CN106780739A - A kind of intelligent substation patrol three-dimension GIS system method for building up - Google Patents

A kind of intelligent substation patrol three-dimension GIS system method for building up Download PDF

Info

Publication number
CN106780739A
CN106780739A CN201710067575.9A CN201710067575A CN106780739A CN 106780739 A CN106780739 A CN 106780739A CN 201710067575 A CN201710067575 A CN 201710067575A CN 106780739 A CN106780739 A CN 106780739A
Authority
CN
China
Prior art keywords
generation
building
dimension gis
gis system
intelligent substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710067575.9A
Other languages
Chinese (zh)
Inventor
高吉普
徐长宝
戴宇
罗显跃
杨华
龙征
张历
辛明勇
王宇
刘斌
鲁彩江
桂军国
肖林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guizhou Power Grid Co Ltd
Tongren Power Supply Bureau of Guizhou Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guizhou Power Grid Co Ltd
Tongren Power Supply Bureau of Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guizhou Power Grid Co Ltd, Tongren Power Supply Bureau of Guizhou Power Grid Co Ltd filed Critical Electric Power Research Institute of Guizhou Power Grid Co Ltd
Priority to CN201710067575.9A priority Critical patent/CN106780739A/en
Publication of CN106780739A publication Critical patent/CN106780739A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/05Geographic models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/047Optimisation of routes or paths, e.g. travelling salesman problem
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Geometry (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Software Systems (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Remote Sensing (AREA)
  • Public Health (AREA)
  • Computer Graphics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of intelligent substation patrol three-dimension GIS system method for building up, it includes:Generation road network;Using in Garmin equipment collection transformer station in all routes longitude and latitude degrees of data a little;In the data inputting Map source that these are put, all key point composition adjacency lists are chosen, while the information that Garmin is got draws specific circuit and generates .shp formatted files by AutoCAD softwares;Step 2, set up three-dimensional scenic;Solve the electric power relevant industries of prior art, three-dimension GIS system is realized being primarily present from the point of view of technology with regard to it and renders that figure efficiency is low, geographic information displaying it is incomplete, and need substantial amounts of three-dimensional modeling work, it is difficult to the technical problem such as safeguard.

Description

A kind of intelligent substation patrol three-dimension GIS system method for building up
Technical field
Technical field, more particularly to a kind of intelligent substation patrol three-dimension GIS system are patrolled and examined the invention belongs to crusing robot Construction in a systematic way cube method.
Background technology
In transformer station build three-dimensional geographic information system fundamental starting point be in order to it is correct, comprehensive, obtain in time The various information of power system, so as to ensure substation safety, efficiently operate, and more improve week for more users are provided The service arrived.Three-dimension GIS system is come by traditional two-dimension GIS System Development, compared to two-dimension GIS system, three-dimension GIS Geography information can more objectively be represented in terms of space.Generalized information system stays in traditional at present in the application of concerned power Two-dimension GIS is described and expresses GIS geodatas and attribute data.In drafting basic geodata and analyze data, when Preceding generalized information system serves good booster action in terms of figure demonstrates one's ability, but has important three dimension for some According to electric power facility, such as building, shaft tower, transformer station, the expressive ability of conventional two-dimensional GIS is barely satisfactory;For two-dimension GIS Can only expression plane geography information shortcoming, the research of GIS technology is started turned to by two dimension three-dimensional.Three-dimension GIS technology is from reason The limitation of plan can only be drawn by two-dimension GIS is above breached, allows one to be carried out in the way of three-dimensional the application of geography information. At present, in electric power relevant industries, three-dimension GIS systematic difference is also little, and this is primarily due to GIS-Geographic Information System and is just locating at present In a transition period for 2 d-to-3 d, three-dimension GIS system realizes being primarily present from the point of view of technology that to render figure efficiency low with regard to it, Geographic information displaying it is incomplete, and need the work of substantial amounts of three-dimensional modeling, it is difficult to the technical problem such as safeguard.
The content of the invention:
The technical problem to be solved in the present invention is:A kind of intelligent substation patrol three-dimension GIS system method for building up is provided, with Solve the electric power relevant industries of prior art, three-dimension GIS system realizes being primarily present from the point of view of technology that to render figure efficiency low with regard to it, Geographic information displaying it is incomplete, and need the work of substantial amounts of three-dimensional modeling, it is difficult to the technical problem such as safeguard.
Technical solution of the present invention:
A kind of intelligent substation patrol three-dimension GIS system method for building up, it includes:
Step 1, generation road network;Using in Garmin equipment collection transformer station in all routes the longitude and latitude number of degrees a little According to;In the data inputting Map-source that these are put, all key point composition adjacency lists are chosen, while Garmin is got Information draws specific circuit and generates .shp formatted files by AutoCAD softwares;
Step 2, set up three-dimensional scenic;Dem data and digital satellite map generation are loaded in Terra builder softwares .mpt form topographic database;The file of the .mtp forms of generation is loaded in Terra Explorer Pro softwares;.mtp lattice It is transformer station's dimensional topography scene that the file of formula is opened in Terra Explorer Pro, and GIS features are loaded in this scenario Figure layer .shp files, plotting, textures, foundation and loading 3D models, so as to set up three-dimensional virtual scene.
It also includes:
Step 3, intelligent patrol detection layout of roads:Determine that the optimal path between two anchor points is advised using dijkstra's algorithm Draw;Circuit is patrolled and examined to more than two inspectors or crusing robot equilibrium assignment using genetic algorithm.
The use dijkstra's algorithm determines that the optimum path planning between two anchor points includes:
Step 3.1, set S and set U when setting up initial, set S only include starting point s;Set U includes the summit in addition to s;
Step 3.2, " the most short summit k of distance " is selected from set U, and summit k is added in set S, while from U Middle removal summit k;
Distance of each summit to starting point s in step 3.3, renewal U;
Step 3.4, repeat step 3.2 and 3.3, until having traveled through all summits, obtain the optimal road between two anchor points Footpath.
The use genetic algorithm includes to the method that more than two inspector's equilibrium assignments patrol and examine circuit:
Step 3.5, unique and continuous array sequence number is given to all cities, use and entered with traveling through the sequential arrangement in city The method of row coding, determines population size n, and n solution X is produced using random deviceiK () (1≤i≤n, k are generation number) constitutes Initial solution group;
Step 3.6, for each individual XiK (), variable k is generation number, k=1 when initial calculates its fitness f (xi (k));
Step 3.7, for each individual XiK (), calculates its survival probabilityThen one is set at random Selector, according to PiK () produces breeding individuality X with certain random devicei(k);
Step 3.8, generation population of future generation, choose two breeding individuality X1(k)、X2(k), and advised according to certain combination Then by X1(k)、X1K () is combined into two individual X of a new generation1(k+1)、x1(k+2), until the n bodily form of new generation is into complete Finish;
Step 3.9,3.6 to 3.8 are repeated, until reaching the generation number finish condition of regulation.
Fitness f (the xi(k)) fitness function be:
In formulaIt is balance factor, Min (Di) is most short path in all travelling salesmans, dijFor Distances of the city i to city j.
Beneficial effects of the present invention:
The present invention establishes a complete road network system and three-dimension GIS system.And operation is patrolled and examined in realization;Calculated by optimizing Method is realized simultaneously for several inspectors plan optimal route, and can be in a balanced way that several inspectors distribute task;By right The secondary development of skyline three-dimension GIS systems, transformer station's three-dimension GIS system of one superior performance of fast construction, typing road network Etc. realizing intelligent patrol detection function after information;Three-dimensional data of the present invention be able to can naturally also be contained with dimensionality reduction to two dimension, therefore three-dimension GIS The spatial analysis functions of two-dimension GIS.The powerful various dimensions spatial analysis functions of three-dimension GIS, are not only GIS spatial analysis functions Once cross over, the characteristics of GIS has also been fully demonstrated to a greater extent and superiority;Using up to date technics and management means Transformer station is managed, strengthens the operational management to substation equipment and ability to supervise, effectively prevent the generation of accident, in time Accident has been sent out in treatment;The electric power relevant industries of prior art are solved, three-dimension GIS system is realized being primarily present from the point of view of technology with regard to it Render that figure efficiency is low, geographic information displaying it is incomplete, and need substantial amounts of three-dimensional modeling work, it is difficult to the technology such as safeguard Problem.
Specific embodiment:
The present invention uses transformer station's high definition image and dem data, builds true three-dimension scene.User can be inquired about in scene The information such as Point Coordinates, elevation, system can be planned patrols and examines route.Realize that step is as follows:
Step one generates road network:
Four class data are needed in power transformation three-dimension GIS system:Transformer station's digital satellite map, transformer station's elevation information (longitude, Latitude, height above sea level), the transformer station route network information, facility information.Transformer station's route network information of the present invention is by Garmin All route longitude and latitude degrees of data are obtained in (equipment of record longitude and latitude) equipment collection transformer station.Patrol and examine algorithm data type all It is point coordinates (longitude and latitude) data, the present invention is using all roads in Garmin (equipment of record longitude and latitude) equipment collections transformer station If the longitude and latitude degrees of data done in line.Data inputting Map-source (a gps data pipes of Garmin exploitations that these are put Reason software) in, it can be seen that the information of the route for constituting a little, chooses all keys in the map of Map-source softwares Point (crossing and anchor point) constitutes adjacency list, while the road network information that Garmin is got is drawn specifically by AutoCAD softwares Circuit simultaneously generates .shp formatted files.
The generation of step 2 three-dimensional scenic:
Terra-Builder is one of skyline three-dimension GIS systems using DEM (elevation mathematical model) data and distant Feel image data to build the instrument of the three-dimensional scenic of oneself.
Terra Explorer Pro be in skyline three-dimension GIS systems one can load opening dimensional topography scene (.mtp files), then can in the scene carry out the instrument of various edit operations, such as loading GIS features figure layer (.shp texts Part), plotting, textures, foundation and loading 3D models etc., so as to set up truer and abundant three-dimensional virtual scene.
The generation of three-dimensional scenic is divided into two steps:
First loads DEM (elevation information) data and digital satellite map in Terra builder softwares.Ultimately generate .mpt form topographic database.
Second, the file of the .mtp forms of first step generation, loading ground are loaded in Terra Explorer Pro softwares Graphic data.Then the line that will be drawn by AutoCAD softwares draw topographic map data (including transformer station's route, substation equipment coordinate, The figure layer data such as transformer station's building scope) corresponding .shp formatted files are generated, in Terra Explorer Pro softwares Batch modeling is imported using figure layer instrument is added.Layer properties table addition attribute field is opened, the addition of building figure layer is given Number fields, an attribute field value is assigned to each building.People two is led in Terra Explorer Pro softwares Dimension GIS feature figure layers.Can not meet beautification to three-dimensional scenic due to only loading feature figure layer, thus need by textures, Plotting etc. operates to realize protrusion and the beautification of the three-dimensional scenic to building and periphery.Building beautifies:Building is assigned first The different height of thing, opens transformer station's building layer properties frame, the roof height option below selection position, and setting height is (number*5), building different number attribute field values of addition according to before show different height.Next step It is that mapping operations are carried out to building, building textures can take the different modes to carry out textures according to different attributes, scheme Piece can be that transformer substation reality photo can also be the samples pictures in system database.Road beautifies:Route figure layer is opened, is made Figure layer is in editing mode, and the Draw options of click menu Tools select Urban Design, according to skyline three-dimension GISs Base map laying road in system, sets street lamp, trees, traffic lights etc..
Step 3 intelligent patrol detection layout of roads:
For the two large problems that robot used for intelligent substation patrol global optimal path planning needs to solve:One is any two The Solve problems of shortest path between anchor point;Two is the Solve problems of all anchor point optimal combinations, proposes to use Two methods of dijkstra's algorithm, genetic algorithm.
Algorithm data type is all point coordinates (longitude and latitude) data, and the present invention is using Garmin (equipment of record longitude and latitude) If the longitude and latitude degrees of data done in all routes in equipment collection transformer station.The data inputting Mapsource that these are put In (a gps data management software of Garmin exploitations), it can be seen that the road for constituting a little in the map of Mapsource The information of line, chooses all key point (crossing and anchor point etc.) composition adjacency lists.
1.Dijkstra algorithms solve the optimum path planning between two anchor points, and dijkstra's algorithm process is as follows:
1) when initial, set S only includes starting point s;Distances of the set U comprising summit in other summits, and U in addition to s for " Distances of the starting point s to the summit " (for example, in U vertex v distance for (s, v) length, then s and v are non-conterminous, then v away from From being ∞).
2) " the most short summit k of distance " is selected from U, and summit k is added in S;Meanwhile, summit k is removed from U.
3) distance of each summit to starting point s in renewal U.The distance on summit in U why is updated, is due in previous step It is the summit for obtaining shortest path that k is determined, such that it is able to update the distance on other summits using k;For example, (s, v) away from From the distance for being likely larger than (s, k)+(k, v).
4) repeat step 2) and 3), until having traveled through all summits.
2. genetic algorithm solves the problems, such as that multiple inspector's equilibrium assignments are covered and all patrols and examines layout of roads
In the case of several inspectors or many crusing robots are sent simultaneously, how to be in a balanced way Several inspectors plan the problem of optimal route.Multirobot is patrolled and examined all anchor point problems and can be generalized into multiple traveling salesmen problem (the M set in city is provided, N number of travelling salesman walks an itinerary respectively from the city at respective place so that each City one and only one travelling salesman pass by.Eventually pass back to it is original set out city and total route is most short).The present invention is using something lost Propagation algorithm solves the above problems.
The process of genetic algorithm is as follows:
1) all cities give unique and continuous array sequence number, use to travel through what the sequential arrangement in city was encoded Method, such as sequence 82631457 are represented since the city 8, successively through city 2,6,3, Isosorbide-5-Nitrae, 5,7, finally return to city 8 time Go through path.Determine population size n (integer), producing n using random device may solve Xi(k) (1≤i≤n, k are generation number) Composition initial solution group;
2) for each individual XiK () (variable k is generation number, initial when k=1), calculates its fitness f (xi(k));
3) for each individual XiK (), calculates its survival probabilityThen a random selection is set Device, according to PiK () produces breeding individuality X with certain random devicei(k)。
4) population of future generation is produced.Choose two breeding individuality X1(k)、X2(k), and according to certain rule of combination (as handed over Fork, variation, reverse etc.) by X1(k)、X1K () is combined into two individual X of a new generation1(k+1)、x1(k+2), until a new generation n Each and every one body is formed and finished.
5) repeat 2) to 4) step, until reaching the generation number finish condition of regulation.
Multiple traveling salesmen problem is converted to the upper problem of travelling by the present invention using the method for setting virtual point:Assuming that there is M trip Doing business will walk N number of point, introduce M-1 virtual point, be designated as N+1, N+2...N+M-1.I-th (0 < i < N) individual point is to jth (N < j < M+N) distance definition of individual point is i-th point to the 1st distance of point.The distance between virtual point and to central point 1 It is defined as infinity.Under such hypothesis, the point that M bar circuits are passed through comprises at least out another point outside central point.
Genetic algorithm is many inspectors path planning in a balanced way, and object function has two:
1) total distance is most short, and formula is:
2) polling path of inspector is distributed in a balanced way, and formula is:Comprehensive two targets of Min { Max (Di)-Min (Di) } The fitness function that function can obtain genetic algorithm is:
WhereinIt is balance factor, Min (Di) is most short path in all travelling salesmans, dijFor Distances of the city i to city j.
Step 4 carries out secondary development using C# programming language combination skyline three-dimension GISs systems
Terra Explorer Pro instruments are loaded in the softwares of Visio studio 2010 and provides an ActiveX Control set.In the interface of exploitation, embedded the 3D window, inforamtion tree and navigation map.Terra Explorer are called by C# The user interface that Pro instruments are provided realizes the functional programming in three-dimension GIS system in systems.

Claims (5)

1. a kind of intelligent substation patrol three-dimension GIS system method for building up, it includes:
Step 1, generation road network;Using in Garmin equipment collection transformer station in all routes longitude and latitude degrees of data a little;Will In the data inputting Map-source of these points, all key point composition adjacency lists are chosen, while the information that Garmin is got Specific circuit is drawn by AutoCAD softwares and .shp formatted files are generated;
Step 2, set up three-dimensional scenic;Dem data and digital satellite map generation .mpt lattice are loaded in Terra builder softwares Formula topographic database;The file of the .mtp forms of generation is loaded in Terra Explorer Pro softwares;.mtp the text of form It is transformer station's dimensional topography scene that part is opened in Terra Explorer Pro, and GIS feature figure layers are loaded in this scenario .shp file, plotting, textures, foundation and loading 3D models, so as to set up three-dimensional virtual scene.
2. a kind of intelligent substation patrol three-dimension GIS system method for building up according to claim 1, it is characterised in that it is also Including:
Step 3, intelligent patrol detection layout of roads:Optimum path planning between two anchor points is determined using dijkstra's algorithm;Adopt Circuit is patrolled and examined to more than two inspectors or crusing robot equilibrium assignment with genetic algorithm.
3. a kind of intelligent substation patrol three-dimension GIS system method for building up according to claim 2, it is characterised in that:Institute State and determine that the optimum path planning between two anchor points includes using dijkstra's algorithm:
Step 3.1, set S and set U when setting up initial, set S only include starting point s;Set U includes the summit in addition to s;
Step 3.2, " the most short summit k of distance " is selected from set U, and summit k is added in set S, while the shifting from U Except summit k;
Distance of each summit to starting point s in step 3.3, renewal U;
Step 3.4, repeat step 3.2 and 3.3, until having traveled through all summits, obtain the optimal path between two anchor points.
4. a kind of intelligent substation patrol three-dimension GIS system method for building up according to claim 2, it is characterised in that:Institute State is included using genetic algorithm to the method that more than two inspector's equilibrium assignments patrol and examine circuit:
Step 3.5, unique and continuous array sequence number is given to all cities, use and compiled with traveling through the sequential arrangement in city The method of code, determines population size n, and n solution X is produced using random deviceiK () (1≤i≤n, k are generation number) composition is initial Xie Qun;
Step 3.6, for each individual XiK (), variable k is generation number, k=1 when initial calculates its fitness f (xi(k));
Step 3.7, for each individual XiK (), calculates its survival probability Then a random selection is set Device, according to PiK () produces breeding individuality X with certain random devicei(k);
Step 3.8, generation population of future generation, choose two breeding individuality X1(k)、X2(k), and will according to certain rule of combination X1(k)、X1K () is combined into two individual X of a new generation1(k+1)、X1(k+2), until the n bodily form of new generation is into finishing;
Step 3.9,3.6 to 3.8 are repeated, until reaching the generation number finish condition of regulation.
5. a kind of intelligent substation patrol three-dimension GIS system method for building up according to claim 4, it is characterised in that:Institute State fitness f (xi(k)) fitness function be:
F ( x ) = M i n { M a x ( D i ) - M i n ( D i ) } k * M i n ( D i ) × Σ i = 1 N + M - 1 Σ j = 1 N + M - 1 d i j x i j + Σ i = 1 N + M - 1 Σ j = 1 N + M - 1 d i j x i j
In formulaIt is balance factor, Min (Di) is most short path in all travelling salesmans, dijIt is city i To the distance of city j.
CN201710067575.9A 2017-02-07 2017-02-07 A kind of intelligent substation patrol three-dimension GIS system method for building up Pending CN106780739A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710067575.9A CN106780739A (en) 2017-02-07 2017-02-07 A kind of intelligent substation patrol three-dimension GIS system method for building up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710067575.9A CN106780739A (en) 2017-02-07 2017-02-07 A kind of intelligent substation patrol three-dimension GIS system method for building up

Publications (1)

Publication Number Publication Date
CN106780739A true CN106780739A (en) 2017-05-31

Family

ID=58955316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710067575.9A Pending CN106780739A (en) 2017-02-07 2017-02-07 A kind of intelligent substation patrol three-dimension GIS system method for building up

Country Status (1)

Country Link
CN (1) CN106780739A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107358324A (en) * 2017-07-18 2017-11-17 浪潮天元通信信息系统有限公司 A kind of IDC visualizations polling path automatically creates method
CN107885960A (en) * 2017-12-07 2018-04-06 北京天润新能投资有限公司 A kind of earthwork estimation system and evaluation method based on construction road automatic route selection in wind power plant field
CN108844541A (en) * 2018-03-09 2018-11-20 广东电网有限责任公司机巡作业中心 A kind of machine based on inspection scene patrols paths planning method
CN110807219A (en) * 2019-10-16 2020-02-18 湖北亿咖通科技有限公司 Three-dimensional simulation modeling method, device, terminal and storage medium for road network
CN111158358A (en) * 2019-11-29 2020-05-15 中国电力科学研究院有限公司 A method and system for self-optimizing inspection of substation/converter station based on three-dimensional model
CN112712183A (en) * 2020-12-23 2021-04-27 北京旋极伏羲科技有限公司 Transformer substation unmanned inspection equipment data management method based on space grid
CN112902970A (en) * 2021-02-25 2021-06-04 深圳市朗驰欣创科技股份有限公司 Routing inspection path planning method and routing inspection robot

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101726309A (en) * 2009-12-18 2010-06-09 吉林大学 Navigation electronic map dynamic topology rebuilding system method based on road data increment updating
CN103400428A (en) * 2013-07-26 2013-11-20 维坤智能科技(上海)有限公司 Multipoint combination polling method of three-dimensional transformer substation polling system
US20140100815A1 (en) * 2012-10-10 2014-04-10 Archidata Inc. Method and apparatus for building and asset management
CN104914866A (en) * 2015-05-29 2015-09-16 国网山东省电力公司电力科学研究院 Tour inspection robot global path planning method based on topological point classification and system
CN105574683A (en) * 2016-01-21 2016-05-11 国家电网公司 Omni-directional transformer station inspection system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101726309A (en) * 2009-12-18 2010-06-09 吉林大学 Navigation electronic map dynamic topology rebuilding system method based on road data increment updating
US20140100815A1 (en) * 2012-10-10 2014-04-10 Archidata Inc. Method and apparatus for building and asset management
CN103400428A (en) * 2013-07-26 2013-11-20 维坤智能科技(上海)有限公司 Multipoint combination polling method of three-dimensional transformer substation polling system
CN104914866A (en) * 2015-05-29 2015-09-16 国网山东省电力公司电力科学研究院 Tour inspection robot global path planning method based on topological point classification and system
CN105574683A (en) * 2016-01-21 2016-05-11 国家电网公司 Omni-directional transformer station inspection system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
郑森泉 等: "电网三维GIS管理平台关键技术研究", 《电力信息化》 *
郭张龙 等: "基于遗传算法的目标分配问题研究", 《现代防御技术》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107358324A (en) * 2017-07-18 2017-11-17 浪潮天元通信信息系统有限公司 A kind of IDC visualizations polling path automatically creates method
CN107885960A (en) * 2017-12-07 2018-04-06 北京天润新能投资有限公司 A kind of earthwork estimation system and evaluation method based on construction road automatic route selection in wind power plant field
CN108844541A (en) * 2018-03-09 2018-11-20 广东电网有限责任公司机巡作业中心 A kind of machine based on inspection scene patrols paths planning method
CN110807219A (en) * 2019-10-16 2020-02-18 湖北亿咖通科技有限公司 Three-dimensional simulation modeling method, device, terminal and storage medium for road network
CN110807219B (en) * 2019-10-16 2021-06-01 湖北亿咖通科技有限公司 Three-dimensional simulation modeling method, device, terminal and storage medium for road network
CN111158358A (en) * 2019-11-29 2020-05-15 中国电力科学研究院有限公司 A method and system for self-optimizing inspection of substation/converter station based on three-dimensional model
CN112712183A (en) * 2020-12-23 2021-04-27 北京旋极伏羲科技有限公司 Transformer substation unmanned inspection equipment data management method based on space grid
CN112902970A (en) * 2021-02-25 2021-06-04 深圳市朗驰欣创科技股份有限公司 Routing inspection path planning method and routing inspection robot

Similar Documents

Publication Publication Date Title
CN106780739A (en) A kind of intelligent substation patrol three-dimension GIS system method for building up
CN108759840B (en) An indoor and outdoor integrated three-dimensional navigation path planning method
CN112052547B (en) An automatic generation method of urban road network based on artificial intelligence
Badwi et al. 3D-GIS parametric modelling for virtual urban simulation using CityEngine
CN101608926B (en) Multi-level multi-modal route-finding navigation method
CN112734176B (en) Charging station building method and device, terminal equipment and readable storage medium
Sabri et al. A multi-dimensional analytics platform to support planning and design for liveable and sustainable urban environment
CN107153744A (en) Subsurface three-dimensional pipeline decision system
Bansal Use of geographic information systems in spatial planning: A case study of an institute campus
CN109374005B (en) Ship internal path planning method based on ship VR model
Shariatpour et al. Urban 3d modeling as a precursor of city information modeling and digital twin for smart city era: A case study of the narmak neighborhood of tehran city, iran
CN101425238B (en) The Method of Building Transportation Geographical Information System
Avezbaev et al. Implementation of GIS-based Smart Community Information System and concepts of Digital Twin in the field of urban planning in Uzbekistan
CN117407550B (en) A digital system for traditional Tibetan and Qiang settlement landscapes based on GIS technology
McElwee et al. Real-time analysis of city scale transportation networks in New Orleans metropolitan area using an agent based model approach
Goss et al. Street network generation with adjustable complexity using k-means clustering
Tiwari et al. 3D city model enabled e-governance for sustainable urbanization
Dai et al. Check for updates Research on the Application of Computerized Parametric Design in the Site Selection Analysis of Pocket Park Design
Wijaya et al. The use of ArcGIS to compose heritage tourism map: A systematic literature review
Dong et al. A topographically preserved road‐network tile model and optimal routing method for virtual globes
Osipov et al. Algorithms of automation of 3D modeling of urban environment objects using attributive information from a digital map
Yangyang et al. Road planning for a scenic environment based on the Dijkstra algorithm: Case study of Nanjing Niushou Mountain Scenic Spot in China
He et al. Analysis of Social Perception and Tourism Potential of Traditional Villages in Zhanjiang Based on Sustainability Eyes by Big Data, RS and GIS
Zhang et al. GIS-Based Street Data Analysis and Information Construction in the Context of Smart City
Zang et al. Intelligent Layout Method of Power Line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531