CN106930654A CN201710203008.1A CN201710203008A CN106930654A CN 106930654 A CN106930654 A CN 106930654A CN 201710203008 A CN201710203008 A CN 201710203008A CN 106930654 A CN106930654 A CN 106930654A
Authority
CN
China
Prior art keywords
sliding door
hanging wheel
section bar
door
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710203008.1A
Other languages
Chinese (zh)
Other versions
CN106930654B (en
Inventor
任晓萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Gerui Gaite Door Industry Co Ltd
Original Assignee
Nanjing Gerui Gaite Door Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Gerui Gaite Door Industry Co Ltd filed Critical Nanjing Gerui Gaite Door Industry Co Ltd
Priority to CN201710203008.1A priority Critical patent/CN106930654B/en
Publication of CN106930654A publication Critical patent/CN106930654A/en
Application granted granted Critical
Publication of CN106930654B publication Critical patent/CN106930654B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B3/00Window sashes, door leaves, or like elements for closing wall or like openings; Layout of fixed or moving closures, e.g. windows in wall or like openings; Features of rigidly-mounted outer frames relating to the mounting of wing frames
    • E06B3/32Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing
    • E06B3/34Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing with only one kind of movement
    • E06B3/42Sliding wings; Details of frames with respect to guiding
    • E06B3/46Horizontally-sliding wings
    • E06B3/4636Horizontally-sliding wings for doors
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05DHINGES OR SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS
    • E05D15/00Suspension arrangements for wings
    • E05D15/06Suspension arrangements for wings for wings sliding horizontally more or less in their own plane
    • E05D15/0621Details, e.g. suspension or supporting guides
    • E05D15/0626Details, e.g. suspension or supporting guides for wings suspended at the top
    • E05D15/0647Details, e.g. suspension or supporting guides for wings suspended at the top on sliding blocks
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/02Base frames, i.e. template frames for openings in walls or the like, provided with means for securing a further rigidly-mounted frame; Special adaptations of frames to be fixed therein

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Support Devices For Sliding Doors (AREA)

Abstract

The invention discloses a kind of installation method of sliding door, including the steps:Secondary frame is installed on crossbeam before furred ceiling is fitted up;After finishing is finished, the corresponding guide rails assembling of sliding door will be fanned to secondary frame more;Hanging wheel is installed in guide rail;The upper ledge frame body sectional material of sliding door door leaf, side section bar, base section bar and glass assemblies are good, and logical hanging wheel load-bearing groove is fixed on the upper ledge frame body sectional material of upper sliding door door leaf;Sliding door door leaf and hanging wheel are mutually fixed:To load at the opening of hanging wheel load-bearing groove of the hanging wheel mounting blocks from sliding door door leaf upper ledge frame body sectional material, after hanging wheel mounting blocks load hanging wheel load-bearing groove, be inserted in hanging wheel load-bearing groove by expansion fixed block, by hanging wheel mounting blocks clamping;The door lowest limit position link gear of each fan sliding door is installed:After each fan sliding door door leaf is fixed with hanging wheel, the base section bar of every two fan sliding doors is connected by connecting connector.The present invention reduces difficulty of construction with can having, while improving the safety and stability of sliding door, improves the aesthetics of sliding door.

Description

A kind of installation method of sliding door
Technical field
The present invention relates to sliding door field, more particularly to a kind of installation method of sliding door.
Background technology
Sliding door is flexible with opening as novel door structure, is the advantages of being occupied little space after unlatching, the characteristics of overhead rail door There is no lower rail, the space to being not suitable for installing lower rail, and some high-grade houses and place, all use overhead rail door.
The installation method of existing hanger rail sliding door mainly includes several steps:(1)Guide rail is direct by modes such as screws It is fixed on crossbeam or reserved steel framework,(2)Load hanging wheel in guide rail, and hanging wheel is directly fixed to door leaf by screw On upper frame body,(3)Furred ceiling is being carried out after sliding door is installed, guide rail is being hidden into plasterboard.Such mode exists following Defect:1st, when finishing, scene is dirty and messy comparing, and sliding door is first installed, and ratio is made finishing meeting price sliding door is carried out Dirtier, some spots are difficult to clean out, and cause sliding door overall unsightly, and influence is used, while being likely to cause the damage of sliding door;
2nd, the upper surface for extending to connector outside hanger rail and sliding door door leaf by hanging wheel is fixed by screw, such mode So that the gap between door leaf and hanger rail is larger, influence attractive in appearance, especially for high-end sliding door, its influence is very much serious;
3rd, because bottom does not have guide rail, only the guide rail and hanging wheel in top face carry out spacing linkage, easily cause rolling between each fan door Dynamic, stability is poor, and influence influence is used, so the bottom between each sliding door needs linkage position-limit mechanism, existing linkage limit Position mechanism is contacted using directive wheel to majority with ground, and such mode has a great impact to the attractive in appearance of entirety.
The content of the invention
The invention aims to overcome above mentioned problem, there is provided a kind of installation method of sliding door.
To reach above-mentioned purpose, the method that the present invention is used is:A kind of installation method of sliding door, including the steps:
(1)Fu Kuang mechanisms are installed:Secondary frame is installed on crossbeam or steelframe before furred ceiling is fitted up;
(2)Guide rail is installed:After finishing is finished, the corresponding guide rails assembling of sliding door will be fanned to secondary frame more;
(3)Hanging wheel is installed:Hanging wheel is installed in guide rail from reserved access hole, hanging wheel is connected with hanging wheel and installs by connecting rod Block;
(4)Assembling sliding door door leaf:The upper ledge frame body sectional material of sliding door door leaf, side section bar, base section bar and glass assemblies are good, and Hanging wheel load-bearing groove is fixed on the upper ledge frame body sectional material of upper sliding door door leaf by screw;
(5)Sliding door door leaf and hanging wheel are mutually fixed:By hanging wheel load-bearing groove of the hanging wheel mounting blocks from sliding door door leaf upper ledge frame body sectional material Opening at load, hanging wheel mounting blocks load hanging wheel load-bearing groove after, will expansion fixed block insertion hanging wheel load-bearing groove in, by hanging wheel Mounting blocks clamping, then turns the bolt on expansion fixed block and expands so as to expansion fixed block be fastened on expansion fixed block In hanging wheel load-bearing groove;
(6)The door lowest limit position link gear of each fan sliding door is installed:After each fan sliding door door leaf is fixed with hanging wheel, every two fans are moved The base section bar of door is connected by connecting connector.
Used as a modification of the present invention, the installation steps of described door lowest limit position link gear are as follows:
(a)In the chute that the base section bar that sliding door is fanned in the directive wheel insertion first of the first connector is set;
(b)The other end of the first connector is fixed to the base section bar left end of the second fan sliding door;
(c)In the chute that the base section bar that the directive wheel of the second connector second fans sliding door is set;
(d)The other end of the second connector is fixed to the base section bar left end of the 3rd fan sliding door;
(e)According to above-mentioned steps installation connecting element if having the 4th fan sliding door;
(f)After part to be connected is installed, stopping means is installed at the left and right end of the base section bar chute of each fan sliding door.
As a modification of the present invention, the draw-in groove that described Fu Kuang mechanisms are reserved by bolt or by secondary arch Fixed with crossbeam or steelframe.
As a modification of the present invention, consolidated by angle grouping device between upper ledge frame body sectional material, side section bar, base section bar It is fixed.
Used as a modification of the present invention, described hanging wheel load-bearing groove is fixed by screw in angle grouping device.
As a modification of the present invention, by being arranged on side section bar inner side between described side section bar and angle grouping device Screw be connected with angle grouping device.
It is " Z " structure in described connector as a modification of the present invention.
Used as a modification of the present invention, described directive wheel is provided with 1 or 2.
Used as a modification of the present invention, described limited block is fixed by screws in the left and right end of described chute.
Beneficial effect:
1st, the present invention just can in advance install secondary mount structure, Ran Houzheng by setting secondary mount structure before decoration construction Normal finishing furred ceiling, the finishing installation for carrying out guide rail sliding door follow-up again after finishing, can so improve the efficiency of finishing, reduce Sliding door damages the probability of pollution;
2nd, by being provided with hanging wheel load-bearing groove on the upper surface of upper ledge frame body sectional material, hanging wheel mounting blocks are from the opening of hanging wheel load-bearing groove Place is inserted into hanging wheel load-bearing groove, and is locked by expanding fixed block, by the installation between hanging wheel mounting blocks and upper ledge frame body sectional material Mode is changed to be snapped in from side, instead of adopting the mode being screwed from front in the prior art, can reduce hanging wheel mounting blocks The operating space needed during installation, that is, reduce hanging wheel to the height between upper ledge frame body sectional material, so as to reduce doorframe with Gap between guide rail, improves aesthetics;Follow-up removing and installing is also allowed for by the way of side snaps in simultaneously;
3rd, angle grouping device and screw will be passed through between upper ledge frame body sectional material and side section bar and between bottom frame section and side section bar It is connected, it is possible to increase the intensity of sliding door.
4th, it is again secured on angle grouping device by by hanging wheel load-bearing groove, it is possible to increase the weight capacity of whole sliding door, especially For the sliding door on height narrow side higher, the quality of whole door body is larger, and because frame is due to narrow, and be aluminium Alloy material, its limited load bearing capacities, therefore hanging wheel load-bearing groove is fixed on angle grouping device, so as to bearing capacity be turned to angle grouping device Move, it is ensured that the load bearing stength of whole sliding door.
5th, pass through the spacing linkage of connector by by sliding door bottom, it is ensured that its stability is high, be difficult to shake between each fan door Dynamic, the spacing linkage structure in bottom is arranged in chute by being directed to wheel, and good concealment improves overall aesthetics.
Brief description of the drawings
Fig. 1 is the structural representation that secondary frame of the invention is connected with guide rail;
Fig. 2 is the explosive view connected between guide rail hanging wheel of the invention and sliding door door leaf;
Fig. 3 is the structural representation between sliding door door leaf framework connection of the invention and hanging wheel load-bearing groove;
Fig. 4 is the partial schematic diagram of sliding door door leaf bottom of the invention;
Fig. 5 structural representation of connector of the present invention;
Fig. 6 is the overall schematic of sliding door of the invention.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the present invention is furture elucidated, and the present embodiment is with technical solution of the present invention Premised under implemented, it should be understood that these embodiments are only illustrative of the invention and is not intended to limit the scope of the invention.
The invention discloses a kind of installation method of sliding door, the installation method is based on the sliding door shown in Fig. 1-6 of the present invention Structure realize that the mounting structure of sliding door includes guide rail 7, hanging wheel 6 and sliding door door leaf structure 2, Fu Kuang mechanisms 1, described Fu Kuang mechanisms 1 include secondary frame body, described secondary frame body includes top board 15 and left side plate 11.
The limiting plate 12 for installing guide rail 7 is provided with secondary frame body 1.The number of the limiting plate 12 in secondary frame body 1 Amount is determined according to the quantity of sliding door door leaf, if the sliding door of three fans is exactly that limiting plate 12 is provided with 3 groups, if 4 fans Sliding door, that is, be provided with 4 groups.Guide rail 7 is stuck between limiting plate 12.The side plate 11 of described secondary frame body guide rail 7 most under Baffle plate 16 is downwardly extending at the height at end, baffle plate 16 is used to block the attachment structure between hanging wheel 6 and sliding door door leaf 2, keeps away Exempted from the later stage is blocked to the attachment structure between hanging wheel and sliding door door leaf again using ornamental strip.
The perpendicular finishing limiting plate 13 for extending laterally is also respectively provided with left side plate 11, limiting plate is fitted up The height of 13 lowermost end differs 2-10mm with the height of the lowermost end of guide rail 7.
Hanging wheel 6 is arranged in guide rail 7, and hanging wheel 6 passes downwardly through connecting rod 62 and is connected with hanging wheel mounting blocks 61, in the present embodiment In, hanging wheel mounting blocks 61 are a thin rectangular block, and hanging wheel mounting blocks 61 are used to be connected with the door leaf of sliding door.
Sliding door door leaf 2 include frame section bar and glass, frame section bar include upper ledge frame body sectional material 21, side section bar 22 and Bottom frame section 24, passes through group between upper ledge frame body sectional material 21 and side section bar 22 and between bottom frame section 24 and side section bar 22 Angle device 5 is connected with screw.
It is provided with hanging wheel load-bearing groove 3 on the upper surface of upper ledge frame body sectional material 21, the described side opening of hanging wheel load-bearing groove 3 one, separately It is one side closed.
The bottom face of the bottom frame section 24 of described sliding door door leaf is provided with chute 25, every two fan sliding doors door leaf 2 it Between be connected by a connector 8, connector 8 is a Z-type structure, and its one end is connected with directive wheel 81 by rotating shaft, led 81 be provided with 1 or 2 to wheel, the quality of the sliding door according to scene, the actual conditions such as height are set, set 2 it is mobile It is more steady.Its other end is provided with screw, and a cushion block 82 is also associated with the end, and described cushion block 82 and connector 8 is one Individual overall structure is separate structure.
The installation of whole sliding door includes the steps:
(1)Fu Kuang mechanisms are installed:Secondary frame is installed on crossbeam or steelframe before furred ceiling is fitted up, can directly use bolt The top board 15 of secondary frame body and crossbeam or wall are fixed, or draw-in groove 2 is provided with by the upper end of top board 15, by card Groove 2 is fixed with the default mounting structure on crossbeam or wall.
(2)Guide rail is installed:After finishing is finished, the corresponding guide rail 7 of many fan sliding doors is installed on secondary frame, guide rail 7 is blocked In the intrinsic finishing limiting plate 13 of secondary frame, and the upper surface of guide rail 7 is fixed by screw with the top board 15 of secondary frame body, Realize the installation of guide rail 7.
(3)Hanging wheel is installed:Hanging wheel 6 is installed in guide rail 7 from reserved access hole, hanging wheel 7 is connected with by connecting rod 62 Hanging wheel mounting blocks 61.
(4)Assembling sliding door door leaf:By the upper ledge frame body sectional material 21 of sliding door door leaf, side section bar 22, base section bar and glass Assemble, and hanging wheel load-bearing groove is fixed on the upper ledge frame body sectional material 21 of upper sliding door door leaf by screw;Side section bar 22 and group It is connected with angle grouping device 5 by being arranged on the screw of the inner side of side section bar 22 between angle device 5, this makes it possible to hide side edge type The screw of the fixation on material, improves aesthetics.
Hanging wheel load-bearing groove 3 is installed on the upper ledge frame body sectional material 21 of door leaf, hanging wheel load-bearing groove 3 is by screw and angle grouping device 5 It is mutually fixed, screw is provided with the connection sheet in the insertion upper ledge of angle grouping device 5 frame body sectional material 21, in the upper surface of upper ledge frame body sectional material 21 And the bottom surface of hanging wheel load-bearing groove 3 is provided with corresponding screw, after upper ledge frame body sectional material 21 and the position of side section bar 22 fix, Each screw is corresponding, and angle grouping device 5, upper ledge frame body sectional material 21 and hanging wheel load-bearing groove 3 are fixed together by screw.
(5)Sliding door door leaf and hanging wheel are mutually fixed:Hanging wheel mounting blocks 61 are inserted into from the opening of hanging wheel load-bearing groove 3 and are hung In wheel load-bearing groove 3, hanging wheel mounting blocks 61 can be thus fixed in hanging wheel load-bearing groove 3, expansion fixed block insertion hanging wheel is held In Baking soda, by hanging wheel mounting blocks clamping, then turn the bolt on expansion fixed block and expand so that will be swollen expansion fixed block Swollen fixed block is fastened in hanging wheel load-bearing groove;
(6)The door lowest limit position link gear of each fan sliding door is installed:After each fan sliding door door leaf is fixed with hanging wheel, every two fans are moved The base section bar of door is connected by connecting connector.Definition be from left to right respectively defined as the first fan sliding door, second fan sliding door, 3rd fan sliding door, is connected between the first fan sliding door and the second fan sliding door by the first connector, and the second fan sliding door is moved with the 3rd fan It is connected by the second connector between door, the first connector and the second connector are specific with the connection method of sliding door door leaf such as Under:
(a)In the chute 25 that the base section bar that sliding door is fanned in the directive wheel insertion first of the first connector is set;
(b)The other end of the first connector is fixed to the base section bar left end of the second fan sliding door, by the first connector Screw and cushion block 82 are connected on the base section bar of the second fan sliding door, and with base section bar in mutually fix;
(c)In the chute that the base section bar that the directive wheel of the second connector second fans sliding door is set;
(d)The other end of the second connector is fixed to the base section bar left end of the 3rd fan sliding door, by the second connector Screw and cushion block 82 be connected to the 3rd fan sliding door base section bar on, and with base section bar in mutually fix;
(e)According to above-mentioned steps installation connecting element if having the 4th fan sliding door;
(f)After part to be connected is installed, stopping means is installed at the left and right end of the base section bar chute of each fan sliding door.
The present invention just can in advance install secondary mount structure, then by setting secondary mount structure before decoration construction Normal finishing furred ceiling, the finishing installation for carrying out guide rail sliding door follow-up again after finishing can so improve the efficiency of finishing, subtract Few sliding door damages the probability of pollution;
By being provided with hanging wheel load-bearing groove on the upper surface of upper ledge frame body sectional material, hanging wheel mounting blocks are from the opening of hanging wheel load-bearing groove It is inserted into hanging wheel load-bearing groove, and is locked by expanding fixed block, by the installation side between hanging wheel mounting blocks and upper ledge frame body sectional material Formula is changed to be snapped in from side, instead of adopting the mode being screwed from front in the prior art, can reduce hanging wheel mounting blocks peace The operating space needed during dress, that is, hanging wheel to the height between upper ledge frame body sectional material is reduced, so as to reduce doorframe and lead Gap between rail, improves aesthetics;Follow-up removing and installing is also allowed for by the way of side snaps in simultaneously;
Angle grouping device and screw phase will be passed through between upper ledge frame body sectional material and side section bar and between bottom frame section and side section bar Connection, it is possible to increase the intensity of sliding door.
It is again secured on angle grouping device by by hanging wheel load-bearing groove, it is possible to increase the weight capacity of whole sliding door, it is especially right For the sliding door on height narrow side higher, the quality of whole door body is larger, and because frame is due to narrow, and be that aluminium is closed Golden material, its limited load bearing capacities, therefore hanging wheel load-bearing groove is fixed on angle grouping device, so as to bearing capacity be turned to angle grouping device Move, it is ensured that the load bearing stength of whole sliding door.
Pass through the spacing linkage of connector by by sliding door bottom, it is ensured that its stability is high, be difficult to rock between each fan door, The spacing linkage structure in bottom is arranged in chute by being directed to wheel, and good concealment improves overall aesthetics.

Claims (9)

1. a kind of installation method of sliding door, it is characterised in that including the steps:
(1)Fu Kuang mechanisms are installed:Secondary frame is installed on crossbeam or steelframe before furred ceiling is fitted up;
(2)Guide rail is installed:After finishing is finished, the corresponding guide rails assembling of sliding door will be fanned to secondary frame more;
(3)Hanging wheel is installed:Hanging wheel is installed in guide rail from reserved access hole, hanging wheel is connected with hanging wheel and installs by connecting rod Block;
(4)Assembling sliding door door leaf:The upper ledge frame body sectional material of sliding door door leaf, side section bar, base section bar and glass assemblies are good, and Hanging wheel load-bearing groove is fixed on the upper ledge frame body sectional material of upper sliding door door leaf by screw;
(5)Sliding door door leaf and hanging wheel are mutually fixed:By hanging wheel load-bearing groove of the hanging wheel mounting blocks from sliding door door leaf upper ledge frame body sectional material Opening at load, hanging wheel mounting blocks load hanging wheel load-bearing groove after, will expansion fixed block insertion hanging wheel load-bearing groove in, by hanging wheel Mounting blocks clamping, then turns the bolt on expansion fixed block and expands so as to expansion fixed block be fastened on expansion fixed block In hanging wheel load-bearing groove;
(6)The door lowest limit position link gear of each fan sliding door is installed:After each fan sliding door door leaf is fixed with hanging wheel, every two fans are moved The base section bar of door is connected by connecting connector.
2. a kind of installation method of sliding door according to claim 1, it is characterised in that described door lowest limit position link gear Installation steps it is as follows:
(a)In the chute that the base section bar that sliding door is fanned in the directive wheel insertion first of the first connector is set;
(b)The other end of the first connector is fixed to the base section bar left end of the second fan sliding door;
(c)In the chute that the base section bar that the directive wheel of the second connector second fans sliding door is set;
(d)The other end of the second connector is fixed to the base section bar left end of the 3rd fan sliding door;
(e)According to above-mentioned steps installation connecting element if having the 4th fan sliding door;
(f)After part to be connected is installed, stopping means is installed at the left and right end of the base section bar chute of each fan sliding door.
3. the installation method of a kind of sliding door according to claim 1, it is characterised in that:Described Fu Kuang mechanisms pass through bolt Or fixed with crossbeam or steelframe by the draw-in groove that secondary arch is reserved.
4. the installation method of a kind of sliding door according to claim 1, it is characterised in that:Upper ledge frame body sectional material, side section bar, It is fixed by angle grouping device between the section bar of base.
5. the installation method of a kind of sliding door according to claim 4, it is characterised in that:Described hanging wheel load-bearing groove passes through spiral shell Follow closely and fixed in angle grouping device.
6. the installation method of a kind of sliding door according to claim 4, it is characterised in that:Described side section bar and angle grouping device Between be connected with angle grouping device by being arranged on the screw on the inside of the section bar of side.
7. the installation method of a kind of sliding door according to claim 2, it is characterised in that:It it is one in described connector " Z " structure.
8. the installation method of a kind of sliding door according to claim 2, it is characterised in that:Described directive wheel is provided with 1 Or 2.
9. the installation method of a kind of sliding door according to claim 2, it is characterised in that:Described limited block is solid by screw It is scheduled on the left and right end of described chute.
CN201710203008.1A 2017-03-30 2017-03-30 A kind of installation method of sliding door Expired - Fee Related CN106930654B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710203008.1A CN106930654B (en) 2017-03-30 2017-03-30 A kind of installation method of sliding door

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710203008.1A CN106930654B (en) 2017-03-30 2017-03-30 A kind of installation method of sliding door

Publications (2)

Publication Number Publication Date
CN106930654A true CN106930654A (en) 2017-07-07
CN106930654B CN106930654B (en) 2019-05-14

Family

ID=59425420

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710203008.1A Expired - Fee Related CN106930654B (en) 2017-03-30 2017-03-30 A kind of installation method of sliding door

Country Status (1)

Country Link
CN (1) CN106930654B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642543A (en) * 2017-09-19 2018-01-30 湖州冠居门窗有限公司 One kind can steering lock fixed pattern Hardware fitting
CN109989651A (en) * 2018-12-27 2019-07-09 南京格锐盖特门业有限公司 A kind of installation method of novel door moving door leaf and guide rail

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2321661A (en) * 1997-01-30 1998-08-05 Stanley Works A roller assembly for a sliding door including an anti-jump member engageable with the track to prevent the roller from derailing
CN201386472Y (en) * 2009-04-10 2010-01-20 常熟中信建材有限公司 Sliding door structure
JP4750603B2 (en) * 2006-03-31 2011-08-17 信行 坪井 Suspended traveling device
CN202520134U (en) * 2012-03-16 2012-11-07 高代国 Mobile door hanger device
KR20130045678A (en) * 2011-10-26 2013-05-06 신정철 Slider mounting device for slide door
CN203113982U (en) * 2012-12-25 2013-08-07 上海大伊亚司贸易有限公司 Sliding door pulley device
CN205047021U (en) * 2015-08-31 2016-02-24 张平国 A sliding door hanging wheel with buffer function
CN206016516U (en) * 2016-08-31 2017-03-15 新兴国琳铝业有限公司 A kind of wall cabinet door slide rail convenient for cleaning

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2321661A (en) * 1997-01-30 1998-08-05 Stanley Works A roller assembly for a sliding door including an anti-jump member engageable with the track to prevent the roller from derailing
JP4750603B2 (en) * 2006-03-31 2011-08-17 信行 坪井 Suspended traveling device
CN201386472Y (en) * 2009-04-10 2010-01-20 常熟中信建材有限公司 Sliding door structure
KR20130045678A (en) * 2011-10-26 2013-05-06 신정철 Slider mounting device for slide door
CN202520134U (en) * 2012-03-16 2012-11-07 高代国 Mobile door hanger device
CN203113982U (en) * 2012-12-25 2013-08-07 上海大伊亚司贸易有限公司 Sliding door pulley device
CN205047021U (en) * 2015-08-31 2016-02-24 张平国 A sliding door hanging wheel with buffer function
CN206016516U (en) * 2016-08-31 2017-03-15 新兴国琳铝业有限公司 A kind of wall cabinet door slide rail convenient for cleaning

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642543A (en) * 2017-09-19 2018-01-30 湖州冠居门窗有限公司 One kind can steering lock fixed pattern Hardware fitting
CN109989651A (en) * 2018-12-27 2019-07-09 南京格锐盖特门业有限公司 A kind of installation method of novel door moving door leaf and guide rail

Also Published As

Publication number Publication date
CN106930654B (en) 2019-05-14

Similar Documents

Publication Publication Date Title
KR101759705B1 (en) Curtain box
CN107060581A (en) A kind of mounting structure of many fan sliding doors
CN106930654A (en) A kind of installation method of sliding door
CN101918666A (en) Sliding window system for multistoried building
CN108118805A (en) Partition wall door opening component and its installation method
CN2760450Y (en) Air conditioner mounting rack with adjustable width
CN206785223U (en) A kind of mounting structure of more fan sliding doors
CN221030872U (en) Assembled curtain window mounting structure
CN209568875U (en) Sliding aluminum alloy doors and windows
CN203515203U (en) Hanging-rail sliding door
CN102953628B (en) A kind of convenient forms mounting means installed and structure thereof
CN202273339U (en) Curtain wallboard of suspension type curtain wall
CN214595424U (en) Novel L-shaped curtain box
CN203865799U (en) Elevator landing door with sill opening facing downwards
CN207974296U (en) Bead plate
CN206785211U (en) Secondary mount structure at the top of a kind of sliding door
CN109972979A (en) A kind of sliding window frame and the sliding window comprising the sliding window frame
CN206917530U (en) Aluminum alloy frame folding door modelled after an antique
CN208473051U (en) A kind of type unitized curtain wall edge list
CN220225825U (en) Building curtain wall convenient to dismantle
CN207633592U (en) Curtain wall decorative strip system
CN207538685U (en) A kind of universal frame material of door and window
CN216364693U (en) Be applicable to assembled fitment integration curtain box
JP3116231U (en) Upper rail mounting structure of the hanging door
CN206448698U (en) A kind of concealed door nested structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190514

CF01 Termination of patent right due to non-payment of annual fee