CN106869863A - A kind of gas well Life cycle engineer testing system - Google Patents

A kind of gas well Life cycle engineer testing system Download PDF

Info

Publication number
CN106869863A
CN106869863A CN201710067654.XA CN201710067654A CN106869863A CN 106869863 A CN106869863 A CN 106869863A CN 201710067654 A CN201710067654 A CN 201710067654A CN 106869863 A CN106869863 A CN 106869863A
Authority
CN
China
Prior art keywords
gas
well
engineer testing
life cycle
gas well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710067654.XA
Other languages
Chinese (zh)
Inventor
孙虎
韩静静
徐迎新
王祖文
吴简
马小龙
张冕
陈文博
席仲琛
谢涛
尤文浩
严勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201710067654.XA priority Critical patent/CN106869863A/en
Publication of CN106869863A publication Critical patent/CN106869863A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/002Survey of boreholes or wells by visual inspection

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention belongs to gas well engineer testing technical field,Specifically provide a kind of gas well Life cycle engineer testing system,Including air compressor,Water pot,Gas storage well,Plunger displacement pump,Gas-liquid mixed precise control injected system,Input manifold,Engineer testing well,Choke manifold,It is automatically separated metering system,Noise elimination filter cyclic utilization system,Sewage collecting,Underground multiple spot parameter direct reading test solution release system and visual control operation integrated system,Gas well Life cycle engineer testing system solves the induced flow discharge opeing during underground work,Water pumping gas production,Downhole choke,The operation techniques such as gas well well workover cannot realize the problem of parameter optimization and compliance test result in default of necessary test platform always,Gas well Life cycle engineer testing system can carry out gas well Life cycle processing simulation and engineering test,Including discharge opeing after gas well pressure,Low-pressure gas well induced flow discharge opeing,Water pumping gas production,Downhole choke,The construction technology such as workover process proving test optimizes with job parameter,And Operating Pressure,Continuous oil pipe operation processing simulation and experiment.

Description

A kind of gas well Life cycle engineer testing system
Technical field
The invention belongs to gas well engineer testing technical field, and in particular to a kind of gas well Life cycle engineer testing system System.
Background technology
The row of returning leads low, shaft bottom hydrops in production process after current oil/gas well stimulation transformation, and flow controller, gaslift defective valve are serious, The principal element of puzzlement gas field production, the induced flow discharge opeing during underground work, water pumping gas production, downhole choke, gas well are turned into The operation techniques such as well workover cannot realize parameter optimization and compliance test result in default of necessary test platform always, and technology is more Year hesitates to move forward, and the new technology of preparing such as gas well Operating Pressure, continuous oil pipe operation directly goes up well experiment and there is greater risk.
The content of the invention
It is an object of the invention to provide a kind of gas well Life cycle engineer testing system, the full Life Cycle of gas well can be carried out Discharge opeing, low-pressure gas well induced flow discharge opeing, water pumping gas production, downhole choke, well workover after phase processing simulation and engineering test, including gas well pressure The construction technology such as technique proving test optimizes with job parameter, and Operating Pressure, continuous oil pipe operation processing simulation and examination Test.
Therefore, the invention provides a kind of gas well Life cycle engineer testing system, including air compressor, water pot, Gas storage well, plunger displacement pump, gas-liquid mixed precise control injected system, input manifold, engineer testing well, choke manifold, it is automatically separated Metering system, noise elimination filter cyclic utilization system, sewage collecting, underground multiple spot parameter direct reading test solution release system and visualization prison Control operation integrated system, the air compressor connects gas storage well, water pot connection plunger displacement pump, gas storage well and plunger displacement pump connection gas-liquid Mixing precise control injected system, gas-liquid mixed precise control injected system, input manifold, engineer testing well, choke manifold, from Dynamic separate measurement system, noise elimination filter cyclic utilization system and sewage collecting are sequentially connected in series, and noise elimination filter recycles and is System connection water pot, gas storage well, plunger displacement pump, gas-liquid mixed precise control injected system and underground multiple spot parameter direct reading test explain system System is connected with visual control operation integrated system respectively.
Described gas-liquid mixed precise control injected system operating pressure 70MPa, injection flow is 0~720m3/d of liquid measure, Tolerance 1000~100000N m3/d, mixed proportion is liquid measure 0~100%, and tolerance 0~100%, measuring accuracy is liquid measure 0.5%, tolerance 1%.
Described engineer testing well is bilayer sleeve High angle engineer testing well, and operating pressure is 70Mpa, and pit shaft is big oblique Degree well, well depth 1700m, straight well section 1200m and lower curved section 500m, vertical well depth 1500m, 80 ° of gradient, lower curved section are gentle, use 73/4 〞 protective casings, 51/2 〞 construction casings and 27/8 〞 operation tubings.
Described noise elimination filter cyclic utilization system include emptying sound-attenuating system and filtration system, emptying sound-attenuating system with from The gas vent connection of dynamic separate measurement system, the import of filtration system is connected with the liquid outlet for being automatically separated metering system, Filtration system includes clear water output and outlet of sewer, and clear water output is connected with water pot, and outlet of sewer is connected with sewage collecting.
Described underground multiple spot parameter direct reading test solution release system include underground survey pipe nipple, high-speed signal transmission cable and Surface power supply and data acquisition control storage system, described underground survey pipe nipple, high-speed signal transmission cable and surface power supply And data acquisition control storage system is sequentially connected in series, surface power supply and data acquisition control storage system and visual control Operation integrated system connection.
Described gas well Life cycle engineer testing system also includes camera, video encoder and network transformation machine, Camera, video encoder, network transformation machine and visual control operation integrated system are sequentially connected in series.
Described underground multiple spot parameter direct reading test solution release system maximum working pressure 100MPa, maximum operating temperature 150 DEG C, 0~100MPa of pressure measurement range, 0~150 DEG C of temperature measurement range;Surface power supply and data acquisition control storage system Single continuously works more than 30 days.
Described gas storage well and the operating pressure of plunger displacement pump are 70Mpa.
Beneficial effects of the present invention:This gas well Life cycle engineer testing system that the present invention is provided, including air Compressor, water pot, gas storage well, plunger displacement pump, gas-liquid mixed precise control injected system, input manifold, engineer testing well, throttle pipe Converge, be automatically separated metering system, noise elimination filter cyclic utilization system, sewage collecting, underground multiple spot parameter direct reading test explanation system System and visual control operate integrated system, the air compressor to connect gas storage well, water pot connection plunger displacement pump, gas storage well and post Plug pump connection gas-liquid mixed precise control injected system, gas-liquid mixed precise control injected system, input manifold, engineer testing Well, choke manifold, it is automatically separated metering system, noise elimination filter cyclic utilization system and sewage collecting and is sequentially connected in series, eliminates the noise Filtration cycle connects water pot, gas storage well, plunger displacement pump, gas-liquid mixed precise control injected system and underground multiple spot parameter using system Direct reading test solution release system is connected with visual control operation integrated system respectively, therefore, gas well Life cycle technique examination Check system can carry out discharge opeing, low-pressure gas well induced flow after gas well Life cycle processing simulation and engineering test, including gas well pressure The construction technology such as discharge opeing, water pumping gas production, downhole choke, workover process proving test and job parameter optimize, and work with pressure Industry, continuous oil pipe operation processing simulation and experiment.
Brief description of the drawings
The present invention is described in further details below with reference to accompanying drawing.
Fig. 1 is the theory diagram of gas well Life cycle engineer testing system.
Fig. 2 is that visual control operates integrated system principle diagram.
Description of reference numerals:101 air compressors;102 water pots;103 gas storage wells;104 plunger displacement pumps;105 gas-liquid mixeds essence Really control injected system;106 input manifolds;107 engineer testing wells;108 choke manifolds;109 are automatically separated metering system;110 Noise elimination filter cyclic utilization system;111 sewage collectings;11011 emptying sound-attenuating systems;1102 filtration systems;11021 Gracefuls Mouthful;11022 outlets of sewer;2 underground multiple spot parameter direct reading test solution release systems;3 visual controls operate integrated system;201 wells Lower temperature, pressure multi-point sampler pipe nipple;202 high-speed signal transmission cables;203 ground data acquisitions control storage system;20 shootings Head;204 Explosionproof cameras;205 high-definition cameras;206 video encoders;207 network transformation machines.
Specific embodiment
Embodiment 1:
As depicted in figs. 1 and 2, a kind of gas well Life cycle engineer testing system, including air compressor 101, water pot 102nd, gas storage well 103, plunger displacement pump 104, gas-liquid mixed precise control injected system 105, input manifold 106, engineer testing well 107th, choke manifold 108, be automatically separated metering system 109, noise elimination filter cyclic utilization system 110, sewage collecting 111, underground Multiple spot parameter direct reading test solution release system 2 and visual control operation integrated system 3, the connection gas storage of the air compressor 101 Well 103, the connection plunger displacement pump 104 of water pot 102, gas storage well 103 and the connection gas-liquid mixed precise control injected system of plunger displacement pump 104 105, gas-liquid mixed precise control injected system 105, input manifold 106, engineer testing well 107, choke manifold 108, automatic point It is sequentially connected in series from metering system 109, noise elimination filter cyclic utilization system 110 and sewage collecting 111, noise elimination filter circulation profit Water pot 102 is connected with system 110, gas storage well 103, plunger displacement pump 104, gas-liquid mixed precise control injected system 105 and underground are more Point parameter direct reading test solution release system 2 is connected with visual control operation integrated system 3 respectively.Described gas-liquid mixed is accurately controlled Injected system processed 105, it is automatically separated metering system 109, noise elimination filter cyclic utilization system 110, the direct-reading of underground multiple spot parameter and surveys Examination solution release system 2 and visual control operation integrated system 3 are prior art.
During simulated test, air injects gas storage well 103 after being compressed by air compressor 101;The water of water pot 102 flows into plunger Pump 104;The gas of gas storage well 103 and the liquid injection gas-liquid mixed precise control injected system 105 of plunger displacement pump 104;It is uniform mixed After conjunction, gas-liquid mixture is through being input into the injection technology test well 107 of manifold 106;The gas-liquid warp knuckle flow tube of returning out of 107 engineer testing wells is converged 108 entrance are automatically separated metering system 109;Enter noise elimination filter circulation profit through being automatically separated gas-liquid after metering system 109 is separated With system 110;By sewage collecting 111, clear water flows into water pot 102 to sewage after filtering after filtering.System of the invention can be with gas well The construction technology proving test such as discharge opeing, low-pressure gas well induced flow discharge opeing, water pumping gas production, downhole choke, workover process and work after pressure Industry parameter optimization, and Operating Pressure, continuous oil pipe operation processing simulation and experiment, lifting process technical merit.
Embodiment 2:
As shown in figure 1, on the basis of embodiment 1, the described operating pressure of gas-liquid mixed precise control injected system 105 70MPa, injection flow is 0~720m3/d of liquid measure, and tolerance 1000~100000N m3/d, mixed proportion is liquid measure 0~100%, Tolerance 0~100%, measuring accuracy is liquid measure 0.5%, tolerance 1%.Be conducive to carrying out theoretical research and close under working condition Tool performance is evaluated and processing simulation experiment, being capable of contracting technique, instrument, the short research and development process of equipment.The gas-liquid mixed is accurately controlled When injected system processed 105 is tested for test well, air-liquid two-phase is carried out into accurate allotment mixing according to different proportion, inject work In skill test well;The gas-liquid mixed precise control injected system 105 is by gas transmission manifold, transfusion manifold, Liqiud-gas mixing device, each The composition such as control valve and sensor, is prior art.
Embodiment 3:
As shown in figure 1, on the basis of embodiment 1-2, described engineer testing well 107 is bilayer sleeve High angle work Skill test well, operating pressure is 70Mpa, and pit shaft is high angle hole, and well depth 1700m, straight well section 1200m and lower curved section 500m hang down Straight well depth 1500m, 80 ° of gradient, lower curved section is gentle, using 73/4 〞 protective casings, 51/2 〞 construction casings and 27/8 〞 operations oil Pipe.With 73/4 〞 intermediate casing cementings, enter 51/2 〞 construction casings and 27/8 〞 operation tubings after pressure testing is qualified down again, well head is used KQ78/65-7011 valve pits mouthful, by input manifold control from the big annular air injections of 73/4 〞 during construction simulation operation, choke manifold control Gas-liquid mixture is returned out in the 51/2 small annular space of 〞 sleeve pipes and operation tubing;Or by input manifold from the 51/2 small annular space of 〞 sleeve pipes and work Gas injection in industry oil pipe, choke manifold control returns out gas-liquid mixture from the big annular spaces of 73/4 〞;Or other.
Described gas storage well 103 and the operating pressure of plunger displacement pump 104 are 70Mpa.The operating pressure of the gas storage well 103 is 70Mpa, pit shaft is straight well, and well depth 1060m, 9 〞 5/8 casing cementing, 27/8 〞 oil pipes are installed as gas storage well completion tubular column, well head Switch valve and overpressure protection apparatus, well head store the source of the gas of 10-70MPa using KQ78/65-709 valve pits mouthful.
The air compressor 101 can manually set as supply source of the gas, pressure at expulsion 0-35MPa;Nominal volume flow It is not less than 5m3/min;Main motor is threephase asynchronous, 380V, 110KW;Air compressor 101 is installed to automatically control System, the pump trip after gas storage well injection compressed gas reach predetermined (0-35MPa) pressure.
The plunger displacement pump 104 is used as feed flow source, design maximum pressure 70MPa;Maximum pump discharge 30m3/h;
Main motor is threephase asynchronous, 380V, 95KW;Three-cylinder plunger pump;Digital Control frequency conversion system.
The air compressor 101, plunger displacement pump 104, gas-liquid mixed precise control injected system 105 are overall skid-mounted knot Structure, skid appearance and size (length × width × height) mm:Simple to operate very much not in 5000 × 2200 × 2300, floor space is small.
The air compressor 101, plunger displacement pump 104, gas-liquid mixed precise control injected system 105 are provided with long-range, near The parameters of device can be controlled, shown and operated by the manual/auto control system of journey, and short range is operation cabinet control, far Journey is computer controls, and the system responsing control command time is less than 1S, and two systems are simultaneously operable.
It is described be automatically separated metering system 109 possess liquid level detect automatically, gas-liquid separate phase flow rate digital metering and teletransmission;System System pressure and temperature Remote monitoring, high-low pressure alarm;The functions such as twin-stage pressure release;It is described to be automatically separated the inside liquid of metering system 109 Position height can be sensed by magnetic double level gauge, and liquid level signal is converted into 4~20mA electric signals by fluid level transmitter, be passed The aperture for adjusting electric control valve after control terminal by control program is delivered to, liquid automatic-discharging is realized;
Gas storage well 103, engineer testing well 107 is connected with the pipeline of all devices using 27/8 〞 external upset tubings, underground water Mud raceway groove is laid.
System process test well of the invention be high angle hole, well depth 1700m, engineer testing well 107, gas storage well 103 and System support design work pressure is 70Mpa, is conducive to carrying out theoretical research and close to the tool performance evaluation under working condition And processing simulation experiment, being capable of contracting technique, instrument, the short research and development process of equipment.
Embodiment 4
As shown in figure 1, on the basis of embodiment 1-3, described noise elimination filter cyclic utilization system 110 disappears including emptying Sound system 11011 and filtration system 1102, emptying sound-attenuating system 11011 connect with the gas vent for being automatically separated metering system 109 Connect, the import of filtration system 1102 is connected with the liquid outlet for being automatically separated metering system 109, filtration system 1102 includes clear water Outlet 11021 and outlet of sewer 11022, clear water output 11021 is connected with water pot 102, outlet of sewer 11022 and sewage collecting 111 connections.When the noise elimination filter cyclic utilization system 110 is tested for test well, process separated through two phase separator respectively Afterwards return out gas-liquid, liquid filtration treatment Posterior circle is utilized, and gas carries out emptying noise elimination treatment;The noise elimination filter is recycled System 110 is prior art, by water pump, dredge pump, vertical suctorial type Full-automatic self-cleaning filter, silencer, pipeline, gate valve The part such as door, electrical system, pressure gauge, skid base constitutes.The filter of the noise elimination filter cyclic utilization system 110 filtering essence It is 10um to spend, and filtering traffic is not less than 60m3/h, automatic cleaning;Pump capacity is 25m3/h;Silencer discharge capacity 80m3/min, disappears Noise is less than 60db at 1 meter of sound device periphery;Skid structure.Simple structure, measurement is accurate, and noise pollution is small, circular regeneration, green Environmental protection.
Described emptying sound-attenuating system 11011 and filtration system 1102 is prior art.
Embodiment 5
As shown in Fig. 2 on the basis of embodiment 1-4, described underground multiple spot parameter direct reading test solution release system 2 includes Underground survey pipe nipple 201, high-speed signal transmission cable 202 and surface power supply and data acquisition control storage system 203, it is described Underground survey pipe nipple 201, high-speed signal transmission cable 202 and surface power supply and data acquisition control storage system 203 are gone here and there successively Connection connection, surface power supply and data acquisition control storage system 203 and visual control operation integrated system 3 are connected.Described The maximum working pressure 100MPa of underground multiple spot parameter direct reading test solution release system 2,150 DEG C of maximum operating temperature, pressure measxurement model Enclose 0~100MPa, 0~150 DEG C of temperature measurement range;Surface power supply and the continuous work of the single of data acquisition control storage system 203 Make more than 30 days.The underground multiple spot parameter direct reading test solution release system 2 is passed by 10 underground survey pipe nipples 201, high speed signal Transmission cable 202, surface power supply and data acquisition control storage system 203, real-time data acquisition, drawing and solution release system composition; Underground multiple spot parameter direct reading test solution release system 2 is used for engineer testing well 107 when testing, by engineer testing well 107 not Same depth installs multiple full-bore underground survey pipe nipples 201, in real-time monitoring oil pipe, Fluid pressure and temperature between oil pipe and sleeve pipe Angle value, is capable of achieving process detection, evaluates and explain.Described surface power supply and data acquisition control storage system 203 are existing Technology.
Embodiment 6
As shown in Fig. 2 on the basis of embodiment 1-5, described gas well Life cycle engineer testing system also includes Camera 20, video encoder 206 and network transformation machine 207, camera 20, video encoder 206, the and of network transformation machine 207 Visual control operation integrated system 3 is sequentially connected in series.Described camera 20 is Explosionproof camera 204 and high-definition camera 205, Explosionproof camera 204 and high-definition camera 205 are prior art, visual control operation integrated system 3 can test, Control, display air compressor 101, downhole temperature pressure multi-point sampler pipe nipple 201, high-speed signal transmission cable 202, ground number According to acquisition control storage system 203, quick-fried camera 204, high-definition camera 205, video encoder 206, network transformation machine work Make state and operational factor 207;Visual control operates the transmission channel of control signal between integrated system 3 and each execution equipment to adopt With 4 more than 〞 steel pipes, the laying of underground secret tunnel;The visual control operation collection of integrated system 3 equipment control, parameter regulation, information Monitoring, effect analysis, view and emulate training and be integrated, the situation of well head, equipment, manifold, valve etc., operational factor can be supervised Survey, control, adjust and real time data acquisition, storage, analysis, can be shown with 2 D animation formal intuition with watch on-line The composition component of separator, the instantaneous operating conditions of each several part, the real time execution parameter of each several part.During simulated test, underground temperature The test signal of degree pressure multi-point sampler pipe nipple 201 is through high-speed signal transmission cable 202 and ground data acquisition control storage system System 203 is transferred to visual control operation integrated system 3;Explosionproof camera 204 and high-definition camera 205 are by vision signal through regarding Frequency encoder 206 and network transformation machine 207 are defeated to visual control operation integrated system 3.High-speed signal transmission cable 202 is existing There is technology.
The beneficial effects of the invention are as follows:
1. system process test well 107 of the invention is high angle hole, and well depth 1700m and is at engineer testing well, gas storage well Analysis of Nested Design operating pressure under unified central planning is 70Mpa, be conducive to carrying out theoretical research and close to the tool performance evaluation under working condition and Processing simulation is tested, being capable of contracting technique, instrument, the short research and development process of equipment.
2. system of the invention can with discharge opeing after gas well pressure, low-pressure gas well induced flow discharge opeing, water pumping gas production, downhole choke, repair The construction technology such as well technique proving test and job parameter optimize, and Operating Pressure, continuous oil pipe operation processing simulation with Experiment, lifting process technical merit.
3. in system of the invention visual control operation integrated system 3 collection equipment control, parameter regulation, information monitoring, Effect analysis, view and emulate training and be integrated, the situation of well head, equipment, manifold, valve etc., operational factor can be monitored, controlled System, regulation and real time data acquisition, storage, analysis.
4. system all devices of the invention are pry bracket structure, convenient transport and installation.
5. system mesohigh equipment of the invention be provided with remotely, the manual/auto control system of short range, it is safe.
Operation principle of the invention is:
During simulated test, air injects gas storage well 103 after being compressed by air compressor 101;The water of water pot 102 flows into plunger Pump 104;The gas of gas storage well 103 and the liquid injection gas-liquid mixed precise control injected system 105 of plunger displacement pump 104;It is uniform mixed After conjunction, gas-liquid mixture is through being input into the injection technology test well 107 of manifold 106;The gas-liquid warp knuckle flow tube of returning out of 107 engineer testing wells is converged 108 entrance are automatically separated metering system 109;Enter noise elimination filter circulation profit through being automatically separated gas-liquid after metering system 109 is separated With system 110;By sewage collecting 111, clear water flows into water pot 102 to sewage after filtering after filtering.Downhole temperature pressure multi-point sampler The test signal of pipe nipple 201 is transferred to visually through high-speed signal transmission cable 202 and ground data acquisition control storage system 203 Change policer operation integrated system 3;Explosionproof camera 204 and high-definition camera 205 are by vision signal through video encoder 206 and net Network transcriber 207 is defeated to operate integrated system 3 to visual control.
It is exemplified as above be only to of the invention for example, do not constitute the limitation to protection scope of the present invention, it is all It is that design same or analogous with the present invention is belonged within protection scope of the present invention.The portion that the present embodiment is not described in detail Part and structure and system belong to the well-known components and common structure or conventional means of the industry, do not describe one by one here.

Claims (8)

1. a kind of gas well Life cycle engineer testing system, it is characterised in that:Including air compressor (101), water pot (102), gas storage well (103), plunger displacement pump (104), gas-liquid mixed precise control injected system (105), input manifold (106), work Skill test well (107), choke manifold (108), be automatically separated metering system (109), noise elimination filter cyclic utilization system (110), Sewage collecting (111), underground multiple spot parameter direct reading test solution release system (2) and visual control operate integrated system (3), described Air compressor (101) connects gas storage well (103), and water pot (102) connects plunger displacement pump (104), gas storage well (103) and plunger displacement pump (104) connection gas-liquid mixed precise control injected system (105), gas-liquid mixed precise control injected system (105), input manifold (106), engineer testing well (107), choke manifold (108), be automatically separated metering system (109), noise elimination filter and recycle and be System (110) and sewage collecting (111) are sequentially connected in series, and noise elimination filter cyclic utilization system (110) connects water pot (102), storage Gas well (103), plunger displacement pump (104), gas-liquid mixed precise control injected system (105) and underground multiple spot parameter direct reading test are explained System (2) operates integrated system (3) to be connected with visual control respectively.
2. gas well Life cycle engineer testing system as claimed in claim 1, it is characterised in that:Described gas-liquid mixed essence Injected system (105) operating pressure 70MPa is really controlled, injection flow is 0~720m of liquid measure3/ d, 1000~100000N of tolerance m3/ d, mixed proportion is liquid measure 0~100%, and tolerance 0~100%, measuring accuracy is liquid measure 0.5%, tolerance 1%.
3. gas well Life cycle engineer testing system as claimed in claim 1, it is characterised in that:Described engineer testing well (107) it is bilayer sleeve High angle engineer testing well, operating pressure is 70Mpa, and pit shaft is high angle hole, well depth 1700m, straight well Section 1200m and lower curved section 500m, vertical well depth 1500m, 80 ° of gradient, lower curved section is gentle, using 73/4 〞 protective casings, 51/2 〞 Construction casing and 27/8 〞 operation tubings.
4. gas well Life cycle engineer testing system as claimed in claim 1, it is characterised in that:Described noise elimination filter is followed Ring includes emptying sound-attenuating system (11011) and filtration system (1102) using system (110), emptying sound-attenuating system (11011) and Be automatically separated metering system (109) gas vent connection, the import of filtration system (1102) be automatically separated metering system (109) liquid outlet connection, filtration system (1102) includes clear water output (11021) and outlet of sewer (11022), Graceful Mouth (11021) is connected with water pot (102), and outlet of sewer (11022) is connected with sewage collecting (111).
5. gas well Life cycle engineer testing system as claimed in claim 1, it is characterised in that:Described underground multiple spot ginseng Number direct reading test solutions release system (2) including underground survey pipe nipple (201), high-speed signal transmission cable (202) and surface power supply and Data acquisition control storage system (203), described underground survey pipe nipple (201), high-speed signal transmission cable (202) and ground Power supply and data acquisition control storage system (203) are sequentially connected in series, surface power supply and data acquisition control storage system (203) connected with visual control operation integrated system (3).
6. gas well Life cycle engineer testing system as claimed in claim 1, it is characterised in that:The full life of described gas well Cycle process pilot system also include camera (20), video encoder (206) and network transformation machine (207), camera (20), Video encoder (206), network transformation machine (207) and visual control operate integrated system (3) to be sequentially connected in series.
7. gas well Life cycle engineer testing system as claimed in claim 5, it is characterised in that:Described underground multiple spot ginseng Number direct reading test solution release system (2) maximum working pressure 100MPa, 150 DEG C of maximum operating temperature, pressure measurement range 0~ 100MPa, 0~150 DEG C of temperature measurement range;Surface power supply and data acquisition control storage system (203) single continuously work 30 More than it.
8. gas well Life cycle engineer testing system as claimed in claim 1, it is characterised in that:Described gas storage well (103) and plunger displacement pump (104) operating pressure be 70Mpa.
CN201710067654.XA 2017-02-07 2017-02-07 A kind of gas well Life cycle engineer testing system Pending CN106869863A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710067654.XA CN106869863A (en) 2017-02-07 2017-02-07 A kind of gas well Life cycle engineer testing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710067654.XA CN106869863A (en) 2017-02-07 2017-02-07 A kind of gas well Life cycle engineer testing system

Publications (1)

Publication Number Publication Date
CN106869863A true CN106869863A (en) 2017-06-20

Family

ID=59165845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710067654.XA Pending CN106869863A (en) 2017-02-07 2017-02-07 A kind of gas well Life cycle engineer testing system

Country Status (1)

Country Link
CN (1) CN106869863A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107564398A (en) * 2017-09-30 2018-01-09 西安航空学院 A kind of gasoline engine electronic controlled fuel feed system experimental bench
CN109296343A (en) * 2018-08-31 2019-02-01 中国海洋石油集团有限公司 A kind of gas well mining technology assessment system integration and method
CN111322040A (en) * 2020-03-16 2020-06-23 西安诚科石油工程技术服务有限公司 Water-producing gas well full-life-cycle drainage gas production method and system
CN112412395A (en) * 2020-12-01 2021-02-26 中国石油天然气集团有限公司 High-pressure gas-liquid mixing injection control system
CN114842699A (en) * 2021-02-01 2022-08-02 中国石油天然气股份有限公司 Under-pressure operation training system and under-pressure operation training method
CN114961671A (en) * 2021-02-23 2022-08-30 中国石油天然气股份有限公司 Gas-liquid two-phase flow simulator
CN114961653A (en) * 2021-02-23 2022-08-30 中国石油天然气股份有限公司 Experimental system for simulation evaluation of gas production process and gas production tool

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006062512A1 (en) * 2004-12-07 2006-06-15 Fmc Technologies, Inc Deepwater seal test apparatus
CN103924948A (en) * 2014-04-02 2014-07-16 中国石油天然气股份有限公司 Vortex flow state simulation visual test device
CN104343421A (en) * 2013-07-24 2015-02-11 深圳市弗赛特检测设备有限公司 Gas lift simulating test system
CN105696999A (en) * 2016-01-29 2016-06-22 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Coiled tubing experimental system and method
CN105735965A (en) * 2016-04-07 2016-07-06 中国地质大学(武汉) Coal-bed gas well shaft drainage gas recovery visual simulation experiment device and simulation method
CN106351614A (en) * 2016-10-19 2017-01-25 西南石油大学 Preferred pipe column water drainage gas production simulation device and experiment method
CN206495665U (en) * 2017-02-07 2017-09-15 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of natural gas well engineer testing system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006062512A1 (en) * 2004-12-07 2006-06-15 Fmc Technologies, Inc Deepwater seal test apparatus
CN104343421A (en) * 2013-07-24 2015-02-11 深圳市弗赛特检测设备有限公司 Gas lift simulating test system
CN103924948A (en) * 2014-04-02 2014-07-16 中国石油天然气股份有限公司 Vortex flow state simulation visual test device
CN105696999A (en) * 2016-01-29 2016-06-22 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Coiled tubing experimental system and method
CN105735965A (en) * 2016-04-07 2016-07-06 中国地质大学(武汉) Coal-bed gas well shaft drainage gas recovery visual simulation experiment device and simulation method
CN106351614A (en) * 2016-10-19 2017-01-25 西南石油大学 Preferred pipe column water drainage gas production simulation device and experiment method
CN206495665U (en) * 2017-02-07 2017-09-15 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of natural gas well engineer testing system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107564398A (en) * 2017-09-30 2018-01-09 西安航空学院 A kind of gasoline engine electronic controlled fuel feed system experimental bench
CN109296343A (en) * 2018-08-31 2019-02-01 中国海洋石油集团有限公司 A kind of gas well mining technology assessment system integration and method
CN111322040A (en) * 2020-03-16 2020-06-23 西安诚科石油工程技术服务有限公司 Water-producing gas well full-life-cycle drainage gas production method and system
CN111322040B (en) * 2020-03-16 2022-03-08 西安诚科石油工程技术服务有限公司 Water-producing gas well full-life-cycle drainage gas production method and system
CN112412395A (en) * 2020-12-01 2021-02-26 中国石油天然气集团有限公司 High-pressure gas-liquid mixing injection control system
CN114842699A (en) * 2021-02-01 2022-08-02 中国石油天然气股份有限公司 Under-pressure operation training system and under-pressure operation training method
CN114842699B (en) * 2021-02-01 2024-03-26 中国石油天然气股份有限公司 Training system and training method for operation under pressure
CN114961671A (en) * 2021-02-23 2022-08-30 中国石油天然气股份有限公司 Gas-liquid two-phase flow simulator
CN114961653A (en) * 2021-02-23 2022-08-30 中国石油天然气股份有限公司 Experimental system for simulation evaluation of gas production process and gas production tool
CN114961653B (en) * 2021-02-23 2024-03-01 中国石油天然气股份有限公司 An experimental system for simulating and evaluating gas production processes and gas production tools
CN114961671B (en) * 2021-02-23 2024-04-30 中国石油天然气股份有限公司 Gas-liquid two-phase flow simulation device

Similar Documents

Publication Publication Date Title
CN106869863A (en) A kind of gas well Life cycle engineer testing system
CN205297504U (en) A bridge-type concentric integrated control device for seal inspection, test and adjustment
CN206495665U (en) A kind of natural gas well engineer testing system
CN104265273B (en) Horizontal well in segments completion becomes a mandarin testing arrangement and method of testing
CN107725034B (en) Pressure monitoring method for judging water incoming direction of multi-stage fractured horizontal well
CN109403894A (en) Early overflow and leakage monitoring system for well drilling
CN111624327A (en) A karst pipeline grouting plugging test device
CN113047826B (en) Intelligent releasable tracer production profile test experimental device and method
CN104563985B (en) A digital dispensing test deployment system and method
CN209743128U (en) Automatic testing device for improving testing precision of water pump
CN115234543A (en) Hydraulic monitoring system
CN111119810B (en) Indoor comprehensive simulation device for underground fine separated injection
CN106121598A (en) Oil well delamination production fluid measure and control test device
CN106401580A (en) Multiphase flow experimental device for complex inner boundary multi-heat-source lifting shaft
CN107494196A (en) Field irrigation system and method
CN206220957U (en) Gas overflow and leakage position detection device in pressure control drilling process
CN108549311A (en) Workover treatment automatic data collection analysis system and control method
CN204782866U (en) Well drilling choke manifold device is pressed in accuse
CN211954823U (en) Automatic crude oil analysis sampling instrument
CN215213477U (en) Device for positioning water flowing crack in drilling layered test process
CN204666329U (en) A kind of air-flow is taken liquid and is taken sand visual experimental apparatus
CN205297502U (en) A Digital Dispensing Cumulative Flow Automatic Regulating System
CN106640063A (en) Monitoring method for overflowing in well cementation construction
CN212656816U (en) Continuous measuring device for liquid production capacity of wellhead of oil pumping well
CN104074511A (en) Pressure wave leakage layer detection experiment device and use method of pressure wave leakage layer detection experiment device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201027

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Applicant after: CHINA NATIONAL PETROLEUM Corp.

Applicant after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

Address before: 710018 Shaanxi province Xi'an Weiyang Changqing Changqing prosperous Park District Building Room 1207

Applicant before: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING COMPANY LIMITED CHANGQING DOWNHOLE TECHNOLOGY Co.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170620

RJ01 Rejection of invention patent application after publication