CN106774802A - The reminding method of terminal power, device and terminal - Google Patents
The reminding method of terminal power, device and terminal Download PDFInfo
- Publication number
- CN106774802A CN106774802A CN201611131136.1A CN201611131136A CN106774802A CN 106774802 A CN106774802 A CN 106774802A CN 201611131136 A CN201611131136 A CN 201611131136A CN 106774802 A CN106774802 A CN 106774802A
- Authority
- CN
- China
- Prior art keywords
- terminal
- consumption
- electricity
- electric quantity
- consumed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 37
- 230000005611 electricity Effects 0.000 claims abstract description 305
- 238000004458 analytical method Methods 0.000 claims description 6
- 238000010586 diagram Methods 0.000 description 10
- 238000012545 processing Methods 0.000 description 10
- 238000004891 communication Methods 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 7
- 238000001514 detection method Methods 0.000 description 4
- 230000003287 optical effect Effects 0.000 description 4
- 230000005236 sound signal Effects 0.000 description 4
- 230000000712 assembly Effects 0.000 description 3
- 238000000429 assembly Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000001133 acceleration Effects 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- KLDZYURQCUYZBL-UHFFFAOYSA-N 2-[3-[(2-hydroxyphenyl)methylideneamino]propyliminomethyl]phenol Chemical compound OC1=CC=CC=C1C=NCCCN=CC1=CC=CC=C1O KLDZYURQCUYZBL-UHFFFAOYSA-N 0.000 description 1
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 201000001098 delayed sleep phase syndrome Diseases 0.000 description 1
- 208000033921 delayed sleep phase type circadian rhythm sleep disease Diseases 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000003384 imaging method Methods 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/32—Means for saving power
- G06F1/3203—Power management, i.e. event-based initiation of a power-saving mode
- G06F1/3206—Monitoring of events, devices or parameters that trigger a change in power modality
- G06F1/3212—Monitoring battery levels, e.g. power saving mode being initiated when battery voltage goes below a certain level
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3058—Monitoring arrangements for monitoring environmental properties or parameters of the computing system or of the computing system component, e.g. monitoring of power, currents, temperature, humidity, position, vibrations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computing Systems (AREA)
- Quality & Reliability (AREA)
- Telephone Function (AREA)
Abstract
The disclosure is directed to a kind of reminding method of terminal power, device and terminal, wherein, the method includes:Determine the current electric quantity of terminal;Whether the information of current electric quantity and the consumption electricity to be consumed of default electricity consumption phase for prestoring according to terminal, judges the sustainable default electricity consumption phase consumption electricity to be consumed of current electric quantity of terminal;If the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed, prompt message is generated, to point out user to be charged.So as to terminal can determine whether the electricity of terminal can support some the electricity consumption time electricity to be consumed required by user, for example frequent or when going using terminal of high capacity is needed in user, terminal can be when it is determined that the current electric quantity of terminal cannot support the consumption electricity to be consumed of default electricity consumption phase, generation prompt message, so as to the current electric quantity for pointing out user terminal not can support the default electricity consumption phase consumption electricity to be consumed, user is pointed out to charge in time.
Description
Technical field
This disclosure relates to field of terminal technology, more particularly to the reminding method of terminal power, device and terminal.
Background technology
With the application and development of terminal, terminal has become the important tool in people's live and work.People use
When terminal, such as personal mobile phone, notebook computer etc., use time is more and more long, although the capacity of the battery of terminal
It is increasing, but can still be frequently encountered when actually used in use, that is shut down because the battery electric quantity of terminal is not enough shows
As the use to user brings inconvenience.
In correlation technique, terminal can the electricity of terminal be less than a power threshold when, point out user need into
Row charges.
But in correlation technique, terminal is merely able to be gone when the electricity of terminal is less than power threshold prompting user for eventually
End is charged, but terminal cannot determine whether the electricity of terminal can support some the electricity consumption times required by user to be consumed
Electricity, for example needed frequently or when going using terminal of high capacity in user, terminal cannot determine that the electricity of terminal is
It is no to support these electricity consumption time electricity to be consumed, and then the electricity of user's terminal when using terminal can be caused
It is not enough or even to cause the problem of shutdown, it is necessary to go the inconvenience of timely charging, so as to the use to user brings inconvenience.
The content of the invention
To overcome problem present in correlation technique, the disclosure to provide a kind of reminding method of terminal power, device and end
End, cannot determine whether the electricity of terminal can support what these electricity consumption times to be consumed for solving terminal in the prior art
Electricity, and then the not enough power supply of user's terminal when using terminal can be caused, it is necessary to go the inconvenience of timely charging, or even make
Into the problem of shutdown, so as to the problem that the use to user brings inconvenience.
According to the first aspect of the embodiment of the present disclosure, there is provided a kind of reminding method of terminal power, including
Determine the current electric quantity of terminal;
The information of current electric quantity and the consumption electricity to be consumed of default electricity consumption phase for prestoring according to terminal, judges
The whether sustainable default electricity consumption phase consumption electricity to be consumed of the current electric quantity of terminal;
If the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed, prompt message is generated,
To point out user to be charged.
Further, the default electricity consumption phase is power consumption rush hour;
If the current electric quantity of the terminal not can support the default electricity consumption phase consumption electricity to be consumed, generation prompting letter
Breath, to point out user to be charged, including:
Preset Time before the power consumption rush hour, however, it is determined that the current electric quantity of terminal not can support power consumption peak
The consumption electricity that time to be consumed, then generate prompt message, to point out user to be charged.
Further, before the current electric quantity of the determination terminal, also include:
The use information of each application in terminal is obtained, when the use information includes each use time of application, respectively uses
Application power consumption corresponding with duration is respectively used long;
Each use time, respectively use duration application corresponding with each use duration in use information according to each application
Power consumption, determines the power consumption rush hour of terminal.
Further, the default electricity consumption phase is the use time of high frequency applications;
If the current electric quantity of the terminal not can support the default electricity consumption phase consumption electricity to be consumed, generation prompting letter
Breath, to point out user to be charged, including:
Preset Time before the use time of high frequency applications, however, it is determined that the current electric quantity of terminal not can support high frequency
In the use time of rate application, the consumption electricity that high frequency applications to be consumed then generates prompt message, to point out user to carry out
Charge.
