CN106988772B - Underground mine arch suspension bridge support bearing method - Google Patents

Underground mine arch suspension bridge support bearing method Download PDF

Info

Publication number
CN106988772B
CN106988772B CN201710081899.8A CN201710081899A CN106988772B CN 106988772 B CN106988772 B CN 106988772B CN 201710081899 A CN201710081899 A CN 201710081899A CN 106988772 B CN106988772 B CN 106988772B
Authority
CN
China
Prior art keywords
arch
anchor
grouting
chamber
greatly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710081899.8A
Other languages
Chinese (zh)
Other versions
CN106988772A (en
Inventor
翟会超
闫满志
胡巍巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Iron & Steel Group Mine Design Co ltd
Original Assignee
Hebei Iron and Steel Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Iron and Steel Group Mining Co Ltd filed Critical Hebei Iron and Steel Group Mining Co Ltd
Priority to CN201710081899.8A priority Critical patent/CN106988772B/en
Publication of CN106988772A publication Critical patent/CN106988772A/en
Application granted granted Critical
Publication of CN106988772B publication Critical patent/CN106988772B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Mining & Mineral Resources (AREA)
  • Evolutionary Computation (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A supporting and bearing method for an arch-suspended bridge of an underground mine belongs to the technical field of supporting methods for horizontal ore block roofs of the underground mine and is used for supporting large-scale first-mining horizontal ore block roofs of the underground mine. The technical scheme is as follows: calculating an internal force value of an arch suspension bridge bearing and supporting system by using a formula, and calculating a laying position and a length value of a grouting anchor cable; a grouting hollow anchor rod is driven into a top plate of the drilling chamber at the upper part of the chamber to form a shallow layer small arch compression area of each chamber top plate to bear the dead weight of a overlying strata layer under a large arch; a grouting anchor cable is driven into a top plate of a drilling chamber of the chamber to form a deep suspension mechanism, and a large-arch lower overlying strata layer is automatically redistributed to a large-span irreversible three-hinged arch structure; horizontally or slightly obliquely driving a grouting anchor rod into a rock drilling chamber of an upper and lower plate ore room of an ore body to reinforce the bearing capacity of the large-span three-hinged arch springback; and reinforcing the grouting anchor rod and the grouting anchor cable. The invention solves the problem of improving the stability of the roof rock stratum of the ore block by using a suspension bridge supporting method.

Description

A kind of underground mine arch suspension bridge supporting bearing method
Technical field
The present invention relates to a kind of extensive head of underground mine to adopt horizontal nugget top plate arch suspension bridge supporting bearing method, belongs to In the horizontal nugget roof timbering method and technology field of underground mine.
Background technique
With the fast development of steel and iron industry, steel and iron industry increasingly increases iron ore demand, in addition to a large amount of imported iron ores Except stone, it is imperative that metallurgical mine enterprises exploit sub-terrain mines on a large scale.Currently, carrying out extensive underground mining must The numerous technical problems that must be solved.Wherein, have inclined thick big or the underground mine of pole big thick ore body is particularly suitable for big Scale exploitation, because of mineral building vertical orebody trend arrangement in its nugget, and formed more mineral buildings (be divided into nugget one or two step mineral buildings into Row back production filling) it exploits simultaneously, but back production level will be different because of mining influence spot buckling, to keep underground large scale mining Safety and orderly carry out, it is necessary to carry out New Supporting for the stability of this exploitation nugget roof strata lower on a large scale Technical research, and entire mining level is calculated into consideration as a whole.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of underground mines to encircle suspension bridge supporting bearing method, this side Method creates underground mine suspension bridge supporting in terms of supporting bearing mechanism, supporting mechanical model and supporting parameter three Newly, it solves the problems, such as to improve the stability of nugget roof strata using suspension bridge method for protecting support.
The technical solution for solving above-mentioned technical problem is:
A kind of underground mine arch suspension bridge supporting bearing method, it is carried out using following steps:
1. calculating the interior force value of arch suspension bridge bearing support system using formula, calculating the cloth of design deep grouting cable anchor If position and its length value and using calculated result decision whether carry out grouted anchor bar reinforcing at ore body upper lower burrs;
2. the drilling chamber just tunneled using mineral building top is squeezed into slip casting hollow bolt in chamber top plate, forms each mine It is self-possessed to carry rock stratum under big encircle the small arch compressional zone of shingle shallow-layer;
3. squeezing into grouting cable anchor in each mineral building or the drilling chamber top plate for being separated by several mineral buildings, forms deep and hang machine Rock stratum self weight under big encircle is assigned to greatly across in irreversible three-hinged arch structure by structure;
4. squeezing into grouted anchor bar in ore body upper lower burrs mineral building drilling chamber level or low dip reinforces arch springing across three-hinged arch greatly Bearing capacity;
5. finally, being reinforced to grouted anchor bar and grouting cable anchor.
Above-mentioned underground mine arch suspension bridge supporting bearing method, it is described to calculate the interior of arch suspension bridge bearing support system The formula of force value are as follows:
Label in public formula (I) is as follows:
VA、VB- it is arch springing vertical reaction, N;
HA、HB- it is arch springing horizontal reacting force, N;
Fi- it is grouting cable anchor suspension force, N;
X-represents abscissa value, m;
F-is to lose across arch arch greatly, m;
L-the degree across the span of arch greatly, m;
- it is moment of flexure at corresponding simply supported beam C point, N*m;
Q (x)-is greatly across covering load function on arch structure.
Above-mentioned underground mine arch suspension bridge supporting bearing method, the installation position for calculating design deep grouting cable anchor And its formula of length value are as follows:
Label in public formula (II) is as follows:
L '-is nugget (or mineral building) length, m;
ρ-is stratum density, kg/m3
G-acceleration of gravity, takes 10N/kg;
D-is anchor cable bore diameter, m;
li- be i-th of anchor cable length, m;
σ-is the tensile strength of anchor cable, Pa;
Then hollow grouting cable anchor total length are as follows:
Above-mentioned underground mine arch suspension bridge supporting bearing method, the supporting parameter of the grouted anchor bar and grouting cable anchor Are as follows:
Shallow-layer hollow grouting anchor: bolt diameter Ф 25mm, the long 3.5m of anchor pole, boring aperture Ф 42-46mm, anchor pole array pitch 1.5m~2m arranges interior anchor pole spacing 1.2m~1.5m;
Upper lower burrs horizontal hollow grouted anchor bar: hollow bolt is helped according to anchor pole array pitch 1.5m~2m chamber is vertical, in row Anchor pole spacing 0.8m~1.2m is laid, bolt diameter Ф 25mm, anchor pole long 5m, boring aperture Ф 42mm-46mm.
The beneficial effects of the present invention are:
The present invention suitably allows chamber roof rock mass voluntarily to deform, discharges stress during the formation of mineral building drilling chamber, Then the technical process for recycling the slip casting of flood mine, is subject to anchor bolt grouting, and will be under the irreversible three-hinged arch structure of large span Rock stratum self weight is hanging on domes, just will form comprising deep layer anchor cable suspension mechanism, shallow-layer anchor pole compression mechanism, upper lower burrs Horizontal reinforcing mechanism, mineral building country rock carry system from the arch suspension bridge supporting of the big load carrier of steady mechanism four.Wherein, middle spare anchor Bar slip casting main function is that top plate shallow layer reinforcement, hollow anchor rope grouting are then that deep reinforces.
The present invention is calculated by formula and analytic process, can effectively calculate and lay deep grouting cable anchor, and to greatly across can not The stability of inverse three-hinged arch structure is analyzed, and then lays shallow layer grouting anchor pole and arch springing grouted anchor bar, forms support reinforcement Area, comprehensive deep layer anchor cable suspension mechanism, shallow-layer anchor pole compression mechanism, upper lower burrs horizontal reinforcing mechanism, mineral building country rock are from steady mechanism The method for protecting support of four big load carriers can ensure the extensive orebody mining safety in underground.
The present invention is the pioneering of underground mine suspension bridge supporting bearing method, and this method hangs bridge to underground mine Supporting is innovated in terms of supporting bearing mechanism, supporting mechanical model and supporting parameter three, is solved using suspension bridge Method for protecting support improves the problem of stability of nugget roof strata, opens new approach for underground mine method for protecting support, has Vast potential for future development.
Detailed description of the invention
Fig. 1 is arch suspension bridge supporting schematic diagram of the invention;
Fig. 2 is arch suspension bridge bearing structural scheme of mechanism of the invention;
Fig. 3 is force analysis figure of the present invention.
It is marked in figure as follows: above covering load 1, three-hinged arch 2, suspension anchor cable 3, deep layer anchor cable suspension area 4, the compression of shallow-layer anchor pole Area 5, upper lower burrs horizontal reinforcing area 6.
Specific embodiment
It has been investigated that for the high-dipping pole big thick ore body of ultra-largeization, (general inclination angle >=55 °, thickness is in 100m ~200m horizontal breadth), underground head adopts buried depth in 300~400m or so;Such ore body mineral building length direction and orebody trend one It causes, mineral building takes multiple step format interval to exploit in nugget, and the width of a step and two step mineral buildings is between 16m~24m, mineral building length one As be 50m~60m, level interval is generally 50m~100m;Mineral building bottom uses moat ditch formula bottom structure, and rock drilling is horizontally disposed At the top of mineral building, carried out under side blasting broken ore or VCR method to vertical long hole to broken ore under cutting.It is opened in multiple step format Formed during adopting, in back production horizontal top overlying rock irreversible across a three-hinged arch structure greatly (arch of the structure lose with across Angle value is equal), it is influenced by mineral building ore back production, top plate and upper lower burrs mine rock stability have different degrees of influence, especially push up There are crack propagations to cause greatly across the harm for encircleing lower rock stratum inbreak for plate.
(1) arch of the invention hangs bridge supporting bearing mechanism
During the thick big above ore body large scale mining, due to the different influence of ground buckling, within the scope of ore body horizontal width, The irreversible three-hinged arch bearing structure of large span is formed in nugget overlying rock to undertake the ore-rock gravity on domes, arch Under rock stratum self weight then need two step rooming ore pillars support maintenance.Research and utilization New Austrian Tunneling Method thought, in one or two step mines During room drilling chamber is formed, chamber top plate (i.e. nugget top plate) rock mass is suitably allowed voluntarily to deform, discharge stress, then again Using the technical process of flood mine slip casting, it is subject to anchor bolt grouting (hollow bolt slip casting and hollow anchor rope grouting).Wherein, hollow Bolt grouting main function is top plate shallow layer reinforcement;Hollow anchor rope grouting is then that deep reinforces, and large span is irreversible Rock stratum self weight is hanging on domes under three-hinged arch structure, forms arch suspension bridge support system.
The arch hangs bridge support system, is the drilling chamber just tunneled using mineral building top first, beats in chamber top plate Enter slip casting hollow bolt, forms the small arch compressional zone of each mineral building top plate shallow-layer to carry rock stratum self weight under big encircle;Again each Mineral building or the drilling chamber top plate for being separated by several mineral buildings squeeze into grouting cable anchor, form deep suspension mechanism, will encircle lower rock stratum greatly Self weight is assigned to greatly across in irreversible three-hinged arch structure;Finally squeezed into ore body upper lower burrs mineral building drilling chamber level or low dip Grouted anchor bar reinforces arch springing bearing capacity across three-hinged arch greatly.In this way, just will form comprising deep layer anchor cable suspension mechanism, shallow-layer anchor pole Compression mechanism, upper lower burrs horizontal reinforcing mechanism, mineral building country rock are carried from the arch suspension bridge supporting of the big load carrier of steady mechanism four System (see attached drawing 2).
(2) arch of the invention suspension bridge supporting carries mechanical model
The present invention creates mechanics analysis model according to arch suspension bridge supporting bearing mechanism, and model structure force diagram is shown in attached Fig. 3.
Here, in model formation (I),
VA、VB- it is arch springing vertical reaction, N;
HA、HB- it is arch springing horizontal reacting force, N;
Fi- it is grouting cable anchor suspension force, N;
X-represents abscissa value, m;
F-is to lose across arch arch greatly, m;
L-the degree across the span of arch greatly, m;
- it is moment of flexure at corresponding simply supported beam C point, N*m;
Q (x)-is greatly across covering load function on arch structure.
It can be solved greatly using model formation I across force value in arch structure.
F anchor cable suspension force in model can be according to greatly across rock stratum self weight progress approximate solution meter under irreversible three-hinged arch It calculates:
In public formula (II),
L '-is nugget (or mineral building) length, m;
ρ-is stratum density, kg/m3
G-acceleration of gravity, takes 10N/kg;
D-is anchor cable bore diameter, m;
li- be i-th of anchor cable length, m;
σ-is the tensile strength of anchor cable, Pa.
Then hollow grouting cable anchor total length are as follows:
It can be carried out greatly using public formula (I)~(III) across irreversible three-hinged arch bearing structure and the hollow grouting cable anchor of deep layer Dimensional parameters design and layout.
