CN106841016A - A kind of flow production line with environmental test test function - Google Patents
A kind of flow production line with environmental test test function Download PDFInfo
- Publication number
- CN106841016A CN106841016A CN201710036391.6A CN201710036391A CN106841016A CN 106841016 A CN106841016 A CN 106841016A CN 201710036391 A CN201710036391 A CN 201710036391A CN 106841016 A CN106841016 A CN 106841016A
- Authority
- CN
- China
- Prior art keywords
- production line
- flow production
- casing
- transition
- environmental test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N17/00—Investigating resistance of materials to the weather, to corrosion, or to light
- G01N17/002—Test chambers
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Ecology (AREA)
- Environmental & Geological Engineering (AREA)
- Environmental Sciences (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
Abstract
The present invention proposes a kind of flow production line with environmental testing function, an at least environmental test chamber including a flow production line and in the production process of the flow production line, the product component to be measured on the flow production line is returned again to flow production line after environmental test chamber carries out environmental test test.The flow production line with environmental test test function continues to complete remaining operation through the product component to be measured of environmental test test passes, underproof product exits flow production line, carry out subsequent treatment, it is achieved thereby that the combination of environmental test equipment and flow production line, it is ensured that the reliability of product.
Description
Technical field
The present invention relates to automated production field, more particularly to a kind of Production line with environmental test test function
Line.
Background technology
Environmental test is a kind of inspection properties of product, the effective means of exposing product defect.National standard is to various products
The environmental test that needs are carried out is specified.In general, environmental test is carried out in the design of product, change, Qualify Phase.
Once after product approval, the environmental test carried out to product in production process is little.Requirement with people to product reliability
Increasingly increase, it is necessary to all carry out environmental test to each product.For war products, more it is necessary to carry out product
100% environmental test test, to ensure the reliability of product.
At present, industrially, including military enterprise, few products can realize 100% environmental test test.On the one hand it is
On the other hand it is current environmental test equipment both in single or a small amount of product design because expense is increased considerably
's.Product is put into, environmental test equipment is taken out by artificial.Environmental test equipment was not accounted for and other equipment yet
Coordinate.It can be said that existing environmental test equipment cannot be attached in flow production line well.
The content of the invention
The present invention proposes a kind of flow production line with environmental test test function, solves environment examination in the prior art
The problems such as equipment is tested with flow production line combination.
The technical proposal of the invention is realized in this way:
A kind of flow production line with environmental testing function, including a flow production line and located at the flow production line
An at least environmental test chamber in production process, the product component to be measured on the flow production line is carried out by environmental test chamber
Returned again to flow production line after environmental test test.
Preferred scheme is that the environmental test chamber includes testing casing positioned at the one of middle part and is connected at the experiment respectively
The First Transition casing of casing both sides and the second transition casing, the First Transition casing, experiment casing and the second transition casing
Be arranged in order on flow production line, the First Transition casing and the second transition casing respectively with the junction between experiment casing
Be respectively provided with can automatic shutter partition door, the side of the First Transition casing and the second transition casing respectively close to flow production line
Chamber door is provided with, connection and the cut-off of each transition casing and flow production line is realized by the opening and closing of chamber door, the flow production line, the
Automatic conveyor is respectively equipped with one transition casing, the second transition casing and chamber body.
Preferred scheme is to be respectively equipped with displacement apparatus in the First Transition casing and the second transition casing, for by transition
Air, steam and impurity in casing are extracted, and are filled with dry air.
Preferred scheme is, the environmental test chamber is several that be set up in parallel, and with the same operation of flow production line
Connection.
Preferred scheme is that the environmental test chamber is several, and is arranged in the different operations of flow production line.
Preferred scheme is that described several environmental test chambers are integrated into one, share a pedestal, shell, refrigeration system and
Humidity system.
Preferred scheme is that the refrigeration system is including the fan located at each environmental test chamber top, below fan
Evaporator and the heater located at each experiment casing bottom.
Preferred scheme is that the automatic conveyor is mechanical gripper.
Beneficial effects of the present invention are:
The flow production line with environmental test test function in the present invention through environmental test test passes product to be measured
Product part continues to complete remaining operation, and underproof product exits flow production line, carries out subsequent treatment, it is achieved thereby that ring
The combination of border testing equipment and flow production line, it is ensured that the reliability of product.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the first embodiment structural representation of flow production line of the present invention with environmental test test function;
Fig. 2 is the second embodiment structural representation of flow production line of the present invention with environmental test test function;
Fig. 3 is the 3rd implementation of the environmental test chamber part of flow production line of the present invention with environmental test test function
Example structural representation;
Fig. 4 is profiles of the Fig. 3 along line A-A;
Fig. 5 is the 4th implementation of the environmental test chamber part of flow production line of the present invention with environmental test test function
Example structural representation.
In figure:
10th, flow production line;20th, environmental test chamber;30th, product component;21st, casing is tested;22nd, First Transition casing;
23rd, the second transition casing;24th, fan;25th, evaporator;26th, heater;28th, dispensing device;29th, shell;11st, branch line.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
As shown in figure 1, the flow production line should with environmental testing function includes a flow production line 10 and located at the stream
An environmental test chamber 20 in the production process of aquatic producing line 10.The product component to be measured 30 being placed on flow production line 10 enters
After environmental test chamber 20 carries out environmental test test, return again to flow production line 10 and complete remaining production stage, product to be measured
Part 30 refers to need to carry out parts, the semifinished or finished goods of environmental test test in process of producing product.
The environmental test chamber 20 includes testing casing 21 positioned at the one of middle part and is connected at 21 liang of the experiment casing respectively
The transition casing 23 of First Transition casing 22 and second of side.The First Transition casing 22, the experiment transition case of casing 21 and second
Body 22 is arranged in order on flow production line 10.The transition casing 22 of First Transition casing 22 and second respectively with experiment casing 21
Between junction be respectively provided with can automatic shutter partition door, the switch of each partition door is capable of achieving each transition casing with experiment casing
Connection and cut-off between 21.Side of the transition casing 22 of First Transition casing 22 and second respectively close to flow production line 10
Chamber door is provided with, connection of each transition casing with flow production line 10 and cut-off are realized by the opening and closing of chamber door.The flow production line
10th, automatic conveyor is respectively equipped with First Transition casing 22, the second transition casing 22 and experiment casing 21, it is to be measured to realize
Movement of the product component 30 between flow production line 10, First Transition casing 22, experimental box body and the second transition casing 22.Institute
Automatic conveyor is stated for mechanical gripper.During specific implementation, set respectively in the transition casing 22 of First Transition casing 22 and second
There are displacement apparatus, for the air in transition casing, steam and impurity to be extracted, and be filled with dry air, the dry air
Speed, tolerance and direction can adjust.
During specific implementation, the time of environmental test of completion and the time of one operation of completion of flow production line 10 are not
With.Product component to be measured 30 in environmental test chamber 20, by heating up (or humidification), test, the process of cooling (or dehumidifying),
According to the time-consuming difference completed with flow production line 10 the time required to an operation of environmental test, environmental test chamber 20 is given birth to flowing water
The configuration of producing line 10 is also different.The test of the environmental test chamber 20 is also including vibrations, salt fog and sand and dust etc..
The present embodiment is suitable suitable for the time of environmental test of completion and the time of the operation most long of flow production line 10
Situation, i.e., one environmental test chamber 20 and a phase configuration of flow production line 10.In concrete application, product component to be measured 30 exists
Flowed on flow production line 10, be sequentially completed production process, when needing to carry out environmental experiment, into the of environmental test chamber 20
One transition casing 22, closes the chamber door of the First Transition casing 22, opens between the First Transition casing 22 and experiment casing 21
Partition door, into experiment casing 21 after close its partition door, carry out environmental test test;After the completion of test, casing 21 is tested
Opened with the partition door between the second transition casing 22, into the second transition casing 22 after close partition door, by after replacement process,
The Parameter reconstructions such as temperature, the humidity of product component to be measured 30 open the second transition to the state entered before environmental test chamber 20
The chamber door of casing 22, the aquatic producing line 10 of product returns.Continued to complete through the product component to be measured 30 of environmental test test passes
Remaining operation, underproof product exits flow production line 10, carries out subsequent treatment, it is achieved thereby that environmental test equipment with
The combination of flow production line 10, it is ensured that the reliability of product.
Fig. 2 be the present invention with environmental test test function flow production line 10 second embodiment, the present embodiment with
The structure of first embodiment is roughly the same, and its difference is:In the present embodiment, the environmental test chamber 20 is multiple, in figure
Only with 5 signals, each environmental test chamber 20 is connected with the same operation of flow production line 10 respectively by dispensing device 28.It is to be measured
Product component 30 flows on flow production line 10, is sequentially completed production process, when needing to carry out environmental test, enters in order
Enter multiple environmental test chambers 20, carry out environmental test test, test process is basically the same as those in the first embodiment.Environmental test is completed to survey
After trying and replacing, flow production line 10 is returned to successively, so, even if the time that single environmental test chamber 20 is completed gives birth to more than flowing water
The activity time most long of producing line 10, does not interfere with the production efficiency of flow production line 10 yet.
Fig. 3 and Fig. 4 are the 3rd embodiment of flow production line 10 of the present invention with environmental test test function, this implementation
Example is roughly the same with the structure of second embodiment, and its difference is:In the present embodiment, the multiple environmental test chamber 20 is whole
One is combined into, multiple environmental tests can be simultaneously completed, only with 3 signals in figure.The experiment of the multiple environmental test chamber 20
Casing 21 shares a pedestal and a shell 29, shares a refrigeration system and humidity system, and the refrigeration system includes being located at each experiment
The fan 24 on the top of casing 21, the evaporator 25 positioned at the lower section of fan 24 and the heater 26 located at each experiment casing 21 bottom,
And using the operation of the multiple experiment casings 21 of a set of control system control.
Fig. 5 is the 4 of the part of environmental test chamber 20 of flow production line 10 of the present invention with environmental test test function
Embodiment, the present embodiment is roughly the same with the structure of first embodiment, and its difference is:The present embodiment is applied to product
Parts and product are required for carrying out the situation of environmental test test, and the product of the flow production line 10 has two parts groups
Into, i.e., there are two branch lines 11 with the lead-in wire terminal of flow production line 10, an environmental test chamber 20 is respectively equipped with each branch line 11.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention
Within god and principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.
Claims (8)
1. a kind of flow production line with environmental testing function, it is characterised in that:Including a flow production line and located at the stream
An at least environmental test chamber in the production process of aquatic producing line, the product component to be measured on the flow production line passes through environment
Chamber is returned again to flow production line after carrying out environmental test test.
2. there is the flow production line of environmental testing function as claimed in claim 1, it is characterised in that:The environmental test chamber
It is connected at including the experiment casing positioned at middle part and respectively First Transition casing and second transition of the experiment casing both sides
Casing, the First Transition casing, experiment casing and the second transition casing are arranged in order on flow production line, the First Transition
Casing and the second transition casing respectively with experiment casing between junction be respectively provided with can automatic shutter partition door, first mistake
Cross casing and the second transition casing is provided with chamber door respectively close to the side of flow production line, each transition is realized by the opening and closing of chamber door
Connection of the casing with flow production line and cut-off, the flow production line, First Transition casing, the second transition casing and experiment casing
Inside it is respectively equipped with automatic conveyor.
3. there is the flow production line of environmental testing function as claimed in claim 2, it is characterised in that:The First Transition casing
And second be respectively equipped with displacement apparatus in transition casing, for the air in transition casing, steam and impurity to be extracted, and it is filled with
Dry air.
4. the flow production line with environmental testing function according to any one of claims 1 to 3, it is characterised in that:Institute
It is several that be set up in parallel to state environmental test chamber, and is connected with the same operation of flow production line.
5. the flow production line with environmental testing function according to any one of claims 1 to 3, it is characterised in that:Institute
Environmental test chamber is stated for several, and is arranged in the different operations of flow production line.
6. there is the flow production line of environmental testing function as claimed in claim 4, it is characterised in that:Described several environment
Chamber is integrated into one, shares a pedestal, shell, refrigeration system and humidity system.
7. there is the flow production line of environmental testing function as claimed in claim 6, it is characterised in that:The refrigeration system bag
Include the fan located at each environmental test chamber top, the evaporator below fan and the heating located at each experiment casing bottom
Device.
8. there is the flow production line of environmental testing function as claimed in claim 1, it is characterised in that:It is described to automatically deliver dress
It is set to mechanical gripper.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710036391.6A CN106841016A (en) | 2017-01-17 | 2017-01-17 | A kind of flow production line with environmental test test function |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710036391.6A CN106841016A (en) | 2017-01-17 | 2017-01-17 | A kind of flow production line with environmental test test function |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106841016A true CN106841016A (en) | 2017-06-13 |
Family
ID=59124342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710036391.6A Pending CN106841016A (en) | 2017-01-17 | 2017-01-17 | A kind of flow production line with environmental test test function |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106841016A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108414912A (en) * | 2018-03-01 | 2018-08-17 | 上海华岭集成电路技术股份有限公司 | Finished semiconductor high/low temperature multistation test device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1989415A (en) * | 2004-07-23 | 2007-06-27 | 株式会社爱德万测试 | Electronic component testing apparatus |
CN104154952A (en) * | 2014-08-13 | 2014-11-19 | 昆山振弘检测设备有限公司 | Integrated testing machine |
CN105974246A (en) * | 2016-07-18 | 2016-09-28 | 深圳市宇泰试验设备有限公司 | Test method based on pipelined constant temperature and humidity room |
CN205642440U (en) * | 2016-04-19 | 2016-10-12 | 东莞市全测电子科技有限公司 | A humiture simulation test equipment for environment reliability testing |
-
2017
- 2017-01-17 CN CN201710036391.6A patent/CN106841016A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1989415A (en) * | 2004-07-23 | 2007-06-27 | 株式会社爱德万测试 | Electronic component testing apparatus |
CN104154952A (en) * | 2014-08-13 | 2014-11-19 | 昆山振弘检测设备有限公司 | Integrated testing machine |
CN205642440U (en) * | 2016-04-19 | 2016-10-12 | 东莞市全测电子科技有限公司 | A humiture simulation test equipment for environment reliability testing |
CN105974246A (en) * | 2016-07-18 | 2016-09-28 | 深圳市宇泰试验设备有限公司 | Test method based on pipelined constant temperature and humidity room |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108414912A (en) * | 2018-03-01 | 2018-08-17 | 上海华岭集成电路技术股份有限公司 | Finished semiconductor high/low temperature multistation test device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105960583A (en) | Improvements to aspirated sampling systems | |
SA517380845B1 (en) | Method and Apparatus for The Curing of Composite Material by Control over Rate Limiting Steps in Water Removal | |
CN109365010A (en) | A kind of high-and-low temperature humid heat test box | |
CN101216484A (en) | Artificial board formaldehyde burst size detection system | |
CN204407295U (en) | The testing integrated machine of IV and EL | |
CN106841016A (en) | A kind of flow production line with environmental test test function | |
CN109000911A (en) | It is a kind of for blade thermal mechanical fatigue-creep experimental rig | |
CN104181316B (en) | A kind of multinomial detection device of sample and method | |
CN208140309U (en) | A kind of high temperature of communication cabinet is drenched with rain experimental provision | |
CN206046057U (en) | Walk-in type high temperature and humidity test case | |
CN106468747A (en) | A kind of ageing testing method and device | |
CN103926415B (en) | Blood group antibody associating rapid detection system in human blood | |
CN205786868U (en) | Detect the detecting system of multiaspect multiport antenna for base station simultaneously | |
CN207137937U (en) | A kind of movable temperature test chamber | |
CN208254797U (en) | It is a kind of for blade thermal mechanical fatigue-creep experimental rig | |
CN208959927U (en) | A kind of stability of drug products experimental rig | |
CN110279962A (en) | A kind of modular data center fire-fighting system | |
CN102435523A (en) | Fuel pump core temperature impact test equipment | |
CN100555029C (en) | Rear module section aging chamber for liquid crystal display screen | |
CN105699039A (en) | High and low temperature environment test device for landing gear drop test | |
CN205792644U (en) | For detecting the detecting system of multi-system access platform | |
CN109729895A (en) | A kind of laboratory system of weather modification | |
CN205749230U (en) | A kind of intelligence tide analog experimental provision | |
CN107269035A (en) | A kind of intelligent modularized apiculture work station of plateau forest | |
CN206199303U (en) | For the water charging system of high-low temperature test chamber humidifier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |