[go: up one dir, main page]

CN106952717B - The auxiliary device of for transformer processing - Google Patents

The auxiliary device of for transformer processing Download PDF

Info

Publication number
CN106952717B
CN106952717B CN201710170943.2A CN201710170943A CN106952717B CN 106952717 B CN106952717 B CN 106952717B CN 201710170943 A CN201710170943 A CN 201710170943A CN 106952717 B CN106952717 B CN 106952717B
Authority
CN
China
Prior art keywords
feed pipe
filling tube
transformer
filling
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710170943.2A
Other languages
Chinese (zh)
Other versions
CN106952717A (en
Inventor
佘加旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PANJIN GUANGLIDA ELECTRIC Co.,Ltd.
Original Assignee
Guizhou Jinlin Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Jinlin Electronic Technology Co Ltd filed Critical Guizhou Jinlin Electronic Technology Co Ltd
Priority to CN201710170943.2A priority Critical patent/CN106952717B/en
Publication of CN106952717A publication Critical patent/CN106952717A/en
Application granted granted Critical
Publication of CN106952717B publication Critical patent/CN106952717B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F41/00Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/28Coils; Windings; Conductive connections
    • H01F27/29Terminals; Tapping arrangements for signal inductances
    • H01F2027/297Terminals; Tapping arrangements for signal inductances with pin-like terminal to be inserted in hole of printed path

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Continuous Casting (AREA)
  • Housings And Mounting Of Transformers (AREA)

Abstract

The present invention relates to the auxiliary devices of for transformer processing, including rack, filling mechanism, cooling body and erecting bed for fixing transformer, filling mechanism includes push plate, it is parallel in push plate that several filling tubes are installed, cast pipeline is communicated on filling tube, it pours into a mould pipeline and is equipped with solenoid valve close to one end of filling tube, be equipped with pressure sensor on the upside of the inner wall of filling tube, which is electrically connected with the solenoid valve;Cooling body includes the clamp for filling tube to be clamped, it is connected with cylinder on the clamp, chamber is equipped in clamp, the chamber has feed pipe and discharge duct, feed pipe is connected with dry ice storage box, the switchboard for closing feed pipe is hinged on feed pipe, one end of switchboard is located at outside feed pipe, and rack is equipped with the fixed pin for the rotation of driving switch plate.By implementing the technical program, solve the problems, such as that transformer lead pin is easily bent in the prior art.

Description

The auxiliary device of for transformer processing
Technical field
The present invention relates to the manufacture field of electronic component more particularly to a kind of processing unit (plant)s of transformer.
Background technology
Transformer is divided into high-power transformer and miniature transformer, and miniature transformer is typically mounted in electric appliance, for these Miniature transformer, row's pin is drawn in both sides, in order to be connect with the pin bores on circuit board, but due to transformer lead pin It is relatively thin longer, durings processing, packaging, transport etc., the phenomenon that root of transformer lead pin is easily bent, so in the later stage When transformer is installed, the corresponding pin hole that each pin could be inserted into after correcting the pin bent on circuit board is needed In, and during correction generally use be manual synchronizing mode, then may be improper and cause pin because exerting a force The problem of damage.
Invention content
The invention is intended to provide a kind of auxiliary device of for transformer processing, to solve transformer lead pin in the prior art The problem of easily bending.
In order to achieve the above objectives, base case of the invention is as follows:The auxiliary device of for transformer processing, including machine Frame, filling mechanism, cooling body and the erecting bed for fixing transformer, the filling mechanism include push plate, in the push plate It is parallel that several filling tubes are installed, it is respectively connected with the cast pipeline equipped with melting gypsum, the cast on each filling tube Pipeline is equipped with solenoid valve close to one end of filling tube, and pressure sensor, the pressure sensing are equipped on the upside of the inner wall of the filling tube Device is electrically connected with the solenoid valve;
The cooling body includes the clamp for filling tube to be clamped, and cylinder is connected on the clamp, is set in the clamp There is chamber, which has feed pipe and discharge duct, the feed pipe to be connected with dry ice storage box, the feed pipe The switchboard for closing feed pipe is hinged on road, one end of the switchboard is located at outside feed pipe, the rack It is equipped with the fixed pin for the rotation of driving switch plate.
The principle and advantage of this programme are:Transformer is fixed on erecting bed, each pin of transformer is hanging, pushes Filling tube is sleeved on corresponding pin by push plate, and melting gypsum is just filled into from cast pipeline in filling tube, and cylinder pushes folder at this time Body moves down and is clamped filling tube, and during moving down, one end of switchboard offsets and make out with fixed pin clamp Plate rotation is closed, to open feed pipe, dry ice powder enters in the chamber of clamp, and the temperature for melting gypsum at this time passes through folder The problem of body passes to dry ice powder, and rapid distillation is to reduce melting gypsum after keeping dry ice powder heated, accelerates consolidating for melting gypsum Chemical conversion type.In addition, the gas that dry ice generates carries out recycling by discharge duct.
The advantages of this programme, is:1, the root for being solidificated in transformer lead pin by the way that gypsum will be melted in this programme, to carry The stress of high transformer pin root reduces transformer in processing, packaging, transportational process, makes its pin that bending phenomenon occur Problem.2, by the cooperating of filling mechanism and cooling body in this programme, pin is on the one hand avoided for a long time by temperature The problem of being had an impact to transformer performance after higher melting gypsum package, on the other hand accelerates melting gypsum to be solidified into Type improves production efficiency.3, by the cooperation of solenoid valve and pressure sensor in filling mechanism, cast pipeline is closed in time, Melting gypsum in separation filling tube and cast pipeline is carrying out cooling admittedly to avoid cooling body to melting gypsum in filling tube The melting gypsum in cast pipeline is influenced when change, and influences filling effect next time.
Preferred embodiment 1:As the improvement of basic scheme, the filling tube is equipped with signal projector, is set on the cylinder There is signal receiver, which is electrically connected with the activation system of cylinder and solenoid valve, by above-mentioned setting, works as filling tube When navigating on the pin of transformer, the signal receiver on cylinder receives the electromagnetism of signal latter aspect control cast pipeline Threshold switch is opened carries out filler to filling tube, on the other hand starts cylinder and clamp is pushed to be moved to filling tube direction, to realize Just melting gypsum is cooled down while filling melts gypsum, be timely filled into melting gypsum at pin into Row cooling preferably reduces transformer hot-spot and influences the risk of its performance;Melting gypsum is preferably reached simultaneously Fast curing-formed purpose.
Preferred embodiment 2:The radii ratio of preferably 1 improvement, the filling tube and transformer lead pin is 1.5- 2.5, if it is less than 1.5, the gypsum of filling cannot play firm effect to pin, if it is greater than 2.5, be attached on pin Gypsum not only causes the waste of material too much, can also influence the installation of transformer.
Preferred embodiment 3:Preferably 2 improvement, in order to ensure the air-tightness of feed pipe, spy is in the switchboard It is connect elasticity layer with the junction of feed pipe, to make switchboard avoid its junction is cracking to ask in rotation process Topic, while also ensuring the air-tightness of feed pipe.
Description of the drawings
Fig. 1 is the structural schematic diagram of the auxiliary device embodiment of for transformer of the present invention processing.
Fig. 2 is the structural schematic diagram of filling tube in the present invention.
Fig. 3 is the partial structural diagram of feed pipe in the present invention.
Specific implementation mode
Below by specific implementation mode, the present invention is described in further detail:
Reference numeral in Figure of description includes:Erecting bed 1, push plate 2, filling tube 3, cast pipeline 4, clamp 5, charging Pipeline 6, discharge duct 7, switchboard 8, fixed pin 9, transformer 10, pin 11, solenoid valve 12, pressure sensor 13.
Embodiment is basic as shown in attached drawing 1, Fig. 2:For transformer processing auxiliary device, including rack, filling mechanism, Cooling body and erecting bed 1 for fixing transformer 10, filling mechanism include push plate 2, in push plate 2 it is parallel be equipped with quantity with The radius scale of the identical filling tube 3 of 10 pin of transformer, 11 quantity, filling tube 3 and 10 pin 11 of transformer is 2:1, each fill out The upper side wall for filling cylinder 3 is communicated with cast pipeline 4, and 4 upper end of cast pipeline is communicated with the mixed melting gypsum for being stored with molten Accommodation tube, the temperature of the mixed melting gypsum controls at 50 ° -60 °, cures to avoid it.One electricity is installed in cast pipeline 4 Magnet valve 12, the solenoid valve 12 are used to open or close cast pipeline 4.Pressure sensor 13 is installed on the upside of the inner wall of filling tube 3, The pressure sensor 13 is electrically connected with solenoid valve 12.
As shown in Figure 3, cooling body includes the clamp 5 for filling tube 3 to be clamped, and clamp 5 is metal material, the clamp 5 Corresponding to each pin 11 of transformer 10,5 upper end of clamp is connected with cylinder, and clamp 5 can be pushed to move up and down.It is equipped in clamp 5 Chamber, the chamber have feed pipe 6 and discharge duct 7,6 upper end of feed pipe to be connected with dry ice storage box, feed pipe 6 Tube wall on be hinged with switchboard 8 for closing feed pipe 6, the left end of switchboard 8 is located at outside feed pipe 6, and opens It is connected with resetting spring between the left end and feed pipe 6 of pass plate 8.Rack is equipped with the fixation rotated for driving switch plate 8 Pin 9.
In addition, filling tube 3 is equipped with signal projector, the letter of the signal for receiving signal projector is installed on cylinder Number receiver, which is electrically connected with the solenoid valve 12 in the starting switch of cylinder and feed pipe 6, when filling tube 3 When being moved on the pin 11 of transformer 10, the signal receiver on cylinder just starts cylinder promotion clamp 5 after receiving signal It is moved to 3 direction of filling tube.
In actual mechanical process, transformer 10 is fixed on erecting bed 1, each pin of transformer is hanging, pushes push plate 2 Filling tube 3 will be made to be sleeved on the root of corresponding pin 11, pin 11 is located at 3 center of filling tube.It is now placed in pin 11 just The signal receiver of top receives the signal of signal projector, and just the switch of solenoid valve 12 on control cast pipeline 4 is opened, and is melted Melt gypsum to be just filled into filling tube 3 from cast pipeline 4, when melting gypsum fills up filling tube 3, be arranged inside filling tube 3 The pressure sensor 13 of upper wall just controls the closing of solenoid valve 12, is carried out to melting gypsum in filling tube 3 to avoid cooling body The melting gypsum in cast pipeline 4 is influenced when cooling and solidifying, and influences the filling effect of next time.Due to being filled in filling tube 3 The temperature of interior melting gypsum is higher, if pin 11 is easily damaged at this temperature for a long time, while in order to accelerate to melt gypsum Curing molding, improves production efficiency, and signal receiver control cylinder pushes clamp 5 to move down and be clamped filling tube 3, clamp 5 During moving down, one end and the fixed pin 9 of switchboard 8 offset and switchboard 8 are made to rotate, to open feed pipe 6, dry ice powder enters in the chamber of clamp 5, and the temperature for melting gypsum at this time passes to dry ice powder by clamp 5, makes dry ice Distillation accelerates the curing molding of melting gypsum to powder to reduce the problem of melting gypsum rapidly.In addition, the gas that dry ice generates is logical It crosses discharge duct 7 and carries out recycling.
Above-described is only the embodiment of the present invention, and the common sense such as well known concrete structure and/or characteristic are herein in scheme It does not describe excessively.It should be pointed out that for those skilled in the art, without departing from the inventive concept of the premise, also Several modifications and improvements can be made, these should also be considered as protection scope of the present invention, these all do not interfere with of the invention real The effect and patent practicability applied.The scope of protection required by this application should be based on the content of the claims, specification In the records such as specific implementation mode can be used for explaining the content of claim.

Claims (4)

1. the auxiliary device of for transformer processing, it is characterised in that:Including rack, filling mechanism, cooling body and it is used for solid Determine the erecting bed of transformer, the filling mechanism includes push plate, parallel in the push plate to be equipped with several filling tubes, each described The cast pipeline equipped with melting gypsum is respectively connected on filling tube, the cast pipeline is equipped with electromagnetism close to one end of filling tube The inner wall upside of valve, the filling tube is equipped with pressure sensor, which is electrically connected with the solenoid valve;
The cooling body includes the clamp for filling tube to be clamped, and cylinder is connected on the clamp, chamber is equipped in the clamp Room, the chamber have a feed pipe and discharge duct, and the feed pipe is connected with dry ice storage box, on the feed pipe It is hinged with the switchboard for closing feed pipe, one end of the switchboard is located at outside feed pipe, is set in the rack It is useful for the fixed pin of driving switch plate rotation.
2. the auxiliary device of for transformer processing according to claim 1, it is characterised in that:The filling tube is equipped with Signal projector, the cylinder are equipped with signal receiver, and the activation system and solenoid valve of the signal receiver and cylinder are electrically connected It connects.
3. the auxiliary device of for transformer processing according to claim 2, it is characterised in that:The filling tube and transformation The radii ratio of device pin is 1.5-2.5.
4. the auxiliary device of for transformer processing according to claim 3, it is characterised in that:The switchboard and charging The junction of pipeline connects elasticity layer.
CN201710170943.2A 2017-03-21 2017-03-21 The auxiliary device of for transformer processing Active CN106952717B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710170943.2A CN106952717B (en) 2017-03-21 2017-03-21 The auxiliary device of for transformer processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710170943.2A CN106952717B (en) 2017-03-21 2017-03-21 The auxiliary device of for transformer processing

Publications (2)

Publication Number Publication Date
CN106952717A CN106952717A (en) 2017-07-14
CN106952717B true CN106952717B (en) 2018-08-21

Family

ID=59472704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710170943.2A Active CN106952717B (en) 2017-03-21 2017-03-21 The auxiliary device of for transformer processing

Country Status (1)

Country Link
CN (1) CN106952717B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111613428B (en) * 2020-06-04 2021-07-30 广安市领誉塑胶电子科技有限公司 Transformer pin correcting and reinforcing device

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08100252A (en) * 1994-09-30 1996-04-16 Kao Corp Film forming equipment
JP3389775B2 (en) * 1995-05-19 2003-03-24 株式会社デンソー Insert product molding method and insert product molding device
CN204276744U (en) * 2014-11-19 2015-04-22 杭州南华科技有限公司 Electronic transformer stitch arbor press
CN204685748U (en) * 2015-04-14 2015-10-07 特变电工沈阳变压器集团有限公司 A kind of transformer core curvature correction prosthetic device
CN105070499B (en) * 2015-08-12 2017-05-31 无锡晶磊电子有限公司 A kind of pin machine of automatic forming

Also Published As

Publication number Publication date
CN106952717A (en) 2017-07-14

Similar Documents

Publication Publication Date Title
CN104668503B (en) A kind of non-crystaline amorphous metal component casting equipment and technique
CN104668504B (en) Non-crystaline amorphous metal component casting equipment and technique
CN101439567B (en) Vacuum pressure pouring process for epoxy resins insulation pouring piece of high voltage electric appliance
CN106952717B (en) The auxiliary device of for transformer processing
US20100028477A1 (en) Denture forming machine for dental use
CZ20011265A3 (en) Rotary casting process and apparatus for making the same
CN106881448B (en) Sleeper beam sand core hot core box
CN110451229A (en) A kind of materials in the tube overturning clamping device
CN207071672U (en) A kind of vacuum pressing and casting casting excess flow control
EP1074367A2 (en) Apparatus and method for producing casting products molded in epoxy resin
CN205495793U (en) Sediment pneumatic door limit structure is arranged to coal pulverizer
CN208499841U (en) A kind of automatic dumping equipment of pitch
CN107914003B (en) Intelligent dust removal device for continuous casting assembly line and control method
CN208608041U (en) A kind of sintered Nd-Fe-B permanent magnetic material tabletting forming machine
CN204638131U (en) Rubber asphalt electronic proportioning device
CN207206473U (en) Manipulator storage cabinet
CN204834517U (en) Automatic quartz lid machine of riveting of fuse
US2330274A (en) Machine and method for marking
CN207911960U (en) chocolate production device
CN108488538B (en) A device for positioning and sealing CIPP hose materials
CN110759722A (en) Manufacturing process of intermediate frequency furnace lining
CN109979771A (en) A kind of security protection magnetic switch and packaging technology
CN207857842U (en) A kind of melting pouring device
CN111009364A (en) Automatic sand filling equipment for aluminum shell resistor
CN105215293B (en) Bend sand box mold weight mechanism with self-locking function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180705

Address after: 564307 Daping Town Industrial Park, Wuchuan, Guizhou, Zunyi

Applicant after: Guizhou Jinlin Electronic Technology Co., Ltd.

Address before: 563501 Shang Yao Industrial Park, upper Ba County, Zunyi, Guizhou province.

Applicant before: Daozhen Autonomous County Jinlin Technology Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201208

Address after: 124000 1-4-135 Industrial Development Zone, Xinglongtai District, Liaoning, Panjin

Patentee after: PANJIN GUANGLIDA ELECTRIC Co.,Ltd.

Address before: 564307 Guizhou city in Zunyi Province, Wuchuan yilao and Miao Autonomous County Town Industrial Park

Patentee before: GUIZHOU JINLIN ELECTRONIC TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right