtures, be PRPCW engineering methods, comprise the following steps:
1st, rig drilling, stirring pore-forming, rig can for single shaft, twin shaft or three axles etc.,
1.1st, stake site is determined;
1.2nd, high-pressure injection pump churning;
1.2.1, configuration cement mortar;
1.2.2 grouting pump churning pressure, is set;
1.3rd, air pump charged air pressure is set, gases at high pressure are formed;
2nd, the aperture of measurement cement earth mixtures mixing pile pore-forming, hole depth;
3rd, Soil-cement pile or wall:
Churning by rig and water under high pressure mud, gases at high pressure to hole wall surrounding soil is cut, stirring, and formation is mixed by soil cement The cement earth mixtures mixing pile body of compound, is set gradually to form foundation ditch ground by multiple cement earth mixtures mixing pile bodies Enclosure wall;
4th, pattern foundation pit supporting structure prefabricated pile is laid;
4.1st, lay whether pronucleus meets foundation pit enclosure Design Requirement Drawing to pattern foundation pit supporting structure prefabricated pile length and specification;
4.2nd, check pattern foundation pit supporting structure prefabricated pile outward appearance whether there is incomplete, fracture etc.;
4.3rd, pattern foundation pit supporting structure prefabricated pile is laid in place.
5th, pattern foundation pit supporting structure prefabricated pile prestressing force beam hole inner hole wall is cleared up, is made unobstructed in prestressing force beam hole;
6th, prestressing tendon is worn:Check prestressing tendon(Muscle)Specification, quantity.
7th, measurement verification pattern foundation pit supporting structure prefabricated pile has assigned length and perpendicularity, makes Soil-cement mixture pressure testing Block.
8th, pattern foundation pit supporting structure prefabricated pile pile grouting;Stirred for increase pattern foundation pit supporting structure prefabricated pile pile body surrounding with cement earth mixtures Mix stake(Wall)Between cohesive force and improve cement earth mixtures mixing pile(Wall)Intensity, pattern foundation pit supporting structure prefabricated pile lay (Insert)After the completion of pass through in pattern foundation pit supporting structure prefabricated pile before reserved special slip casting hole carry out pile grouting
8.1st, cement mortar is configured
8.2.1, the test verification ratio of mud
8.3rd, grouting pressure is set on request
9th, the post-stretching of pattern foundation pit supporting structure prefabricated pile is locked, i.e., apply prestressing force to pattern foundation pit supporting structure prefabricated pile:
10.1st, test is with age Soil-cement mixture pressure testing bulk strength;
10.1.1, the Soil-cement Wall/stake for test block test failure carry out reinforcement or again complement soil stir wall/ Stake;
10.2nd, calculated prestressing force tensioning value and record;
10th, slip casting in post-stress beam hole:
10.1st, grouting pump is in place
10.2nd, cement mortar is configured
10.3rd, the test verification ratio of mud
10.4th, grouting pressure is set
11st, construction of prefabricated piles is finished.
12nd, stake internal stress Shu Huishou:
12.1st, after after the completion of power transmission belt construction on the outside of shear wall or after the peripheral backfilling of earthwork of foundation ditch, the recovery anchor of prefabricated pile upper end Has prestressing force in device unblock, slow release stake.
12.2nd, steel strand wires or deformed bar in PRP are reclaimed
12.3rd, stress Shu Huishou is finished.
Pattern foundation pit supporting structure prefabricated pile uses as follows:
The pattern foundation pit supporting structure prefabricated pile that the pattern foundation pit supporting structure prefabricated pile figure present invention is provided and Soil-cement water curtain wall 18 and concrete Inner support beam structure 21 cooperatively forms overall foundation pit support system;Or with Soil-cement water curtain wall and oblique pull anchor cable Structure 19 cooperatively forms overall foundation pit support system.As shown in Figure 10.
Pattern foundation pit supporting structure prefabricated pile function uses releasing:Treat that overall foundation pit construction is finished, agent structure support replacement beam or load transfering strip Intensity is reached after design requirement, to other inner support systems(Concrete inner support beam system or anchor cable oblique pull system)Removed Or abolish.To the stress of prestressing tendon pre-add before in slow release pattern foundation pit supporting structure prefabricated pile, until being zero.
Prestressing tendon in pattern foundation pit supporting structure prefabricated pile(Muscle)Reclaim:By the dress for being embedded in pattern foundation pit supporting structure prefabricated pile bottom before Put and recovery is unlocked to prestressing tendon.
Pattern foundation pit supporting structure prefabricated pile function is using terminating:Agent structure goes out the positive negative zero of foundation ditch, internal support of foundation pit system(Concrete Inner support beam system or anchor cable oblique pull system)Remove or abolish, the outer backfilling of earthwork of foundation ditch shear wall is finished.Pattern foundation pit supporting structure prefabricated pile Support Function failure in pattern foundation pit supporting structure, foundation ditch integer support systemic effect terminates.
As shown in figure 8, present invention additionally comprises the construction of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile Method, it is characterised in that the construction method is that post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile combines height The retaining wall that pressure rotary-spraying stake 20 is formed, i.e. PRPJW engineering methods, comprise the following steps:
1st, excavate rig drilling, excavate pore-forming:
1.1st, unwrapping wire determines stake site;
1.2nd, rig is excavated in place;
1.3rd, the aperture of measurement pore-forming, hole depth:
2nd, pattern foundation pit supporting structure prefabricated pile is laid:
2.1st, lay whether pronucleus meets foundation pit enclosure Design Requirement Drawing to pattern foundation pit supporting structure prefabricated pile length and specification;
2.2nd, check pattern foundation pit supporting structure prefabricated pile outward appearance whether there is incomplete, fracture etc.;
2.3rd, pattern foundation pit supporting structure prefabricated pile is laid in place.
3rd, prestressing tendon is worn:
3.1st, pattern foundation pit supporting structure prefabricated pile prestressing force beam hole inner hole wall is cleared up, is made unobstructed in prestressing force beam hole;3.2nd, prestressing force is checked Specification, the quantity of beam.
4th, pattern foundation pit supporting structure prefabricated pile pile grouting, the slurry is cement mortar or cement mortar or pea gravel concreten):
After pattern foundation pit supporting structure prefabricated pile is laid and reaches layout design length, pass through slip casting reserved before in pattern foundation pit supporting structure prefabricated pile Hole carries out mud soil in pile grouting, former excavated hole and is replaced as concrete bodies or body or cement slurry sets body, makes coagulation The soil body or body or one firm stress of cement slurry sets body and the formation of pattern foundation pit supporting structure prefabricated pile are overall.Also increase simultaneously Frictional force between pattern foundation pit supporting structure prefabricated pile pile body surrounding and ground, improves foundation ditch ground(The soil body)Steadiness.
4.1st, cement mortar is configured(Or cement mortar or pea gravel concreten);
4.1.1, the test verification ratio of mud;
4.2nd, grouting pressure is set on request;
5th, pattern foundation pit supporting structure prefabricated pile waterproof between piles stake/wall rotary-spraying construction:
High-pressure spiral jetting diaphragm stake is located between two pattern foundation pit supporting structure prefabricated piles, passes through rig and water under high pressure mud, gases at high pressure device to hole Wall surrounding soil churning cutting, stirring, formed cement earth mixtures high-pressure rotary jet grouting pile 20, by multiple high-pressure rotary jet grouting piles 20 according to Secondary set forms a closed foundation pit waterproof curtain wall(Retaining wall).
5.1st, unwrapping wire determines rotary churning pile site
5.2nd, hole is drawn
5.2.1 drilling machine, is drawn in place
5.2.2, rig drilling draws hole
5.2.3 aperture hole depth, is measured
5.3rd, water under high pressure mud churning pile
5.3.1, high-pressure rotary-spray pump machine is in place
5.3.2 cement mortar, is configured, the ratio of mud is checked
5.3.3 grouting pump churning pressure, is set
5.4th, gases at high pressure stirring concrete earth, forms the stake of cement earth mixtures(Water-seal pile)
5.4.1, high-pressure pump it is in place
5.4.2 high-pressure pump supply gas pressure, is set
5.5th, the sampling same period makes cement churning body test block
5.5.1, cement churning body test block maintenance age is set by design of foundation pit drawing requirement
6th, the post-stretching of pattern foundation pit supporting structure prefabricated pile is locked, i.e., apply prestressing force to pattern foundation pit supporting structure prefabricated pile:
6.1st, test is with age high-pressure rotary jet grouting pile pressure testing bulk strength;
6.1.1, for test block test failure, the high-pressure rotary-spray wall of reply correspondence section(Stake)Carry out reinforcement or again complement;
6.2nd, stretching machine prepares in place;
6.2.1, calculated prestressing force tensioning value;
6.2.2, check and record the prestressed stretch-draw lock value of single pile application;
7th, slip casting in post-stress beam hole;
8th, construction of prefabricated piles is finished;
9th, stake internal stress Shu Huishou:
9.1st, after after the completion of power transmission belt construction on the outside of shear wall or after the peripheral backfilling of earthwork of foundation ditch, the recovery anchorage of prefabricated pile upper end Device is unlocked, prestressing force in slow release stake;
9.2nd, steel strand wires or deformed bar in PRP are reclaimed;
9.3rd, stress Shu Huishou is finished.
As shown in Figure 9, Figure 10, pattern foundation pit supporting structure prefabricated pile uses as follows:Pattern foundation pit supporting structure prefabricated pile and high-pressure rotary jet grouting pile 20 and The pattern foundation pit supporting structure curtain system that concrete inner support beam structure is collectively forming, or with high-pressure rotary jet grouting pile 20 and oblique pull anchor cable structure The 19 pattern foundation pit supporting structure curtain systems being collectively forming.
Pattern foundation pit supporting structure prefabricated pile function uses releasing:Treat that overall foundation pit construction is finished, agent structure support replacement beam or load transfering strip Intensity is reached after design requirement, to other inner support systems(Concrete inner support beam system or anchor cable oblique pull system)Removed Or abolish.To the stress of prestressing tendon pre-add before in slow release PRP, until being zero.
Prestressing tendon is reclaimed in pattern foundation pit supporting structure prefabricated pile:By being embedded in the device of PRP bottoms before to prestressing tendon It is unlocked recovery.
Pattern foundation pit supporting structure prefabricated pile function and foundation ditch integer support systemic effect terminate:Agent structure goes out the positive negative zero of foundation ditch, base Cheat inner support system(Concrete inner support beam system or anchor cable oblique pull system)Remove or abolish, the outer backfilling of earthwork of foundation ditch shear wall Finish.The PRP Support Function failures in pattern foundation pit supporting structure, overall foundation pit support system effect terminates.

Claims (10)

1. post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile, it is characterised in that the pattern foundation pit supporting structure prefabricated pile Cross section is T-shaped, and the T-shaped top of pattern foundation pit supporting structure prefabricated pile and T-shaped bottom are vertically arranged with prestressing force beam hole, institute State prestressing force beam hole and wear prestressing tendon, the pattern foundation pit supporting structure prefabricated pile also includes joint, construction muscle and stirrup, the joint position In the two ends of pattern foundation pit supporting structure prefabricated pile, the construction flaccidity of tendon and muscle is to being arranged in pattern foundation pit supporting structure prefabricated pile, and the stirrup is laterally arranged In pattern foundation pit supporting structure prefabricated pile, longitudinal two ends of the pattern foundation pit supporting structure prefabricated pile are provided with stake end butt junction location pin and positioning hole, institute The longitudinal two ends for stating pattern foundation pit supporting structure prefabricated pile are provided with component hoisting ring or lifting eye, and the pile body side is provided with neck.
2. post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile as claimed in claim 1, it is characterised in that institute State and be provided with pile grouting hole below the T-shaped top of pattern foundation pit supporting structure prefabricated pile, and the superposed prestressing force beam hole, it is described Grouting behind shaft or drift lining body is filled with pile grouting hole.
3. post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile as claimed in claim 1, it is characterised in that pre- Stress beam end is provided with prestressing tendon retracting device, and the prestressing tendon retracting device includes being respectively arranged at prestressing tendon two ends The first prestressing tendon trap and the second prestressing tendon trap.
4. the post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile as described in claim 1 or 4, its feature exists In being provided with outside prestressing tendon outside prestressing tendon sleeve pipe, the prestressing tendon sleeve pipe and be provided with stress beam locking piece.
5. post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile as claimed in claim 1, it is characterised in that institute State joint and be provided with reinforcement and reinforced pipe.
6. post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile as claimed in claim 1, it is characterised in that institute The longitudinal two ends for stating pattern foundation pit supporting structure prefabricated pile are provided with stake end butt junction location pin and positioning hole, the longitudinal direction of the pattern foundation pit supporting structure prefabricated pile Two ends are provided with component hoisting ring or lifting eye.
7. post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile as claimed in claim 1, it is characterised in that institute State and grouting behind shaft or drift lining body is filled with prestressing force beam hole.
8. the preparation method of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile, it is characterised in that including following Step:
1st, compacting, with flattening pattern foundation pit supporting structure prefabricated pile fabricating yard platform;
2nd, laying pattern foundation pit supporting structure prefabricated pile end template is carried out using integrated form template;
3rd, pattern foundation pit supporting structure prefabricated pile reinforcing bar colligation is carried out;
The 4th, pattern foundation pit supporting structure prefabricated pile built-in fitting and support are installed;
5th, the integrated template encapsulation of pile body both sides;
6th, pattern foundation pit supporting structure prefabricated pile concrete placings shape;
7th, the prefabricated pile body of pattern foundation pit supporting structure is steam-cured:
7.1st, it is synchronous to make the steam-cured test block of concrete;
7.2nd, the steam-cured test block pressure testing of concrete:
7.2.1 the steam-cured test block of concrete, is detected by pressure testing, it is qualified to determine whether;
7.2.2 the sampling observation of pattern foundation pit supporting structure prefabricated pile batch and static load test, are carried out;
If the 8, the steam-cured test block of concrete and sampling static load Two indices are qualified after tested, come into operation, if unqualified, carry out structure benefit Come into operation, or scrap after strong;
9th, pattern foundation pit supporting structure prefabricated pile prestressing force beam hole inner hole wall is cleared up, it is ensured that unobstructed in prestressing force beam hole;
10th, the lashing prestressing tendon in prestressing force beam hole;
11st, carry out pattern foundation pit supporting structure prefabricated pile and lay construction;
12nd, prestressing tendon tensioning;
12.1st, calculated prestressing force tensioning value;
13rd, sealing off and covering anchorage;
14th, slip casting in prestressing force beam hole;
14.1st, slip casting is cement mortar;
15th, make and form pattern foundation pit supporting structure prefabricated pile.
9. the construction method of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile, it is characterised in that the construction Method is that post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile is inserted to the earth-retaining formed in cement earth mixtures Wall, as PRPCW engineering methods, comprise the following steps:
1st, rig drilling, stirring pore-forming:
1.1st, stake site is determined;
1.2nd, high-pressure injection pump churning;
1.2.1, configuration cement mortar;
1.2.2 grouting pump churning pressure, is set;
1.3rd, air pump charged air pressure is set, gases at high pressure are formed;
2nd, the aperture of measurement cement earth mixtures mixing pile pore-forming, hole depth;
3rd, Soil-cement pile or wall:
Churning by rig and water under high pressure mud, gases at high pressure to hole wall surrounding soil is cut, stirring, and formation is mixed by soil cement The cement earth mixtures mixing pile body of compound, is set gradually to form foundation ditch ground by multiple cement earth mixtures mixing pile bodies Enclosure wall;
4th, pattern foundation pit supporting structure prefabricated pile is laid;
5th, pattern foundation pit supporting structure prefabricated pile prestressing force beam hole inner hole wall is cleared up, is made unobstructed in prestressing force beam hole;
6th, prestressing tendon is worn:
7th, measurement verification pattern foundation pit supporting structure prefabricated pile has assigned length and perpendicularity;
8th, pattern foundation pit supporting structure prefabricated pile pile grouting;
9th, the post-stretching of pattern foundation pit supporting structure prefabricated pile is locked, i.e., apply prestressing force to pattern foundation pit supporting structure prefabricated pile:
9.1st, test is with age Soil-cement mixture pressure testing bulk strength;
9.1.1, Soil-cement Wall/stake for test block test failure carries out reinforcement or complement soil stirs wall/stake again;
9.2nd, calculated prestressing force tensioning value and record;
10th, slip casting in post-stress beam hole;
11st, construction of prefabricated piles is finished;
12nd, stake internal stress Shu Huishou:
12.1st, after after the completion of power transmission belt construction on the outside of shear wall or after the peripheral backfilling of earthwork of foundation ditch, the recovery anchor of prefabricated pile upper end Has prestressing force in device unblock, slow release stake;
12.2nd, steel strand wires or deformed bar in PRP are reclaimed
12.3rd, stress Shu Huishou is finished.
10. the construction method of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile, it is characterised in that the construction Method is the retaining wall of post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile combination high-pressure rotary jet grouting pile formation, i.e., PRPJW engineering methods, comprise the following steps:
1st, excavate rig drilling, excavate pore-forming:
1.1st, unwrapping wire determines stake site;
1.2, excavate rig it is in place;
1.3rd, the aperture of measurement pore-forming, hole depth:
2nd, pattern foundation pit supporting structure prefabricated pile is laid:
3rd, prestressing tendon is worn:
3.1st, pattern foundation pit supporting structure prefabricated pile prestressing force beam hole inner hole wall is cleared up, is made unobstructed in prestressing force beam hole;
5th, pattern foundation pit supporting structure prefabricated pile pile grouting, the slurry is cement mortar or cement mortar or pea gravel concreten:
Mud soil in pile grouting, former excavated hole is carried out by injected hole reserved before in pattern foundation pit supporting structure prefabricated pile to be replaced as Concrete bodies or body or cement slurry sets body, make concrete bodies or body or cement slurry sets body and pattern foundation pit supporting structure prefabricated It is overall that stake forms a firm stress;
5.1st, cement mortar is configured;
6th, pattern foundation pit supporting structure prefabricated pile waterproof between piles stake/wall rotary-spraying construction:
High-pressure spiral jetting diaphragm stake is located between two pattern foundation pit supporting structure prefabricated piles, passes through rig and water under high pressure mud, gases at high pressure device to hole Wall surrounding soil churning cutting, stirring, formed cement earth mixtures high-pressure rotary-spray pile body, by multiple high-pressure rotary-spray pile bodies according to Secondary set forms closed a foundation pit waterproof curtain wall or retaining wall;
7th, the post-stretching of pattern foundation pit supporting structure prefabricated pile is locked, i.e., apply prestressing force to pattern foundation pit supporting structure prefabricated pile:
7.1st, test is with age high-pressure rotary jet grouting pile pressure testing bulk strength;
7.1.1, for test block test failure, reinforcement or again complement should be carried out to high-pressure rotary-spray wall/stake of correspondence section;
7.2nd, stretching machine prepares in place;
7.2.1, calculated prestressing force tensioning value;
7.2.2, check and record the prestressed stretch-draw lock value of single pile application;
8th, slip casting in post-stress beam hole;
9th, construction of prefabricated piles is finished;
10th, stake internal stress Shu Huishou:
10.1st, after after the completion of power transmission belt construction on the outside of shear wall or after the peripheral backfilling of earthwork of foundation ditch, the recovery anchor of prefabricated pile upper end Has prestressing force in device unblock, slow release stake;
10.2nd, steel strand wires or deformed bar in PRP are reclaimed
10.3rd, stress Shu Huishou is finished.
CN201710171396.XA 2017-03-21 2017-03-21 Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method Pending CN107034894A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710171396.XA CN107034894A (en) 2017-03-21 2017-03-21 Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710171396.XA CN107034894A (en) 2017-03-21 2017-03-21 Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method

Publications (1)

Publication Number Publication Date
CN107034894A true CN107034894A (en) 2017-08-11

Family

ID=59533703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710171396.XA Pending CN107034894A (en) 2017-03-21 2017-03-21 Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method

Country Status (1)

Country Link
CN (1) CN107034894A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547276A (en) * 2018-05-28 2018-09-18 宁波交通工程建设集团有限公司 It is waterborne to fill sand steel tube pile embeded in rock workbench and its construction method
CN109024570A (en) * 2018-06-05 2018-12-18 上海建工集团股份有限公司 Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and method
CN111173004A (en) * 2020-03-23 2020-05-19 南京市测绘勘察研究院股份有限公司 Special-shaped precast pile zipper type supporting structure and construction method thereof
CN115467340A (en) * 2022-09-28 2022-12-13 上海同人里岩土工程技术有限公司 Foundation pit enclosure prefabricated component and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05171638A (en) * 1991-12-19 1993-07-09 Taisei Corp Construction method of pile used as drawing yield strength
CN201031389Y (en) * 2007-04-25 2008-03-05 严平 Prefabricated reinforced concrete T shaped I-shaped anti-side-force pile
CN102261065A (en) * 2010-05-25 2011-11-30 张继红 Opened high-strength concrete prefabricated pile, and pile mould and centrifugal manufacturing method thereof
CN102773918A (en) * 2012-08-24 2012-11-14 周晓伟 Manufacturing method of concrete precast pile
CN102975282A (en) * 2012-12-17 2013-03-20 上海中技桩业股份有限公司 Method for forming unnonuniformly reinforcement-arranged precast pile
CN103541356A (en) * 2013-10-15 2014-01-29 杨发 Prestressed concrete solid pile manufacturing method and tensioning frame used therein
CN204780943U (en) * 2015-07-08 2015-11-18 周同和 H type precast concrete pile and excavation supporting device
CN207538041U (en) * 2017-03-21 2018-06-26 杭州钜力锚杆科技有限公司 Post-tensioned prestressed tensile stress beam recoverable pattern foundation pit supporting structure prefabricated pile

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05171638A (en) * 1991-12-19 1993-07-09 Taisei Corp Construction method of pile used as drawing yield strength
CN201031389Y (en) * 2007-04-25 2008-03-05 严平 Prefabricated reinforced concrete T shaped I-shaped anti-side-force pile
CN102261065A (en) * 2010-05-25 2011-11-30 张继红 Opened high-strength concrete prefabricated pile, and pile mould and centrifugal manufacturing method thereof
CN102773918A (en) * 2012-08-24 2012-11-14 周晓伟 Manufacturing method of concrete precast pile
CN102975282A (en) * 2012-12-17 2013-03-20 上海中技桩业股份有限公司 Method for forming unnonuniformly reinforcement-arranged precast pile
CN103541356A (en) * 2013-10-15 2014-01-29 杨发 Prestressed concrete solid pile manufacturing method and tensioning frame used therein
CN204780943U (en) * 2015-07-08 2015-11-18 周同和 H type precast concrete pile and excavation supporting device
CN207538041U (en) * 2017-03-21 2018-06-26 杭州钜力锚杆科技有限公司 Post-tensioned prestressed tensile stress beam recoverable pattern foundation pit supporting structure prefabricated pile

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
段思文等: "预应力锚索挤入桩应用于基坑支护的探讨", 《山西建筑》 *
苑晴峦: "预应力钢筋混凝土", 《建筑工人》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547276A (en) * 2018-05-28 2018-09-18 宁波交通工程建设集团有限公司 It is waterborne to fill sand steel tube pile embeded in rock workbench and its construction method
CN108547276B (en) * 2018-05-28 2023-11-28 宁波交通工程建设集团有限公司 Water sand-filled rock-socketed steel pipe pile working platform and construction method thereof
CN109024570A (en) * 2018-06-05 2018-12-18 上海建工集团股份有限公司 Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and method
CN111173004A (en) * 2020-03-23 2020-05-19 南京市测绘勘察研究院股份有限公司 Special-shaped precast pile zipper type supporting structure and construction method thereof
CN111173004B (en) * 2020-03-23 2025-01-07 南京市测绘勘察研究院股份有限公司 A construction method for a special-shaped prefabricated pile zipper support structure
CN115467340A (en) * 2022-09-28 2022-12-13 上海同人里岩土工程技术有限公司 Foundation pit enclosure prefabricated component and construction method thereof

Similar Documents

Publication Publication Date Title
CN106958256B (en) A kind of placement layer by layer, the open caisson construction technique repeatedly sunk
CN108797598A (en) The construction technology of pre-loaded support struts in a kind of deep basal pit
CN102518135A (en) Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles
CN105442605B (en) Extract PHC and be reused in deep foundation pit supporting construction method
CN106968139B (en) Construction method for railway roadbed support in jacking process of underpass railway jacking frame bridge
CN105155550A (en) Construction method for digging deep foundation pit in large-thickness highly weathered sandstone stratum in combined supporting mode
CN104532957B (en) Existing building sets up basement reversed construction method
CN110219300B (en) Construction process of partially-bonded prestressed uplift anchor rod
CN104196014A (en) Combined rock-embedded anchor cable slide-resistant pile where round steel is implanted and construction method thereof
CN106948340B (en) Construction method of artificial digging pile structure protected by high polymer grouting
CN110106889A (en) A kind of deep basal pit perfusion slope protection pile adds cable bolting construction
CN107034894A (en) Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method
CN1067453C (en) Foundation pit slope flat anchor spray net supporting method
CN110004991A (en) Underground structure anti-floating system and construction method based on raised type tangs plate
CN110777836A (en) Reinforced concrete plate-anchor rod composite foundation and using method thereof
CN107130609A (en) Without the basement supporting to support
CN110552371A (en) Construction method for eliminating horizontal construction joints of annular lining wall based on reverse construction method
CN107100164A (en) A kind of long auger guncreting pile construction method
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN108914945A (en) A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method
CN109537579A (en) The construction method of cast-in-situ bored pile
CN105484270B (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN114215090A (en) Construction method of raft and compression pile in closed space
CN212561494U (en) Prestressed anchor rod pile for reinforcing foundation through rotary spraying, powder spraying or stirring pile
CN111636875B (en) Construction method of vertical shaft locking ring for underground excavation construction of subway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170811