CN106966227A - A kind of electromechanical equipment cable fast winding equipment - Google Patents
A kind of electromechanical equipment cable fast winding equipment Download PDFInfo
- Publication number
- CN106966227A CN106966227A CN201710209456.2A CN201710209456A CN106966227A CN 106966227 A CN106966227 A CN 106966227A CN 201710209456 A CN201710209456 A CN 201710209456A CN 106966227 A CN106966227 A CN 106966227A
- Authority
- CN
- China
- Prior art keywords
- screw rod
- welding
- block
- motor
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H54/00—Winding, coiling, or depositing filamentary material
- B65H54/02—Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
- B65H54/40—Arrangements for rotating packages
- B65H54/54—Arrangements for supporting cores or formers at winding stations; Securing cores or formers to driving members
- B65H54/553—Both-ends supporting arrangements
Landscapes
- Transmission Devices (AREA)
Abstract
本发明涉及一种,尤其涉及一种机电设备用线缆快速卷绕设备。本发明要解决的技术问题是提供能够对绕线盘进行稳定的旋转、能够对绕线盘进行转移的一种机电设备用线缆快速卷绕设备。为了解决上述技术问题,本发明提供了这样一种机电设备用线缆快速卷绕设备,包括有底板、第一轴承座、转杆、第一齿轮、第一电机、第二齿轮、放置架、第一定位块、第一螺杆、第一推块等;底板内中部通过螺栓连接的方式安装有第一轴承座,第一轴承座内通过过盈连接的方式安装有转杆。本发明达到了能够对绕线盘进行稳定的旋转、能够对绕线盘进行转移的效果,通过采用旋转第三螺杆来使压块固定绕线盘的方式。
The present invention relates to one, in particular to a fast winding device for cables used in electromechanical equipment. The technical problem to be solved by the present invention is to provide a fast cable winding device for electromechanical equipment capable of stably rotating and transferring the winding reel. In order to solve the above-mentioned technical problems, the present invention provides such a rapid cable winding device for electromechanical equipment, which includes a bottom plate, a first bearing seat, a rotating rod, a first gear, a first motor, a second gear, a placement frame, The first positioning block, the first screw rod, the first push block, etc.; the first bearing seat is installed in the middle of the bottom plate through bolt connection, and the rotating rod is installed in the first bearing seat through interference connection. The present invention achieves the effects of stably rotating the winding disk and transferring the winding disk, by adopting the method of rotating the third screw to make the pressure block fix the winding disk.
Description
技术领域technical field
本发明涉及一种,尤其涉及一种机电设备用线缆快速卷绕设备。The present invention relates to one, in particular to a fast winding device for cables used in electromechanical equipment.
背景技术Background technique
线缆是光缆、电缆等物品的统称。线缆的用途有很多,主要用于控制安装、连接设备、输送电力等多重作用,是日常生活中常见而不可缺少的一种东西。由于电缆带电,所以安装需要特别谨慎。Cable is a general term for items such as optical cables and cables. There are many uses of cables, mainly used for multiple functions such as control installation, connection equipment, power transmission, etc. It is a common and indispensable thing in daily life. Since the cables are live, installation requires special care.
电缆卷盘又称电缆卷筒或电缆卷线器,以其安装空间小、维护方便、使用可靠及成本低等特点取代滑触线而成为移动传输领域(动力、数据及流体介质)的主流解决方案。电缆卷盘根据驱动形式分为非电动式和电动式两大类;按电缆排列方式分为轴向单排和轴向多排两种;按集电滑环位置分为滑环内装式和滑环外装式两种形式;按卷绕材料分为电缆卷筒和软管卷筒。Cable reel, also known as cable reel or cable reel, replaces trolley wire and becomes the mainstream solution in the field of mobile transmission (power, data and fluid media) due to its small installation space, convenient maintenance, reliable use and low cost. plan. According to the driving form, the cable reel is divided into two categories: non-electric type and electric type; according to the cable arrangement, it is divided into axial single row and axial multi-row; according to the position of the collector slip ring, it is divided into slip ring built-in type and slip ring There are two forms of ring external installation; according to the winding material, it is divided into cable reel and hose reel.
目前在对机电设备的线缆进行卷绕的时候,大部分都会存在这样的缺点,那就是在进行绕线盘旋转绕线的时候,会存在绕线盘旋转不稳定,这样造成的后果就是无法对线缆的卷绕有较好的质量,而且在进行转移绕线盘的时候,因为其重量较大,所以很难进行平稳的转移。At present, when winding the cables of electromechanical equipment, most of them will have such shortcomings, that is, when the winding reel is rotating and winding, there will be unstable rotation of the reel, which will result in the inability to The quality of the winding of the cable is good, and when transferring the winding reel, it is difficult to transfer smoothly because of its heavy weight.
因此亟需研发一种能够对绕线盘进行稳定的旋转、能够对绕线盘进行转移的机电设备用线缆快速卷绕设备来克服目前在对绕线盘进行卷绕的时候存在很难对绕线盘进行稳定的旋转、很难对绕线盘进行转移的缺点。Therefore, it is urgent to develop a kind of fast winding equipment for electromechanical equipment that can stably rotate the winding reel and transfer the winding reel to overcome the current difficulty in winding the winding reel. The winding reel rotates stably, and it is difficult to transfer the reel.
发明内容Contents of the invention
(1)要解决的技术问题(1) Technical problems to be solved
本发明为了克服目前在对绕线盘进行卷绕的时候存在很难对绕线盘进行稳定的旋转、很难对绕线盘进行转移的缺点,本发明要解决的技术问题是提供能够对绕线盘进行稳定的旋转、能够对绕线盘进行转移的一种机电设备用线缆快速卷绕设备。In order to overcome the current disadvantages that it is difficult to rotate the winding reel stably and transfer the winding reel when winding the reel, the technical problem to be solved by the present invention is to provide a It is a kind of fast cable winding equipment for electromechanical equipment that rotates stably and can transfer the winding reel.
(2)技术方案(2) Technical solution
为了解决上述技术问题,本发明提供了这样一种机电设备用线缆快速卷绕设备,包括有底板、第一轴承座、转杆、第一齿轮、第一电机、第二齿轮、放置架、第一定位块、第一螺杆、第一推块、导轨、导套、第二螺杆、第二推块、支撑板和第二定位块,底板内中部通过螺栓连接的方式安装有第一轴承座,第一轴承座内通过过盈连接的方式安装有转杆,转杆上侧中部通过螺栓连接的方式安装有第一齿轮,底板内右侧通过螺栓连接的方式安装有第一电机,第一电机上端的第一电机输出轴通过联轴器连接有第二齿轮,第二齿轮与第一齿轮啮合,转杆上端通过焊接的方式安装有放置架,放置架上侧开有第一空槽,放置架上侧中部通过焊接的方式安装有第一定位块,放置架左右两侧开有第一螺纹孔,第一螺纹孔内放置有第一螺杆,第一螺杆与第一螺纹孔配合,第一螺杆伸进第一空槽内,第一螺杆内侧旋转式连接有第一推块,底板上左侧通过焊接的方式安装有导轨,导轨上滑动式连接有导套,导套左侧开有第二螺纹孔,第二螺纹孔内放置有第二螺杆,第二螺杆与第二螺纹孔配合,第二螺杆右端旋转式连接有第二推块,导套右端通过焊接的方式安装有支撑板,支撑板下侧中部通过焊接的方式安装有第二定位块。In order to solve the above technical problems, the present invention provides such a fast winding device for cables for electromechanical equipment, which includes a bottom plate, a first bearing seat, a rotating rod, a first gear, a first motor, a second gear, a placement frame, The first positioning block, the first screw, the first push block, the guide rail, the guide sleeve, the second screw, the second push block, the support plate and the second positioning block, and the first bearing seat is installed in the middle of the bottom plate through bolt connection , the rotating rod is installed in the first bearing seat through an interference connection, the first gear is installed in the middle part of the upper side of the rotating rod through a bolt connection, and the first motor is installed on the right side of the bottom plate through a bolt connection. The output shaft of the first motor at the upper end of the motor is connected with the second gear through a coupling, and the second gear meshes with the first gear. The upper end of the rotating rod is installed with a placement frame by welding, and the upper side of the placement frame has a first empty slot. The middle part of the upper side of the shelf is equipped with a first positioning block by welding, the left and right sides of the shelf are provided with first threaded holes, and a first screw is placed in the first threaded hole, and the first screw is matched with the first threaded hole. A screw rod protrudes into the first empty slot, the inside of the first screw rod is rotatably connected with the first push block, the left side of the base plate is installed with a guide rail by welding, the guide rail is slidably connected with a guide sleeve, and the left side of the guide sleeve is opened with a The second threaded hole, the second screw rod is placed in the second threaded hole, the second screw rod cooperates with the second threaded hole, the right end of the second screw rod is rotatably connected with the second push block, and the right end of the guide sleeve is installed with a support plate by welding , the middle part of the lower side of the support plate is installed with a second positioning block by welding.
优选地,还包括有第二轴承座、连接板和齿带,支撑板内中部通过螺栓连接的方式安装有第二轴承座,第二轴承座内连接有第二定位块,第二定位块中部通过焊接的方式安装有连接板,连接板下侧通过螺栓连接的方式安装有齿带。Preferably, it also includes a second bearing seat, a connecting plate and a toothed belt, the second bearing seat is installed in the middle part of the support plate through bolt connection, the second positioning block is connected in the second bearing seat, and the middle part of the second positioning block A connecting plate is installed by welding, and a toothed belt is installed on the lower side of the connecting plate by bolting.
优选地,还包括有压紧装置,压紧装置包括有第一螺母、第三螺杆、第一锥形块、第一滑轨、第一滑块、弹簧、推杆、压块和第二锥形块,第二定位块内设有压紧装置,第二定位块上端通过焊接的方式安装有第一螺母,第一螺母内放置有第三螺杆,第三螺杆与第一螺母配合,第三螺杆伸进第二定位块内,第三螺杆下端旋转式连接有第一锥形块,第二定位块内下侧左右两侧通过螺栓连接的方式安装有第一滑轨,第一滑轨内滑动式连接有第一滑块,第一滑块外侧通过焊接的方式安装有弹簧,弹簧另一端通过焊接的方式安装在第一滑轨内外侧,第一滑块外侧通过焊接的方式安装有推杆,推杆位于弹簧前侧,推杆外侧通过焊接的方式安装有压块,第一滑块前侧通过焊接的方式安装有第二锥形块。Preferably, a pressing device is also included, and the pressing device includes a first nut, a third screw rod, a first tapered block, a first slide rail, a first slider, a spring, a push rod, a pressing block and a second cone Shaped block, the second positioning block is provided with a pressing device, the upper end of the second positioning block is installed with a first nut by welding, a third screw is placed in the first nut, the third screw cooperates with the first nut, and the third The screw extends into the second positioning block, the lower end of the third screw is rotatably connected to the first tapered block, and the left and right sides of the second positioning block are connected by bolts to the first sliding rail. A sliding connection is provided with a first slider, a spring is installed on the outside of the first slider by welding, the other end of the spring is installed on the inside and outside of the first slide rail by welding, and a pusher is installed on the outside of the first slider by welding. The push rod is located at the front side of the spring, the outside of the push rod is installed with a pressing block through welding, and the front side of the first slider is equipped with a second tapered block through welding.
优选地,还包括有第三推块、第四螺杆和伸缩杆,推杆内开有第二空槽,第二空槽内放置有伸缩杆,伸缩杆外侧通过焊接的方式安装有压块,推杆右侧开有第三螺纹孔,第三螺纹孔内放置有第四螺杆,第四螺杆与第三螺纹孔配合,第四螺杆下端旋转式连接有第三推块。Preferably, it also includes a third push block, a fourth screw rod and a telescopic rod, a second hollow slot is opened in the push rod, a telescopic rod is placed in the second hollow slot, and a pressing block is installed on the outside of the telescopic rod by welding, The right side of the push rod is provided with a third threaded hole, a fourth screw is placed in the third threaded hole, the fourth screw cooperates with the third threaded hole, and the lower end of the fourth screw is rotatably connected with a third push block.
优选地,还包括有移动装置,移动装置包括有第二滑轨、第二滑块、转轴、第一转轮、摇把和第一传动条,支撑板内设有移动装置,支撑板内下侧通过螺栓连接的方式安装有第二滑轨,第二滑轨内滑动式连接有第二滑块,第二滑块前侧通过螺栓连接的方式安装有第二轴承座,支撑板前侧左右两侧连接有转轴,转轴位于第二滑轨左右两侧,转轴上连接有第一转轮,第一转轮之间连接有第一传动条,第一传动条下侧与第二滑块连接,左侧第一转轮前侧连接有摇把。Preferably, a moving device is also included. The moving device includes a second slide rail, a second slider, a rotating shaft, a first runner, a crank and a first transmission bar. The second slide rail is installed on the side by bolt connection, the second slide block is slidably connected in the second slide rail, the second bearing seat is installed on the front side of the second slide block by bolt connection, and the left and right sides The side is connected with a rotating shaft, and the rotating shaft is located on the left and right sides of the second slide rail. The rotating shaft is connected with a first runner, and a first transmission bar is connected between the first runners. The lower side of the first transmission bar is connected with the second slider. A rocking handle is connected to the front side of the first runner on the left side.
优选地,还包括有第二转轮、第二传动条和第二电机,支撑板上左侧通过螺栓连接的方式安装有第二电机,第二电机前侧的第二电机输出轴通过联轴器连接有第二转轮,左侧第一转轮前侧也连接有第二转轮,第二转轮之间连接有第二传动条。Preferably, it also includes a second runner, a second transmission bar and a second motor, the left side of the support plate is connected with a second motor by bolts, and the output shaft of the second motor on the front side of the second motor is connected by a shaft coupling The device is connected with a second runner, and the front side of the first runner on the left side is also connected with a second runner, and a second transmission bar is connected between the second runners.
优选地,底板的材料为不锈钢。Preferably, the bottom plate is made of stainless steel.
优选地,支撑板的材料为Q235钢。Preferably, the material of the support plate is Q235 steel.
优选地,第一电机和第二电机为伺服电机。Preferably, the first motor and the second motor are servo motors.
工作原理:当用户需要对线缆进行卷绕的时候,用户可以将绕线盘下侧放入第一空槽内,使绕线盘下侧中部进入第一定位块,然后推动向下推动导套,使导套带动支撑板和第二定位块向下移动,使第二定位块进入绕线盘上侧内,然后旋转第二螺杆,第二螺杆通过与第二螺纹孔的配合旋进导套内,第二螺杆推动第二推块,使第二推块固定住导套在导轨上的这个位置,此时旋转第一螺杆,第一螺杆通过与第一螺纹孔的配合旋进第一空槽,第一螺杆推动第一推块,第一推块将绕线盘固定在第一空擦上,然后将线缆系在绕线盘上,打开第一电机,第一电机带动第二齿轮旋转,第二齿轮带动与之啮合的第一齿轮旋转,第一齿轮带动转杆通过第一轴承座旋转,转杆带动放置架旋转,从而带动绕线盘旋转,从而对线缆进行卷绕。Working principle: When the user needs to wind the cable, the user can put the lower side of the winding reel into the first empty slot, so that the middle part of the lower side of the winding reel enters the first positioning block, and then push down to push the guide sleeve, so that the guide sleeve drives the support plate and the second positioning block to move downward, so that the second positioning block enters the upper side of the winding reel, and then rotates the second screw, and the second screw is screwed into the guide by cooperating with the second threaded hole. In the sleeve, the second screw rod pushes the second push block, so that the second push block fixes the position of the guide sleeve on the guide rail. At this time, the first screw rod is rotated, and the first screw rod is screwed into the first threaded hole through cooperation with the first threaded hole. Empty slot, the first screw pushes the first push block, the first push block fixes the winding reel on the first empty wiper, then the cable is tied to the winding reel, the first motor is turned on, the first motor drives the second The gear rotates, the second gear drives the first gear meshed with it to rotate, the first gear drives the rotating rod to rotate through the first bearing seat, and the rotating rod drives the placement frame to rotate, thereby driving the winding reel to rotate, thereby winding the cable .
因为还包括有第二轴承座、连接板和齿带,支撑板内中部通过螺栓连接的方式安装有第二轴承座,第二轴承座内连接有第二定位块,第二定位块中部通过焊接的方式安装有连接板,连接板下侧通过螺栓连接的方式安装有齿带,当用户需要在绕线盘旋转的时候保证绕线盘的稳定性,用户只需在放置好绕线盘的时候移动导套,导套带动支撑板向下移动的同时,带动连接板向下移动接触到绕线盘上侧,齿带将固定住绕线盘,然后旋转第二螺杆固定住导套和支撑板,然后再绕线盘旋转的时候,第二定位块将通过第二轴承座旋转。Because it also includes the second bearing seat, connecting plate and toothed belt, the second bearing seat is installed in the middle part of the support plate through bolt connection, the second positioning block is connected in the second bearing seat, and the middle part of the second positioning block is welded The connection plate is installed in the way, and the toothed belt is installed on the lower side of the connection plate through bolt connection. When the user needs to ensure the stability of the winding reel when the winding reel is rotating, the user only needs to place the winding reel. Move the guide sleeve, the guide sleeve drives the support plate to move downward, and at the same time drives the connecting plate to move downward to touch the upper side of the winding reel, the toothed belt will fix the winding reel, and then rotate the second screw to fix the guide sleeve and support plate , and then when the reel rotates, the second positioning block will rotate through the second bearing seat.
因为还包括有压紧装置,压紧装置包括有第一螺母、第三螺杆、第一锥形块、第一滑轨、第一滑块、弹簧、推杆、压块和第二锥形块,第二定位块内设有压紧装置,第二定位块上端通过焊接的方式安装有第一螺母,第一螺母内放置有第三螺杆,第三螺杆与第一螺母配合,第三螺杆伸进第二定位块内,第三螺杆下端旋转式连接有第一锥形块,第二定位块内下侧左右两侧通过螺栓连接的方式安装有第一滑轨,第一滑轨内滑动式连接有第一滑块,第一滑块外侧通过焊接的方式安装有弹簧,弹簧另一端通过焊接的方式安装在第一滑轨内外侧,第一滑块外侧通过焊接的方式安装有推杆,推杆位于弹簧前侧,推杆外侧通过焊接的方式安装有压块,第一滑块前侧通过焊接的方式安装有第二锥形块,当用户需要进一步的保证绕线盘旋转时候的稳定性,用户可以在第二定位块进入到绕线盘内时,旋转第三螺杆,第三螺杆通过与第一螺母的配合推动第一锥形块,第一锥形块将推动两侧的第二锥形块,第二锥形块将推动第一滑块,第一滑块通过第一滑轨向外侧移动,第一滑块将推动弹簧使之处于压缩状态,第一滑块也将推动推杆向外侧移动,推杆推动压块向外侧移动,压块将接触到绕线盘内壁上,将绕线盘进行固定,当绕线盘已经绕好线缆的时候,用户只需反向旋转第三螺杆,使第一锥形块与第二锥形块脱离接触,此时弹簧将从压缩状态恢复,推动第一滑块向内侧移动,第一滑块也将带动推杆和压块向内侧移动。Because it also includes a compression device, the compression device includes a first nut, a third screw rod, a first tapered block, a first slide rail, a first slide block, a spring, a push rod, a pressing block and a second tapered block , the second positioning block is provided with a compression device, the upper end of the second positioning block is installed with the first nut by welding, the third screw is placed in the first nut, the third screw cooperates with the first nut, and the third screw extends Into the second positioning block, the lower end of the third screw rod is connected with the first conical block in a rotating manner, and the first sliding rail is installed on the left and right sides of the inner lower side of the second positioning block through bolt connection, and the sliding type inside the first sliding rail A first slider is connected, a spring is installed on the outside of the first slider by welding, the other end of the spring is installed on the inside and outside of the first slide rail by welding, and a push rod is installed on the outside of the first slider by welding. The push rod is located on the front side of the spring, and the outer side of the push rod is installed with a pressure block by welding, and the front side of the first slider is installed with a second conical block by welding. When the user needs to further ensure the stability of the winding reel when it rotates The user can rotate the third screw when the second positioning block enters the winding reel, and the third screw pushes the first conical block by cooperating with the first nut, and the first conical block will push the second conical block on both sides. Two conical blocks, the second conical block will push the first slider, the first slider will move outward through the first rail, the first slider will push the spring to make it in a compressed state, and the first slider will also push The push rod moves to the outside, and the push rod pushes the pressing block to move outward. The pressing block will touch the inner wall of the winding reel and fix the winding reel. When the winding reel has wound the cable, the user only needs to reverse Rotate the third screw to disengage the first conical block from the second conical block. At this time, the spring will recover from the compressed state and push the first slider to move inward. The first slider will also drive the push rod and the pressing block. Move inward.
因为还包括有第三推块、第四螺杆和伸缩杆,推杆内开有第二空槽,第二空槽内放置有伸缩杆,伸缩杆外侧通过焊接的方式安装有压块,推杆右侧开有第三螺纹孔,第三螺纹孔内放置有第四螺杆,第四螺杆与第三螺纹孔配合,第四螺杆下端旋转式连接有第三推块,当用户需要对更多不同直径的绕线盘进行固定的时候,而原先的推杆已经无法进行固定的时候,用户只需要将伸缩杆在第二空槽内左右移动,伸缩杆将带动压块左右移动,当移动到所需的长度后,旋转第四螺杆,第四螺杆通过与第三螺纹孔的配合旋进第二空槽内,第四螺杆将推动第三推块,使第三推块固定住伸缩杆在空槽内的这个位置上。Because it also includes the third push block, the fourth screw rod and the telescopic rod, there is a second empty slot in the push rod, and the telescopic rod is placed in the second empty slot. There is a third threaded hole on the right side, and a fourth screw is placed in the third threaded hole. The fourth screw cooperates with the third threaded hole. The lower end of the fourth screw is rotatably connected with a third push block. When the diameter of the winding reel is fixed, and the original push rod cannot be fixed, the user only needs to move the telescopic rod left and right in the second empty slot, and the telescopic rod will drive the pressing block to move left and right. After the required length, rotate the fourth screw, the fourth screw is screwed into the second empty slot through cooperation with the third threaded hole, the fourth screw will push the third push block, so that the third push block fixes the telescopic rod in the empty space. at this position in the slot.
因为还包括有移动装置,移动装置包括有第二滑轨、第二滑块、转轴、第一转轮、摇把和第一传动条,支撑板内设有移动装置,支撑板内下侧通过螺栓连接的方式安装有第二滑轨,第二滑轨内滑动式连接有第二滑块,第二滑块前侧通过螺栓连接的方式安装有第二轴承座,支撑板前侧左右两侧连接有转轴,转轴位于第二滑轨左右两侧,转轴上连接有第一转轮,第一转轮之间连接有第一传动条,第一传动条下侧与第二滑块连接,左侧第一转轮前侧连接有摇把,当用户需要对卷绕好的绕线盘进行转移时候,用户可以先将绕线盘下侧的第一螺杆反向旋转,然后推动导套使支撑板向上移动,然后逆时针旋转摇把,摇把旋转带动左侧第一转轮逆时针旋转,左侧第一转轮带动通过第一传动条带动右侧第一转轮逆时针旋转,使第一传动条带动第二滑块在第二滑轨内向右移动,第二滑块带动第二轴承座和第二定位块向右移动,从而带动绕线盘向右移动。Because it also includes a moving device, the moving device includes a second slide rail, a second slide block, a rotating shaft, a first runner, a handle and a first transmission bar, the supporting plate is provided with a moving device, and the inner lower side of the supporting plate passes The second sliding rail is installed in the way of bolt connection, and the second sliding block is slidably connected in the second sliding rail. There is a rotating shaft, the rotating shaft is located on the left and right sides of the second slide rail, the first rotating wheel is connected to the rotating shaft, the first transmission bar is connected between the first rotating wheels, the lower side of the first driving bar is connected with the second slider, and the left side The front side of the first wheel is connected with a handle. When the user needs to transfer the wound winding reel, the user can first rotate the first screw on the lower side of the winding reel in the opposite direction, and then push the guide sleeve to make the support plate Move up, then rotate the crank handle counterclockwise, the rotation of the crank handle drives the first runner on the left to rotate counterclockwise, and the first runner on the left drives the first runner on the right to rotate counterclockwise through the first transmission bar, making the first The transmission bar drives the second slider to move to the right in the second slide rail, and the second slider drives the second bearing seat and the second positioning block to move to the right, thereby driving the winding disc to move to the right.
因为还包括有第二转轮、第二传动条和第二电机,支撑板上左侧通过螺栓连接的方式安装有第二电机,第二电机前侧的第二电机输出轴通过联轴器连接有第二转轮,左侧第一转轮前侧也连接有第二转轮,第二转轮之间连接有第二传动条,当用户在进行转移绕线盘的时候,用户可以打开第二电机,第二电机带动上侧第二转轮旋转,第二转轮旋转通过第二传动条旋转,第二传动条带动左侧第一转轮旋转。Because it also includes the second runner, the second transmission bar and the second motor, the left side of the support plate is connected with the second motor by bolts, and the output shaft of the second motor on the front side of the second motor is connected by a coupling There is a second runner, and the front side of the first runner on the left is also connected to the second runner, and a second transmission bar is connected between the second runners. When the user is transferring the winding reel, the user can open the second runner. Two motors, the second motor drives the second runner on the upper side to rotate, the second runner rotates through the second transmission bar, and the second transmission bar drives the left first runner to rotate.
因为底板的材料为不锈钢,不锈钢耐腐蚀性和耐酸性强,可延长装置的使用寿命。Because the material of the bottom plate is stainless steel, the stainless steel has strong corrosion resistance and acid resistance, which can prolong the service life of the device.
因为支撑板的材料为Q235钢,Q235钢硬度高,不容易变形,使装置的使用寿命更长。Because the material of the support plate is Q235 steel, the hardness of Q235 steel is high, and it is not easily deformed, so that the service life of the device is longer.
因为第一电机和第二电机为伺服电机,抗过载能力强,高速性能好,能精准控制其转速。Because the first motor and the second motor are servo motors, they have strong overload resistance, good high-speed performance, and can precisely control their rotational speeds.
(3)有益效果(3) Beneficial effect
本发明达到了能够对绕线盘进行稳定的旋转、能够对绕线盘进行转移的效果,通过采用旋转第三螺杆来使压块固定绕线盘的方式,不但能够对绕线盘进行较为稳定的定心,还能够使绕线盘在旋转的过程中保持稳定。The present invention achieves the effect of being able to stably rotate the winding reel and transfer the winding reel. By using the method of rotating the third screw to fix the pressing block to the winding reel, not only can the winding reel be more stably The centering can also keep the reel stable during the rotation.
附图说明Description of drawings
图1为本发明的第一种主视结构示意图。Fig. 1 is a schematic diagram of the first front view structure of the present invention.
图2为本发明的第二种主视结构示意图。Fig. 2 is a schematic structural diagram of the second front view of the present invention.
图3为本发明压紧装置的主视结构示意图。Fig. 3 is a front structural schematic view of the pressing device of the present invention.
图4为本发明压块的主视结构示意图。Fig. 4 is a schematic diagram of the front view of the compact of the present invention.
图5为本发明移动装置的主视结构示意图。FIG. 5 is a schematic front view structural diagram of the mobile device of the present invention.
图6为本发明第二电机的主视结构示意图。Fig. 6 is a front structural schematic view of the second motor of the present invention.
附图中的标记为:1-底板,2-第一轴承座,3-转杆,4-第一齿轮,5-第一电机,6-第二齿轮,7-放置架,8-第一定位块,9-第一空槽,10-第一螺纹孔,11-第一螺杆,12-第一推块,13-导轨,14-导套,15-第二螺纹孔,16-第二螺杆,17-第二推块,18-支撑板,19-第二定位块,201-第二轴承座,202-连接板,203-齿带,21-压紧装置,211-第一螺母,212-第三螺杆,213-第一锥形块,214-第一滑轨,215-第一滑块,216-弹簧,217-推杆,218-压块,219-第二锥形块,2171-第二空槽,2172-第三螺纹孔,2173-第三推块,2174-第四螺杆,2175-伸缩杆,22-移动装置,221-第二滑轨,222-第二滑块,223-转轴,224-第一转轮,225-摇把,226-第一传动条,2231-第二转轮,2232-第二传动条,2233-第二电机。The marks in the accompanying drawings are: 1-base plate, 2-first bearing seat, 3-rotating rod, 4-first gear, 5-first motor, 6-second gear, 7-placement frame, 8-first Positioning block, 9-first empty slot, 10-first threaded hole, 11-first screw, 12-first push block, 13-guide rail, 14-guide sleeve, 15-second threaded hole, 16-second Screw rod, 17-the second push block, 18-support plate, 19-the second positioning block, 201-the second bearing block, 202-connecting plate, 203-toothed belt, 21-pressing device, 211-the first nut, 212-the third screw rod, 213-the first conical block, 214-the first slide rail, 215-the first slide block, 216-spring, 217-push rod, 218-briquetting block, 219-the second conical block, 2171-second empty slot, 2172-third threaded hole, 2173-third push block, 2174-fourth screw, 2175-telescopic rod, 22-moving device, 221-second slide rail, 222-second slide block , 223-rotating shaft, 224-the first runner, 225-cradle, 226-the first drive bar, 2231-the second runner, 2232-the second drive bar, 2233-the second motor.
具体实施方式detailed description
下面结合附图和实施例对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
实施例1Example 1
一种机电设备用线缆快速卷绕设备,如图1-6所示,包括有底板1、第一轴承座2、转杆3、第一齿轮4、第一电机5、第二齿轮6、放置架7、第一定位块8、第一螺杆11、第一推块12、导轨13、导套14、第二螺杆16、第二推块17、支撑板18和第二定位块19,底板1内中部通过螺栓连接的方式安装有第一轴承座2,第一轴承座2内通过过盈连接的方式安装有转杆3,转杆3上侧中部通过螺栓连接的方式安装有第一齿轮4,底板1内右侧通过螺栓连接的方式安装有第一电机5,第一电机5上端的第一电机5输出轴通过联轴器连接有第二齿轮6,第二齿轮6与第一齿轮4啮合,转杆3上端通过焊接的方式安装有放置架7,放置架7上侧开有第一空槽9,放置架7上侧中部通过焊接的方式安装有第一定位块8,放置架7左右两侧开有第一螺纹孔10,第一螺纹孔10内放置有第一螺杆11,第一螺杆11与第一螺纹孔10配合,第一螺杆11伸进第一空槽9内,第一螺杆11内侧旋转式连接有第一推块12,底板1上左侧通过焊接的方式安装有导轨13,导轨13上滑动式连接有导套14,导套14左侧开有第二螺纹孔15,第二螺纹孔15内放置有第二螺杆16,第二螺杆16与第二螺纹孔15配合,第二螺杆16右端旋转式连接有第二推块17,导套14右端通过焊接的方式安装有支撑板18,支撑板18下侧中部通过焊接的方式安装有第二定位块19。A rapid cable winding device for electromechanical equipment, as shown in Figure 1-6, includes a bottom plate 1, a first bearing seat 2, a rotating rod 3, a first gear 4, a first motor 5, a second gear 6, Placement frame 7, first positioning block 8, first screw rod 11, first pushing block 12, guide rail 13, guide sleeve 14, second screw rod 16, second pushing block 17, support plate 18 and second positioning block 19, bottom plate 1. The first bearing seat 2 is installed in the middle part by bolt connection, the rotating rod 3 is installed in the first bearing seat 2 by interference connection, and the first gear is installed in the middle part of the upper side of the rotating rod 3 by bolt connection 4. The first motor 5 is installed on the right side of the bottom plate 1 through bolt connection, and the output shaft of the first motor 5 at the upper end of the first motor 5 is connected with the second gear 6 through a coupling, and the second gear 6 and the first gear 4 meshing, the upper end of the rotating rod 3 is installed with a placement frame 7 by welding, the upper side of the placement frame 7 is provided with a first empty groove 9, and the middle part of the upper side of the placement frame 7 is installed with a first positioning block 8 by welding, and the placement frame 7 There are first threaded holes 10 on the left and right sides, and a first screw 11 is placed in the first threaded hole 10. The first screw 11 cooperates with the first threaded hole 10, and the first screw 11 extends into the first empty groove 9. The inner side of the first screw 11 is rotationally connected with a first push block 12, the left side of the base plate 1 is installed with a guide rail 13 by welding, the guide rail 13 is slidably connected with a guide sleeve 14, and the left side of the guide sleeve 14 is provided with a second screw thread Hole 15, the second screw rod 16 is placed in the second threaded hole 15, the second screw rod 16 cooperates with the second threaded hole 15, the right end of the second screw rod 16 is rotatably connected with the second push block 17, and the right end of the guide sleeve 14 is welded A support plate 18 is installed in a manner, and a second positioning block 19 is installed in the middle part of the lower side of the support plate 18 by welding.
实施例2Example 2
一种机电设备用线缆快速卷绕设备,如图1-6所示,包括有底板1、第一轴承座2、转杆3、第一齿轮4、第一电机5、第二齿轮6、放置架7、第一定位块8、第一螺杆11、第一推块12、导轨13、导套14、第二螺杆16、第二推块17、支撑板18和第二定位块19,底板1内中部通过螺栓连接的方式安装有第一轴承座2,第一轴承座2内通过过盈连接的方式安装有转杆3,转杆3上侧中部通过螺栓连接的方式安装有第一齿轮4,底板1内右侧通过螺栓连接的方式安装有第一电机5,第一电机5上端的第一电机5输出轴通过联轴器连接有第二齿轮6,第二齿轮6与第一齿轮4啮合,转杆3上端通过焊接的方式安装有放置架7,放置架7上侧开有第一空槽9,放置架7上侧中部通过焊接的方式安装有第一定位块8,放置架7左右两侧开有第一螺纹孔10,第一螺纹孔10内放置有第一螺杆11,第一螺杆11与第一螺纹孔10配合,第一螺杆11伸进第一空槽9内,第一螺杆11内侧旋转式连接有第一推块12,底板1上左侧通过焊接的方式安装有导轨13,导轨13上滑动式连接有导套14,导套14左侧开有第二螺纹孔15,第二螺纹孔15内放置有第二螺杆16,第二螺杆16与第二螺纹孔15配合,第二螺杆16右端旋转式连接有第二推块17,导套14右端通过焊接的方式安装有支撑板18,支撑板18下侧中部通过焊接的方式安装有第二定位块19。A rapid cable winding device for electromechanical equipment, as shown in Figure 1-6, includes a bottom plate 1, a first bearing seat 2, a rotating rod 3, a first gear 4, a first motor 5, a second gear 6, Placement frame 7, first positioning block 8, first screw rod 11, first pushing block 12, guide rail 13, guide sleeve 14, second screw rod 16, second pushing block 17, support plate 18 and second positioning block 19, bottom plate 1. The first bearing seat 2 is installed in the middle part by bolt connection, the rotating rod 3 is installed in the first bearing seat 2 by interference connection, and the first gear is installed in the middle part of the upper side of the rotating rod 3 by bolt connection 4. The first motor 5 is installed on the right side of the bottom plate 1 through bolt connection, and the output shaft of the first motor 5 at the upper end of the first motor 5 is connected with the second gear 6 through a coupling, and the second gear 6 and the first gear 4 meshing, the upper end of the rotating rod 3 is installed with a placement frame 7 by welding, the upper side of the placement frame 7 is provided with a first empty groove 9, and the middle part of the upper side of the placement frame 7 is installed with a first positioning block 8 by welding, and the placement frame 7 There are first threaded holes 10 on the left and right sides, and a first screw 11 is placed in the first threaded hole 10. The first screw 11 cooperates with the first threaded hole 10, and the first screw 11 extends into the first empty groove 9. The inner side of the first screw 11 is rotationally connected with a first push block 12, the left side of the base plate 1 is installed with a guide rail 13 by welding, the guide rail 13 is slidably connected with a guide sleeve 14, and the left side of the guide sleeve 14 is provided with a second screw thread Hole 15, the second screw rod 16 is placed in the second threaded hole 15, the second screw rod 16 cooperates with the second threaded hole 15, the right end of the second screw rod 16 is rotatably connected with the second push block 17, and the right end of the guide sleeve 14 is welded A support plate 18 is installed in a manner, and a second positioning block 19 is installed in the middle part of the lower side of the support plate 18 by welding.
还包括有第二轴承座201、连接板202和齿带203,支撑板18内中部通过螺栓连接的方式安装有第二轴承座201,第二轴承座201内连接有第二定位块19,第二定位块19中部通过焊接的方式安装有连接板202,连接板202下侧通过螺栓连接的方式安装有齿带203。It also includes a second bearing seat 201, a connecting plate 202 and a toothed belt 203. The middle part of the support plate 18 is equipped with a second bearing seat 201 by means of bolt connection, and the second bearing seat 201 is connected with a second positioning block 19. A connecting plate 202 is installed in the middle of the two positioning blocks 19 by welding, and a toothed belt 203 is installed on the lower side of the connecting plate 202 by bolting.
实施例3Example 3
一种机电设备用线缆快速卷绕设备,如图1-6所示,包括有底板1、第一轴承座2、转杆3、第一齿轮4、第一电机5、第二齿轮6、放置架7、第一定位块8、第一螺杆11、第一推块12、导轨13、导套14、第二螺杆16、第二推块17、支撑板18和第二定位块19,底板1内中部通过螺栓连接的方式安装有第一轴承座2,第一轴承座2内通过过盈连接的方式安装有转杆3,转杆3上侧中部通过螺栓连接的方式安装有第一齿轮4,底板1内右侧通过螺栓连接的方式安装有第一电机5,第一电机5上端的第一电机5输出轴通过联轴器连接有第二齿轮6,第二齿轮6与第一齿轮4啮合,转杆3上端通过焊接的方式安装有放置架7,放置架7上侧开有第一空槽9,放置架7上侧中部通过焊接的方式安装有第一定位块8,放置架7左右两侧开有第一螺纹孔10,第一螺纹孔10内放置有第一螺杆11,第一螺杆11与第一螺纹孔10配合,第一螺杆11伸进第一空槽9内,第一螺杆11内侧旋转式连接有第一推块12,底板1上左侧通过焊接的方式安装有导轨13,导轨13上滑动式连接有导套14,导套14左侧开有第二螺纹孔15,第二螺纹孔15内放置有第二螺杆16,第二螺杆16与第二螺纹孔15配合,第二螺杆16右端旋转式连接有第二推块17,导套14右端通过焊接的方式安装有支撑板18,支撑板18下侧中部通过焊接的方式安装有第二定位块19。A rapid cable winding device for electromechanical equipment, as shown in Figure 1-6, includes a bottom plate 1, a first bearing seat 2, a rotating rod 3, a first gear 4, a first motor 5, a second gear 6, Placement frame 7, first positioning block 8, first screw rod 11, first pushing block 12, guide rail 13, guide sleeve 14, second screw rod 16, second pushing block 17, support plate 18 and second positioning block 19, bottom plate 1. The first bearing seat 2 is installed in the middle part by bolt connection, the rotating rod 3 is installed in the first bearing seat 2 by interference connection, and the first gear is installed in the middle part of the upper side of the rotating rod 3 by bolt connection 4. The first motor 5 is installed on the right side of the bottom plate 1 through bolt connection, and the output shaft of the first motor 5 at the upper end of the first motor 5 is connected with the second gear 6 through a coupling, and the second gear 6 and the first gear 4 meshing, the upper end of the rotating rod 3 is installed with a placement frame 7 by welding, the upper side of the placement frame 7 is provided with a first empty groove 9, and the middle part of the upper side of the placement frame 7 is installed with a first positioning block 8 by welding, and the placement frame 7 There are first threaded holes 10 on the left and right sides, and a first screw 11 is placed in the first threaded hole 10. The first screw 11 cooperates with the first threaded hole 10, and the first screw 11 extends into the first empty groove 9. The inner side of the first screw 11 is rotationally connected with a first push block 12, the left side of the base plate 1 is installed with a guide rail 13 by welding, the guide rail 13 is slidably connected with a guide sleeve 14, and the left side of the guide sleeve 14 is provided with a second screw thread Hole 15, the second screw rod 16 is placed in the second threaded hole 15, the second screw rod 16 cooperates with the second threaded hole 15, the right end of the second screw rod 16 is rotatably connected with the second push block 17, and the right end of the guide sleeve 14 is welded A support plate 18 is installed in a manner, and a second positioning block 19 is installed in the middle part of the lower side of the support plate 18 by welding.
还包括有第二轴承座201、连接板202和齿带203,支撑板18内中部通过螺栓连接的方式安装有第二轴承座201,第二轴承座201内连接有第二定位块19,第二定位块19中部通过焊接的方式安装有连接板202,连接板202下侧通过螺栓连接的方式安装有齿带203。It also includes a second bearing seat 201, a connecting plate 202 and a toothed belt 203. The middle part of the support plate 18 is equipped with a second bearing seat 201 by means of bolt connection, and the second bearing seat 201 is connected with a second positioning block 19. A connecting plate 202 is installed in the middle of the two positioning blocks 19 by welding, and a toothed belt 203 is installed on the lower side of the connecting plate 202 by bolting.
还包括有压紧装置21,压紧装置21包括有第一螺母211、第三螺杆212、第一锥形块213、第一滑轨214、第一滑块215、弹簧216、推杆217、压块218和第二锥形块219,第二定位块19内设有压紧装置21,第二定位块19上端通过焊接的方式安装有第一螺母211,第一螺母211内放置有第三螺杆212,第三螺杆212与第一螺母211配合,第三螺杆212伸进第二定位块19内,第三螺杆212下端旋转式连接有第一锥形块213,第二定位块19内下侧左右两侧通过螺栓连接的方式安装有第一滑轨214,第一滑轨214内滑动式连接有第一滑块215,第一滑块215外侧通过焊接的方式安装有弹簧216,弹簧216另一端通过焊接的方式安装在第一滑轨214内外侧,第一滑块215外侧通过焊接的方式安装有推杆217,推杆217位于弹簧216前侧,推杆217外侧通过焊接的方式安装有压块218,第一滑块215前侧通过焊接的方式安装有第二锥形块219。Also include hold-down device 21, hold-down device 21 includes first nut 211, the 3rd screw rod 212, the first tapered block 213, the first slide rail 214, the first slide block 215, spring 216, push rod 217, Pressing block 218 and the second conical block 219, the second positioning block 19 is provided with a pressing device 21, the second positioning block 19 upper end is equipped with a first nut 211 by welding, and a third nut 211 is placed in the first nut 211. Screw rod 212, the third screw rod 212 cooperates with the first nut 211, the third screw rod 212 stretches into the second positioning block 19, the third screw rod 212 lower end is rotatably connected with the first tapered block 213, and the second positioning block 19 inner and lower The first sliding rail 214 is installed on the left and right sides by bolt connection, the first sliding block 215 is slidably connected in the first sliding rail 214, the outer side of the first sliding block 215 is installed with a spring 216 by welding, and the spring 216 The other end is installed on the inside and outside of the first slide rail 214 by welding, and a push rod 217 is installed on the outside of the first slider 215 by welding. The push rod 217 is located on the front side of the spring 216, and the outside of the push rod 217 is installed by welding. There is a pressing block 218, and a second tapered block 219 is installed on the front side of the first sliding block 215 by welding.
实施例4Example 4
一种机电设备用线缆快速卷绕设备,如图1-6所示,包括有底板1、第一轴承座2、转杆3、第一齿轮4、第一电机5、第二齿轮6、放置架7、第一定位块8、第一螺杆11、第一推块12、导轨13、导套14、第二螺杆16、第二推块17、支撑板18和第二定位块19,底板1内中部通过螺栓连接的方式安装有第一轴承座2,第一轴承座2内通过过盈连接的方式安装有转杆3,转杆3上侧中部通过螺栓连接的方式安装有第一齿轮4,底板1内右侧通过螺栓连接的方式安装有第一电机5,第一电机5上端的第一电机5输出轴通过联轴器连接有第二齿轮6,第二齿轮6与第一齿轮4啮合,转杆3上端通过焊接的方式安装有放置架7,放置架7上侧开有第一空槽9,放置架7上侧中部通过焊接的方式安装有第一定位块8,放置架7左右两侧开有第一螺纹孔10,第一螺纹孔10内放置有第一螺杆11,第一螺杆11与第一螺纹孔10配合,第一螺杆11伸进第一空槽9内,第一螺杆11内侧旋转式连接有第一推块12,底板1上左侧通过焊接的方式安装有导轨13,导轨13上滑动式连接有导套14,导套14左侧开有第二螺纹孔15,第二螺纹孔15内放置有第二螺杆16,第二螺杆16与第二螺纹孔15配合,第二螺杆16右端旋转式连接有第二推块17,导套14右端通过焊接的方式安装有支撑板18,支撑板18下侧中部通过焊接的方式安装有第二定位块19。A rapid cable winding device for electromechanical equipment, as shown in Figure 1-6, includes a bottom plate 1, a first bearing seat 2, a rotating rod 3, a first gear 4, a first motor 5, a second gear 6, Placement frame 7, first positioning block 8, first screw rod 11, first pushing block 12, guide rail 13, guide sleeve 14, second screw rod 16, second pushing block 17, support plate 18 and second positioning block 19, bottom plate 1. The first bearing seat 2 is installed in the middle part by bolt connection, the rotating rod 3 is installed in the first bearing seat 2 by interference connection, and the first gear is installed in the middle part of the upper side of the rotating rod 3 by bolt connection 4. The first motor 5 is installed on the right side of the bottom plate 1 through bolt connection, and the output shaft of the first motor 5 at the upper end of the first motor 5 is connected with the second gear 6 through a coupling, and the second gear 6 and the first gear 4 meshing, the upper end of the rotating rod 3 is installed with a placement frame 7 by welding, the upper side of the placement frame 7 is provided with a first empty groove 9, and the middle part of the upper side of the placement frame 7 is installed with a first positioning block 8 by welding, and the placement frame 7 There are first threaded holes 10 on the left and right sides, and a first screw 11 is placed in the first threaded hole 10. The first screw 11 cooperates with the first threaded hole 10, and the first screw 11 extends into the first empty groove 9. The inner side of the first screw 11 is rotationally connected with a first push block 12, the left side of the base plate 1 is installed with a guide rail 13 by welding, the guide rail 13 is slidably connected with a guide sleeve 14, and the left side of the guide sleeve 14 is provided with a second screw thread Hole 15, the second screw rod 16 is placed in the second threaded hole 15, the second screw rod 16 cooperates with the second threaded hole 15, the right end of the second screw rod 16 is rotatably connected with the second push block 17, and the right end of the guide sleeve 14 is welded A support plate 18 is installed in a manner, and a second positioning block 19 is installed in the middle part of the lower side of the support plate 18 by welding.
还包括有第二轴承座201、连接板202和齿带203,支撑板18内中部通过螺栓连接的方式安装有第二轴承座201,第二轴承座201内连接有第二定位块19,第二定位块19中部通过焊接的方式安装有连接板202,连接板202下侧通过螺栓连接的方式安装有齿带203。It also includes a second bearing seat 201, a connecting plate 202 and a toothed belt 203. The middle part of the support plate 18 is equipped with a second bearing seat 201 by means of bolt connection, and the second bearing seat 201 is connected with a second positioning block 19. A connecting plate 202 is installed in the middle of the two positioning blocks 19 by welding, and a toothed belt 203 is installed on the lower side of the connecting plate 202 by bolting.
还包括有压紧装置21,压紧装置21包括有第一螺母211、第三螺杆212、第一锥形块213、第一滑轨214、第一滑块215、弹簧216、推杆217、压块218和第二锥形块219,第二定位块19内设有压紧装置21,第二定位块19上端通过焊接的方式安装有第一螺母211,第一螺母211内放置有第三螺杆212,第三螺杆212与第一螺母211配合,第三螺杆212伸进第二定位块19内,第三螺杆212下端旋转式连接有第一锥形块213,第二定位块19内下侧左右两侧通过螺栓连接的方式安装有第一滑轨214,第一滑轨214内滑动式连接有第一滑块215,第一滑块215外侧通过焊接的方式安装有弹簧216,弹簧216另一端通过焊接的方式安装在第一滑轨214内外侧,第一滑块215外侧通过焊接的方式安装有推杆217,推杆217位于弹簧216前侧,推杆217外侧通过焊接的方式安装有压块218,第一滑块215前侧通过焊接的方式安装有第二锥形块219。Also include hold-down device 21, hold-down device 21 includes first nut 211, the 3rd screw rod 212, the first tapered block 213, the first slide rail 214, the first slide block 215, spring 216, push rod 217, Pressing block 218 and the second conical block 219, the second positioning block 19 is provided with a pressing device 21, the second positioning block 19 upper end is equipped with a first nut 211 by welding, and a third nut 211 is placed in the first nut 211. Screw rod 212, the third screw rod 212 cooperates with the first nut 211, the third screw rod 212 stretches into the second positioning block 19, the third screw rod 212 lower end is rotatably connected with the first tapered block 213, and the second positioning block 19 inner and lower The first sliding rail 214 is installed on the left and right sides by bolt connection, the first sliding block 215 is slidably connected in the first sliding rail 214, the outer side of the first sliding block 215 is installed with a spring 216 by welding, and the spring 216 The other end is installed on the inside and outside of the first slide rail 214 by welding, and a push rod 217 is installed on the outside of the first slider 215 by welding. The push rod 217 is located on the front side of the spring 216, and the outside of the push rod 217 is installed by welding. There is a pressing block 218, and a second tapered block 219 is installed on the front side of the first sliding block 215 by welding.
还包括有第三推块2173、第四螺杆2174和伸缩杆2175,推杆217内开有第二空槽2171,第二空槽2171内放置有伸缩杆2175,伸缩杆2175外侧通过焊接的方式安装有压块218,推杆217右侧开有第三螺纹孔2172,第三螺纹孔2172内放置有第四螺杆2174,第四螺杆2174与第三螺纹孔2172配合,第四螺杆2174下端旋转式连接有第三推块2173。It also includes a third push block 2173, a fourth screw rod 2174 and a telescopic rod 2175. There is a second empty slot 2171 in the push rod 217, and a telescopic rod 2175 is placed in the second empty slot 2171. The outer side of the telescopic rod 2175 is welded. A pressing block 218 is installed, and the right side of the push rod 217 has a third threaded hole 2172, and a fourth screw 2174 is placed in the third threaded hole 2172, and the fourth screw 2174 cooperates with the third threaded hole 2172, and the lower end of the fourth screw 2174 rotates There is a third push block 2173 connected in the formula.
还包括有移动装置22,移动装置22包括有第二滑轨221、第二滑块222、转轴223、第一转轮224、摇把225和第一传动条226,支撑板18内设有移动装置22,支撑板18内下侧通过螺栓连接的方式安装有第二滑轨221,第二滑轨221内滑动式连接有第二滑块222,第二滑块222前侧通过螺栓连接的方式安装有第二轴承座201,支撑板18前侧左右两侧连接有转轴223,转轴223位于第二滑轨221左右两侧,转轴223上连接有第一转轮224,第一转轮224之间连接有第一传动条226,第一传动条226下侧与第二滑块222连接,左侧第一转轮224前侧连接有摇把225。Also includes mobile device 22, and mobile device 22 includes second slide rail 221, second slide block 222, rotating shaft 223, first runner 224, crank handle 225 and first drive bar 226, is provided with in supporting plate 18 In the device 22, a second sliding rail 221 is installed on the inner lower side of the support plate 18 through bolt connection, and a second sliding block 222 is slidably connected inside the second sliding rail 221, and the front side of the second sliding block 222 is connected through bolt connection. The second bearing seat 201 is installed, and the left and right sides of the front side of the support plate 18 are connected with the rotating shaft 223. The rotating shaft 223 is located at the left and right sides of the second slide rail 221. A first transmission bar 226 is connected between them, the lower side of the first transmission bar 226 is connected with the second slider 222 , and the front side of the left first runner 224 is connected with a crank handle 225 .
还包括有第二转轮2231、第二传动条2232和第二电机2233,支撑板18上左侧通过螺栓连接的方式安装有第二电机2233,第二电机2233前侧的第二电机2233输出轴通过联轴器连接有第二转轮2231,左侧第一转轮224前侧也连接有第二转轮2231,第二转轮2231之间连接有第二传动条2232。It also includes a second runner 2231, a second drive bar 2232 and a second motor 2233. The left side of the support plate 18 is connected with a second motor 2233 by means of bolts, and the second motor 2233 on the front side of the second motor 2233 outputs The shaft is connected with a second runner 2231 through a coupling, and the front side of the left first runner 224 is also connected with a second runner 2231 , and a second transmission bar 2232 is connected between the second runners 2231 .
底板1的材料为不锈钢。The material of the bottom plate 1 is stainless steel.
支撑板18的材料为Q235钢。The material of the support plate 18 is Q235 steel.
第一电机5和第二电机2233为伺服电机。The first motor 5 and the second motor 2233 are servo motors.
工作原理:当用户需要对线缆进行卷绕的时候,用户可以将绕线盘下侧放入第一空槽9内,使绕线盘下侧中部进入第一定位块8,然后推动向下推动导套14,使导套14带动支撑板18和第二定位块19向下移动,使第二定位块19进入绕线盘上侧内,然后旋转第二螺杆16,第二螺杆16通过与第二螺纹孔15的配合旋进导套14内,第二螺杆16推动第二推块17,使第二推块17固定住导套14在导轨13上的这个位置,此时旋转第一螺杆11,第一螺杆11通过与第一螺纹孔10的配合旋进第一空槽9,第一螺杆11推动第一推块12,第一推块12将绕线盘固定在第一空擦上,然后将线缆系在绕线盘上,打开第一电机5,第一电机5带动第二齿轮6旋转,第二齿轮6带动与之啮合的第一齿轮4旋转,第一齿轮4带动转杆3通过第一轴承座2旋转,转杆3带动放置架7旋转,从而带动绕线盘旋转,从而对线缆进行卷绕。Working principle: When the user needs to wind the cable, the user can put the lower side of the winding disc into the first empty slot 9, so that the middle part of the lower side of the winding disc enters the first positioning block 8, and then push it down Push the guide sleeve 14 to make the guide sleeve 14 drive the support plate 18 and the second positioning block 19 to move downward, so that the second positioning block 19 enters the upper side of the winding reel, and then rotate the second screw rod 16, and the second screw rod 16 passes through the upper side of the winding reel. The cooperation of the second threaded hole 15 is screwed into the guide sleeve 14, and the second screw rod 16 promotes the second push block 17, so that the second push block 17 fixes the position of the guide sleeve 14 on the guide rail 13, and now rotates the first screw rod 11. The first screw 11 is screwed into the first empty slot 9 by cooperating with the first threaded hole 10, the first screw 11 pushes the first push block 12, and the first push block 12 fixes the winding reel on the first empty wiper , then tie the cable on the reel, turn on the first motor 5, the first motor 5 drives the second gear 6 to rotate, the second gear 6 drives the first gear 4 meshed with it to rotate, and the first gear 4 drives the rotation The rod 3 rotates through the first bearing seat 2, and the rotating rod 3 drives the placement frame 7 to rotate, thereby driving the winding reel to rotate, thereby winding the cable.
因为还包括有第二轴承座201、连接板202和齿带203,支撑板18内中部通过螺栓连接的方式安装有第二轴承座201,第二轴承座201内连接有第二定位块19,第二定位块19中部通过焊接的方式安装有连接板202,连接板202下侧通过螺栓连接的方式安装有齿带203,当用户需要在绕线盘旋转的时候保证绕线盘的稳定性,用户只需在放置好绕线盘的时候移动导套14,导套14带动支撑板18向下移动的同时,带动连接板202向下移动接触到绕线盘上侧,齿带203将固定住绕线盘,然后旋转第二螺杆16固定住导套14和支撑板18,然后再绕线盘旋转的时候,第二定位块19将通过第二轴承座201旋转。Because it also includes the second bearing seat 201, the connecting plate 202 and the toothed belt 203, the middle part of the support plate 18 is installed with the second bearing seat 201 through bolt connection, and the second bearing seat 201 is connected with the second positioning block 19, The middle part of the second positioning block 19 is installed with a connecting plate 202 by welding, and the lower side of the connecting plate 202 is equipped with a toothed belt 203 by means of bolt connection, so as to ensure the stability of the winding reel when the user needs to rotate the reel. The user only needs to move the guide sleeve 14 when placing the winding reel. When the guide sleeve 14 drives the support plate 18 to move downward, it drives the connecting plate 202 to move downward to touch the upper side of the reel, and the toothed belt 203 will be fixed. Winding the reel, and then rotating the second screw rod 16 to fix the guide sleeve 14 and the support plate 18 , and then when the reel is rotating, the second positioning block 19 will rotate through the second bearing seat 201 .
因为还包括有压紧装置21,压紧装置21包括有第一螺母211、第三螺杆212、第一锥形块213、第一滑轨214、第一滑块215、弹簧216、推杆217、压块218和第二锥形块219,第二定位块19内设有压紧装置21,第二定位块19上端通过焊接的方式安装有第一螺母211,第一螺母211内放置有第三螺杆212,第三螺杆212与第一螺母211配合,第三螺杆212伸进第二定位块19内,第三螺杆212下端旋转式连接有第一锥形块213,第二定位块19内下侧左右两侧通过螺栓连接的方式安装有第一滑轨214,第一滑轨214内滑动式连接有第一滑块215,第一滑块215外侧通过焊接的方式安装有弹簧216,弹簧216另一端通过焊接的方式安装在第一滑轨214内外侧,第一滑块215外侧通过焊接的方式安装有推杆217,推杆217位于弹簧216前侧,推杆217外侧通过焊接的方式安装有压块218,第一滑块215前侧通过焊接的方式安装有第二锥形块219,当用户需要进一步的保证绕线盘旋转时候的稳定性,用户可以在第二定位块19进入到绕线盘内时,旋转第三螺杆212,第三螺杆212通过与第一螺母211的配合推动第一锥形块213,第一锥形块213将推动两侧的第二锥形块219,第二锥形块219将推动第一滑块215,第一滑块215通过第一滑轨214向外侧移动,第一滑块215将推动弹簧216使之处于压缩状态,第一滑块215也将推动推杆217向外侧移动,推杆217推动压块218向外侧移动,压块218将接触到绕线盘内壁上,将绕线盘进行固定,当绕线盘已经绕好线缆的时候,用户只需反向旋转第三螺杆212,使第一锥形块213与第二锥形块219脱离接触,此时弹簧216将从压缩状态恢复,推动第一滑块215向内侧移动,第一滑块215也将带动推杆217和压块218向内侧移动。Because also include holddown device 21, holddown device 21 comprises first nut 211, the 3rd screw rod 212, first tapered piece 213, first slide rail 214, first slide block 215, spring 216, push rod 217 , a briquetting block 218 and a second conical block 219, a pressing device 21 is provided in the second positioning block 19, a first nut 211 is installed on the upper end of the second positioning block 19 by welding, and a first nut 211 is placed in the first nut 211 Three screw rods 212, the third screw rod 212 cooperates with the first nut 211, the third screw rod 212 stretches into the second positioning block 19, the third screw rod 212 is connected with the first conical block 213 in a rotating manner, and the second positioning block 19 The first sliding rail 214 is installed on the left and right sides of the lower side by means of bolt connection, and the first sliding block 215 is slidably connected in the first sliding rail 214, and a spring 216 is installed on the outside of the first sliding block 215 by welding. The other end of 216 is installed on the inside and outside of the first slide rail 214 by welding, the outside of the first slider 215 is installed with a push rod 217 by welding, the push rod 217 is located on the front side of the spring 216, and the outside of the push rod 217 is welded A pressure block 218 is installed, and a second tapered block 219 is installed on the front side of the first slider 215 by welding. When the user needs to further ensure the stability of the winding reel rotation, the user can enter the second positioning block 19 When entering the reel, rotate the third screw 212, the third screw 212 pushes the first conical block 213 by cooperating with the first nut 211, and the first conical block 213 will push the second conical block 219 on both sides , the second tapered block 219 will push the first slider 215, the first slider 215 will move to the outside through the first slide rail 214, the first slider 215 will push the spring 216 to make it in a compressed state, the first slider 215 Also push the push rod 217 to move to the outside, and the push rod 217 pushes the briquetting block 218 to move to the outside, and the briquetting block 218 will touch the inner wall of the reel to fix the reel. At this time, the user only needs to reversely rotate the third screw rod 212 to disengage the first conical block 213 from the second conical block 219. At this time, the spring 216 will recover from the compressed state and push the first slider 215 to move inwardly. The first slider 215 will also drive the push rod 217 and the pressure block 218 to move inwardly.
因为还包括有第三推块2173、第四螺杆2174和伸缩杆2175,推杆217内开有第二空槽2171,第二空槽2171内放置有伸缩杆2175,伸缩杆2175外侧通过焊接的方式安装有压块218,推杆217右侧开有第三螺纹孔2172,第三螺纹孔2172内放置有第四螺杆2174,第四螺杆2174与第三螺纹孔2172配合,第四螺杆2174下端旋转式连接有第三推块2173,当用户需要对更多不同直径的绕线盘进行固定的时候,而原先的推杆217已经无法进行固定的时候,用户只需要将伸缩杆2175在第二空槽2171内左右移动,伸缩杆2175将带动压块218左右移动,当移动到所需的长度后,旋转第四螺杆2174,第四螺杆2174通过与第三螺纹孔2172的配合旋进第二空槽2171内,第四螺杆2174将推动第三推块2173,使第三推块2173固定住伸缩杆2175在空槽内的这个位置上。Because also include the 3rd push piece 2173, the 4th screw rod 2174 and telescopic rod 2175, have the second empty groove 2171 in the push rod 217, be placed with telescopic rod 2175 in the second empty groove 2171, the outer side of telescopic rod 2175 is welded There is a third threaded hole 2172 on the right side of the push rod 217, and a fourth screw 2174 is placed in the third threaded hole 2172. The fourth screw 2174 cooperates with the third threaded hole 2172, and the lower end of the fourth screw 2174 The rotary connection has a third push block 2173. When the user needs to fix more winding reels with different diameters, and the original push rod 217 cannot be fixed, the user only needs to place the telescopic rod 2175 on the second Move left and right in the empty slot 2171, and the telescopic rod 2175 will drive the briquetting block 218 to move left and right. After moving to the required length, the fourth screw 2174 is rotated, and the fourth screw 2174 is screwed into the second threaded hole 2172 by cooperating with the third threaded hole 2172. In the empty groove 2171, the fourth screw rod 2174 will promote the third push block 2173, so that the third push block 2173 fixes the telescopic rod 2175 at this position in the empty groove.
因为还包括有移动装置22,移动装置22包括有第二滑轨221、第二滑块222、转轴223、第一转轮224、摇把225和第一传动条226,支撑板18内设有移动装置22,支撑板18内下侧通过螺栓连接的方式安装有第二滑轨221,第二滑轨221内滑动式连接有第二滑块222,第二滑块222前侧通过螺栓连接的方式安装有第二轴承座201,支撑板18前侧左右两侧连接有转轴223,转轴223位于第二滑轨221左右两侧,转轴223上连接有第一转轮224,第一转轮224之间连接有第一传动条226,第一传动条226下侧与第二滑块222连接,左侧第一转轮224前侧连接有摇把225,当用户需要对卷绕好的绕线盘进行转移时候,用户可以先将绕线盘下侧的第一螺杆11反向旋转,然后推动导套14使支撑板18向上移动,然后逆时针旋转摇把225,摇把225旋转带动左侧第一转轮224逆时针旋转,左侧第一转轮224带动通过第一传动条226带动右侧第一转轮224逆时针旋转,使第一传动条226带动第二滑块222在第二滑轨221内向右移动,第二滑块222带动第二轴承座201和第二定位块19向右移动,从而带动绕线盘向右移动。Because it also includes the mobile device 22, the mobile device 22 includes a second slide rail 221, a second slide block 222, a rotating shaft 223, a first runner 224, a crank handle 225 and a first transmission bar 226, and the support plate 18 is provided with The mobile device 22 is equipped with a second slide rail 221 in the lower side of the support plate 18 through bolt connection, and a second slide block 222 is slidably connected in the second slide rail 221, and the front side of the second slide block 222 is connected by bolts. The second bearing seat 201 is installed in the way, and the left and right sides of the front side of the support plate 18 are connected with the rotating shaft 223. The first transmission bar 226 is connected between them, the lower side of the first transmission bar 226 is connected with the second slider 222, and the front side of the first runner 224 on the left side is connected with a crank handle 225. When the disk is transferred, the user can reversely rotate the first screw 11 on the lower side of the winding disk, then push the guide sleeve 14 to move the support plate 18 upward, and then rotate the handle 225 counterclockwise, and the rotation of the handle 225 drives the left side The first runner 224 rotates counterclockwise, and the first runner 224 on the left side drives the first runner 224 on the right side to rotate counterclockwise through the first drive bar 226, so that the first drive bar 226 drives the second slider 222 to move in the second The slide rail 221 moves to the right, and the second slider 222 drives the second bearing seat 201 and the second positioning block 19 to move to the right, thereby driving the winding disc to move to the right.
因为还包括有第二转轮2231、第二传动条2232和第二电机2233,支撑板18上左侧通过螺栓连接的方式安装有第二电机2233,第二电机2233前侧的第二电机2233输出轴通过联轴器连接有第二转轮2231,左侧第一转轮224前侧也连接有第二转轮2231,第二转轮2231之间连接有第二传动条2232,当用户在进行转移绕线盘的时候,用户可以打开第二电机2233,第二电机2233带动上侧第二转轮2231旋转,第二转轮2231旋转通过第二传动条2232旋转,第二传动条2232带动左侧第一转轮224旋转。Because the second runner 2231, the second drive bar 2232 and the second motor 2233 are also included, the left side of the support plate 18 is equipped with a second motor 2233 by bolt connection, and the second motor 2233 on the front side of the second motor 2233 The output shaft is connected with a second runner 2231 through a coupling, and the front side of the first runner 224 on the left side is also connected with a second runner 2231, and a second transmission bar 2232 is connected between the second runners 2231. When transferring the winding reel, the user can turn on the second motor 2233, the second motor 2233 drives the upper second runner 2231 to rotate, the second runner 2231 rotates through the second transmission bar 2232, and the second transmission bar 2232 drives The left first rotating wheel 224 rotates.
因为底板1的材料为不锈钢,不锈钢耐腐蚀性和耐酸性强,可延长装置的使用寿命。Because the material of the bottom plate 1 is stainless steel, the stainless steel has strong corrosion resistance and acid resistance, which can prolong the service life of the device.
因为支撑板18的材料为Q235钢,Q235钢硬度高,不容易变形,使装置的使用寿命更长。Because the material of the supporting plate 18 is Q235 steel, the hardness of Q235 steel is high, and it is not easily deformed, so that the service life of the device is longer.
因为第一电机5和第二电机2233为伺服电机,抗过载能力强,高速性能好,能精准控制其转速。Because the first motor 5 and the second motor 2233 are servo motors, they have strong overload resistance, good high-speed performance, and can precisely control their rotation speeds.
以上所述实施例仅表达了本发明的优选实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形、改进及替代,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express the preferred implementation of the present invention, and the description thereof is relatively specific and detailed, but should not be construed as limiting the patent scope of the present invention. It should be noted that those skilled in the art can make several modifications, improvements and substitutions without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent for the present invention should be based on the appended claims.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710209456.2A CN106966227B (en) | 2017-03-31 | 2017-03-31 | A kind of electromechanical equipment cable fast winding equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710209456.2A CN106966227B (en) | 2017-03-31 | 2017-03-31 | A kind of electromechanical equipment cable fast winding equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106966227A true CN106966227A (en) | 2017-07-21 |
CN106966227B CN106966227B (en) | 2019-03-01 |
Family
ID=59336532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710209456.2A Active CN106966227B (en) | 2017-03-31 | 2017-03-31 | A kind of electromechanical equipment cable fast winding equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106966227B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107572307A (en) * | 2017-09-16 | 2018-01-12 | 晋江诺研机械设计有限公司 | A kind of clothes plastic winding shaft Winder |
CN107697739A (en) * | 2017-08-22 | 2018-02-16 | 乐甜桃 | A kind of wrap-up for cable |
CN108346525A (en) * | 2018-04-14 | 2018-07-31 | 六和电子(江西)有限公司 | A kind of flat thin-film capacitor fuse cored device |
CN108385249A (en) * | 2018-05-15 | 2018-08-10 | 湖州南浔富龙纺织有限公司 | A kind of weaving creel convenient for clamping |
CN106966227B (en) * | 2017-03-31 | 2019-03-01 | 浙江工业职业技术学院 | A kind of electromechanical equipment cable fast winding equipment |
CN109507044A (en) * | 2018-10-08 | 2019-03-22 | 钟超 | A kind of bumper uses the impact test equipment of material |
CN109823920A (en) * | 2018-12-21 | 2019-05-31 | 丁予泽 | A kind of yarn waxing equipment |
CN110775713A (en) * | 2019-11-05 | 2020-02-11 | 安徽翰联色纺股份有限公司 | Novel yarn section of thick bamboo fixed knot constructs |
CN114523457A (en) * | 2022-02-15 | 2022-05-24 | 湖南方能电力有限公司 | Electric power facility complete set pre-installation fixed multilayer combination strorage device |
CN115246592A (en) * | 2021-04-28 | 2022-10-28 | 石家庄顺美生活用纸科技有限公司 | Arc dust-free paper forming device on disposable sanitary product production line |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4062923B2 (en) * | 2002-01-23 | 2008-03-19 | 株式会社ベステック | Winding machine work holding unit and winding machine using the same |
CN204416762U (en) * | 2015-01-29 | 2015-06-24 | 山东惠杰油气技术有限公司 | Hawser balance device of boarding |
CN204528884U (en) * | 2015-01-30 | 2015-08-05 | 苏州圣利线缆有限公司 | A kind of enamel wire high precision Winder |
CN204778007U (en) * | 2015-06-05 | 2015-11-18 | 河北志达伟业通讯器材股份公司 | Steel wire admission machine drum clamping device |
CN204802752U (en) * | 2015-06-10 | 2015-11-25 | 张洁 | Improved generation cable winding mechanism |
CN205076550U (en) * | 2015-10-21 | 2016-03-09 | 张家港白熊科美机械有限公司 | Plastics wire drawing rolling machine |
CN205765604U (en) * | 2016-07-18 | 2016-12-07 | 赣州云信工贸有限责任公司 | A kind of fixing device for the processing of plastic-steel door and window edging |
CN106393445A (en) * | 2016-11-30 | 2017-02-15 | 广东轻工职业技术学院 | Automatic stone machining device |
CN106425818A (en) * | 2017-01-03 | 2017-02-22 | 南昌安润科技有限公司 | Polishing equipment for industrial steel pipe |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106966227B (en) * | 2017-03-31 | 2019-03-01 | 浙江工业职业技术学院 | A kind of electromechanical equipment cable fast winding equipment |
-
2017
- 2017-03-31 CN CN201710209456.2A patent/CN106966227B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4062923B2 (en) * | 2002-01-23 | 2008-03-19 | 株式会社ベステック | Winding machine work holding unit and winding machine using the same |
CN204416762U (en) * | 2015-01-29 | 2015-06-24 | 山东惠杰油气技术有限公司 | Hawser balance device of boarding |
CN204528884U (en) * | 2015-01-30 | 2015-08-05 | 苏州圣利线缆有限公司 | A kind of enamel wire high precision Winder |
CN204778007U (en) * | 2015-06-05 | 2015-11-18 | 河北志达伟业通讯器材股份公司 | Steel wire admission machine drum clamping device |
CN204802752U (en) * | 2015-06-10 | 2015-11-25 | 张洁 | Improved generation cable winding mechanism |
CN205076550U (en) * | 2015-10-21 | 2016-03-09 | 张家港白熊科美机械有限公司 | Plastics wire drawing rolling machine |
CN205765604U (en) * | 2016-07-18 | 2016-12-07 | 赣州云信工贸有限责任公司 | A kind of fixing device for the processing of plastic-steel door and window edging |
CN106393445A (en) * | 2016-11-30 | 2017-02-15 | 广东轻工职业技术学院 | Automatic stone machining device |
CN106425818A (en) * | 2017-01-03 | 2017-02-22 | 南昌安润科技有限公司 | Polishing equipment for industrial steel pipe |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106966227B (en) * | 2017-03-31 | 2019-03-01 | 浙江工业职业技术学院 | A kind of electromechanical equipment cable fast winding equipment |
CN107697739A (en) * | 2017-08-22 | 2018-02-16 | 乐甜桃 | A kind of wrap-up for cable |
CN107572307A (en) * | 2017-09-16 | 2018-01-12 | 晋江诺研机械设计有限公司 | A kind of clothes plastic winding shaft Winder |
CN107572307B (en) * | 2017-09-16 | 2019-08-20 | 宁夏诺莱普服装有限公司 | A kind of clothes plastic winding shaft bobbin winder device |
CN108346525B (en) * | 2018-04-14 | 2023-11-14 | 六和电子(江西)有限公司 | Flat thin film capacitor core wrapping device |
CN108346525A (en) * | 2018-04-14 | 2018-07-31 | 六和电子(江西)有限公司 | A kind of flat thin-film capacitor fuse cored device |
CN108385249A (en) * | 2018-05-15 | 2018-08-10 | 湖州南浔富龙纺织有限公司 | A kind of weaving creel convenient for clamping |
CN109507044A (en) * | 2018-10-08 | 2019-03-22 | 钟超 | A kind of bumper uses the impact test equipment of material |
CN109823920A (en) * | 2018-12-21 | 2019-05-31 | 丁予泽 | A kind of yarn waxing equipment |
CN110775713A (en) * | 2019-11-05 | 2020-02-11 | 安徽翰联色纺股份有限公司 | Novel yarn section of thick bamboo fixed knot constructs |
CN115246592A (en) * | 2021-04-28 | 2022-10-28 | 石家庄顺美生活用纸科技有限公司 | Arc dust-free paper forming device on disposable sanitary product production line |
CN115246592B (en) * | 2021-04-28 | 2024-09-27 | 石家庄顺美生活用纸科技有限公司 | Arc dust-free paper forming device on disposable sanitary product production line |
CN114523457A (en) * | 2022-02-15 | 2022-05-24 | 湖南方能电力有限公司 | Electric power facility complete set pre-installation fixed multilayer combination strorage device |
CN114523457B (en) * | 2022-02-15 | 2024-03-12 | 湖南方能电力有限公司 | Electric power facility complete sets pre-loading is put multilayer combination strorage device in advance |
Also Published As
Publication number | Publication date |
---|---|
CN106966227B (en) | 2019-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106966227A (en) | A kind of electromechanical equipment cable fast winding equipment | |
CN110407030B (en) | An intelligent textile production system based on AGV trolley | |
CN106966228A (en) | A kind of cable processing cable fast winding equipment | |
CN204368448U (en) | One controls bag-making and packaging apparatus automatically | |
CN102674085A (en) | Moving type cable winding device | |
CN107140432A (en) | One kind supply transport vehicle | |
CN109466957B (en) | Winding core replacing device for amorphous thin strip full-automatic winding machine | |
CN210635260U (en) | Paper tube or spinning cake transfer device | |
CN202502058U (en) | Automatic lamp inspection machine | |
CN209097224U (en) | A kind of hollow structure wall winding pipeline storing unit | |
CN208662671U (en) | A kind of petroleum pipeline process equipment | |
CN202848708U (en) | Adjustable automatic winding device | |
CN208601376U (en) | A kind of mechanical equipment bearing roller detection fixture | |
CN102628792A (en) | Automatic lamp inspector | |
CN211844557U (en) | Root-resistant waterproofing membrane production is with delivery device | |
CN206677993U (en) | A kind of manipulator clamping jaw with over-pressed detection function | |
CN210555037U (en) | Lubricating oil transportation device with fixing function | |
CN214985979U (en) | Boats and ships machinery maintenance is with auxiliary stay frame convenient to adjust | |
CN206940130U (en) | Guiding mechanism and pipe-reeling device | |
CN206551541U (en) | A kind of self-feeding platform mechanism | |
CN209921762U (en) | Packaging machinery carousel mechanism that durability is high | |
CN210182912U (en) | Aluminum Wrapped Tape Winder | |
CN210397476U (en) | Transmission shaft for industrial robot | |
CN207329574U (en) | The Electric Actuator of frictional dissipation can be reduced | |
CN201941187U (en) | Paper tube winding machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210705 Address after: 317500 Building 2, Dongan village, Daxi Town, Wenling City, Taizhou City, Zhejiang Province Patentee after: Yuanjing Pump Co.,Ltd. Address before: 312000 No. 151 Tuen Mun Road, Jinghu New District, Zhejiang, Shaoxing Patentee before: ZHEJIANG INDUSTRY POLYTECHNIC College |