(3) supporting parameter
1. shallow-layer hollow grouting anchor
Bolt diameter Ф 25mm, the long 3.5m of anchor pole, boring aperture Ф 42-46mm, anchor pole array pitch 1.5m~2m arrange interior anchor pole Spacing 1.2m~1.5m.Meanwhile analogy uses diameter for the reinforcing bar of 6.5mm, carries out metal mesh establishment according to 300mm × 300mm. Gunite concrete cement, sand, rubble proportion be 1:2:2, the ratio of mud be 0.4~0.45, cement use normal silicate water Mud, label 425, jet thickness 150mm carry out m esh-hanging sprayed concrete and carry out the surface layer supporting of chamber inner top panel.
2. upper lower burrs horizontal hollow grouted anchor bar
Hollow bolt is laid in vertical help of chamber according to anchor pole array pitch 1.5m~2m, the interior anchor pole spacing 0.8m~1.2m of row. Bolt diameter Ф 25mm, anchor pole long 5m, boring aperture Ф 42mm-46mm.Equally, analogy uses diameter for the reinforcing bar of 6.5mm, presses Metal mesh establishment is carried out according to 300mm × 300mm.Gunite concrete cement, sand, rubble proportion be 1:2:2, the ratio of mud is 0.4~0.45, cement uses ordinary portland cement, label 425, and jet thickness 150mm carries out m esh-hanging sprayed concrete progress The surface layer supporting of chamber inner top panel.
3. the hollow grouting cable anchor of deep layer
Anchor Cable Technique parameter: steel wire nominal diameter 6.0mm;Anchor cable diameter Ф 22mm;Length >=8000mm;Mounting hole Diameter Ф 32mm;Intensity 1760Mpa;1000~1500mm of resin anchoring length;Hollow Grouting Pipe specification internal diameter Ф 7.5mm outer diameter Ф 10mm;Grouting pressure >=5.0MPa, maximum 7.0MPa.
Length, radical and the position of anchor cable should be calculated according to model formation (III) and be solved.
The step of specific implementation:
(1) the interior force value of arch suspension bridge bearing support system is calculated using formula, calculate design deep grouting cable anchor Installation position and its length value and using calculated result decision whether carry out grouted anchor bar reinforcing at ore body upper lower burrs;
(2) drilling chamber just tunneled using mineral building top, is squeezed into slip casting hollow bolt in chamber top plate, forms each mine It is self-possessed to carry rock stratum under big encircle the small arch compressional zone of shingle shallow-layer;
(3) in each mineral building or it is separated by the drilling chamber top plates of several mineral buildings and squeezes into grouting cable anchor, forms deep and hang machine Rock stratum self weight under big encircle is assigned to greatly across in irreversible three-hinged arch structure by structure;
(4) grouted anchor bar is squeezed into ore body upper lower burrs mineral building drilling chamber level or low dip reinforce arch springing across three-hinged arch greatly Bearing capacity;
(5) finally, being reinforced to grouted anchor bar and grouting cable anchor.
In step 1, calculating process is as follows:
(1) installation position and its length value of design deep grouting cable anchor are calculated using public formula (II) and (III);
(2) the interior force value that arch suspension bridge bearing support system is calculated using public formula (I), facilitates the stabilization of large-span structure Property analysis;
(3) be based ultimately upon step (2) calculated result determine at ore body upper lower burrs (at arch springing across arch structure greatly) whether Carry out grouted anchor bar reinforcing.But it is influenced by the strong blast disturbance of large scale mining, the shallow-layer hollow grouting anchor of nugget top plate level Reinforcing is necessary, and forms the necessary means greatly across the joist of rock stratum under arch structure.
By above-mentioned formula and analytic process, it can effectively calculate and lay deep grouting cable anchor, and to greatly across irreversible three hinge The stability of arch structure is analyzed, and then lays shallow layer grouting anchor pole and arch springing grouted anchor bar, forms support reinforcement area, comprehensive Deep layer anchor cable suspension mechanism, shallow-layer anchor pole compression mechanism, upper lower burrs horizontal reinforcing mechanism, mineral building country rock carry greatly from steady mechanism four The method for protecting support of mechanism can ensure the extensive orebody mining safety in underground.
One embodiment of the present of invention is as follows:
Battalion of the family emerging iron ore ore body horizontal breadth 200m in South field (greatly across the span of arch) is taken charge of, encircles and loses 200m, 45 ° of inclination angle~ 60 °, head adopts horizontal overlying burden q=10.4MPa, ore body uniaxial compressive strength 13.59MPa, ore-rock density 3300kg/m3, mine Room length 50m (L ').
Implementation steps:
Firstly, hollow grouting cable anchor drilling bore dia 0.032m, anchor cable tensile strength 1.76*E9Pa is selected to utilize formula (II) it is 180m that anchor cable overall length angle value can be obtained with (III), considers that detail design and tissue are convenient, it is long that every anchor cable is selected in research Equalization 20m is spent, then needs 9 anchor cables, i.e., lays 3 rows on mineral building length direction and hangs anchor cable, often come greatly across span of arch degree 1/4,1 is respectively arranged at 1/2,3/4 3.
Secondly, public formula (I) and designed anchor cable installation position are utilized, in suspension bridge supporting bearing structure Power is calculated, and VA=VB=3.5*E9N is obtained, and is 20m according to width is carried at arch springing, loaded length is 50/3m (because of 3 The length that row's anchor cable undertakes is 50m, and every row is then 50/3m), then value of compressive stress is 10.5MPa < 13.59MPa at arch springing, is belonged to Stable state, therefore can be reinforced without the grouted anchor bar at arch springing.
Finally, being influenced by the strong blast disturbance of large scale mining, the shallow-layer hollow grouting anchor reinforcing of nugget top plate level is It is necessary, and form the necessary means greatly across the joist of rock stratum under arch structure.Its technical parameter is shown in summary of the invention.

Claims (2)

1. a kind of underground mine arch suspension bridge supporting bearing method, it is characterised in that: it is carried out using following steps:
A. the interior force value of arch suspension bridge bearing support system is calculated using formula, calculate the laying of design deep grouting cable anchor Position and its length value and using calculated result decision whether carry out grouted anchor bar reinforcing at ore body upper lower burrs;The meter Calculate the formula of the interior force value of arch suspension bridge bearing support system are as follows:
Label in public formula (I) is as follows:
V A V B - it is arch springing vertical reaction,N
H A H B - it is arch springing horizontal reacting force,N
F i - it is grouting cable anchor suspension force,N
x- represent abscissa value, m;
f- to be lost across arch arch greatly, m;
L- across the span of arch greatly degree, m;
- it is corresponding simply supported beamCMoment of flexure at point,N*m
q(x)-for greatly across covering load function on arch structure;
B. the drilling chamber just tunneled using mineral building top, is squeezed into slip casting hollow bolt in chamber top plate, forms each mineral building top It is self-possessed to carry rock stratum under big encircle the small arch compressional zone of plate shallow-layer;
C. in each mineral building or it is separated by the drilling chamber top plates of several mineral buildings and squeezes into grouting cable anchor, forms deep suspension mechanism, it will The big lower rock stratum self weight of arch is assigned to greatly across in irreversible three-hinged arch structure;
D. grouted anchor bar is squeezed into ore body upper lower burrs mineral building drilling chamber level or low dip reinforce arch springing carrying across three-hinged arch greatly Ability;
E. finally, being reinforced to grouted anchor bar and grouting cable anchor;
The formula of the length value for calculating design deep grouting cable anchor are as follows:
Label in public formula (II) is as follows:
F i - it is grouting cable anchor suspension force,N
f- to be lost across arch arch greatly, m;
L- across the span of arch greatly degree, m;
L’- it is nugget or mineral building length, m;
- it is stratum density, kg/m3;
G-acceleration of gravity, takes 10N/kg;
d- it is anchor cable bore diameter, m;
l i - be i-th of anchor cable length, m;
σ-is the tensile strength of anchor cable, Pa;
Then hollow grouting cable anchor total length are as follows:
2. underground mine arch suspension bridge supporting bearing method according to claim 1, it is characterised in that: the slip casting anchor The supporting parameter of bar are as follows:
Shallow-layer hollow grouting anchor: bolt diameter Ф 25mm, the long 3.5m of anchor pole, boring aperture Ф 42-46mm, anchor pole array pitch 1.5 M~2m arranges interior anchor pole spacing 1.2m~1.5m;
Upper lower burrs horizontal hollow grouted anchor bar: hollow bolt stands in chamber and helps according to anchor pole array pitch 1.5m~2m, arranges interior anchor pole Spacing 0.8m~1.2m is laid, bolt diameter Ф 25mm, anchor pole long 5m, boring aperture Ф 42mm-46mm.
CN201710081899.8A 2017-02-15 2017-02-15 Underground mine arch suspension bridge support bearing method Active CN106988772B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710081899.8A CN106988772B (en) 2017-02-15 2017-02-15 Underground mine arch suspension bridge support bearing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710081899.8A CN106988772B (en) 2017-02-15 2017-02-15 Underground mine arch suspension bridge support bearing method

Publications (2)

Publication Number Publication Date
CN106988772A CN106988772A (en) 2017-07-28
CN106988772B true CN106988772B (en) 2019-01-01

Family

ID=59414218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710081899.8A Active CN106988772B (en) 2017-02-15 2017-02-15 Underground mine arch suspension bridge support bearing method

Country Status (1)

Country Link
CN (1) CN106988772B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108446413B (en) * 2017-12-06 2021-07-13 青岛理工大学 An optimized method for measuring the diameter of grouting piles with expanded bottoms
CN108843321A (en) * 2018-05-31 2018-11-20 河北钢铁集团矿业有限公司 A kind of horizontally disposed method of inclined thick gulf mineral building
CN109684676B (en) * 2018-12-04 2022-02-11 昆明理工大学 Calculation Method of Technical Parameters of Anchor Nets in Underground Mine
CN111502715B (en) * 2020-05-29 2021-07-20 中铁第六勘察设计院集团有限公司 Method for comprehensively constructing fractured rock mass in oversized underground cavern crossing stage

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3629214A1 (en) * 1986-08-28 1988-03-10 Armo Bauelemente EXTENSION PROFILE FOR PIT AND TUNNEL EXPANSION
CN103603688B (en) * 2013-09-25 2015-07-15 安徽理工大学 Gob-side entry three-dimensional reinforcement filled wall structure and filling method thereof
CN103867223B (en) * 2014-02-24 2016-06-01 欧亚伟 Hacking shed tunnel is with suspended back timber hydraulic prop device

Also Published As

Publication number Publication date
CN106988772A (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN108678769B (en) Main control method of roadway retention by anchoring and roof cutting in deep mining roadway
CN101122235B (en) A Surrounding Rock Method for Controlling the Side Coal Seam Roadway in the Goaf of Fully Mechanized Caving Face
CN108071405B (en) A kind of brutal method for protecting support such as coal mine rectangular shaped roadways top plate
CN105971606B (en) A kind of thick sandstone coal wall recovery method
CN106988772B (en) Underground mine arch suspension bridge support bearing method
CN102011588A (en) House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock
CN108316941B (en) Broken surrounding rock and soft rock roadway U-shaped steel canopy supporting method
CN108278115A (en) A kind of three step Rapid Construction of Tunnels method of big arch springing and structure based on pre-timbering with tubular prop
CN101852083A (en) Rapid support method and device for large deformation, easy to fall and broken loose roadway
CN105545353B (en) A kind of Man-made False construction method based on paste body filling
CN108087008A (en) A kind of three-soft seam gob side entry method for protecting support
CN103195443B (en) Deep mining method capable of optimizing support parameters and preventing roadway delaying water gushing
CN112922598A (en) Method for reducing gob-side entry driving roof pressure through roof cutting and pressure relief
CN111456735A (en) Method for filling false roof without interval column and maintaining stability of downward single access
CN108979666B (en) Method for controlling tunnel floor heave by concrete filled steel tube pile
CN105822306B (en) Inclined thick gulf is even across the mineral building construction design method of structural system
CN207620820U (en) A kind of breaking surrounding rock and soft-rock tunnel U-shaped steel cover canopy supporting construction
CN210948737U (en) Efficient and rapid tunneling roadway support facility for inclined small-section half-coal-rock roadway with thin coal seam
CN117108351A (en) Flexible filling retaining wall structure and rapid construction method thereof
CN113818882B (en) Method for recycling stope jack posts under loose tailing filling body
CN113756282B (en) A Precise Grouting Reinforcement Method for High-rise Buildings Affected by Mining
CN106761749A (en) Large-inclination-angle coal bed breaking roof big gun is adopted and turns fully mechanized mining
CN114087016A (en) A method for pre-control and support of isolated roof pillar for caving-to-fill mining
CN109372519B (en) Tunneling construction method for hexagonal section of roadway
CN206280089U (en) Large-inclination-angle coal bed big gun is adopted and turns fully mechanized mining open-off cut supporting facility

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220523

Address after: 063701 Yanshan iron ore building, Xiangtang Town, Luan county, Tangshan City, Hebei Province

Patentee after: HEBEI IRON & STEEL GROUP MINE DESIGN Co.,Ltd.

Address before: 063000 No.81 Jianshe North Road, Lubei District, Tangshan City, Hebei Province

Patentee before: HEBEI IRON AND STEEL GROUP MINING Co.,Ltd.

TR01 Transfer of patent right