Further, before the current electric quantity of the determination terminal, also include:
The use information of each application in terminal is obtained, when the use information includes each use time of application, respectively uses
Application power consumption corresponding with duration is respectively used long;
Each use time in use information according to each application, counts the access times of each application;
According to the access times of each application, high frequency applications are determined;
Application power consumption corresponding with each use duration in the use information of high frequency applications, determines that high-frequency should
With the consumption electricity to be consumed.
The technical scheme provided by this disclosed embodiment can include the following benefits:By the current electricity for determining terminal
Amount;The information of current electric quantity and the consumption electricity to be consumed of default electricity consumption phase for prestoring according to terminal, judges terminal
The whether sustainable default electricity consumption phase consumption electricity to be consumed of current electric quantity;If the current electric quantity of terminal not can support default using
The consumption electricity that the electric phase to be consumed, then generate prompt message, to point out user to be charged.So as to terminal can determine terminal
Electricity whether can support some electricity consumption time electricity to be consumed required by user, for example need frequently in user,
Or when going using terminal of high capacity, terminal can be it is determined that the current electric quantity of terminal cannot support default electricity consumption phase institute
When the consumption electricity to be consumed, prompt message is generated, so as to point out the current electric quantity of user terminal not can support default using
The consumption electricity that the electric phase to be consumed, points out user to charge in time, it is to avoid causing the electricity of terminal can not support default electricity consumption
The situation of the consumption electricity that the phase to be consumed, is easy to the using terminal of user.
According to the second aspect of the embodiment of the present disclosure, there is provided a kind of suggestion device of terminal power, including:
Determining module, is configured to determine that the current electric quantity of terminal;
Judge module, is configured as according to disappearing that the current electric quantity of terminal and the default electricity consumption phase for prestoring to be consumed
Whether the information of power consumption, judges the sustainable default electricity consumption phase consumption electricity to be consumed of current electric quantity of terminal;
Reminding module, if the current electric quantity for being configured as terminal not can support the default electricity consumption phase consumption to be consumed electricity
Amount, then generate prompt message, to point out user to be charged.
Further, the default electricity consumption phase is power consumption rush hour;
The reminding module, is specifically configured to:
Preset Time before the power consumption rush hour, however, it is determined that the current electric quantity of terminal not can support power consumption peak
The consumption electricity that time to be consumed, then generate prompt message, to point out user to be charged.
Further, described device, also includes:
First analysis module, was configured as before the current electric quantity that the determining module determines terminal, in acquisition terminal
The use information of each application, the use information includes each use time of application, respectively uses duration corresponding using duration with each
Application power consumption;It is each use time in use information according to each application, respectively corresponding using duration with each using duration
Using power consumption, the power consumption rush hour of terminal is determined.
Further, the default electricity consumption phase is the use time of high frequency applications;
The reminding module, is specifically configured to:
Preset Time before the use time of high frequency applications, however, it is determined that the current electric quantity of terminal not can support high frequency
In the use time of rate application, the consumption electricity that high frequency applications to be consumed then generates prompt message, to point out user to carry out
Charge.
Further, described device, also includes:
Second analysis module, was configured as before the current electric quantity that the determining module determines terminal, in acquisition terminal
The use information of each application, the use information includes each use time of application, respectively uses duration corresponding using duration with each
Application power consumption;Each use time in use information according to each application, counts the access times of each application;According to respectively should
Access times, determine high frequency applications;In the use information of high frequency applications it is corresponding with each use duration should
With power consumption, the high frequency applications consumption electricity to be consumed is determined.
The technical scheme provided by this disclosed embodiment can include the following benefits:By the current electricity for determining terminal
Amount;The information of current electric quantity and the consumption electricity to be consumed of default electricity consumption phase for prestoring according to terminal, judges terminal
The whether sustainable default electricity consumption phase consumption electricity to be consumed of current electric quantity;If the current electric quantity of terminal not can support default using
The consumption electricity that the electric phase to be consumed, then generate prompt message, to point out user to be charged.So as to terminal can determine terminal
Electricity whether can support some electricity consumption time electricity to be consumed required by user, for example need frequently in user,
Or when going using terminal of high capacity, terminal can be it is determined that the current electric quantity of terminal cannot support default electricity consumption phase institute
When the consumption electricity to be consumed, prompt message is generated, so as to point out the current electric quantity of user terminal not can support default using
The consumption electricity that the electric phase to be consumed, points out user to charge in time, it is to avoid causing the electricity of terminal can not support default electricity consumption
The situation of the consumption electricity that the phase to be consumed, is easy to the using terminal of user.
According to the third aspect of the embodiment of the present disclosure, there is provided a kind of terminal, including:
Processor, and for storing the memory of processor-executable instruction;
Wherein, the processor is configured as:Determine the current electric quantity of terminal;Current electric quantity according to terminal and pre-
Whether the information of the consumption electricity that the default electricity consumption phase deposited to be consumed, judges the current electric quantity sustainable default electricity consumption phase of terminal
The consumption electricity to be consumed;If the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed, give birth to
Into prompt message, to point out user to be charged.
The technical scheme provided by this disclosed embodiment can include the following benefits:By the current electricity for determining terminal
Amount;The information of current electric quantity and the consumption electricity to be consumed of default electricity consumption phase for prestoring according to terminal, judges terminal
The whether sustainable default electricity consumption phase consumption electricity to be consumed of current electric quantity;If the current electric quantity of terminal not can support default using
The consumption electricity that the electric phase to be consumed, then generate prompt message, to point out user to be charged.So as to terminal can determine terminal
Electricity whether can support some electricity consumption time electricity to be consumed required by user, for example need frequently in user,
Or when going using terminal of high capacity, terminal can be it is determined that the current electric quantity of terminal cannot support default electricity consumption phase institute
When the consumption electricity to be consumed, prompt message is generated, so as to point out the current electric quantity of user terminal not can support default using
The consumption electricity that the electric phase to be consumed, points out user to charge in time, it is to avoid causing the electricity of terminal can not support default electricity consumption
The situation of the consumption electricity that the phase to be consumed, is easy to the using terminal of user.
It should be appreciated that the general description of the above and detailed description hereinafter are only exemplary and explanatory, not
The disclosure can be limited.
Brief description of the drawings
Accompanying drawing herein is merged in specification and constitutes the part of this specification, shows and meets implementation of the invention
Example, and be used to explain principle of the invention together with specification.
Fig. 1 is a kind of flow chart of the reminding method embodiment one of the terminal power according to an exemplary embodiment;
Fig. 2 is a kind of flow chart of the reminding method embodiment two of the terminal power according to an exemplary embodiment;
Fig. 3 is a kind of flow chart of the reminding method embodiment three of the terminal power according to an exemplary embodiment;
Fig. 4 is a kind of block diagram of the suggestion device example IV of the terminal power according to an exemplary embodiment;
Fig. 5 is a kind of block diagram of the suggestion device embodiment five of the terminal power according to an exemplary embodiment;
Fig. 6 is a kind of block diagram of the suggestion device embodiment six of the terminal power according to an exemplary embodiment;
Fig. 7 is a kind of block diagram of the entity of the terminal according to an exemplary embodiment;
Fig. 8 is a kind of block diagram of the terminal device 800 according to an exemplary embodiment.
Specific embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Following description is related to
During accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represent same or analogous key element.Following exemplary embodiment
Described in implementation method do not represent and the consistent all implementation methods of the present invention.Conversely, they be only with it is such as appended
The example of the consistent apparatus and method of some aspects being described in detail in claims, of the invention.
Fig. 1 is a kind of flow chart of the reminding method embodiment one of the terminal power according to an exemplary embodiment,
As shown in figure 1, the reminding method of terminal power is used in terminal, the terminal includes mobile terminal, personal terminal etc., for example, touch
Screen mobile phone, panel computer, PC etc., the method is comprised the following steps.
In step s 11, the current electric quantity of terminal is determined.
In this step, terminal determines the current electric quantity of lower terminal first.
For example, terminal can determine that the current electric quantity of terminal is the 50% of total electricity.
In step s 12, according to terminal current electric quantity and the consumption electricity to be consumed of default electricity consumption phase for prestoring
Information, judge the whether sustainable default electricity consumption phase consumption electricity to be consumed of current electric quantity of terminal.
In this step, in terminal and the advance information for storing the consumption electricity to be consumed of default electricity consumption phase.
Whether terminal is assured that the sustainable default electricity consumption phase consumption electricity to be consumed of the current electric quantity of terminal.Wherein, preset
The electricity consumption phase can be power consumption rush hour, the use time of high frequency applications, the terminal use time of user oneself selection etc..
For example, the current electric quantity of terminal is the 50% of total electricity, the consumption electricity that the default electricity consumption phase to be consumed
It is 40% that the consumption electricity to be consumed of default electricity consumption phase is indicated in information, it can be determined that whether the current electric quantity of terminal can prop up
The default electricity consumption phase consumption electricity to be consumed of support.
In step s 13, if the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed, give birth to
Into prompt message, to point out user to be charged.
In this step, terminal is not if it is determined that the current electric quantity of terminal can support the default electricity consumption phase consumption to be consumed electricity
Amount, then terminal can generate a prompt message, wherein, prompt message can be voice messaging, text information, vibration information etc.
Deng so as to go prompting user to need to be charged.
For example, the current electric quantity of terminal is the 40% of total electricity, the consumption electricity that the default electricity consumption phase to be consumed
It is 60% that the consumption electricity to be consumed of default electricity consumption phase is indicated in information, it can be determined that the current electric quantity of terminal not can support
The default electricity consumption phase consumption electricity to be consumed, terminal can generate voice messaging, and " not enough power supply of terminal enough supports default use
The consumption electricity that the electric phase to be consumed ", so as to point out user to be charged.
The present embodiment is by determining the current electric quantity of terminal;Current electric quantity according to terminal and the default electricity consumption for prestoring
The information of the consumption electricity that the phase to be consumed, judge the current electric quantity of terminal it is whether sustainable preset that the electricity consumption phase to be consumed disappear
Power consumption;If the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed, prompt message is generated, with
Prompting user is charged.When can determine whether the electricity of terminal can support some electricity consumptions required by user so as to terminal
Between the electricity to be consumed, for example user need frequently or when going using terminal of high capacity, terminal can it is determined that
When the current electric quantity of terminal cannot support the consumption electricity to be consumed of default electricity consumption phase, prompt message is generated, so that
Point out the current electric quantity of user terminal not can support the default electricity consumption phase consumption electricity to be consumed, point out user to charge in time,
The situation for consuming electricity for avoiding the electricity for causing terminal that the default electricity consumption phase can not be supported to be consumed, is easy to the use of user
Terminal.
On the basis of the embodiment shown in above-mentioned Fig. 1, Fig. 2 is a kind of terminal electricity according to an exemplary embodiment
The flow chart of the reminding method embodiment two of amount, as shown in Fig. 2 the default electricity consumption phase is power consumption rush hour;
It is further comprising the steps of before step S11:
In the step s 21, the use information of each application in terminal is obtained, the use information includes when respectively using of application
Between, respectively using duration use the corresponding application power consumption of duration with each;In use information according to each application when respectively using
Between, respectively using duration with each using the corresponding application power consumption of duration, determine the power consumption rush hour of terminal.
In this step, the electricity consumption phase is preset for power consumption rush hour.Using for each application is believed during terminal needs to obtain terminal
Breath, the use information of each application includes each use time of each application, respectively uses duration corresponding using duration with each
Application power consumption.Such that it is able to according to each use time in the use information of each application, respectively using duration and when respectively using
The corresponding application power consumption of length, counts the power consumption rush hour of terminal.
For example, answered using duration is corresponding with each in acquisition terminal using each use time of A, respectively using duration
Power consumption A is used, using each use time of B, duration application power consumption B corresponding with duration is respectively used, etc. is respectively used;Eventually
The power consumption rush hour that end according to these information, can count terminal is 12:00-13:00.
The specific implementation of step S13 is:
Preset Time before the power consumption rush hour, however, it is determined that the current electric quantity of terminal not can support power consumption peak
The consumption electricity that time to be consumed, then generate prompt message, to point out user to be charged.
In this step, when Preset Time of the terminal before power consumption rush hour, terminal is if it is determined that terminal is worked as
Preceding electricity not can support the power consumption rush hour consumption electricity to be consumed, then can generate a prompt message, wherein, point out
Information can be voice messaging, text information, vibration information etc., so as to go prompting user to need to be charged.
For example, determine that power consumption rush hour is daily 22:00 to 23:00, user can be set small half in advance
When remind power consumption rush hour before whether need charge;Then terminal is 21:When 30, the current electricity of detection terminal is for eventually
The 30% of end total electricity, the user that contrast the is excavated consumption electricity to be consumed in power consumption rush hour position terminal is always electric
The 50% of amount, determines that the current electric quantity of terminal not can support the power consumption rush hour consumption electricity to be consumed, it is determined that no
Foot causes user in power consumption rush hour using terminal, then " not enough power supply of terminal enough supports power consumption peak to generate voice messaging
The consumption electricity that time to be consumed ", reminds user to need to be terminal charge immediately.
The present embodiment is by determining the current electric quantity of terminal;Current electric quantity according to terminal and the default electricity consumption for prestoring
The information of the consumption electricity that the phase to be consumed, judge the current electric quantity of terminal it is whether sustainable preset that the electricity consumption phase to be consumed disappear
Power consumption;Preset Time before power consumption rush hour, however, it is determined that the current electric quantity of terminal not can support power consumption rush hour
The consumption electricity to be consumed, then generate prompt message, to point out user to be charged.The electricity of terminal can be determined so as to terminal
Whether amount can support some electricity consumption time electricity to be consumed required by user, i.e., in the power consumption rush hour of user
When, terminal can it is determined that the current electric quantity of terminal cannot support the consumption electricity that power consumption rush hour to be consumed when
Wait, generate prompt message, so as to point out the current electric quantity of user terminal not can support the consumption to be consumed of power consumption rush hour
Electricity, points out user to charge in time, it is to avoid causing the electricity of terminal can not support the consumption to be consumed of power consumption rush hour
The situation of electricity, is easy to the using terminal of user.
On the basis of the embodiment shown in above-mentioned Fig. 1, Fig. 3 is a kind of terminal electricity according to an exemplary embodiment
The flow chart of the reminding method embodiment three of amount, as shown in figure 3, use time of the default electricity consumption phase for high frequency applications;
It is further comprising the steps of before step S11:
In step S31, the use information of each application in terminal is obtained, the use information includes when respectively using of application
Between, respectively using duration use the corresponding application power consumption of duration with each.
In this step, the use time that the electricity consumption phase is high frequency applications is preset.Terminal needs respectively to be applied in acquisition terminal
Use information, the use information of each application includes each use time of each application, respectively using duration and respectively uses
The corresponding application power consumption of duration.
For example, answered using duration is corresponding with each in acquisition terminal using each use time of A, respectively using duration
Power consumption A is used, using each use time of B, duration application power consumption B corresponding with duration is respectively used, etc. is respectively used.
In step s 32, each use time in the use information according to each application, counts the access times of each application;
According to the access times of each application, high frequency applications are determined;In the use information of high frequency applications with each use duration
Corresponding application power consumption, determines the high frequency applications consumption electricity to be consumed.
In this step, each use time of the terminal in the use information of each application, counts the use of each application
Number of times;Then according to the access times of each application, high frequency applications are determined.Then, it is possible to according to making for high frequency applications
With application power consumption corresponding with each use duration in information, the high frequency applications consumption electricity to be consumed is determined.
For example, each use time of the terminal in the use information of each application A, B, C etc., count each application A,
The access times of B, C etc. are respectively a, b, c;Then according to the access times of each application, determine that high frequency applications are to apply A.
Then, it is possible to the application power consumption corresponding with each use duration in the use information according to high frequency applications A, height is determined
The frequency application A consumption electricity to be consumed is the 30% of terminal total electricity.
The specific implementation of step S13 is:
Preset Time before the use time of high frequency applications, however, it is determined that the current electric quantity of terminal not can support high frequency
In the use time of rate application, the consumption electricity that high frequency applications to be consumed then generates prompt message, to point out user to carry out
Charge.
In this step, when Preset Time of the terminal before the use time of high frequency applications, terminal if it is determined that
The current electric quantity of terminal not can support in the use time of high frequency applications, the consumption electricity that high frequency applications to be consumed, then
A prompt message can be generated, wherein, prompt message can be voice messaging, text information, vibration information etc., so as to go
Prompting user needs to be charged.
For example, terminal can determine that high frequency applications are to apply A, and the use time of high frequency applications A is daily
20:00-22:00, whether user needs to charge before can setting the use time for half an hour in advance reminding high frequency applications;
Then terminal is 19:When 30, the current electricity of detection terminal is the 30% of terminal total electricity, and the user that contrast is excavated exists
The 50% of the consumption electricity position terminal total electricity that high frequency applications to be consumed during the use time of high frequency applications, determines end
The current electric quantity at end not can support the high frequency applications consumption electricity to be consumed, it is determined that deficiency causes that user should in high-frequency
The high frequency applications of use time using terminal, then " not enough power supply of terminal enough supports high-frequency to answer to generate voice messaging
With the consumption electricity to be consumed ", remind user to need to be terminal charge immediately.
The present embodiment is by determining the current electric quantity of terminal;Current electric quantity according to terminal and the default electricity consumption for prestoring
The information of the consumption electricity that the phase to be consumed, judge the current electric quantity of terminal it is whether sustainable preset that the electricity consumption phase to be consumed disappear
Power consumption;Preset Time before the use time of high frequency applications, however, it is determined that the current electric quantity of terminal not can support high frequency
In the use time of rate application, the consumption electricity that high frequency applications to be consumed then generates prompt message, to point out user to carry out
Charge.So as to terminal can determine whether the electricity of terminal can support what some the electricity consumption times required by user to be consumed
Electricity, i.e., when the use time of high frequency applications, terminal can be it is determined that the current electric quantity of terminal cannot support height
When the consumption electricity that frequency application to be consumed, prompt message is generated, so as to point out the current electric quantity of user terminal can not
The support high frequency applications consumption electricity to be consumed, points out user to charge in time, it is to avoid causing the electricity of terminal can not prop up
The situation of the support consumption high frequency applications consumption electricity to be consumed, is easy to the using terminal of user.
Fig. 4 is a kind of block diagram of the suggestion device example IV of the terminal power according to an exemplary embodiment.Ginseng
According to Fig. 4, the device includes:
Determining module 41, is configured to determine that the current electric quantity of terminal;
Judge module 42, is configured as what is consumed according to the current electric quantity of terminal and the default electricity consumption phase for prestoring
The information of electricity is consumed, whether the sustainable default electricity consumption phase consumption electricity to be consumed of current electric quantity of terminal is judged;
Reminding module 43, if the current electric quantity for being configured as terminal not can support the default electricity consumption phase consumption to be consumed electricity
Amount, then generate prompt message, to point out user to be charged.
On the device in above-described embodiment, wherein modules perform the concrete mode of operation in relevant the method
Embodiment one in be described in detail, explanation will be not set forth in detail herein.
The present embodiment is by determining the current electric quantity of terminal;Current electric quantity according to terminal and the default electricity consumption for prestoring
The information of the consumption electricity that the phase to be consumed, judge the current electric quantity of terminal it is whether sustainable preset that the electricity consumption phase to be consumed disappear
Power consumption;If the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed, prompt message is generated, with
Prompting user is charged.When can determine whether the electricity of terminal can support some electricity consumptions required by user so as to terminal
Between the electricity to be consumed, for example user need frequently or when going using terminal of high capacity, terminal can it is determined that
When the current electric quantity of terminal cannot support the consumption electricity to be consumed of default electricity consumption phase, prompt message is generated, so that
Point out the current electric quantity of user terminal not can support the default electricity consumption phase consumption electricity to be consumed, point out user to charge in time,
The situation for consuming electricity for avoiding the electricity for causing terminal that the default electricity consumption phase can not be supported to be consumed, is easy to the use of user
Terminal.
On the basis of the embodiment shown in above-mentioned Fig. 4, Fig. 5 is a kind of terminal electricity according to an exemplary embodiment
The block diagram of the suggestion device embodiment five of amount.Reference picture 5, the default electricity consumption phase is power consumption rush hour;
The reminding module 43, is specifically configured to:
Preset Time before the power consumption rush hour, however, it is determined that the current electric quantity of terminal not can support power consumption peak
The consumption electricity that time to be consumed, then generate prompt message, to point out user to be charged.
Described device, also includes:
First analysis module 44, was configured as before the current electric quantity that the determining module 41 determines terminal, obtained eventually
The use information of each application in end, the use information includes each use time of application, respectively uses duration and respectively use duration
Corresponding application power consumption;Each use time, respectively use duration and each use duration pair in use information according to each application
The application power consumption answered, determines the power consumption rush hour of terminal.
On the device in above-described embodiment, wherein modules perform the concrete mode of operation in relevant the method
Embodiment two in be described in detail, explanation will be not set forth in detail herein.
The present embodiment is by determining the current electric quantity of terminal;Current electric quantity according to terminal and the default electricity consumption for prestoring
The information of the consumption electricity that the phase to be consumed, judge the current electric quantity of terminal it is whether sustainable preset that the electricity consumption phase to be consumed disappear
Power consumption;Preset Time before power consumption rush hour, however, it is determined that the current electric quantity of terminal not can support power consumption rush hour
The consumption electricity to be consumed, then generate prompt message, to point out user to be charged.The electricity of terminal can be determined so as to terminal
Whether amount can support some electricity consumption time electricity to be consumed required by user, i.e., in the power consumption rush hour of user
When, terminal can it is determined that the current electric quantity of terminal cannot support the consumption electricity that power consumption rush hour to be consumed when
Wait, generate prompt message, so as to point out the current electric quantity of user terminal not can support the consumption to be consumed of power consumption rush hour
Electricity, points out user to charge in time, it is to avoid causing the electricity of terminal can not support the consumption to be consumed of power consumption rush hour
The situation of electricity, is easy to the using terminal of user.
On the basis of the embodiment shown in above-mentioned Fig. 4, Fig. 6 is a kind of terminal electricity according to an exemplary embodiment
The block diagram of the suggestion device embodiment six of amount.Reference picture 6, the default electricity consumption phase is the use time of high frequency applications;
The reminding module 43, is specifically configured to:
Preset Time before the use time of high frequency applications, however, it is determined that the current electric quantity of terminal not can support high frequency
In the use time of rate application, the consumption electricity that high frequency applications to be consumed then generates prompt message, to point out user to carry out
Charge.
Described device, also includes:
Second analysis module 45, was configured as before the current electric quantity that the determining module 41 determines terminal, obtained eventually
The use information of each application in end, the use information includes each use time of application, respectively uses duration and respectively use duration
Corresponding application power consumption;Each use time in use information according to each application, counts the access times of each application;According to
The access times of each application, determine high frequency applications;It is corresponding with each use duration in the use information of high frequency applications
Application power consumption, determine the high frequency applications consumption electricity to be consumed.
On the device in above-described embodiment, wherein modules perform the concrete mode of operation in relevant the method
Embodiment three in be described in detail, explanation will be not set forth in detail herein.
The present embodiment is by determining the current electric quantity of terminal;Current electric quantity according to terminal and the default electricity consumption for prestoring
The information of the consumption electricity that the phase to be consumed, judge the current electric quantity of terminal it is whether sustainable preset that the electricity consumption phase to be consumed disappear
Power consumption;Preset Time before the use time of high frequency applications, however, it is determined that the current electric quantity of terminal not can support high frequency
In the use time of rate application, the consumption electricity that high frequency applications to be consumed then generates prompt message, to point out user to carry out
Charge.So as to terminal can determine whether the electricity of terminal can support what some the electricity consumption times required by user to be consumed
Electricity, i.e., when the use time of high frequency applications, terminal can be it is determined that the current electric quantity of terminal cannot support height
When the consumption electricity that frequency application to be consumed, prompt message is generated, so as to point out the current electric quantity of user terminal can not
The support high frequency applications consumption electricity to be consumed, points out user to charge in time, it is to avoid causing the electricity of terminal can not prop up
The situation of the support consumption high frequency applications consumption electricity to be consumed, is easy to the using terminal of user.
Fig. 7 is a kind of block diagram of the entity of the terminal according to an exemplary embodiment.Reference picture 7, the terminal can be with
It is implemented as:Processor 51, and it is configured as storing the memory 52 of processor-executable instruction;
Wherein, the processor 51 is configured as:Determine the current electric quantity of terminal;Current electric quantity according to terminal and
Whether the information of the consumption electricity that the default electricity consumption phase for prestoring to be consumed, judges the sustainable default electricity consumption of current electric quantity of terminal
The consumption electricity that phase to be consumed;If the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed,
Generation prompt message, to point out user to be charged.
In the above-described embodiments, it should be appreciated that the processor can be CPU (English:Central
Processing Unit, referred to as:CPU), can also be other general processors, digital signal processor (English:Digital
Signal Processor, referred to as:DSP), application specific integrated circuit (English:Application Specific Integrated
Circuit, referred to as:ASIC) etc..General processor can be microprocessor or the processor can also be any conventional place
Reason device etc., and foregoing memory can be read-only storage (English:Read-only memory, abbreviation:ROM), deposit at random
Access to memory (English:Random access memory, referred to as:RAM), flash memory, hard disk or solid state hard disc.SIM
Card is also referred to as subscriber identification card, smart card, and digital mobile telephone must load onto this card and can use.I.e. in computer chip
On store the information of digital mobile phone client, the content such as the key of encryption and the telephone directory of user.With reference to of the invention real
The step of applying the method disclosed in example can be embodied directly in hardware processor and perform completion, or with the hardware in processor and
Software module combination performs completion.
On the terminal in above-described embodiment, wherein modules perform the concrete mode of operation in relevant the method
It has been described in detail with the embodiment of device, explanation will be not set forth in detail herein.
The present embodiment is by determining the current electric quantity of terminal;Current electric quantity according to terminal and the default electricity consumption for prestoring
The information of the consumption electricity that the phase to be consumed, judge the current electric quantity of terminal it is whether sustainable preset that the electricity consumption phase to be consumed disappear
Power consumption;If the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed, prompt message is generated, with
Prompting user is charged.When can determine whether the electricity of terminal can support some electricity consumptions required by user so as to terminal
Between the electricity to be consumed, for example user need frequently or when going using terminal of high capacity, terminal can it is determined that
When the current electric quantity of terminal cannot support the consumption electricity to be consumed of default electricity consumption phase, prompt message is generated, so that
Point out the current electric quantity of user terminal not can support the default electricity consumption phase consumption electricity to be consumed, point out user to charge in time,
The situation for consuming electricity for avoiding the electricity for causing terminal that the default electricity consumption phase can not be supported to be consumed, is easy to the use of user
Terminal.
Fig. 8 is a kind of block diagram of the terminal device 800 according to an exemplary embodiment.For example, terminal device 800 can
To be mobile phone, computer, digital broadcast terminal, messaging devices, game console, tablet device, Medical Devices are good for
Body equipment, personal digital assistant etc..
Reference picture 8, terminal device 800 can include following one or more assemblies:Processing assembly 802, memory 804,
Power supply module 806, multimedia groupware 808, audio-frequency assembly 810, the interface 812 of input/output (I/O), sensor cluster 814,
And communication component 816.
The integrated operation of the usual control terminal equipment 800 of processing assembly 802, such as with display, call, data are led to
Letter, camera operation and the associated operation of record operation.Processing assembly 802 can include one or more processors 820 to hold
Row instruction, to complete all or part of step of above-mentioned method.Additionally, processing assembly 802 can include one or more moulds
Block, is easy to the interaction between processing assembly 802 and other assemblies.For example, processing assembly 802 can include multi-media module, with
Facilitate the interaction between multimedia groupware 808 and processing assembly 802.
Memory 804 is configured as storing various types of data supporting the operation in terminal device 800.These data
Example include on terminal device 800 operate any application program or method instruction, contact data, telephone directory
Data, message, picture, video etc..Memory 804 can by any kind of volatibility or non-volatile memory device or it
Combination realize that such as static RAM (SRAM), Electrically Erasable Read Only Memory (EEPROM) is erasable
Except programmable read only memory (EPROM), programmable read only memory (PROM), read-only storage (ROM), magnetic memory, soon
Flash memory, disk or CD.
Power supply module 806 provides electric power for the various assemblies of terminal device 800.Power supply module 806 can include power supply pipe
Reason system, one or more power supplys, and other generate, manage and distribute the component that electric power is associated with for terminal device 800.
Multimedia groupware 808 is included in one screen of output interface of offer between the terminal device 800 and user.
In certain embodiments, screen can include liquid crystal display (LCD) and touch panel (TP).If screen includes touch surface
Plate, screen may be implemented as touch-screen, to receive the input signal from user.Touch panel is touched including one or more
Sensor is with the gesture on sensing touch, slip and touch panel.The touch sensor can not only sensing touch or slip
The border of action, but also the detection duration related to the touch or slide and pressure.In certain embodiments,
Multimedia groupware 808 includes a front camera and/or rear camera.When terminal device 800 is in operator scheme, such as clap
When taking the photograph pattern or video mode, front camera and/or rear camera can receive outside multi-medium data.Each is preposition
Camera and rear camera can be a fixed optical lens systems or with focusing and optical zoom capabilities.
Audio-frequency assembly 810 is configured as output and/or input audio signal.For example, audio-frequency assembly 810 includes a Mike
Wind (MIC), when terminal device 800 is in operator scheme, such as call model, logging mode and speech recognition mode, microphone
It is configured as receiving external audio signal.The audio signal for being received can be further stored in memory 804 or via logical
Letter component 816 sends.In certain embodiments, audio-frequency assembly 810 also includes a loudspeaker, for exports audio signal.
, to provide interface between processing assembly 802 and peripheral interface module, above-mentioned peripheral interface module can for I/O interfaces 812
To be keyboard, click wheel, button etc..These buttons may include but be not limited to:Home button, volume button, start button and lock
Determine button.
Sensor cluster 814 includes one or more sensors, the state for providing various aspects for terminal device 800
Assessment.For example, sensor cluster 814 can detect the opening/closed mode of terminal device 800, the relative positioning of component, example
As described component for terminal device 800 display and keypad, sensor cluster 814 can also detect terminal device 800 or
The position of 800 1 components of terminal device changes, and user is presence or absence of with what terminal device 800 was contacted, terminal device 800
The temperature change in orientation or acceleration/deceleration and terminal device 800.Sensor cluster 814 can include proximity transducer, be configured
For the presence of object near detection when without any physical contact.Sensor cluster 814 can also include optical sensor,
Such as CMOS or ccd image sensor, for being used in imaging applications.In certain embodiments, the sensor cluster 814 may be used also
With including acceleration transducer, gyro sensor, Magnetic Sensor, pressure sensor or temperature sensor.
Communication component 816 is configured to facilitate the communication of wired or wireless way between terminal device 800 and other equipment.
Terminal device 800 can access the wireless network based on communication standard, such as WiFi, 2G or 3G, or combinations thereof.Show at one
In example property embodiment, communication component 816 receives broadcast singal or broadcast from external broadcasting management system via broadcast channel
Relevant information.In one exemplary embodiment, the communication component 816 also includes near-field communication (NFC) module, short to promote
Cheng Tongxin.For example, radio frequency identification (RFID) technology, Infrared Data Association (IrDA) technology, ultra wide band can be based in NFC module
(UWB) technology, bluetooth (BT) technology and other technologies are realized.
In the exemplary embodiment, terminal device 800 can be by one or more application specific integrated circuits (ASIC), number
Word signal processor (DSP), digital signal processing appts (DSPD), PLD (PLD), field programmable gate array
(FPGA), controller, microcontroller, microprocessor or other electronic components realization, for performing the above method.
In the exemplary embodiment, a kind of non-transitorycomputer readable storage medium including instructing, example are additionally provided
Such as include the memory 804 of instruction, above-mentioned instruction can be performed to complete the above method by the processor 820 of terminal device 800.Example
Such as, the non-transitorycomputer readable storage medium can be ROM, random access memory (RAM), CD-ROM, tape, soft
Disk and optical data storage devices etc..
A kind of non-transitorycomputer readable storage medium, when the instruction in the storage medium is by the treatment of mobile terminal
When device is performed so that mobile terminal is able to carry out a kind of reminding method of terminal power, and methods described includes:
Determine the current electric quantity of terminal;
The information of current electric quantity and the consumption electricity to be consumed of default electricity consumption phase for prestoring according to terminal, judges
The whether sustainable default electricity consumption phase consumption electricity to be consumed of the current electric quantity of terminal;
If the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed, prompt message is generated,
To point out user to be charged.
Those skilled in the art considering specification and after putting into practice invention disclosed herein, will readily occur to it is of the invention its
Its embodiment.The application is intended to any modification of the invention, purposes or adaptations, these modifications, purposes or
Person's adaptations follow general principle of the invention and including the undocumented common knowledge in the art of the disclosure
Or conventional techniques.Description and embodiments are considered only as exemplary, and true scope and spirit of the invention are by following
Claim is pointed out.
It should be appreciated that the invention is not limited in the precision architecture being described above and be shown in the drawings, and
And can without departing from the scope carry out various modifications and changes.The scope of the present invention is only limited by appended claim.
Claims (11)
1. a kind of reminding method of terminal power, it is characterised in that including:
Determine the current electric quantity of terminal;
The information of current electric quantity and the consumption electricity to be consumed of default electricity consumption phase for prestoring according to terminal, judges terminal
The whether sustainable default electricity consumption phase consumption electricity to be consumed of current electric quantity;
If the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed, prompt message is generated, to carry
Show that user is charged.
2. method according to claim 1, it is characterised in that the default electricity consumption phase is power consumption rush hour;
If the current electric quantity of the terminal not can support the default electricity consumption phase consumption electricity to be consumed, prompt message is generated,
To point out user to be charged, including:
Preset Time before the power consumption rush hour, however, it is determined that the current electric quantity of terminal not can support power consumption rush hour
The consumption electricity to be consumed, then generate prompt message, to point out user to be charged.
3. method according to claim 2, it is characterised in that before the current electric quantity of the determination terminal, also include:
Obtain the use information of each application in terminal, the use information include application each use time, respectively using duration and
It is each to use the corresponding application power consumption of duration;
Each use time, respectively use duration application power consumption corresponding with each use duration in use information according to each application
Amount, determines the power consumption rush hour of terminal.
4. method according to claim 1, it is characterised in that the default electricity consumption phase for high frequency applications use when
Between;
If the current electric quantity of the terminal not can support the default electricity consumption phase consumption electricity to be consumed, prompt message is generated,
To point out user to be charged, including:
Preset Time before the use time of high frequency applications, however, it is determined that the current electric quantity of terminal not can support high-frequency should
In use time, the consumption electricity that high frequency applications to be consumed then generates prompt message, to point out user to be filled
Electricity.
5. method according to claim 4, it is characterised in that before the current electric quantity of the determination terminal, also include:
Obtain the use information of each application in terminal, the use information include application each use time, respectively using duration and
It is each to use the corresponding application power consumption of duration;
Each use time in use information according to each application, counts the access times of each application;
According to the access times of each application, high frequency applications are determined;
Application power consumption corresponding with each use duration in the use information of high frequency applications, determines high frequency applications institute
The consumption electricity to be consumed.
6. a kind of suggestion device of terminal power, it is characterised in that including:
Determining module, is configured to determine that the current electric quantity of terminal;
Judge module, is configured as according to the current electric quantity of terminal and the consumption to be consumed of the default electricity consumption phase for prestoring electricity
Whether the information of amount, judges the sustainable default electricity consumption phase consumption electricity to be consumed of current electric quantity of terminal;
Reminding module, if the current electric quantity for being configured as terminal not can support the default electricity consumption phase consumption electricity to be consumed,
Generation prompt message, to point out user to be charged.
7. device according to claim 6, it is characterised in that the default electricity consumption phase is power consumption rush hour;
The reminding module, is specifically configured to:
Preset Time before the power consumption rush hour, however, it is determined that the current electric quantity of terminal not can support power consumption rush hour
The consumption electricity to be consumed, then generate prompt message, to point out user to be charged.
8. device according to claim 7, it is characterised in that described device, also includes:
First analysis module, was configured as before the current electric quantity that the determining module determines terminal, respectively should in acquisition terminal
Use information, the use information include application each use time, respectively using duration and it is each using duration is corresponding should
Use power consumption;Each use time, respectively use duration application corresponding with each use duration in use information according to each application
Power consumption, determines the power consumption rush hour of terminal.
9. device according to claim 6, it is characterised in that the default electricity consumption phase for high frequency applications use when
Between;
The reminding module, is specifically configured to:
Preset Time before the use time of high frequency applications, however, it is determined that the current electric quantity of terminal not can support high-frequency should
In use time, the consumption electricity that high frequency applications to be consumed then generates prompt message, to point out user to be filled
Electricity.
10. device according to claim 9, it is characterised in that described device, also includes:
Second analysis module, was configured as before the current electric quantity that the determining module determines terminal, respectively should in acquisition terminal
Use information, the use information include application each use time, respectively using duration and it is each using duration is corresponding should
Use power consumption;Each use time in use information according to each application, counts the access times of each application;According to each application
Access times, determine high frequency applications;Application corresponding with each use duration consumption in the use information of high frequency applications
Electricity, determines the high frequency applications consumption electricity to be consumed.
A kind of 11. terminals, it is characterised in that including:
Processor, and for storing the memory of processor-executable instruction;
Wherein, the processor is configured as:Determine the current electric quantity of terminal;Current electric quantity according to terminal and prestore
The information of the consumption electricity that the default electricity consumption phase to be consumed, judges that whether the current electric quantity sustainable default electricity consumption phase of terminal is wanted
The consumption electricity of consumption;If the current electric quantity of terminal not can support the default electricity consumption phase consumption electricity to be consumed, generation is carried
Show information, to point out user to be charged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611131136.1A CN106774802A (en) | 2016-12-09 | 2016-12-09 | The reminding method of terminal power, device and terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611131136.1A CN106774802A (en) | 2016-12-09 | 2016-12-09 | The reminding method of terminal power, device and terminal |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106774802A true CN106774802A (en) | 2017-05-31 |
Family
ID=58879665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611131136.1A Pending CN106774802A (en) | 2016-12-09 | 2016-12-09 | The reminding method of terminal power, device and terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106774802A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107548142A (en) * | 2017-07-31 | 2018-01-05 | 努比亚技术有限公司 | A kind of electricity-saving control method, terminal and computer-readable recording medium |
CN108156314A (en) * | 2017-12-13 | 2018-06-12 | 北京小米移动软件有限公司 | Electricity based reminding method, device, electronic equipment and storage medium |
CN109922423A (en) * | 2017-12-11 | 2019-06-21 | 阿里巴巴集团控股有限公司 | A kind of localization method, device, terminal device and storage medium |
CN110022403A (en) * | 2019-03-06 | 2019-07-16 | 华为技术有限公司 | Terminal charge based reminding method, device, equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102811289A (en) * | 2012-08-15 | 2012-12-05 | 东莞宇龙通信科技有限公司 | Terminal and power management method of same |
CN103501390A (en) * | 2013-09-30 | 2014-01-08 | 上海华勤通讯技术有限公司 | Mobile terminal with reminding function and reminding realization method thereof |
US20140340037A1 (en) * | 2009-01-28 | 2014-11-20 | Kyocera Corporation | Delayed power-on function for an electronic device |
CN104796533A (en) * | 2015-03-16 | 2015-07-22 | 深圳市金立通信设备有限公司 | Terminal |
CN105100429A (en) * | 2015-06-08 | 2015-11-25 | 北京金山安全软件有限公司 | Method and device for determining use time of residual electric quantity of mobile terminal |
-
2016
- 2016-12-09 CN CN201611131136.1A patent/CN106774802A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140340037A1 (en) * | 2009-01-28 | 2014-11-20 | Kyocera Corporation | Delayed power-on function for an electronic device |
CN102811289A (en) * | 2012-08-15 | 2012-12-05 | 东莞宇龙通信科技有限公司 | Terminal and power management method of same |
CN103501390A (en) * | 2013-09-30 | 2014-01-08 | 上海华勤通讯技术有限公司 | Mobile terminal with reminding function and reminding realization method thereof |
CN104796533A (en) * | 2015-03-16 | 2015-07-22 | 深圳市金立通信设备有限公司 | Terminal |
CN105100429A (en) * | 2015-06-08 | 2015-11-25 | 北京金山安全软件有限公司 | Method and device for determining use time of residual electric quantity of mobile terminal |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107548142A (en) * | 2017-07-31 | 2018-01-05 | 努比亚技术有限公司 | A kind of electricity-saving control method, terminal and computer-readable recording medium |
CN109922423A (en) * | 2017-12-11 | 2019-06-21 | 阿里巴巴集团控股有限公司 | A kind of localization method, device, terminal device and storage medium |
CN108156314A (en) * | 2017-12-13 | 2018-06-12 | 北京小米移动软件有限公司 | Electricity based reminding method, device, electronic equipment and storage medium |
CN108156314B (en) * | 2017-12-13 | 2020-06-19 | 北京小米移动软件有限公司 | Electric quantity reminding method and device, electronic equipment and storage medium |
CN110022403A (en) * | 2019-03-06 | 2019-07-16 | 华为技术有限公司 | Terminal charge based reminding method, device, equipment and storage medium |
WO2020177619A1 (en) * | 2019-03-06 | 2020-09-10 | 华为技术有限公司 | Method, device and apparatus for providing reminder to charge terminal, and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104219388B (en) | Sound control method and device | |
CN104539009B (en) | charging management method and device | |
CN103885588B (en) | Automatic switching method and device | |
CN106055458B (en) | A kind of charging reminding method, device and mobile device | |
CN104536935B (en) | Calculate display methods, calculate edit methods and device | |
CN105224349A (en) | The deletion reminding method of application program and device | |
CN106774774A (en) | The electric quantity display method and device of end cell | |
CN103916468B (en) | Method for upgrading system, terminal, server and upgrade-system | |
CN104238912A (en) | Application control method and application control device | |
CN105892618A (en) | Information display method and device and electronic device | |
CN103927081A (en) | Method and device for processing notification events | |
CN104298547A (en) | Terminal setting method and device | |
KR20170038178A (en) | Method, apparatus, and mobile terminal for identificating fingerprint | |
CN103995666A (en) | Method and device for setting work mode | |
CN106033397A (en) | Method and device for adjusting memory buffer, and terminal | |
CN106774802A (en) | The reminding method of terminal power, device and terminal | |
CN105227660A (en) | A kind of based reminding method and device | |
CN104463047B (en) | The device and method of control module work | |
CN107340996A (en) | Screen lights method and device | |
CN108476379A (en) | Information recording method and information record carrier | |
CN107368280A (en) | Method for controlling volume, device and the interactive voice equipment of interactive voice | |
CN105653186A (en) | Terminal control method and device | |
EP3828716A1 (en) | Method and apparatus for identifying electronic device, terminal device, and electronic device | |
CN104219648A (en) | Method and device for prompting top-up information | |
CN106708243A (en) | Terminal equipment control method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |