CN106930654A - A kind of installation method of sliding door - Google Patents
A kind of installation method of sliding door Download PDFInfo
- Publication number
- CN106930654A CN106930654A CN201710203008.1A CN201710203008A CN106930654A CN 106930654 A CN106930654 A CN 106930654A CN 201710203008 A CN201710203008 A CN 201710203008A CN 106930654 A CN106930654 A CN 106930654A
- Authority
- CN
- China
- Prior art keywords
- sliding door
- hanging wheel
- section bar
- door
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title abstract description 19
- 238000000034 method Methods 0.000 title abstract description 11
- 239000000463 material Substances 0.000 abstract description 27
- 239000011521 glass Substances 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 230000000712 assembly Effects 0.000 abstract description 2
- 238000000429 assembly Methods 0.000 abstract description 2
- 230000004048 modification Effects 0.000 description 8
- 238000012986 modification Methods 0.000 description 8
- 230000007246 mechanism Effects 0.000 description 7
- 238000003780 insertion Methods 0.000 description 5
- 230000037431 insertion Effects 0.000 description 5
- UIIMBOGNXHQVGW-UHFFFAOYSA-M Sodium bicarbonate Chemical compound [Na+].OC([O-])=O UIIMBOGNXHQVGW-UHFFFAOYSA-M 0.000 description 2
- 238000005034 decoration Methods 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002360 explosive Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- -1 side section bar Substances 0.000 description 1
- 229910000030 sodium bicarbonate Inorganic materials 0.000 description 1
- 235000017557 sodium bicarbonate Nutrition 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B3/00—Window sashes, door leaves, or like elements for closing wall or like openings; Layout of fixed or moving closures, e.g. windows in wall or like openings; Features of rigidly-mounted outer frames relating to the mounting of wing frames
- E06B3/32—Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing
- E06B3/34—Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing with only one kind of movement
- E06B3/42—Sliding wings; Details of frames with respect to guiding
- E06B3/46—Horizontally-sliding wings
- E06B3/4636—Horizontally-sliding wings for doors
-
- E—FIXED CONSTRUCTIONS
- E05—LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
- E05D—HINGES OR SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS
- E05D15/00—Suspension arrangements for wings
- E05D15/06—Suspension arrangements for wings for wings sliding horizontally more or less in their own plane
- E05D15/0621—Details, e.g. suspension or supporting guides
- E05D15/0626—Details, e.g. suspension or supporting guides for wings suspended at the top
- E05D15/0647—Details, e.g. suspension or supporting guides for wings suspended at the top on sliding blocks
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B1/00—Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
- E06B1/02—Base frames, i.e. template frames for openings in walls or the like, provided with means for securing a further rigidly-mounted frame; Special adaptations of frames to be fixed therein
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Support Devices For Sliding Doors (AREA)
Abstract
The invention discloses a kind of installation method of sliding door, including the steps:Secondary frame is installed on crossbeam before furred ceiling is fitted up;After finishing is finished, the corresponding guide rails assembling of sliding door will be fanned to secondary frame more;Hanging wheel is installed in guide rail;The upper ledge frame body sectional material of sliding door door leaf, side section bar, base section bar and glass assemblies are good, and logical hanging wheel load-bearing groove is fixed on the upper ledge frame body sectional material of upper sliding door door leaf;Sliding door door leaf and hanging wheel are mutually fixed:To load at the opening of hanging wheel load-bearing groove of the hanging wheel mounting blocks from sliding door door leaf upper ledge frame body sectional material, after hanging wheel mounting blocks load hanging wheel load-bearing groove, be inserted in hanging wheel load-bearing groove by expansion fixed block, by hanging wheel mounting blocks clamping;The door lowest limit position link gear of each fan sliding door is installed:After each fan sliding door door leaf is fixed with hanging wheel, the base section bar of every two fan sliding doors is connected by connecting connector.The present invention reduces difficulty of construction with can having, while improving the safety and stability of sliding door, improves the aesthetics of sliding door.
Description
Technical field
The present invention relates to sliding door field, more particularly to a kind of installation method of sliding door.
Background technology
Sliding door is flexible with opening as novel door structure, is the advantages of being occupied little space after unlatching, the characteristics of overhead rail door
There is no lower rail, the space to being not suitable for installing lower rail, and some high-grade houses and place, all use overhead rail door.
The installation method of existing hanger rail sliding door mainly includes several steps:(1)Guide rail is direct by modes such as screws
It is fixed on crossbeam or reserved steel framework,(2)Load hanging wheel in guide rail, and hanging wheel is directly fixed to door leaf by screw
On upper frame body,(3)Furred ceiling is being carried out after sliding door is installed, guide rail is being hidden into plasterboard.Such mode exists following
Defect:1st, when finishing, scene is dirty and messy comparing, and sliding door is first installed, and ratio is made finishing meeting price sliding door is carried out
Dirtier, some spots are difficult to clean out, and cause sliding door overall unsightly, and influence is used, while being likely to cause the damage of sliding door;
2nd, the upper surface for extending to connector outside hanger rail and sliding door door leaf by hanging wheel is fixed by screw, such mode
So that the gap between door leaf and hanger rail is larger, influence attractive in appearance, especially for high-end sliding door, its influence is very much serious;
3rd, because bottom does not have guide rail, only the guide rail and hanging wheel in top face carry out spacing linkage, easily cause rolling between each fan door
Dynamic, stability is poor, and influence influence is used, so the bottom between each sliding door needs linkage position-limit mechanism, existing linkage limit
Position mechanism is contacted using directive wheel to majority with ground, and such mode has a great impact to the attractive in appearance of entirety.
The content of the invention
The invention aims to overcome above mentioned problem, there is provided a kind of installation method of sliding door.
To reach above-mentioned purpose, the method that the present invention is used is:A kind of installation method of sliding door, including the steps:
(1)Fu Kuang mechanisms are installed:Secondary frame is installed on crossbeam or steelframe before furred ceiling is fitted up;
(2)Guide rail is installed:After finishing is finished, the corresponding guide rails assembling of sliding door will be fanned to secondary frame more;
(3)Hanging wheel is installed:Hanging wheel is installed in guide rail from reserved access hole, hanging wheel is connected with hanging wheel and installs by connecting rod
Block;
(4)Assembling sliding door door leaf:The upper ledge frame body sectional material of sliding door door leaf, side section bar, base section bar and glass assemblies are good, and
Hanging wheel load-bearing groove is fixed on the upper ledge frame body sectional material of upper sliding door door leaf by screw;
(5)Sliding door door leaf and hanging wheel are mutually fixed:By hanging wheel load-bearing groove of the hanging wheel mounting blocks from sliding door door leaf upper ledge frame body sectional material
Opening at load, hanging wheel mounting blocks load hanging wheel load-bearing groove after, will expansion fixed block insertion hanging wheel load-bearing groove in, by hanging wheel
Mounting blocks clamping, then turns the bolt on expansion fixed block and expands so as to expansion fixed block be fastened on expansion fixed block
In hanging wheel load-bearing groove;
(6)The door lowest limit position link gear of each fan sliding door is installed:After each fan sliding door door leaf is fixed with hanging wheel, every two fans are moved
The base section bar of door is connected by connecting connector.
Used as a modification of the present invention, the installation steps of described door lowest limit position link gear are as follows:
(a)In the chute that the base section bar that sliding door is fanned in the directive wheel insertion first of the first connector is set;
(b)The other end of the first connector is fixed to the base section bar left end of the second fan sliding door;
(c)In the chute that the base section bar that the directive wheel of the second connector second fans sliding door is set;
(d)The other end of the second connector is fixed to the base section bar left end of the 3rd fan sliding door;
(e)According to above-mentioned steps installation connecting element if having the 4th fan sliding door;
(f)After part to be connected is installed, stopping means is installed at the left and right end of the base section bar chute of each fan sliding door.
As a modification of the present invention, the draw-in groove that described Fu Kuang mechanisms are reserved by bolt or by secondary arch
Fixed with crossbeam or steelframe.
As a modification of the present invention, consolidated by angle grouping device between upper ledge frame body sectional material, side section bar, base section bar
It is fixed.
Used as a modification of the present invention, described hanging wheel load-bearing groove is fixed by screw in angle grouping device.
As a modification of the present invention, by being arranged on side section bar inner side between described side section bar and angle grouping device
Screw be connected with angle grouping device.
It is " Z " structure in described connector as a modification of the present invention.
Used as a modification of the present invention, described directive wheel is provided with 1 or 2.
Used as a modification of the present invention, described limited block is fixed by screws in the left and right end of described chute.
Beneficial effect:
1st, the present invention just can in advance install secondary mount structure, Ran Houzheng by setting secondary mount structure before decoration construction
Normal finishing furred ceiling, the finishing installation for carrying out guide rail sliding door follow-up again after finishing, can so improve the efficiency of finishing, reduce
Sliding door damages the probability of pollution;
2nd, by being provided with hanging wheel load-bearing groove on the upper surface of upper ledge frame body sectional material, hanging wheel mounting blocks are from the opening of hanging wheel load-bearing groove
Place is inserted into hanging wheel load-bearing groove, and is locked by expanding fixed block, by the installation between hanging wheel mounting blocks and upper ledge frame body sectional material
Mode is changed to be snapped in from side, instead of adopting the mode being screwed from front in the prior art, can reduce hanging wheel mounting blocks
The operating space needed during installation, that is, reduce hanging wheel to the height between upper ledge frame body sectional material, so as to reduce doorframe with
Gap between guide rail, improves aesthetics;Follow-up removing and installing is also allowed for by the way of side snaps in simultaneously;
3rd, angle grouping device and screw will be passed through between upper ledge frame body sectional material and side section bar and between bottom frame section and side section bar
It is connected, it is possible to increase the intensity of sliding door.
4th, it is again secured on angle grouping device by by hanging wheel load-bearing groove, it is possible to increase the weight capacity of whole sliding door, especially
For the sliding door on height narrow side higher, the quality of whole door body is larger, and because frame is due to narrow, and be aluminium
Alloy material, its limited load bearing capacities, therefore hanging wheel load-bearing groove is fixed on angle grouping device, so as to bearing capacity be turned to angle grouping device
Move, it is ensured that the load bearing stength of whole sliding door.
5th, pass through the spacing linkage of connector by by sliding door bottom, it is ensured that its stability is high, be difficult to shake between each fan door
Dynamic, the spacing linkage structure in bottom is arranged in chute by being directed to wheel, and good concealment improves overall aesthetics.
Brief description of the drawings
Fig. 1 is the structural representation that secondary frame of the invention is connected with guide rail;
Fig. 2 is the explosive view connected between guide rail hanging wheel of the invention and sliding door door leaf;
Fig. 3 is the structural representation between sliding door door leaf framework connection of the invention and hanging wheel load-bearing groove;
Fig. 4 is the partial schematic diagram of sliding door door leaf bottom of the invention;
Fig. 5 structural representation of connector of the present invention;
Fig. 6 is the overall schematic of sliding door of the invention.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the present invention is furture elucidated, and the present embodiment is with technical solution of the present invention
Premised under implemented, it should be understood that these embodiments are only illustrative of the invention and is not intended to limit the scope of the invention.
The invention discloses a kind of installation method of sliding door, the installation method is based on the sliding door shown in Fig. 1-6 of the present invention
Structure realize that the mounting structure of sliding door includes guide rail 7, hanging wheel 6 and sliding door door leaf structure 2, Fu Kuang mechanisms 1, described
Fu Kuang mechanisms 1 include secondary frame body, described secondary frame body includes top board 15 and left side plate 11.
The limiting plate 12 for installing guide rail 7 is provided with secondary frame body 1.The number of the limiting plate 12 in secondary frame body 1
Amount is determined according to the quantity of sliding door door leaf, if the sliding door of three fans is exactly that limiting plate 12 is provided with 3 groups, if 4 fans
Sliding door, that is, be provided with 4 groups.Guide rail 7 is stuck between limiting plate 12.The side plate 11 of described secondary frame body guide rail 7 most under
Baffle plate 16 is downwardly extending at the height at end, baffle plate 16 is used to block the attachment structure between hanging wheel 6 and sliding door door leaf 2, keeps away
Exempted from the later stage is blocked to the attachment structure between hanging wheel and sliding door door leaf again using ornamental strip.
The perpendicular finishing limiting plate 13 for extending laterally is also respectively provided with left side plate 11, limiting plate is fitted up
The height of 13 lowermost end differs 2-10mm with the height of the lowermost end of guide rail 7.
Hanging wheel 6 is arranged in guide rail 7, and hanging wheel 6 passes downwardly through connecting rod 62 and is connected with hanging wheel mounting blocks 61, in the present embodiment
In, hanging wheel mounting blocks 61 are a thin rectangular block, and hanging wheel mounting blocks 61 are used to be connected with the door leaf of sliding door.
Sliding door door leaf 2 include frame section bar and glass, frame section bar include upper ledge frame body sectional material 21, side section bar 22 and
Bottom frame section 24, passes through group between upper ledge frame body sectional material 21 and side section bar 22 and between bottom frame section 24 and side section bar 22
Angle device 5 is connected with screw.
It is provided with hanging wheel load-bearing groove 3 on the upper surface of upper ledge frame body sectional material 21, the described side opening of hanging wheel load-bearing groove 3 one, separately
It is one side closed.
The bottom face of the bottom frame section 24 of described sliding door door leaf is provided with chute 25, every two fan sliding doors door leaf 2 it
Between be connected by a connector 8, connector 8 is a Z-type structure, and its one end is connected with directive wheel 81 by rotating shaft, led
81 be provided with 1 or 2 to wheel, the quality of the sliding door according to scene, the actual conditions such as height are set, set 2 it is mobile
It is more steady.Its other end is provided with screw, and a cushion block 82 is also associated with the end, and described cushion block 82 and connector 8 is one
Individual overall structure is separate structure.
The installation of whole sliding door includes the steps:
(1)Fu Kuang mechanisms are installed:Secondary frame is installed on crossbeam or steelframe before furred ceiling is fitted up, can directly use bolt
The top board 15 of secondary frame body and crossbeam or wall are fixed, or draw-in groove 2 is provided with by the upper end of top board 15, by card
Groove 2 is fixed with the default mounting structure on crossbeam or wall.
(2)Guide rail is installed:After finishing is finished, the corresponding guide rail 7 of many fan sliding doors is installed on secondary frame, guide rail 7 is blocked
In the intrinsic finishing limiting plate 13 of secondary frame, and the upper surface of guide rail 7 is fixed by screw with the top board 15 of secondary frame body,
Realize the installation of guide rail 7.
(3)Hanging wheel is installed:Hanging wheel 6 is installed in guide rail 7 from reserved access hole, hanging wheel 7 is connected with by connecting rod 62
Hanging wheel mounting blocks 61.
(4)Assembling sliding door door leaf:By the upper ledge frame body sectional material 21 of sliding door door leaf, side section bar 22, base section bar and glass
Assemble, and hanging wheel load-bearing groove is fixed on the upper ledge frame body sectional material 21 of upper sliding door door leaf by screw;Side section bar 22 and group
It is connected with angle grouping device 5 by being arranged on the screw of the inner side of side section bar 22 between angle device 5, this makes it possible to hide side edge type
The screw of the fixation on material, improves aesthetics.
Hanging wheel load-bearing groove 3 is installed on the upper ledge frame body sectional material 21 of door leaf, hanging wheel load-bearing groove 3 is by screw and angle grouping device 5
It is mutually fixed, screw is provided with the connection sheet in the insertion upper ledge of angle grouping device 5 frame body sectional material 21, in the upper surface of upper ledge frame body sectional material 21
And the bottom surface of hanging wheel load-bearing groove 3 is provided with corresponding screw, after upper ledge frame body sectional material 21 and the position of side section bar 22 fix,
Each screw is corresponding, and angle grouping device 5, upper ledge frame body sectional material 21 and hanging wheel load-bearing groove 3 are fixed together by screw.
(5)Sliding door door leaf and hanging wheel are mutually fixed:Hanging wheel mounting blocks 61 are inserted into from the opening of hanging wheel load-bearing groove 3 and are hung
In wheel load-bearing groove 3, hanging wheel mounting blocks 61 can be thus fixed in hanging wheel load-bearing groove 3, expansion fixed block insertion hanging wheel is held
In Baking soda, by hanging wheel mounting blocks clamping, then turn the bolt on expansion fixed block and expand so that will be swollen expansion fixed block
Swollen fixed block is fastened in hanging wheel load-bearing groove;
(6)The door lowest limit position link gear of each fan sliding door is installed:After each fan sliding door door leaf is fixed with hanging wheel, every two fans are moved
The base section bar of door is connected by connecting connector.Definition be from left to right respectively defined as the first fan sliding door, second fan sliding door,
3rd fan sliding door, is connected between the first fan sliding door and the second fan sliding door by the first connector, and the second fan sliding door is moved with the 3rd fan
It is connected by the second connector between door, the first connector and the second connector are specific with the connection method of sliding door door leaf such as
Under:
(a)In the chute 25 that the base section bar that sliding door is fanned in the directive wheel insertion first of the first connector is set;
(b)The other end of the first connector is fixed to the base section bar left end of the second fan sliding door, by the first connector
Screw and cushion block 82 are connected on the base section bar of the second fan sliding door, and with base section bar in mutually fix;
(c)In the chute that the base section bar that the directive wheel of the second connector second fans sliding door is set;
(d)The other end of the second connector is fixed to the base section bar left end of the 3rd fan sliding door, by the second connector
Screw and cushion block 82 be connected to the 3rd fan sliding door base section bar on, and with base section bar in mutually fix;
(e)According to above-mentioned steps installation connecting element if having the 4th fan sliding door;
(f)After part to be connected is installed, stopping means is installed at the left and right end of the base section bar chute of each fan sliding door.
The present invention just can in advance install secondary mount structure, then by setting secondary mount structure before decoration construction
Normal finishing furred ceiling, the finishing installation for carrying out guide rail sliding door follow-up again after finishing can so improve the efficiency of finishing, subtract
Few sliding door damages the probability of pollution;
By being provided with hanging wheel load-bearing groove on the upper surface of upper ledge frame body sectional material, hanging wheel mounting blocks are from the opening of hanging wheel load-bearing groove
It is inserted into hanging wheel load-bearing groove, and is locked by expanding fixed block, by the installation side between hanging wheel mounting blocks and upper ledge frame body sectional material
Formula is changed to be snapped in from side, instead of adopting the mode being screwed from front in the prior art, can reduce hanging wheel mounting blocks peace
The operating space needed during dress, that is, hanging wheel to the height between upper ledge frame body sectional material is reduced, so as to reduce doorframe and lead
Gap between rail, improves aesthetics;Follow-up removing and installing is also allowed for by the way of side snaps in simultaneously;
Angle grouping device and screw phase will be passed through between upper ledge frame body sectional material and side section bar and between bottom frame section and side section bar
Connection, it is possible to increase the intensity of sliding door.
It is again secured on angle grouping device by by hanging wheel load-bearing groove, it is possible to increase the weight capacity of whole sliding door, it is especially right
For the sliding door on height narrow side higher, the quality of whole door body is larger, and because frame is due to narrow, and be that aluminium is closed
Golden material, its limited load bearing capacities, therefore hanging wheel load-bearing groove is fixed on angle grouping device, so as to bearing capacity be turned to angle grouping device
Move, it is ensured that the load bearing stength of whole sliding door.
Pass through the spacing linkage of connector by by sliding door bottom, it is ensured that its stability is high, be difficult to rock between each fan door,
The spacing linkage structure in bottom is arranged in chute by being directed to wheel, and good concealment improves overall aesthetics.
Claims (9)
1. a kind of installation method of sliding door, it is characterised in that including the steps:
(1)Fu Kuang mechanisms are installed:Secondary frame is installed on crossbeam or steelframe before furred ceiling is fitted up;
(2)Guide rail is installed:After finishing is finished, the corresponding guide rails assembling of sliding door will be fanned to secondary frame more;
(3)Hanging wheel is installed:Hanging wheel is installed in guide rail from reserved access hole, hanging wheel is connected with hanging wheel and installs by connecting rod
Block;
(4)Assembling sliding door door leaf:The upper ledge frame body sectional material of sliding door door leaf, side section bar, base section bar and glass assemblies are good, and
Hanging wheel load-bearing groove is fixed on the upper ledge frame body sectional material of upper sliding door door leaf by screw;
(5)Sliding door door leaf and hanging wheel are mutually fixed:By hanging wheel load-bearing groove of the hanging wheel mounting blocks from sliding door door leaf upper ledge frame body sectional material
Opening at load, hanging wheel mounting blocks load hanging wheel load-bearing groove after, will expansion fixed block insertion hanging wheel load-bearing groove in, by hanging wheel
Mounting blocks clamping, then turns the bolt on expansion fixed block and expands so as to expansion fixed block be fastened on expansion fixed block
In hanging wheel load-bearing groove;
(6)The door lowest limit position link gear of each fan sliding door is installed:After each fan sliding door door leaf is fixed with hanging wheel, every two fans are moved
The base section bar of door is connected by connecting connector.
2. a kind of installation method of sliding door according to claim 1, it is characterised in that described door lowest limit position link gear
Installation steps it is as follows:
(a)In the chute that the base section bar that sliding door is fanned in the directive wheel insertion first of the first connector is set;
(b)The other end of the first connector is fixed to the base section bar left end of the second fan sliding door;
(c)In the chute that the base section bar that the directive wheel of the second connector second fans sliding door is set;
(d)The other end of the second connector is fixed to the base section bar left end of the 3rd fan sliding door;
(e)According to above-mentioned steps installation connecting element if having the 4th fan sliding door;
(f)After part to be connected is installed, stopping means is installed at the left and right end of the base section bar chute of each fan sliding door.
3. the installation method of a kind of sliding door according to claim 1, it is characterised in that:Described Fu Kuang mechanisms pass through bolt
Or fixed with crossbeam or steelframe by the draw-in groove that secondary arch is reserved.
4. the installation method of a kind of sliding door according to claim 1, it is characterised in that:Upper ledge frame body sectional material, side section bar,
It is fixed by angle grouping device between the section bar of base.
5. the installation method of a kind of sliding door according to claim 4, it is characterised in that:Described hanging wheel load-bearing groove passes through spiral shell
Follow closely and fixed in angle grouping device.
6. the installation method of a kind of sliding door according to claim 4, it is characterised in that:Described side section bar and angle grouping device
Between be connected with angle grouping device by being arranged on the screw on the inside of the section bar of side.
7. the installation method of a kind of sliding door according to claim 2, it is characterised in that:It it is one in described connector
" Z " structure.
8. the installation method of a kind of sliding door according to claim 2, it is characterised in that:Described directive wheel is provided with 1
Or 2.
9. the installation method of a kind of sliding door according to claim 2, it is characterised in that:Described limited block is solid by screw
It is scheduled on the left and right end of described chute.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710203008.1A CN106930654B (en) | 2017-03-30 | 2017-03-30 | A kind of installation method of sliding door |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710203008.1A CN106930654B (en) | 2017-03-30 | 2017-03-30 | A kind of installation method of sliding door |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106930654A true CN106930654A (en) | 2017-07-07 |
CN106930654B CN106930654B (en) | 2019-05-14 |
Family
ID=59425420
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710203008.1A Expired - Fee Related CN106930654B (en) | 2017-03-30 | 2017-03-30 | A kind of installation method of sliding door |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106930654B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107642543A (en) * | 2017-09-19 | 2018-01-30 | 湖州冠居门窗有限公司 | One kind can steering lock fixed pattern Hardware fitting |
CN109989651A (en) * | 2018-12-27 | 2019-07-09 | 南京格锐盖特门业有限公司 | A kind of installation method of novel door moving door leaf and guide rail |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2321661A (en) * | 1997-01-30 | 1998-08-05 | Stanley Works | A roller assembly for a sliding door including an anti-jump member engageable with the track to prevent the roller from derailing |
CN201386472Y (en) * | 2009-04-10 | 2010-01-20 | 常熟中信建材有限公司 | Sliding door structure |
JP4750603B2 (en) * | 2006-03-31 | 2011-08-17 | 信行 坪井 | Suspended traveling device |
CN202520134U (en) * | 2012-03-16 | 2012-11-07 | 高代国 | Mobile door hanger device |
KR20130045678A (en) * | 2011-10-26 | 2013-05-06 | 신정철 | Slider mounting device for slide door |
CN203113982U (en) * | 2012-12-25 | 2013-08-07 | 上海大伊亚司贸易有限公司 | Sliding door pulley device |
CN205047021U (en) * | 2015-08-31 | 2016-02-24 | 张平国 | A sliding door hanging wheel with buffer function |
CN206016516U (en) * | 2016-08-31 | 2017-03-15 | 新兴国琳铝业有限公司 | A kind of wall cabinet door slide rail convenient for cleaning |
-
2017
- 2017-03-30 CN CN201710203008.1A patent/CN106930654B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2321661A (en) * | 1997-01-30 | 1998-08-05 | Stanley Works | A roller assembly for a sliding door including an anti-jump member engageable with the track to prevent the roller from derailing |
JP4750603B2 (en) * | 2006-03-31 | 2011-08-17 | 信行 坪井 | Suspended traveling device |
CN201386472Y (en) * | 2009-04-10 | 2010-01-20 | 常熟中信建材有限公司 | Sliding door structure |
KR20130045678A (en) * | 2011-10-26 | 2013-05-06 | 신정철 | Slider mounting device for slide door |
CN202520134U (en) * | 2012-03-16 | 2012-11-07 | 高代国 | Mobile door hanger device |
CN203113982U (en) * | 2012-12-25 | 2013-08-07 | 上海大伊亚司贸易有限公司 | Sliding door pulley device |
CN205047021U (en) * | 2015-08-31 | 2016-02-24 | 张平国 | A sliding door hanging wheel with buffer function |
CN206016516U (en) * | 2016-08-31 | 2017-03-15 | 新兴国琳铝业有限公司 | A kind of wall cabinet door slide rail convenient for cleaning |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107642543A (en) * | 2017-09-19 | 2018-01-30 | 湖州冠居门窗有限公司 | One kind can steering lock fixed pattern Hardware fitting |
CN109989651A (en) * | 2018-12-27 | 2019-07-09 | 南京格锐盖特门业有限公司 | A kind of installation method of novel door moving door leaf and guide rail |
Also Published As
Publication number | Publication date |
---|---|
CN106930654B (en) | 2019-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101759705B1 (en) | Curtain box | |
CN107060581A (en) | A kind of mounting structure of many fan sliding doors | |
CN106930654A (en) | A kind of installation method of sliding door | |
CN101918666A (en) | Sliding window system for multistoried building | |
CN108118805A (en) | Partition wall door opening component and its installation method | |
CN2760450Y (en) | Air conditioner mounting rack with adjustable width | |
CN206785223U (en) | A kind of mounting structure of more fan sliding doors | |
CN221030872U (en) | Assembled curtain window mounting structure | |
CN209568875U (en) | Sliding aluminum alloy doors and windows | |
CN203515203U (en) | Hanging-rail sliding door | |
CN102953628B (en) | A kind of convenient forms mounting means installed and structure thereof | |
CN202273339U (en) | Curtain wallboard of suspension type curtain wall | |
CN214595424U (en) | Novel L-shaped curtain box | |
CN203865799U (en) | Elevator landing door with sill opening facing downwards | |
CN207974296U (en) | Bead plate | |
CN206785211U (en) | Secondary mount structure at the top of a kind of sliding door | |
CN109972979A (en) | A kind of sliding window frame and the sliding window comprising the sliding window frame | |
CN206917530U (en) | Aluminum alloy frame folding door modelled after an antique | |
CN208473051U (en) | A kind of type unitized curtain wall edge list | |
CN220225825U (en) | Building curtain wall convenient to dismantle | |
CN207633592U (en) | Curtain wall decorative strip system | |
CN207538685U (en) | A kind of universal frame material of door and window | |
CN216364693U (en) | Be applicable to assembled fitment integration curtain box | |
JP3116231U (en) | Upper rail mounting structure of the hanging door | |
CN206448698U (en) | A kind of concealed door nested structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190514 |
|
CF01 | Termination of patent right due to non-payment of annual fee |