CN106948375A - A kind of prefabricated pipe gallery steel plate concrete attachment structure - Google Patents

A kind of prefabricated pipe gallery steel plate concrete attachment structure Download PDF

Info

Publication number
CN106948375A
CN106948375A CN201710338716.6A CN201710338716A CN106948375A CN 106948375 A CN106948375 A CN 106948375A CN 201710338716 A CN201710338716 A CN 201710338716A CN 106948375 A CN106948375 A CN 106948375A
Authority
CN
China
Prior art keywords
section
steel plate
prefabricated
pipe gallery
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710338716.6A
Other languages
Chinese (zh)
Inventor
刘昌永
夏启龙
王玉银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Institute of Technology Shenzhen
Original Assignee
Harbin Institute of Technology Shenzhen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Institute of Technology Shenzhen filed Critical Harbin Institute of Technology Shenzhen
Priority to CN201710338716.6A priority Critical patent/CN106948375A/en
Publication of CN106948375A publication Critical patent/CN106948375A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

一种预制综合管廊钢板混凝土连接结构,本发明涉及结构工程技术领域。本发明要解决目前预制综合管廊结构节段连接处抗渗性能弱,抗不均匀沉降性能低,且刚性连接在连接处易发生脆断的技术问题。该连接结构由预制段、后浇段和钢板构成,后浇段设置在两个相邻预制段之间,预制段内部设置钢筋和预埋件,预埋件嵌入预制段,预埋件顶面露出预制段表面,钢筋纵向伸出预制段断面,钢筋和预埋件在预制段内部固定连接,两个相邻预制段纵向伸出的钢筋在后浇段内固定连接,后浇段的上表面和下表面均覆盖钢板。本发明施工速度快,可靠性高,连接处抗渗性能,抗不均匀沉降性能,整体性强;刚性连接不易发生脆断。可用于预制管廊结构。

A prefabricated comprehensive pipe gallery steel plate concrete connection structure, the invention relates to the technical field of structural engineering. The invention aims to solve the technical problems of weak anti-seepage performance and low non-uniform settlement resistance performance at the joints of the current prefabricated comprehensive pipe gallery structure, and the rigid connection is prone to brittle fracture at the joints. The connection structure is composed of a prefabricated section, a post-cast section and a steel plate. The post-cast section is set between two adjacent precast sections. The precast section is equipped with steel bars and embedded parts. The embedded parts are embedded in the precast section. The top surface of the embedded part The surface of the prefabricated section is exposed, the steel bars protrude longitudinally from the section of the precast section, the steel bars and embedded parts are fixedly connected inside the precast section, the steel bars protruding longitudinally from two adjacent precast sections are fixedly connected in the post-cast section, and the upper surface of the post-cast section and the lower surface are covered with steel plates. The invention has the advantages of fast construction speed, high reliability, anti-seepage performance at joints, anti-uniform subsidence performance, and strong integrity; the rigid connection is not easy to be brittle. It can be used in prefabricated pipe gallery structure.

Description

一种预制综合管廊钢板混凝土连接结构A prefabricated comprehensive pipe gallery steel plate concrete connection structure

技术领域technical field

本发明涉及结构工程技术领域。The invention relates to the technical field of structural engineering.

背景技术Background technique

如今,城市地下空间利用成了城市开发的关键问题,特别是对于发展迅速的大城市。由于城市的发展和各种公用事业的发展,城市公共管线日益增加。现在城市公共管线已逐渐放入地下,以减少因气候,人为或者自然灾害对其的破坏。城市综合管廊作为收容公共管线的一种有效形式,不仅充分利用了地下空间,而且也避免了随处开挖现象的产生。Today, the utilization of urban underground space has become a key issue in urban development, especially for fast-growing large cities. Due to the development of cities and the development of various public utilities, urban public pipelines are increasing day by day. Now urban public pipelines have been gradually put underground to reduce their damage due to climate, man-made or natural disasters. As an effective form of accommodating public pipelines, the urban comprehensive utility corridor not only makes full use of the underground space, but also avoids the phenomenon of excavation everywhere.

地下综合管廊有现浇和预制两种施工方式,预制综合管廊由于其施工速度快,施工作业噪声低、现场文明,管廊质量可靠性高,抗渗及耐久性好等优点在国内管廊结构中得到了广泛使用。There are two construction methods of cast-in-place and prefabricated underground comprehensive pipe gallery. The prefabricated comprehensive pipe gallery has the advantages of fast construction speed, low construction noise, civilized site, high quality and reliability of pipe gallery, and good impermeability and durability. It is widely used in corridor structure.

然而,预制综合管廊结构同时也存在结构整体性差,接口多,接口出现问题的概率大等缺点。预制管廊的接头可分为刚性接头和柔性接头两种,但是不论哪种接头,都很少有接头形式既能够满足接头处的抗渗要求,同时又能抵御较大的不均匀沉降,而不出现错位或者折断现象。如纵向预应力筋张拉连接方法,作为一种刚性连接,采用预应力将节段进行连接,但是其预应力是为了对防水胶圈施加压力达到密封要求,而未在廊体内部形成预压应力,没有抵抗沉降能力,当沉降较大时,可能出现箱体折断;又如双胶圈大企口接头,作为一种柔性接头,可以适应一定程度的位移和转角,但是当位移较大会产生错位现象,而且此类接头的工作面尺寸精度要求高,接口制作难度相对较大。However, the prefabricated integrated pipe gallery structure also has disadvantages such as poor structural integrity, many interfaces, and a high probability of interface problems. The joints of prefabricated pipe racks can be divided into rigid joints and flexible joints, but no matter what kind of joints, there are few joint forms that can not only meet the anti-seepage requirements at the joints, but also resist large uneven settlement. There is no misalignment or breakage. For example, the longitudinal prestressed tendon tension connection method, as a rigid connection, uses prestress to connect the segments, but the prestress is to apply pressure to the waterproof rubber ring to meet the sealing requirements, and does not form a preload inside the corridor. Stress, no ability to resist settlement, when the settlement is large, the box may break; another example is the double rubber ring large tongue and groove joint, as a flexible joint, it can adapt to a certain degree of displacement and rotation angle, but when the displacement is large, it will produce Dislocation phenomenon, and the dimensional accuracy of the working surface of this type of joint is required to be high, and the interface production is relatively difficult.

发明内容Contents of the invention

本发明要解决目前预制综合管廊结构节段连接处抗渗性能弱,抗不均匀沉降性能低,且刚性连接在连接处易发生脆断的技术问题,而提供种预制综合管廊钢板混凝土连接结构。The present invention aims to solve the technical problems of weak anti-seepage performance, low anti-uniform settlement performance, and brittle fracture of the rigid connection at the joint of the structural section of the prefabricated comprehensive pipe gallery at present, and provides a steel plate concrete connection for the prefabricated comprehensive pipe gallery structure.

一种预制综合管廊钢板混凝土连接结构由预制段、后浇段和钢板构成,其中后浇段设置在两个相邻预制段之间,预制段内部设置钢筋和预埋件,预埋件嵌入预制段,且预埋件顶面露出预制段表面,钢筋纵向伸出预制段断面,钢筋和预埋件在预制段内部固定连接,两个相邻预制段纵向伸出的钢筋在后浇段内固定连接,后浇段的上表面和下表面均覆盖钢板,钢板的两端分别与两个相邻预制段的预埋件固定连接。A steel plate concrete connection structure of a prefabricated comprehensive pipe gallery is composed of a prefabricated section, a post-cast section and a steel plate, wherein the post-cast section is arranged between two adjacent precast sections, steel bars and embedded parts are arranged inside the prefabricated section, and the embedded parts are embedded Prefabricated section, and the top surface of the embedded part is exposed on the surface of the precast section, the steel bar extends longitudinally out of the precast section section, the steel bar and the embedded part are fixedly connected inside the precast section, and the longitudinally protruding steel bars of two adjacent precast sections are in the post-casting section Fixed connection, the upper surface and the lower surface of the post-casting section are covered with steel plates, and the two ends of the steel plate are respectively fixedly connected with the embedded parts of two adjacent prefabricated sections.

预制段在预制时需预埋预埋件,预埋件采用异型钢;预制时,纵向钢筋需从断面伸出,伸出长度大于纵向钢筋相互连接时所要求的长度;预制段断面末端采用齿状结构,以增大后浇段与预制段混凝土的粘结,若没有采用齿状结构则需对预制段断面末端进行凿毛处理。The prefabricated section needs to pre-embed embedded parts, and the embedded parts are made of special-shaped steel; during prefabrication, the longitudinal steel bars need to protrude from the section, and the protruding length is greater than the length required when the longitudinal steel bars are connected to each other; the end of the prefabricated section section adopts tooth In order to increase the bond between the post-casting section and the concrete of the precast section, if the toothed structure is not used, it is necessary to chisel the end of the section of the precast section.

预制段完成后需按要求的位置进行就位,就位完成后可进行纵向伸出钢筋的连接。纵向伸出钢筋连接接头可采用焊接或者套筒连接,具体需满足《混凝土结构设计规范》(GB50010-2010)、《钢筋焊接及验收规程》(JGJ18-2012)和《钢筋机械连接技术规程》(JGJ107-2016)的相关要求。After the prefabricated section is completed, it needs to be placed in place according to the required position. After the completion of the position, the connection of the longitudinally extending steel bars can be carried out. The connection joints of longitudinally protruding steel bars can be connected by welding or sleeve connection, and the specific requirements must meet the "Code for Design of Concrete Structures" (GB50010-2010), "Regulations for Welding and Acceptance of Reinforcement Bars" (JGJ18-2012) and "Technical Regulations for Mechanical Connection of Reinforcement Bars" ( Relevant requirements of JGJ107-2016).

纵向钢筋连接完成后,可进行钢板与预埋件的连接,其中顶板外部钢板需混凝土浇筑后再进行连接。钢板与预埋件采用螺栓连接或焊接,钢板采用普通钢板或带肋钢板,钢板需进行特殊的防腐、除锈处理,以保证其满足设计使用年限的要求。螺栓、焊缝、钢板和加劲肋的各项参数需根据埋深,土体性能参数等因素计算确定。After the longitudinal reinforcement connection is completed, the steel plate can be connected with the embedded parts, and the external steel plate of the top plate needs to be concreted before being connected. The steel plate and the embedded parts are connected by bolts or welded. The steel plate is made of ordinary steel plate or ribbed steel plate. The steel plate needs special anti-corrosion and derusting treatment to ensure that it meets the requirements of the design service life. The parameters of bolts, welds, steel plates and stiffeners need to be calculated and determined according to factors such as buried depth and soil performance parameters.

待钢模板完成后即可浇筑混凝土,混凝土采用抗渗、微膨胀、早强混凝土,其强度等级不得低于预制段混凝土强度等级。当混凝土终凝后,即可连接顶部钢板和预埋件,形成管廊整体。After the steel formwork is completed, concrete can be poured. The concrete is impermeable, micro-expansion, early-strength concrete, and its strength grade must not be lower than that of the prefabricated section concrete. After the concrete is finally set, the top steel plate and embedded parts can be connected to form the whole pipe gallery.

本发明的有益效果是:The beneficial effects of the present invention are:

1、钢板混凝土连接结构由于连接段采用后浇混凝土,使得预制综合管廊的整体性更好,并且在连接处没有预留空隙,从上到下为钢板、混凝土、钢板,有三层防漏水层,使得结构抗渗性更好;1. The steel plate concrete connection structure uses post-cast concrete for the connection section, which makes the integrity of the prefabricated comprehensive pipe gallery better, and there is no gap reserved at the connection. From top to bottom, there are steel plates, concrete, and steel plates, and there are three leak-proof water layers. , making the structure better impermeable;

2、钢板混凝土连接结构中钢板起到了混凝土模板,防水层和受力钢筋的作用,使得此种连接方式不仅施工速度快,施工方法简单,而且此种连接方式在连接部位承载能力高,不会由于地基不均匀沉降而产生脆断或者错位现象,有更好的抵抗沉降的能力;2. In the steel plate concrete connection structure, the steel plate plays the role of concrete formwork, waterproof layer and stressed steel bar, which makes this connection method not only fast in construction speed and simple in construction method, but also has a high bearing capacity at the connection part and will not Due to uneven settlement of the foundation, brittle fracture or dislocation occurs, and it has better ability to resist settlement;

3、钢板混凝土连接结构中由于节段采用钢筋和钢板的连接,相较于一些柔性防水结构,对于工作面尺寸的加工精度要求有所降低,加工相对方便;3. In the steel plate concrete connection structure, since the sections are connected by steel bars and steel plates, compared with some flexible waterproof structures, the processing accuracy requirements for the size of the working face are reduced, and the processing is relatively convenient;

4、钢板混凝土连接结构中由于连接处是由钢和混凝土两种材料组成的,不存在使用防水胶圈作为防水措施时所带来的橡胶老化现象。而且根据工程实践,混凝土和钢板经过一定处理后,能够满足《城市综合管廊工程技术规范》(GB50838-2015)中设计使用年限100年的要求。4. In the steel plate concrete connection structure, since the connection is composed of steel and concrete, there is no rubber aging phenomenon caused by using waterproof rubber rings as waterproof measures. Moreover, according to engineering practice, after certain treatment, the concrete and steel plates can meet the requirements of the design service life of 100 years in the "Technical Specifications for Urban Comprehensive Pipe Gallery Engineering" (GB50838-2015).

本发明预制综合管廊钢板混凝土连接结构用于城市管廊建设,特别是管廊结构处于地下水位以下,或者地基不均匀沉降较大的环境中。The prefabricated comprehensive pipe gallery steel plate concrete connection structure of the present invention is used in the construction of urban pipe gallery, especially in the environment where the pipe gallery structure is below the groundwater level or the uneven settlement of the foundation is relatively large.

附图说明Description of drawings

图1为实施例一预制综合管廊钢板混凝土连接结构示意图,其中1为预制段、2为后浇段、3为钢筋、4为钢筋连接接头、5为钢板、6为预埋件;Fig. 1 is a schematic diagram of the steel plate concrete connection structure of the prefabricated comprehensive pipe gallery in embodiment 1, wherein 1 is a prefabricated section, 2 is a post-casting section, 3 is a steel bar, 4 is a steel bar connection joint, 5 is a steel plate, and 6 is an embedded part;

图2为实施例二预制综合管廊钢板混凝土连接结构示意图,其中7为螺栓;Fig. 2 is a schematic diagram of the steel plate concrete connection structure of the prefabricated comprehensive pipe gallery in embodiment 2, wherein 7 is a bolt;

图3为实施例三预制综合管廊钢板混凝土连接结构示意图,其中8为带肋钢板;Fig. 3 is a schematic diagram of the steel plate concrete connection structure of the prefabricated comprehensive pipe gallery in embodiment three, wherein 8 is a ribbed steel plate;

图4为实施例四预制综合管廊钢板混凝土连接结构示意图,其中9为齿状结构。Fig. 4 is a schematic diagram of the steel plate concrete connection structure of the prefabricated comprehensive utility gallery in embodiment 4, in which 9 is a toothed structure.

具体实施方式detailed description

本发明技术方案不局限于以下所列举的具体实施方式,还包括各具体实施方式之间的任意组合。The technical solution of the present invention is not limited to the specific embodiments listed below, but also includes any combination of the specific embodiments.

具体实施方式一:本实施方式一种预制综合管廊钢板混凝土连接结构由预制段1、后浇段2和钢板5构成,其中后浇段2设置在两个相邻预制段1之间,预制段1内部设置钢筋3和预埋件6,预埋件6嵌入预制段1,且预埋件6顶面露出预制段1表面,钢筋3纵向伸出预制段1断面,钢筋3和预埋件6在预制段1内部固定连接,两个相邻预制段1纵向伸出的钢筋3在后浇段2内固定连接,后浇段2的上表面和下表面均覆盖钢板5,钢板5的两端分别与两个相邻预制段1的预埋件6固定连接。Specific Embodiment 1: In this embodiment, a steel plate concrete connection structure of a prefabricated comprehensive pipe gallery is composed of a prefabricated section 1, a postcast section 2 and a steel plate 5, wherein the postcast section 2 is arranged between two adjacent precast sections 1, and the prefabricated Reinforcement bars 3 and embedded parts 6 are arranged inside section 1, embedded parts 6 are embedded in precast section 1, and the top surface of embedded parts 6 is exposed from the surface of precast section 1, and steel bars 3 protrude longitudinally from the section of precast section 1. Reinforcement bars 3 and embedded parts 6 is fixedly connected inside the prefabricated section 1, and the steel bars 3 protruding longitudinally from two adjacent prefabricated sections 1 are fixedly connected in the post-casting section 2, the upper surface and the lower surface of the post-casting section 2 are covered with steel plates 5, and the two The ends are fixedly connected with the embedded parts 6 of two adjacent prefabricated sections 1 respectively.

具体实施方式二:本实施方式与具体实施方式一不同的是:钢筋3在后浇段2内固定连接接头4的连接方式为焊接或者套筒连接。其它与具体实施方式一相同。Embodiment 2: This embodiment differs from Embodiment 1 in that: the steel bar 3 is fixedly connected to the joint 4 in the post-casting section 2 by welding or sleeve connection. Others are the same as in the first embodiment.

具体实施方式三:本实施方式与具体实施方式一或二不同的是:钢板5与预埋件6的固定连接方式为焊接或螺栓连接。其它与具体实施方式一或二相同。Embodiment 3: This embodiment differs from Embodiment 1 or Embodiment 2 in that: the steel plate 5 and the embedded part 6 are fixedly connected by welding or bolts. Others are the same as in the first or second embodiment.

具体实施方式四:本实施方式与具体实施方式一至三之一不同的是:所述预埋件6为异型钢。其它与具体实施方式一至三之一相同。Embodiment 4: This embodiment is different from Embodiment 1 to Embodiment 3 in that: the embedded part 6 is shaped steel. Others are the same as those in the first to third specific embodiments.

具体实施方式五:本实施方式与具体实施方式一至四之一不同的是:所述异型钢为π型钢、槽型钢或角钢。其它与具体实施方式一至四之一相同。Embodiment 5: This embodiment is different from one of Embodiments 1 to 4 in that: the special-shaped steel is π-shaped steel, channel-shaped steel or angle steel. Others are the same as one of the specific embodiments 1 to 4.

具体实施方式六:本实施方式与具体实施方式一至五之一不同的是:所述钢板5为普通钢板或带肋钢板。其它与具体实施方式一至五之一相同。Embodiment 6: This embodiment differs from Embodiment 1 to Embodiment 5 in that: the steel plate 5 is a common steel plate or a ribbed steel plate. Others are the same as one of the specific embodiments 1 to 5.

具体实施方式七:本实施方式与具体实施方式一至六之一不同的是:预制段1与后浇段2混凝土接触面做成齿状结构。其它与具体实施方式一至六之一相同。Embodiment 7: This embodiment differs from Embodiment 1 to Embodiment 6 in that: the concrete contact surface of the prefabricated section 1 and the post-cast section 2 is made into a tooth-like structure. Others are the same as one of the specific embodiments 1 to 6.

具体实施方式八:本实施方式与具体实施方式一至七之一不同的是:预制段1与后浇段2混凝土接触面进行凿毛处理。其它与具体实施方式一至七之一相同。Embodiment 8: This embodiment is different from Embodiment 1 to Embodiment 7 in that: the concrete contact surface of the prefabricated section 1 and the post-casting section 2 is roughened. Others are the same as one of the specific embodiments 1 to 7.

具体实施方式九:本实施方式与具体实施方式一至八之一不同的是:后浇段2采用后浇混凝土填充。其它与具体实施方式一至八之一相同。Embodiment 9: This embodiment is different from Embodiment 1 to Embodiment 8 in that the post-cast section 2 is filled with post-cast concrete. Others are the same as one of the specific embodiments 1 to 8.

采用以下实施例验证本发明的有益效果:Adopt the following examples to verify the beneficial effects of the present invention:

实施例一:Embodiment one:

本实施例一种预制综合管廊钢板混凝土连接结构由预制段1、后浇段2和钢板5构成,其中后浇段2设置在两个相邻预制段1之间,预制段1内部设置钢筋3和预埋件6,预埋件6嵌入预制段1,且预埋件6顶面露出预制段1表面,钢筋3纵向伸出预制段1断面,钢筋3和预埋件6在预制段1内部固定连接,两个相邻预制段1纵向伸出的钢筋3在后浇段2内固定连接,后浇段2的上表面和下表面均覆盖钢板5,钢板5的两端分别与两个相邻预制段1的预埋件6固定连接。In this embodiment, a prefabricated comprehensive pipe gallery steel plate concrete connection structure is composed of a prefabricated section 1, a post-cast section 2 and a steel plate 5, wherein the post-cast section 2 is arranged between two adjacent precast sections 1, and steel bars are arranged inside the precast section 1 3 and embedded part 6, the embedded part 6 is embedded in the precast section 1, and the top surface of the embedded part 6 exposes the surface of the precast section 1, the steel bar 3 extends longitudinally out of the section of the precast section 1, and the steel bar 3 and the embedded part 6 are in the precast section 1 Internal fixed connection, two adjacent prefabricated sections 1 longitudinally protruding steel bars 3 are fixedly connected in the post-casting section 2, the upper surface and lower surface of the post-casting section 2 are covered with steel plates 5, and the two ends of the steel plate 5 are respectively connected with two The embedded parts 6 of adjacent prefabricated sections 1 are fixedly connected.

其中钢筋3在后浇段2内固定连接方式为焊接;钢板5与预埋件6的固定连接方式为焊接;所述预埋件为π型钢;所述钢板5为普通钢板;预制段1与后浇段2混凝土接触面进行凿毛处理;后浇段2采用后浇混凝土填充。Wherein the steel bar 3 is fixedly connected in the post-cast section 2 by welding; the fixed connection of the steel plate 5 and the embedded part 6 is welded; the embedded part is π-shaped steel; the steel plate 5 is an ordinary steel plate; the prefabricated section 1 and the The concrete contact surface of the post-casting section 2 shall be chiseled; the post-casting section 2 shall be filled with post-casting concrete.

本实施例连接结构示意图如图1所示。The schematic diagram of the connection structure of this embodiment is shown in FIG. 1 .

实施例二:Embodiment two:

本实施例一种预制综合管廊钢板混凝土连接结构由预制段1、后浇段2和钢板5构成,其中后浇段2设置在两个相邻预制段1之间,预制段1内部设置钢筋3和预埋件6,预埋件6嵌入预制段1,且预埋件6顶面露出预制段1表面,钢筋3纵向伸出预制段1断面,钢筋3和预埋件6在预制段1内部固定连接,两个相邻预制段1纵向伸出的钢筋3在后浇段2内固定连接,后浇段2的上表面和下表面均覆盖钢板5,钢板5的两端分别与两个相邻预制段1的预埋件6固定连接。In this embodiment, a prefabricated comprehensive pipe gallery steel plate concrete connection structure is composed of a prefabricated section 1, a post-cast section 2 and a steel plate 5, wherein the post-cast section 2 is arranged between two adjacent precast sections 1, and steel bars are arranged inside the precast section 1 3 and embedded part 6, the embedded part 6 is embedded in the precast section 1, and the top surface of the embedded part 6 exposes the surface of the precast section 1, the steel bar 3 extends longitudinally out of the section of the precast section 1, and the steel bar 3 and the embedded part 6 are in the precast section 1 Internal fixed connection, two adjacent prefabricated sections 1 longitudinally protruding steel bars 3 are fixedly connected in the post-casting section 2, the upper surface and lower surface of the post-casting section 2 are covered with steel plates 5, and the two ends of the steel plate 5 are respectively connected with two The embedded parts 6 of adjacent prefabricated sections 1 are fixedly connected.

其中钢筋3在后浇段2内固定连接方式为焊接;钢板5与预埋件6的固定连接方式为螺栓连接;所述预埋件为π型钢;所述钢板5为普通钢板;预制段1与后浇段2混凝土接触面进行凿毛处理;后浇段2采用后浇混凝土填充。Wherein the steel bar 3 is fixedly connected in the post-casting section 2 by welding; the fixed connection of the steel plate 5 and the embedded part 6 is bolted; the embedded part is π-shaped steel; the steel plate 5 is an ordinary steel plate; the prefabricated section 1 The concrete contact surface of the post-casting section 2 shall be roughened; the post-casting section 2 shall be filled with post-casting concrete.

本实施例连接结构示意图如图2所示。The schematic diagram of the connection structure of this embodiment is shown in FIG. 2 .

实施例三:Embodiment three:

本实施例一种预制综合管廊钢板混凝土连接结构由预制段1、后浇段2和钢板5构成,其中后浇段2设置在两个相邻预制段1之间,预制段1内部设置钢筋3和预埋件6,预埋件6嵌入预制段1,且预埋件6顶面露出预制段1表面,钢筋3纵向伸出预制段1断面,钢筋3和预埋件6在预制段1内部固定连接,两个相邻预制段1纵向伸出的钢筋3在后浇段2内固定连接,后浇段2的上表面和下表面均覆盖钢板5,钢板5的两端分别与两个相邻预制段1的预埋件6固定连接。In this embodiment, a prefabricated comprehensive pipe gallery steel plate concrete connection structure is composed of a prefabricated section 1, a post-cast section 2 and a steel plate 5, wherein the post-cast section 2 is arranged between two adjacent precast sections 1, and steel bars are arranged inside the precast section 1 3 and embedded part 6, the embedded part 6 is embedded in the precast section 1, and the top surface of the embedded part 6 exposes the surface of the precast section 1, the steel bar 3 extends longitudinally out of the section of the precast section 1, and the steel bar 3 and the embedded part 6 are in the precast section 1 Internal fixed connection, two adjacent prefabricated sections 1 longitudinally protruding steel bars 3 are fixedly connected in the post-casting section 2, the upper surface and lower surface of the post-casting section 2 are covered with steel plates 5, and the two ends of the steel plate 5 are respectively connected with two The embedded parts 6 of adjacent prefabricated sections 1 are fixedly connected.

其中钢筋3在后浇段2内固定连接方式为焊接;钢板5与预埋件6的固定连接方式为焊接;所述预埋件为π型钢;所述钢板5为带肋钢板;预制段1与后浇段2混凝土接触面进行凿毛处理;后浇段2采用后浇混凝土填充。Wherein the steel bar 3 is fixedly connected in the post-cast section 2 by welding; the fixed connection of the steel plate 5 and the embedded part 6 is welded; the embedded part is π-shaped steel; the steel plate 5 is a ribbed steel plate; the prefabricated section 1 The concrete contact surface of the post-casting section 2 shall be roughened; the post-casting section 2 shall be filled with post-casting concrete.

本实施例连接结构示意图如图3所示。The schematic diagram of the connection structure of this embodiment is shown in FIG. 3 .

实施例四:Embodiment four:

本实施例一种预制综合管廊钢板混凝土连接结构由预制段1、后浇段2和钢板5构成,其中后浇段2设置在两个相邻预制段1之间,预制段1内部设置钢筋3和预埋件6,预埋件6嵌入预制段1,且预埋件6顶面露出预制段1表面,钢筋3纵向伸出预制段1断面,钢筋3和预埋件6在预制段1内部固定连接,两个相邻预制段1纵向伸出的钢筋3在后浇段2内固定连接,后浇段2的上表面和下表面均覆盖钢板5,钢板5的两端分别与两个相邻预制段1的预埋件6固定连接。In this embodiment, a prefabricated comprehensive pipe gallery steel plate concrete connection structure is composed of a prefabricated section 1, a post-cast section 2 and a steel plate 5, wherein the post-cast section 2 is arranged between two adjacent precast sections 1, and steel bars are arranged inside the precast section 1 3 and embedded part 6, the embedded part 6 is embedded in the precast section 1, and the top surface of the embedded part 6 exposes the surface of the precast section 1, the steel bar 3 extends longitudinally out of the section of the precast section 1, and the steel bar 3 and the embedded part 6 are in the precast section 1 Internal fixed connection, two adjacent prefabricated sections 1 longitudinally protruding steel bars 3 are fixedly connected in the post-casting section 2, the upper surface and lower surface of the post-casting section 2 are covered with steel plates 5, and the two ends of the steel plate 5 are respectively connected with two The embedded parts 6 of adjacent prefabricated sections 1 are fixedly connected.

其中钢筋3在后浇段2内固定连接方式为焊接;钢板5与预埋件6的固定连接方式为焊接;所述预埋件为π型钢;所述钢板5为带肋钢板;预制段1与后浇段2混凝土接触面做成齿状结构;后浇段2采用后浇混凝土填充。Wherein the steel bar 3 is fixedly connected in the post-cast section 2 by welding; the fixed connection of the steel plate 5 and the embedded part 6 is welded; the embedded part is π-shaped steel; the steel plate 5 is a ribbed steel plate; the prefabricated section 1 The contact surface with the concrete of the post-casting section 2 is made into a tooth-like structure; the post-casting section 2 is filled with post-casting concrete.

本实施例连接结构示意图如图4所示。The schematic diagram of the connection structure of this embodiment is shown in FIG. 4 .

本实施例连接结构一方面保留预制结构施工速度快,质量可靠性高等优点,另一方面在连接处有良好的抗渗性,抗地基不均匀沉降性能,此外钢板在连接段起着模板、防水层和受力筋的三重作用,使得连接处的承载能力高,不会因沉降差产生脆断。该连接结构可广泛适用于预制综合管廊节段连接中,特别适用于管廊位于地下水位以下或者地基情况较差的环境中。On the one hand, the connection structure of this embodiment retains the advantages of fast construction speed and high quality reliability of the prefabricated structure. On the other hand, it has good impermeability at the connection and anti-uniform settlement of the foundation. The triple effect of the layer and the stress rib makes the connection have a high bearing capacity and will not cause brittle fracture due to poor settlement. The connection structure can be widely used in the segmental connection of the prefabricated comprehensive pipe gallery, and is especially suitable for the environment where the pipe gallery is located below the groundwater level or the foundation condition is poor.

与其它预制管廊连接结构相比,由于连接段是采用后浇混凝土进行连接,其整体性能、抗渗性能都很好,表面上与现浇混凝土没有差异,在保留了预制方法的优点的同时继承了现浇方法的优点;此外由于钢筋连接和钢板的存在,此种方法在连接处受力性能更好,承载力更高,对地基不均匀沉降的抵抗能力更强。Compared with other prefabricated pipe gallery connection structures, since the connection section is connected by post-cast concrete, its overall performance and impermeability are very good, and there is no difference from the surface of the cast-in-place concrete, while retaining the advantages of the prefabricated method Inheriting the advantages of the cast-in-place method; in addition, due to the existence of steel bars and steel plates, this method has better mechanical performance at the connection, higher bearing capacity, and stronger resistance to uneven settlement of the foundation.

Claims (9)

1. a kind of prefabricated pipe gallery steel plate concrete attachment structure, it is characterised in that the structure by prefabricated section (1), after pour section (2) constituted with steel plate (5), wherein after pour section (2) and be arranged between two contiguous prefabricated section (1), steel is set inside prefabricated section (1) Muscle (3) and built-in fitting (6), built-in fitting (6) are embedded in prefabricated section (1), and built-in fitting (6) top surface exposes prefabricated section of (1) surface, reinforcing bar (3) longitudinally projecting prefabricated section of (1) section, reinforcing bar (3) and built-in fitting (6) are fixedly connected inside prefabricated section (1), and two adjacent pre- The longitudinally projecting reinforcing bar (3) of section (1) processed poured after and is fixedly connected in section (2), after pour the upper and lower surface of section (2) and cover Steel plate (5), the built-in fitting (6) of the two ends of steel plate (5) respectively with two contiguous prefabricated section (1) is fixedly connected.
2. a kind of prefabricated pipe gallery steel plate concrete attachment structure according to claim 1, it is characterised in that reinforcing bar (3) It is welding or sleeve connection to be poured after and the connected mode of joint (4) is fixedly connected in section (2).
3. a kind of prefabricated pipe gallery steel plate concrete attachment structure according to claim 1, it is characterised in that steel plate (5) The mode that is fixedly connected with built-in fitting (6) is welding or bolt connection.
4. a kind of prefabricated pipe gallery steel plate concrete attachment structure according to claim 1, it is characterised in that described pre- Embedded part (6) is deformed steel.
5. a kind of prefabricated pipe gallery steel plate concrete attachment structure according to claim 4, it is characterised in that described different Shaped steel is π shaped steel, U-steel or angle steel.
6. a kind of prefabricated pipe gallery steel plate concrete attachment structure according to claim 1, it is characterised in that the steel Plate (5) is general steel plate or ribbed steel.
7. a kind of prefabricated pipe gallery steel plate concrete attachment structure according to claim 1, it is characterised in that prefabricated section (1) pour section (2) concrete surface with after and make dentalation.
8. a kind of prefabricated pipe gallery steel plate concrete attachment structure according to claim 1, it is characterised in that prefabricated section (1) section (2) concrete surface is poured with after and carries out dabbing processing.
9. a kind of prefabricated pipe gallery steel plate concrete attachment structure according to claim 1, it is characterised in that after pour section (2) filled using rear pouring concrete.
CN201710338716.6A 2017-05-15 2017-05-15 A kind of prefabricated pipe gallery steel plate concrete attachment structure Pending CN106948375A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710338716.6A CN106948375A (en) 2017-05-15 2017-05-15 A kind of prefabricated pipe gallery steel plate concrete attachment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710338716.6A CN106948375A (en) 2017-05-15 2017-05-15 A kind of prefabricated pipe gallery steel plate concrete attachment structure

Publications (1)

Publication Number Publication Date
CN106948375A true CN106948375A (en) 2017-07-14

Family

ID=59479468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710338716.6A Pending CN106948375A (en) 2017-05-15 2017-05-15 A kind of prefabricated pipe gallery steel plate concrete attachment structure

Country Status (1)

Country Link
CN (1) CN106948375A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108774960A (en) * 2018-08-30 2018-11-09 中铁六局集团广州工程有限公司 A kind of armored concrete tube coupling and water supply and sewage culvert pipe
CN110284521A (en) * 2019-07-31 2019-09-27 招商局重庆交通科研设计院有限公司 It is a kind of using the tunnel structure and installation method that pour connector after ultra-high performance concrete
CN110847053A (en) * 2019-11-29 2020-02-28 中铁二院工程集团有限责任公司 Construction method of vacuum magnetic suspension prefabricated assembly type pipeline beam
CN111119354A (en) * 2020-01-17 2020-05-08 中铁第六勘察设计院集团有限公司 Novel universal construction joint waterproof manufacturing method
CN113216259A (en) * 2021-06-08 2021-08-06 吉林建筑大学 Method for applying prestress to concrete pipe gallery
CN113417458A (en) * 2021-06-29 2021-09-21 武汉一冶建筑安装工程有限责任公司 Post-cast strip mold sealing method
CN114809592A (en) * 2022-05-19 2022-07-29 中建五局第三建设(深圳)有限公司 Post-cast strip wall formwork structure and construction method for advanced water stop of outer wall post-cast strip

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6092962A (en) * 1998-08-06 2000-07-25 To-Am Industrial Co., Ltd. Prefabricated pre-cast culvert provided with couplings
KR101358830B1 (en) * 2013-07-02 2014-02-11 주식회사 지구코퍼레이션 Connecting structure of precast box culverts
CN203654484U (en) * 2013-12-10 2014-06-18 中铁四局集团第三建设有限公司 Repeated type reserved hole rapid sealing device
CN104088254A (en) * 2014-07-11 2014-10-08 泛华建设集团有限公司 Leakage repairing device for pressure-bearing reinforced concrete structure and construction method thereof
CN204023430U (en) * 2014-05-07 2014-12-17 四川华西绿舍建材有限公司 Prefabricated box culvert and prefabricated box culvert system
CN204551547U (en) * 2015-02-10 2015-08-12 中国十七冶集团有限公司 Outer wall of basement vertical ater-casting plugging device
CN206693271U (en) * 2017-05-15 2017-12-01 哈尔滨工业大学 A kind of prefabricated pipe gallery steel plate concrete attachment structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6092962A (en) * 1998-08-06 2000-07-25 To-Am Industrial Co., Ltd. Prefabricated pre-cast culvert provided with couplings
KR101358830B1 (en) * 2013-07-02 2014-02-11 주식회사 지구코퍼레이션 Connecting structure of precast box culverts
CN203654484U (en) * 2013-12-10 2014-06-18 中铁四局集团第三建设有限公司 Repeated type reserved hole rapid sealing device
CN204023430U (en) * 2014-05-07 2014-12-17 四川华西绿舍建材有限公司 Prefabricated box culvert and prefabricated box culvert system
CN104088254A (en) * 2014-07-11 2014-10-08 泛华建设集团有限公司 Leakage repairing device for pressure-bearing reinforced concrete structure and construction method thereof
CN204551547U (en) * 2015-02-10 2015-08-12 中国十七冶集团有限公司 Outer wall of basement vertical ater-casting plugging device
CN206693271U (en) * 2017-05-15 2017-12-01 哈尔滨工业大学 A kind of prefabricated pipe gallery steel plate concrete attachment structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
魏承景: "《预应力混凝土施工》", 冶金工业出版社 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108774960A (en) * 2018-08-30 2018-11-09 中铁六局集团广州工程有限公司 A kind of armored concrete tube coupling and water supply and sewage culvert pipe
CN110284521A (en) * 2019-07-31 2019-09-27 招商局重庆交通科研设计院有限公司 It is a kind of using the tunnel structure and installation method that pour connector after ultra-high performance concrete
CN110847053A (en) * 2019-11-29 2020-02-28 中铁二院工程集团有限责任公司 Construction method of vacuum magnetic suspension prefabricated assembly type pipeline beam
CN111119354A (en) * 2020-01-17 2020-05-08 中铁第六勘察设计院集团有限公司 Novel universal construction joint waterproof manufacturing method
CN113216259A (en) * 2021-06-08 2021-08-06 吉林建筑大学 Method for applying prestress to concrete pipe gallery
CN113417458A (en) * 2021-06-29 2021-09-21 武汉一冶建筑安装工程有限责任公司 Post-cast strip mold sealing method
CN114809592A (en) * 2022-05-19 2022-07-29 中建五局第三建设(深圳)有限公司 Post-cast strip wall formwork structure and construction method for advanced water stop of outer wall post-cast strip
CN114809592B (en) * 2022-05-19 2024-03-29 中建五局第三建设(深圳)有限公司 Construction method for advanced water stop of post-pouring strip of outer wall

Similar Documents

Publication Publication Date Title
CN106948375A (en) A kind of prefabricated pipe gallery steel plate concrete attachment structure
CN104005419B (en) The box culvert structure of sinking method construction and construction method
CN206693271U (en) A kind of prefabricated pipe gallery steel plate concrete attachment structure
CN101012750B (en) Combined connection method between lining segment and inner lining in shield tunneling
CN110485532A (en) A kind of urban discharging pipeline structure and construction method based on waste tire
CN108468347A (en) Corrugated steel outer lining concrete structure for underground pipe gallery
CN210086032U (en) An ultra-high performance concrete combined permanent formwork
CN107816117A (en) A kind of large-scale pressure current box culvert is not cut off the water outer restorative procedure
CN108547316B (en) Double-layer corrugated steel structure for underground integrated pipe gallery
CN207700221U (en) A kind of prefabricated pipe gallery steel plate cast-in-place concrete sealing connection structure
CN114032720B (en) Arc-shaped device for eliminating railway roadbed bulging deformation and installation method thereof
CN216477359U (en) Laminated prefabricated double-layer segment structure
CN109137764B (en) Prefabricated assembly device for rapidly increasing bearing capacity of culvert and method for strengthening culvert
CN208105318U (en) The double-deck corrugated steel construction for underground pipe gallery
CN103103981B (en) A Construction Method of Prestressed Wedge Pipe Pile Joint
CN211976106U (en) Pipe jacking interface structure to improve longitudinal stiffness
CN104612142A (en) Integral abutment bridge structure based on composite flexible piles and construction method thereof
CN211689844U (en) Corrugated steel reinforcing arch utilizing high-strength grouting material
CN210856912U (en) New prefabricated seawater sea sand bridge pier
CN210086033U (en) Quick-positioning high-waterproof ultrahigh-performance concrete combined permanent formwork
CN209854671U (en) Pre-buried sleeve device of prefabricated reinforced concrete component installation waterstop
CN109853366B (en) Quick positioning high waterproof ultra-high performance concrete combined type permanent formwork
CN111305093A (en) Self-unloading steel corrugated plate arch culvert
CN208105317U (en) Corrugated steel outer lining concrete structure for underground pipe gallery
CN205714225U (en) A kind of railway culvert, tunnel defect wavy metal culvert pipe liner bracing means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170714