Publication number
CN106762439A
CN106762439A CN201710200525.3A CN201710200525A CN106762439A CN 106762439 A CN106762439 A CN 106762439A CN 201710200525 A CN201710200525 A CN 201710200525A CN 106762439 A CN106762439 A CN 106762439A
Authority
CN
China
Prior art keywords
crane
bad luck
fan part
wind turbine
integral type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710200525.3A
Other languages
Chinese (zh)
Inventor
刘德进
曲俐俐
鞠鹏
王翔
冯甲鑫
冯海暴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201710200525.3A priority Critical patent/CN106762439A/en
Publication of CN106762439A publication Critical patent/CN106762439A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B27/00Arrangement of ship-based loading or unloading equipment for cargo or passengers
    • B63B27/16Arrangement of ship-based loading or unloading equipment for cargo or passengers of lifts or hoists
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Wind Motors (AREA)

Abstract

Had bad luck this application discloses a kind of fan part, assembled, lifting integral type wind turbine installation vessel and technique.Fan part has bad luck, assembles, lift integral type wind turbine installation vessel including installation ship hull, the first crane is provided with the deck of installation ship hull, the crane arm lower section of the first crane is provided with the second crane for assembling blower fan, crane arm one end of first crane and the second crane is all connected with handling component, the lifting brachium of the lifting brachium less than the first crane of the second crane;The transporting trolley for having bad luck fan part to the second crane is additionally provided with the deck of installation ship hull.By having bad luck, assembling, hanging apparatus coordinate, greatly reduce the stand-by period of fan part ships that transport, assemble it is synchronous with lifting, reduced while improve installation effectiveness transport and installation cost.

Description

Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique
Technical field
Apparatus field is installed present application relates generally to offshore wind farm, and in particular to wind turbine installation vessel field, more particularly to wind Machine part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique.
Background technology
The installation of offshore wind power equipment can be assembled first, whole machine installation, and first nearby berthing facilities are built on land, be transported after assembling It is defeated, but whole machine carries out hoisting transportation, and hanging device is expensive, larger by inside even from weather, and the time cycle lengthens, and exists larger Security risk.Conventional is first to transport at present, is installed using installation ship afterwards, and the transport of fan part is general when Wind turbines are installed Be divided into two kinds of situations, one is that itself installation ship is sufficiently large has enough spaces can to transport blower fan component, two be need it is special The round-the-clock stop of ships that transport is at the construction field (site) at any time for construction operation provides part.With offshore wind farm installed capacity not Disconnected increase, weight, the volume of Wind turbines part are also constantly becoming big, so if still being transported using traditional fan part Defeated, mounting means can be higher to the scale requirement of installation ship or has one to the quantity and loading capacity of cargo ship or stand-by period Provisioning request, this will certainly increase the cost of wind-powered electricity generation installation.Therefore, carry efficient in the transport of Wind turbines and installation process Reduces cost is most important simultaneously.
The content of the invention
In view of drawbacks described above of the prior art or deficiency, expect that providing a kind of fan part has bad luck, assembles, lifting one Formula wind turbine installation vessel and technique, by having bad luck, assembling, hanging apparatus coordinate, greatly reduce the wait of fan part ships that transport Time, assembling is synchronous with lifting, and transport and the cost installed are reduced while improve installation effectiveness.
In a first aspect, fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel, including installation ship hull, installation ship It is provided with the first crane on the deck of hull, the crane arm lower section of the first crane is provided with for assemble blower fan second Crane arm one end of heavy-duty machine, the first crane and the second crane is all connected with handling component, and the lifting brachium of the second crane is small In the lifting brachium of the first crane;It is additionally provided with the deck of installation ship hull for having bad luck fan part to the second crane Transporting trolley.
Further, several are provided with the deck of installation ship hull is used to run the track of transporting trolley, rail end It is arranged at the crane arm lower section of the second crane.
Further, the crane arm lower section of the second crane is provided with the rotatable pedestal for holding blower fan hub.
Further, the supporting leg stake up and down through hull is provided with the installation ship hull, being provided with supporting leg stake can The lowering or hoisting gear of lifting landing leg stake, lowering or hoisting gear is internally provided with pressure sensor.
Further, the supporting leg stake is respectively arranged at the both sides of forward andor aft.
Further, first crane takes off bar crane for fixed, and the second crane is Full Rotary crane.
Further, the fixed gin pole top of first crane is provided with transverse shifting component.
The construction technology of integral type wind turbine installation vessel, including following step are had bad luck, assemble, being lifted to second aspect, fan part Suddenly:
(1) cabin in fan part and other parts are hoisted to installation ship ship from cargo ship using the first crane Placed on body, other parts in fan part are had bad luck to the second crane boom by track using transporting trolley Side;
(2) axial fan hub in fan part is positioned on pedestal, using the second crane to the blade and wheel of blower fan Hub is assembled, and pedestal adjustment angle is passed through in assembling process;
(3) after assembling is finished, cabin is installed and tower top using the first crane, blower fan is lifted in cabin.
According to the technical scheme that the embodiment of the present application is provided, used cooperatively by said modules, part fortune can be greatly reduced The stand-by period of defeated ship, and be the assembling of achievable fan blade and wheel hub by installation ship itself, assemble synchronous with lifting Carry out, the set-up time of whole blower fan can be saved, meanwhile, installation ship can avoid land from setting up assembling as assembly platform Place increases cost, it is to avoid the difficulty that whole blower fan is transported.Further, according to some embodiments of the application, pass through Track on deck can ensure that the steady of transporting trolley is had bad luck, and wind and wave resistance impact capacity is strong, because fan blade is into different Angle, the rotatable base below the crane arm of the second crane can be adjusted to suitable position so as to ensure by by wheel hub The Fast Installation of blade.Both can guarantee that ship remained half floating state using the lowering or hoisting gear of supporting leg stake, and do not increased largely The stress of staking leg, reduces influence of the wave to stability of ship, so as to the stabilization for realizing installation exercise is carried out.
Brief description of the drawings
By the detailed description made to non-limiting example made with reference to the following drawings of reading, the application other Feature, objects and advantages will become more apparent upon:
Fig. 1 is the integral type wind turbine installation vessel structural representation of one embodiment of the invention;
Fig. 2 is the top view of the integral type wind turbine installation vessel of one embodiment of the invention;
Fig. 3 is the supporting leg pilework schematic diagram of one embodiment of the invention;
Fig. 4 for one embodiment of the invention fan part have bad luck, assemble, hoisting process schematic diagram;
Wherein, 1- installation ships hull;The cranes of 2- first;The cranes of 3- second;4- transporting trolleys;5- tracks;6- supporting legs Stake;7- lowering or hoisting gears.
Specific embodiment
The application is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched The specific embodiment stated is used only for explaining related invention, rather than the restriction to the invention.It also should be noted that, in order to It is easy to description, the part related to invention is illustrate only in accompanying drawing.
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the application in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
Referring to Fig. 1, fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel, including installation ship hull 1, installation ship Be provided with the first crane 2 on the deck of hull 1, the crane arm lower section of the first crane 2 be provided with for assemble blower fan the Crane arm one end of two cranes 3, the first crane 2 and the second crane 3 is all connected with handling component, and the second crane 3 rises The weighing arm lifting brachium for being less than the first crane 2 long;It is additionally provided with the deck of installation ship hull 1 for having bad luck fan part extremely The transporting trolley 4 of the second crane.Used cooperatively by said modules, fan part is risen and is transported to installation ship by the first crane 2 Hull 1, realizes assembling on installation ship hull 1, can greatly reduce the stand-by period of part ships that transport, reduces transport and waits Cost.Second crane is assembled, and realizes the assembling to fan blade and wheel hub by installation ship itself, it is not necessary in land Superstructure assembles place, and the blower fan being completed is lifted by the first crane 2 at any time, assembles and lifts same stepping OK, the set-up time of whole blower fan can be saved.Referring to Fig. 1, the cabin of blower fan can beforehand through the first crane 2 be transported to peace Load the fore position of hull 1 onto ship, wait the assembling with fan blade and wheel hub.
Referring to Fig. 2, as preferred embodiment, several are provided with the deck of installation ship hull 1 and have bad luck small for operation The track 5 of car, the end of track 5 is arranged at the crane arm lower section of the second crane 3.By the setting of the track 5 on deck, can be with Ensure that the steady of transporting trolley is had bad luck, wind and wave resistance impact capacity is strong during operation on the sea, it is ensured that transporting trolley is fast and effectively operated, Each fan part is had bad luck to precalculated position.
Used as preferred embodiment, with reference to Fig. 1 and Fig. 2, the crane arm lower section of the second crane 3 is provided with rotatable use In the pedestal for holding blower fan hub.This kind of setting is that, due to fan blade into different angles, the second crane 3 is being transported During with installing, in order to ensure the installation accuracy of blade, the labour intensity of the second crane 3, the crane arm of the second crane are reduced The rotatable base of lower section can be adjusted to suitable position so as to ensure the Fast Installation of blade by by wheel hub.As more excellent The embodiment of choosing, rotatable base is the round platform coordinated with wheel hub size, and round platform lower section sets rotating driving device, it is ensured that platform Stabilization rotation so as to formed drive wheel hub rotation rotatable base.
Further, since in installation process, hull needs the change for adapting to the hydrology and tidal level to heave, and brings certain installation Difficulty, simple offshore platform requirement is higher, and the carrying to pile foundation and spud leg all there are certain requirements, and improve cost, the present invention Wind turbine installation vessel be semi-floating, specifically, referring to Fig. 3, by setting on hull supporting leg stake 6 up and down through hull, branch The lowering or hoisting gear 7 of liftable supporting leg stake 6 is provided with leg stake 6, lowering or hoisting gear 7 is internally provided with pressure sensor.Lowering or hoisting gear 7 By hydraulic oil cylinder driving, lowering or hoisting gear 7 and supporting leg stake 6 is locking condition to main body during operation, ship without heave movement, when tide or wave become During change, the pressure sensor inside lowering or hoisting gear 7 senses the increase or reduction of active force, waits active force to increase or reduce to carrying During the threshold values of preceding setting, lowering or hoisting gear 7 can adjust itself thrust by adjusting itself decrement, so as to slowly adjust ship Rise or fall after rise, so both can guarantee that ship remained half floating state, and do not roll up the stress of spud leg, reduce ripple Influence of the wave to vessel stability, so as to the stabilization for realizing installation exercise is carried out.
Used as preferred embodiment, the supporting leg stake 6 with reference to described in Fig. 3 is respectively arranged at the both sides of forward andor aft, so that right The heave of whole hull is regulated and controled, and four groups of lowering or hoisting gears 7 of four supporting leg stakes 6 be able to can also both be linked with single action, it is ensured that peace The stability of ship-loading operation.Compared to flat-bottomed boat, semi-floating wind turbine installation vessel cost of the invention is lower, and flat-bottomed boat is compared in supporting leg stake It is more flexible, can be adjusted according to tide or wave at any time, the possibility of puncture is effectively prevent, to the bearing capacity of spud leg It is required that being greatly reduced compared to flat-bottomed boat.
In preferred embodiment scheme, referring to Fig. 1, the first crane takes off bar crane, the second crane for fixation It is Full Rotary crane.First crane uses fixed gin pole formula elevator boom rack, under same cost condition, compared to full circle swinging Formula crane, fixed gin pole hoisting facilities can realize bigger lift heavy, and operation expense is relatively low, so as to substantially reduce manufacture Cost, and the second crane for the ease of assembling, using Full Rotary more flexible.
Used as preferred scheme, the fixed gin pole of first crane can be the common setting in this area, but In order to obtain more preferable lifting effect, transverse shifting component is provided with the top of the fixed gin pole of the first crane.Can solve Because the installation that fixed arm support brings is limited, efficiently solve due to the lifting deviation that the factors such as ship's fix deviation are brought.
On the other hand embodiments of the invention are additionally provided and are had bad luck using above-mentioned fan part, assembled, lifting integral type wind The construction technology of electric installation ship, referring to Fig. 4, specifically includes following steps:
Cabin in fan part and other parts are hoisted to wind-powered electricity generation and installed by S1 using the first crane from cargo ship Fore, is had bad luck to the second crane boom lower section other parts in fan part by track using transporting trolley.
In this step, the cabin in blower fan is risen the first crane 2 fore or other skies for being transported to installation ship hull first Remaining position, the part for waiting and assembling further is assembled.Part for other needs assemblings passes through transporting trolley 4 and rail Road 5 is had bad luck to the lower section of the second crane 3, is assembled with miscellaneous part again after being assembled by the second crane 3, actual In implementation process, order and assembling sequence are started shipment according to be can adjust the need for part and assembling.
Be positioned over engine-room fan wheel hub in fan part on pedestal by S2, using the second crane to the blade of blower fan and Wheel hub is assembled, and pedestal adjustment angle is passed through in assembling process.
This step is the installation of fan main body, referring specifically to Fig. 4, blade and wheel hub is started shipment using the first crane 2, with Fortune dolly 4 is had bad luck to the lower section of the second crane 3, is assembled on wheel hub blade one by one with the crane arm of the second crane 3, this During, preferentially wheel hub can be positioned on pedestal, blade is installed after the suitable installation site of rotating basis to blade.
After S3 assemblings are finished, cabin is installed and tower top using the first crane, blower fan is lifted in cabin.
It is complete using the first crane 2 by the top of cabin and blower fan lifting and the tower of wind-powered electricity generation installation foundation in this step Into the construction that wind-powered electricity generation is installed.
By above-mentioned technique, fan part can be had bad luck on installation ship, assembled, be lifted, significantly be saved The stand-by period of cargo ship, the utilization rate of cargo ship is improve, reduce cost, while above-mentioned technique does not need large-scale land group Dress place, step is easy, and operable ability is strong.
Above description is only the preferred embodiment and the explanation to institute's application technology principle of the application.People in the art Member is it should be appreciated that involved invention scope in the application, however it is not limited to the technology of the particular combination of above-mentioned technical characteristic Scheme, while should also cover in the case where the inventive concept is not departed from, is carried out by above-mentioned technical characteristic or its equivalent feature Other technical schemes for being combined and being formed.Such as features described above has similar work(with (but not limited to) disclosed herein The technical scheme that the technical characteristic of energy is replaced mutually and formed.

Claims (8)

1. fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel, including installation ship hull (1), it is characterised in that peace The first crane (2) is provided with the deck of shipment hull (1), the crane arm lower section of the first crane (2) is provided with for group Crane arm one end of second crane (3) of dress blower fan, the first crane (2) and the second crane (3) is all connected with handling component, Lifting brachium of the lifting brachium of the second crane (3) less than the first crane (2);Also set on the deck of installation ship hull (1) It is equipped with the transporting trolley (4) for having bad luck fan part to the second crane (3).
2. fan part according to claim 1 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that peace Several are provided with the deck of shipment hull (1) is used to run the track (5) of transporting trolley, and track (5) end is arranged at second The crane arm lower section of crane (3).
3. fan part according to claim 1 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that the The crane arm lower section of two cranes (3) is provided with the rotatable pedestal for holding blower fan hub.
4. fan part according to claim 1 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that institute Supporting leg stake (6) being provided with installation ship hull (1) up and down through hull is stated, the stake of liftable supporting leg is provided with supporting leg stake (6) (6) lowering or hoisting gear (7), lowering or hoisting gear (7) is internally provided with pressure sensor.
5. fan part according to claim 4 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that institute State the both sides that supporting leg stake (6) is respectively arranged at forward andor aft.
6. fan part according to claim 1 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that institute The first crane (2) is stated for bar crane is taken off in fixation, the second crane (3) is Full Rotary crane.
7. fan part according to claim 6 is had bad luck, assembles, lifting integral type wind turbine installation vessel, it is characterised in that institute The fixed gin pole top for stating the first crane (2) is provided with transverse shifting component.
8. the construction for had bad luck using the fan part described in claim any one of 1-7, assembling, lift integral type wind turbine installation vessel Technique, comprises the following steps:
(1) cabin in fan part and other parts are hoisted on installation ship hull from cargo ship using the first crane Place, other parts in fan part are had bad luck to the second crane boom lower section by track using transporting trolley;
(2) axial fan hub in fan part is positioned on pedestal, the blade and wheel hub of blower fan are entered using the second crane Row assembling, passes through pedestal adjustment angle in assembling process;
(3) after assembling is finished, cabin is installed and tower top using the first crane, blower fan is lifted in cabin.
CN201710200525.3A 2017-03-29 2017-03-29 Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique Pending CN106762439A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710200525.3A CN106762439A (en) 2017-03-29 2017-03-29 Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710200525.3A CN106762439A (en) 2017-03-29 2017-03-29 Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique

Publications (1)

Publication Number Publication Date
CN106762439A true CN106762439A (en) 2017-05-31

Family

ID=58967983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710200525.3A Pending CN106762439A (en) 2017-03-29 2017-03-29 Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique

Country Status (1)

Country Link
CN (1) CN106762439A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109533209A (en) * 2018-12-24 2019-03-29 中交航局第二工程有限公司 Large-scale component lifting transport installation integrated ship and construction technology

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202594666U (en) * 2012-03-23 2012-12-12 华锐风电科技(集团)股份有限公司 wind turbine generator installation vessel
WO2012175091A1 (en) * 2011-06-21 2012-12-27 Logima Aps A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm
CN205469697U (en) * 2016-04-06 2016-08-17 大连理工大学 High loading capacity, multi-working conditions, environment-friendly wind power installation ship
CN206608280U (en) * 2017-03-29 2017-11-03 中交一航局第二工程有限公司 Fan part is had bad luck, assembled, lifting integral type wind turbine installation vessel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012175091A1 (en) * 2011-06-21 2012-12-27 Logima Aps A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm
CN202594666U (en) * 2012-03-23 2012-12-12 华锐风电科技(集团)股份有限公司 wind turbine generator installation vessel
CN205469697U (en) * 2016-04-06 2016-08-17 大连理工大学 High loading capacity, multi-working conditions, environment-friendly wind power installation ship
CN206608280U (en) * 2017-03-29 2017-11-03 中交一航局第二工程有限公司 Fan part is had bad luck, assembled, lifting integral type wind turbine installation vessel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109533209A (en) * 2018-12-24 2019-03-29 中交航局第二工程有限公司 Large-scale component lifting transport installation integrated ship and construction technology

Similar Documents

Publication Publication Date Title
US8701579B2 (en) Offshore wind turbine installation
EP2724021B1 (en) A self-propelled offshore wind farm installation vessel, and method of installation used in the construction of an offshore wind turbine farm
US20110129334A1 (en) Wind turbine holding and lifting system and movable operating platform above water
US20110126748A1 (en) Wind turbine holding and lifting system and movable operating platform above water
EP3715628B1 (en) System and method for loading and transporting offshore wind turbines on a ship
CN106828812B (en) Semi-submersible type deep-sea wind-powered electricity generation mounting platform and its wind power generating set integral installation method
US9022691B2 (en) Method of installing an offshore wind turbine and a transport vessel thereof
CN106965906B (en) A kind of marine three basic formula wind-powered electricity generation complete machine installation ships and its single step construction method
CN101786494A (en) Mounting ship of offshore wind turbine and construction method thereof
CN110712721A (en) Offshore wind farm fan installation operation engineering ship and operation method thereof
WO2023041730A1 (en) Installation and/or removal of a wind turbine component for a floating foundation wind turbine
CN213566364U (en) Single-column mast type device for transporting and installing multiple offshore wind turbine complete machines
CN109629541A (en) A kind of offshore wind farm units' installation boat equipment and its installation method
WO2012060112A1 (en) Ship for installing offshore wind turbine and method for installing offshore wind turbine using same
CN206608280U (en) Fan part is had bad luck, assembled, lifting integral type wind turbine installation vessel
CN206634171U (en) Semi-submersible type deep-sea wind-powered electricity generation mounting platform
CN101402393A (en) Special operation platform for mounting wind driven generator
CN106762439A (en) Fan part is had bad luck, assembles, lifting integral type wind turbine installation vessel and technique
CN117846884A (en) Efficient offshore wind turbine integrated installation method and device
CN201901538U (en) Self-lifting fan-mounted crane and marine fan transporting and mounting equipment
CN101850833B (en) Swing arm type crane barge for mounting wind power equipment
CN201670343U (en) Swinging arm type lifting lighter for installing wind power equipment
CN106080980B (en) Complete offshore wind power machine transportation installation method
CN203612179U (en) Wind wheel assembly platform used for mounting offshore wind farm wind turbine in a split mode
CN221251701U (en) Novel arrangement form offshore wind power installation platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination