CN106762439A - Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique - Google Patents
Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique Download PDFInfo
- Publication number
- CN106762439A CN106762439A CN201710200525.3A CN201710200525A CN106762439A CN 106762439 A CN106762439 A CN 106762439A CN 201710200525 A CN201710200525 A CN 201710200525A CN 106762439 A CN106762439 A CN 106762439A
- Authority
- CN
- China
- Prior art keywords
- crane
- bad luck
- fan part
- wind turbine
- integral type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 67
- 238000000034 method Methods 0.000 title claims abstract description 13
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 10
- 238000010276 construction Methods 0.000 claims description 6
- 230000008569 process Effects 0.000 claims description 5
- 230000001360 synchronised effect Effects 0.000 abstract description 3
- 238000005516 engineering process Methods 0.000 description 5
- 230000005611 electricity Effects 0.000 description 4
- 238000007667 floating Methods 0.000 description 4
- 230000006641 stabilisation Effects 0.000 description 3
- 238000011105 stabilization Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000010720 hydraulic oil Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B27/00—Arrangement of ship-based loading or unloading equipment for cargo or passengers
- B63B27/16—Arrangement of ship-based loading or unloading equipment for cargo or passengers of lifts or hoists
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Wind Motors (AREA)
Abstract
Had bad luck this application discloses a kind of fan part, assembled, lifting integral type wind turbine installation vessel and technique.Fan part has bad luck, assembles, lift integral type wind turbine installation vessel including installation ship hull, the first crane is provided with the deck of installation ship hull, the crane arm lower section of the first crane is provided with the second crane for assembling blower fan, crane arm one end of first crane and the second crane is all connected with handling component, the lifting brachium of the lifting brachium less than the first crane of the second crane;The transporting trolley for having bad luck fan part to the second crane is additionally provided with the deck of installation ship hull.By having bad luck, assembling, hanging apparatus coordinate, greatly reduce the stand-by period of fan part ships that transport, assemble it is synchronous with lifting, reduced while improve installation effectiveness transport and installation cost.
Description
Technical field
Apparatus field is installed present application relates generally to offshore wind farm, and in particular to wind turbine installation vessel field, more particularly to wind
Machine part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique.
Background technology
The installation of offshore wind power equipment can be assembled first, whole machine installation, and first nearby berthing facilities are built on land, be transported after assembling
It is defeated, but whole machine carries out hoisting transportation, and hanging device is expensive, larger by inside even from weather, and the time cycle lengthens, and exists larger
Security risk.Conventional is first to transport at present, is installed using installation ship afterwards, and the transport of fan part is general when Wind turbines are installed
Be divided into two kinds of situations, one is that itself installation ship is sufficiently large has enough spaces can to transport blower fan component, two be need it is special
The round-the-clock stop of ships that transport is at the construction field (site) at any time for construction operation provides part.With offshore wind farm installed capacity not
Disconnected increase, weight, the volume of Wind turbines part are also constantly becoming big, so if still being transported using traditional fan part
Defeated, mounting means can be higher to the scale requirement of installation ship or has one to the quantity and loading capacity of cargo ship or stand-by period
Provisioning request, this will certainly increase the cost of wind-powered electricity generation installation.Therefore, carry efficient in the transport of Wind turbines and installation process
Reduces cost is most important simultaneously.
The content of the invention
In view of drawbacks described above of the prior art or deficiency, expect that providing a kind of fan part has bad luck, assembles, lifting one
Formula wind turbine installation vessel and technique, by having bad luck, assembling, hanging apparatus coordinate, greatly reduce the wait of fan part ships that transport
Time, assembling is synchronous with lifting, and transport and the cost installed are reduced while improve installation effectiveness.
In a first aspect, fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel, including installation ship hull, installation ship
It is provided with the first crane on the deck of hull, the crane arm lower section of the first crane is provided with for assemble blower fan second
Crane arm one end of heavy-duty machine, the first crane and the second crane is all connected with handling component, and the lifting brachium of the second crane is small
In the lifting brachium of the first crane;It is additionally provided with the deck of installation ship hull for having bad luck fan part to the second crane
Transporting trolley.
Further, several are provided with the deck of installation ship hull is used to run the track of transporting trolley, rail end
It is arranged at the crane arm lower section of the second crane.
Further, the crane arm lower section of the second crane is provided with the rotatable pedestal for holding blower fan hub.
Further, the supporting leg stake up and down through hull is provided with the installation ship hull, being provided with supporting leg stake can
The lowering or hoisting gear of lifting landing leg stake, lowering or hoisting gear is internally provided with pressure sensor.
Further, the supporting leg stake is respectively arranged at the both sides of forward andor aft.
Further, first crane takes off bar crane for fixed, and the second crane is Full Rotary crane.
Further, the fixed gin pole top of first crane is provided with transverse shifting component.
The construction technology of integral type wind turbine installation vessel, including following step are had bad luck, assemble, being lifted to second aspect, fan part
Suddenly:
(1) cabin in fan part and other parts are hoisted to installation ship ship from cargo ship using the first crane
Placed on body, other parts in fan part are had bad luck to the second crane boom by track using transporting trolley
Side;
(2) axial fan hub in fan part is positioned on pedestal, using the second crane to the blade and wheel of blower fan
Hub is assembled, and pedestal adjustment angle is passed through in assembling process;
(3) after assembling is finished, cabin is installed and tower top using the first crane, blower fan is lifted in cabin.
According to the technical scheme that the embodiment of the present application is provided, used cooperatively by said modules, part fortune can be greatly reduced
The stand-by period of defeated ship, and be the assembling of achievable fan blade and wheel hub by installation ship itself, assemble synchronous with lifting
Carry out, the set-up time of whole blower fan can be saved, meanwhile, installation ship can avoid land from setting up assembling as assembly platform
Place increases cost, it is to avoid the difficulty that whole blower fan is transported.Further, according to some embodiments of the application, pass through
Track on deck can ensure that the steady of transporting trolley is had bad luck, and wind and wave resistance impact capacity is strong, because fan blade is into different
Angle, the rotatable base below the crane arm of the second crane can be adjusted to suitable position so as to ensure by by wheel hub
The Fast Installation of blade.Both can guarantee that ship remained half floating state using the lowering or hoisting gear of supporting leg stake, and do not increased largely
The stress of staking leg, reduces influence of the wave to stability of ship, so as to the stabilization for realizing installation exercise is carried out.
Brief description of the drawings
By the detailed description made to non-limiting example made with reference to the following drawings of reading, the application other
Feature, objects and advantages will become more apparent upon:
Fig. 1 is the integral type wind turbine installation vessel structural representation of one embodiment of the invention;
Fig. 2 is the top view of the integral type wind turbine installation vessel of one embodiment of the invention;
Fig. 3 is the supporting leg pilework schematic diagram of one embodiment of the invention;
Fig. 4 for one embodiment of the invention fan part have bad luck, assemble, hoisting process schematic diagram;
Wherein, 1- installation ships hull;The cranes of 2- first;The cranes of 3- second;4- transporting trolleys;5- tracks;6- supporting legs
Stake;7- lowering or hoisting gears.
Specific embodiment
The application is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched
The specific embodiment stated is used only for explaining related invention, rather than the restriction to the invention.It also should be noted that, in order to
It is easy to description, the part related to invention is illustrate only in accompanying drawing.
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase
Mutually combination.Describe the application in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Referring to Fig. 1, fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel, including installation ship hull 1, installation ship
Be provided with the first crane 2 on the deck of hull 1, the crane arm lower section of the first crane 2 be provided with for assemble blower fan the
Crane arm one end of two cranes 3, the first crane 2 and the second crane 3 is all connected with handling component, and the second crane 3 rises
The weighing arm lifting brachium for being less than the first crane 2 long;It is additionally provided with the deck of installation ship hull 1 for having bad luck fan part extremely
The transporting trolley 4 of the second crane.Used cooperatively by said modules, fan part is risen and is transported to installation ship by the first crane 2
Hull 1, realizes assembling on installation ship hull 1, can greatly reduce the stand-by period of part ships that transport, reduces transport and waits
Cost.Second crane is assembled, and realizes the assembling to fan blade and wheel hub by installation ship itself, it is not necessary in land
Superstructure assembles place, and the blower fan being completed is lifted by the first crane 2 at any time, assembles and lifts same stepping
OK, the set-up time of whole blower fan can be saved.Referring to Fig. 1, the cabin of blower fan can beforehand through the first crane 2 be transported to peace
Load the fore position of hull 1 onto ship, wait the assembling with fan blade and wheel hub.
Referring to Fig. 2, as preferred embodiment, several are provided with the deck of installation ship hull 1 and have bad luck small for operation
The track 5 of car, the end of track 5 is arranged at the crane arm lower section of the second crane 3.By the setting of the track 5 on deck, can be with
Ensure that the steady of transporting trolley is had bad luck, wind and wave resistance impact capacity is strong during operation on the sea, it is ensured that transporting trolley is fast and effectively operated,
Each fan part is had bad luck to precalculated position.
Used as preferred embodiment, with reference to Fig. 1 and Fig. 2, the crane arm lower section of the second crane 3 is provided with rotatable use
In the pedestal for holding blower fan hub.This kind of setting is that, due to fan blade into different angles, the second crane 3 is being transported
During with installing, in order to ensure the installation accuracy of blade, the labour intensity of the second crane 3, the crane arm of the second crane are reduced
The rotatable base of lower section can be adjusted to suitable position so as to ensure the Fast Installation of blade by by wheel hub.As more excellent
The embodiment of choosing, rotatable base is the round platform coordinated with wheel hub size, and round platform lower section sets rotating driving device, it is ensured that platform
Stabilization rotation so as to formed drive wheel hub rotation rotatable base.
Further, since in installation process, hull needs the change for adapting to the hydrology and tidal level to heave, and brings certain installation
Difficulty, simple offshore platform requirement is higher, and the carrying to pile foundation and spud leg all there are certain requirements, and improve cost, the present invention
Wind turbine installation vessel be semi-floating, specifically, referring to Fig. 3, by setting on hull supporting leg stake 6 up and down through hull, branch
The lowering or hoisting gear 7 of liftable supporting leg stake 6 is provided with leg stake 6, lowering or hoisting gear 7 is internally provided with pressure sensor.Lowering or hoisting gear 7
By hydraulic oil cylinder driving, lowering or hoisting gear 7 and supporting leg stake 6 is locking condition to main body during operation, ship without heave movement, when tide or wave become
During change, the pressure sensor inside lowering or hoisting gear 7 senses the increase or reduction of active force, waits active force to increase or reduce to carrying
During the threshold values of preceding setting, lowering or hoisting gear 7 can adjust itself thrust by adjusting itself decrement, so as to slowly adjust ship
Rise or fall after rise, so both can guarantee that ship remained half floating state, and do not roll up the stress of spud leg, reduce ripple
Influence of the wave to vessel stability, so as to the stabilization for realizing installation exercise is carried out.
Used as preferred embodiment, the supporting leg stake 6 with reference to described in Fig. 3 is respectively arranged at the both sides of forward andor aft, so that right
The heave of whole hull is regulated and controled, and four groups of lowering or hoisting gears 7 of four supporting leg stakes 6 be able to can also both be linked with single action, it is ensured that peace
The stability of ship-loading operation.Compared to flat-bottomed boat, semi-floating wind turbine installation vessel cost of the invention is lower, and flat-bottomed boat is compared in supporting leg stake
It is more flexible, can be adjusted according to tide or wave at any time, the possibility of puncture is effectively prevent, to the bearing capacity of spud leg
It is required that being greatly reduced compared to flat-bottomed boat.
In preferred embodiment scheme, referring to Fig. 1, the first crane takes off bar crane, the second crane for fixation
It is Full Rotary crane.First crane uses fixed gin pole formula elevator boom rack, under same cost condition, compared to full circle swinging
Formula crane, fixed gin pole hoisting facilities can realize bigger lift heavy, and operation expense is relatively low, so as to substantially reduce manufacture
Cost, and the second crane for the ease of assembling, using Full Rotary more flexible.
Used as preferred scheme, the fixed gin pole of first crane can be the common setting in this area, but
In order to obtain more preferable lifting effect, transverse shifting component is provided with the top of the fixed gin pole of the first crane.Can solve
Because the installation that fixed arm support brings is limited, efficiently solve due to the lifting deviation that the factors such as ship's fix deviation are brought.
On the other hand embodiments of the invention are additionally provided and are had bad luck using above-mentioned fan part, assembled, lifting integral type wind
The construction technology of electric installation ship, referring to Fig. 4, specifically includes following steps:
Cabin in fan part and other parts are hoisted to wind-powered electricity generation and installed by S1 using the first crane from cargo ship
Fore, is had bad luck to the second crane boom lower section other parts in fan part by track using transporting trolley.
In this step, the cabin in blower fan is risen the first crane 2 fore or other skies for being transported to installation ship hull first
Remaining position, the part for waiting and assembling further is assembled.Part for other needs assemblings passes through transporting trolley 4 and rail
Road 5 is had bad luck to the lower section of the second crane 3, is assembled with miscellaneous part again after being assembled by the second crane 3, actual
In implementation process, order and assembling sequence are started shipment according to be can adjust the need for part and assembling.
Be positioned over engine-room fan wheel hub in fan part on pedestal by S2, using the second crane to the blade of blower fan and
Wheel hub is assembled, and pedestal adjustment angle is passed through in assembling process.
This step is the installation of fan main body, referring specifically to Fig. 4, blade and wheel hub is started shipment using the first crane 2, with
Fortune dolly 4 is had bad luck to the lower section of the second crane 3, is assembled on wheel hub blade one by one with the crane arm of the second crane 3, this
During, preferentially wheel hub can be positioned on pedestal, blade is installed after the suitable installation site of rotating basis to blade.
After S3 assemblings are finished, cabin is installed and tower top using the first crane, blower fan is lifted in cabin.
It is complete using the first crane 2 by the top of cabin and blower fan lifting and the tower of wind-powered electricity generation installation foundation in this step
Into the construction that wind-powered electricity generation is installed.
By above-mentioned technique, fan part can be had bad luck on installation ship, assembled, be lifted, significantly be saved
The stand-by period of cargo ship, the utilization rate of cargo ship is improve, reduce cost, while above-mentioned technique does not need large-scale land group
Dress place, step is easy, and operable ability is strong.
Above description is only the preferred embodiment and the explanation to institute's application technology principle of the application.People in the art
Member is it should be appreciated that involved invention scope in the application, however it is not limited to the technology of the particular combination of above-mentioned technical characteristic
Scheme, while should also cover in the case where the inventive concept is not departed from, is carried out by above-mentioned technical characteristic or its equivalent feature
Other technical schemes for being combined and being formed.Such as features described above has similar work(with (but not limited to) disclosed herein
The technical scheme that the technical characteristic of energy is replaced mutually and formed.
Claims (8)
1. fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel, including installation ship hull (1), it is characterised in that peace
The first crane (2) is provided with the deck of shipment hull (1), the crane arm lower section of the first crane (2) is provided with for group
Crane arm one end of second crane (3) of dress blower fan, the first crane (2) and the second crane (3) is all connected with handling component,
Lifting brachium of the lifting brachium of the second crane (3) less than the first crane (2);Also set on the deck of installation ship hull (1)
It is equipped with the transporting trolley (4) for having bad luck fan part to the second crane (3).
2. fan part according to claim 1 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that peace
Several are provided with the deck of shipment hull (1) is used to run the track (5) of transporting trolley, and track (5) end is arranged at second
The crane arm lower section of crane (3).
3. fan part according to claim 1 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that the
The crane arm lower section of two cranes (3) is provided with the rotatable pedestal for holding blower fan hub.
4. fan part according to claim 1 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that institute
Supporting leg stake (6) being provided with installation ship hull (1) up and down through hull is stated, the stake of liftable supporting leg is provided with supporting leg stake (6)
(6) lowering or hoisting gear (7), lowering or hoisting gear (7) is internally provided with pressure sensor.
5. fan part according to claim 4 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that institute
State the both sides that supporting leg stake (6) is respectively arranged at forward andor aft.
6. fan part according to claim 1 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that institute
The first crane (2) is stated for bar crane is taken off in fixation, the second crane (3) is Full Rotary crane.
7. fan part according to claim 6 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that institute
The fixed gin pole top for stating the first crane (2) is provided with transverse shifting component.
8. the construction for had bad luck using the fan part described in claim any one of 1-7, assembling, lift integral type wind turbine installation vessel
Technique, comprises the following steps:
(1) cabin in fan part and other parts are hoisted on installation ship hull from cargo ship using the first crane
Place, other parts in fan part are had bad luck to the second crane boom lower section by track using transporting trolley;
(2) axial fan hub in fan part is positioned on pedestal, the blade and wheel hub of blower fan are entered using the second crane
Row assembling, passes through pedestal adjustment angle in assembling process;
(3) after assembling is finished, cabin is installed and tower top using the first crane, blower fan is lifted in cabin.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710200525.3A CN106762439A (en) | 2017-03-29 | 2017-03-29 | Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710200525.3A CN106762439A (en) | 2017-03-29 | 2017-03-29 | Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106762439A true CN106762439A (en) | 2017-05-31 |
Family
ID=58967983
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710200525.3A Pending CN106762439A (en) | 2017-03-29 | 2017-03-29 | Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106762439A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109533209A (en) * | 2018-12-24 | 2019-03-29 | 中交航局第二工程有限公司 | Large-scale component lifting transport installation integrated ship and construction technology |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202594666U (en) * | 2012-03-23 | 2012-12-12 | 华锐风电科技(集团)股份有限公司 | wind turbine generator installation vessel |
WO2012175091A1 (en) * | 2011-06-21 | 2012-12-27 | Logima Aps | A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm |
CN205469697U (en) * | 2016-04-06 | 2016-08-17 | 大连理工大学 | High loading capacity, multi-working conditions, environment-friendly wind power installation ship |
CN206608280U (en) * | 2017-03-29 | 2017-11-03 | 中交一航局第二工程有限公司 | Fan part is had bad luck, assembled, lifting integral type wind turbine installation vessel |
-
2017
- 2017-03-29 CN CN201710200525.3A patent/CN106762439A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012175091A1 (en) * | 2011-06-21 | 2012-12-27 | Logima Aps | A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm |
CN202594666U (en) * | 2012-03-23 | 2012-12-12 | 华锐风电科技(集团)股份有限公司 | wind turbine generator installation vessel |
CN205469697U (en) * | 2016-04-06 | 2016-08-17 | 大连理工大学 | High loading capacity, multi-working conditions, environment-friendly wind power installation ship |
CN206608280U (en) * | 2017-03-29 | 2017-11-03 | 中交一航局第二工程有限公司 | Fan part is had bad luck, assembled, lifting integral type wind turbine installation vessel |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109533209A (en) * | 2018-12-24 | 2019-03-29 | 中交航局第二工程有限公司 | Large-scale component lifting transport installation integrated ship and construction technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8701579B2 (en) | Offshore wind turbine installation | |
EP2724021B1 (en) | A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm | |
US20110129334A1 (en) | Wind turbine holding and lifting system and movable operating platform above water | |
US20110126748A1 (en) | Wind turbine holding and lifting system and movable operating platform above water | |
EP3715628B1 (en) | System and method for loading and transporting offshore wind turbines on a ship | |
CN106828812B (en) | Semi-submersible type deep-sea wind-powered electricity generation mounting platform and its wind power generating set integral installation method | |
US9022691B2 (en) | Method of installing an offshore wind turbine and a transport vessel thereof | |
CN106965906B (en) | A kind of marine three basic formula wind-powered electricity generation complete machine installation ships and its single step construction method | |
CN101786494A (en) | Mounting ship of offshore wind turbine and construction method thereof | |
CN110712721A (en) | Offshore wind farm fan installation operation engineering ship and operation method thereof | |
WO2023041730A1 (en) | Installation and/or removal of a wind turbine component for a floating foundation wind turbine | |
CN213566364U (en) | Single-column mast type device for transporting and installing multiple offshore wind turbine complete machines | |
CN109629541A (en) | A kind of offshore wind farm units' installation boat equipment and its installation method | |
WO2012060112A1 (en) | Ship for installing offshore wind turbine and method for installing offshore wind turbine using same | |
CN206608280U (en) | Fan part is had bad luck, assembled, lifting integral type wind turbine installation vessel | |
CN206634171U (en) | Semi-submersible type deep-sea wind-powered electricity generation mounting platform | |
CN101402393A (en) | Special operation platform for mounting wind driven generator | |
CN106762439A (en) | Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique | |
CN117846884A (en) | Efficient offshore wind turbine integrated installation method and device | |
CN201901538U (en) | Self-lifting fan-mounted crane and marine fan transporting and mounting equipment | |
CN101850833B (en) | Swing arm type crane barge for mounting wind power equipment | |
CN201670343U (en) | Swinging arm type lifting lighter for installing wind power equipment | |
CN106080980B (en) | Complete offshore wind power machine transportation installation method | |
CN203612179U (en) | Wind wheel assembly platform used for mounting offshore wind farm wind turbine in a split mode | |
CN221251701U (en) | Novel arrangement form offshore wind power installation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |