[go: up one dir, main page]

CN106761863B - A kind of mine support hand-held anchor pole angle correction device and its application method - Google Patents

A kind of mine support hand-held anchor pole angle correction device and its application method Download PDF

Info

Publication number
CN106761863B
CN106761863B CN201710135194.XA CN201710135194A CN106761863B CN 106761863 B CN106761863 B CN 106761863B CN 201710135194 A CN201710135194 A CN 201710135194A CN 106761863 B CN106761863 B CN 106761863B
Authority
CN
China
Prior art keywords
anchor pole
correction device
angle correction
held
bolter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710135194.XA
Other languages
Chinese (zh)
Other versions
CN106761863A (en
Inventor
宋卫华
赵辉
李幼泽
韩彦龙
史苗壮
吕鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Technical University
Original Assignee
Liaoning Technical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Technical University filed Critical Liaoning Technical University
Priority to CN201710135194.XA priority Critical patent/CN106761863B/en
Publication of CN106761863A publication Critical patent/CN106761863A/en
Application granted granted Critical
Publication of CN106761863B publication Critical patent/CN106761863B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention belongs to mine support technology, Tunnel Engineering, underground space engineering fields, and in particular to a kind of mine support hand-held anchor pole angle correction device and its application method.Device is formed by rigidly fastening main body, rectangle slideway, rigid support plate and 360 degree of protractors;Wherein rigidity fastening body shape is the hollow cylinder of the lateral opening to match with roof-bolter size, is equipped with main body fastening screw in the side of opening, 360 degree of protractors are welded in rigidity fastening main body;Rectangle slideway one end connection rigidity fastening main body, the other end connect rigid support plate, and rectangle slideway is equipped with rectangle slide plate, and rectangle slide plate position is fixed by fastening bolt, and rectangle slideway is connected by connecting rod with rigidity fastening main body.For the mine support hand-held anchor pole angle correction device of the present invention in down-hole, Tunnel Engineering, underground space engineering, installation is simple, and transport is flexible, and convenient disassembly is less prone to failure, and scene can dismantle, replace at any time, and reliability is high.

Description

一种矿井支护手持式锚杆角度矫正装置及其使用方法A hand-held bolt angle correction device for mine support and its application method

技术领域technical field

本发明属于矿井支护、隧道工程及地下空间工程技术领域,具体涉及一种矿井支护手持式锚杆角度矫正装置及其使用方法。The invention belongs to the technical field of mine support, tunnel engineering and underground space engineering, and in particular relates to a hand-held bolt angle correction device for mine support and a method for using the same.

背景技术Background technique

手持式锚杆机在煤矿及岩体支护领域被广泛使用,由于人工手持很难把握锚杆打进的角度,全凭借现场施工人员的经验对偏转的角度进行判断,通常人为判断与施工设计的角度难以精确吻合,而且手持式锚杆机相对笨重,在没有纠偏设施下,人为误差就很明显,这些都导致设计的支护效果降低,无法达到设计预期,因此需要一种能够矫正锚杆机角度的装置,降低因人工疲劳及人为判断因素带来的误差。Hand-held bolters are widely used in the field of coal mine and rock mass support. Because it is difficult to grasp the angle of bolt driving by manual hand-holding, the deflection angle is judged based on the experience of on-site construction personnel. Usually, human judgment and construction design It is difficult to accurately match the angle of the bolt, and the hand-held bolter is relatively cumbersome. Without correction facilities, human error is obvious. These all lead to the reduction of the designed support effect and cannot meet the design expectations. Therefore, a method that can correct the bolt is needed. The machine angle device reduces errors caused by artificial fatigue and human judgment factors.

发明内容Contents of the invention

针对现有技术存在的问题,本发明提供一种矿井支护手持式锚杆角度矫正装置及其使用方法,目的是通过使用角度矫正装置,降低人工疲劳及人为直观判断因素带来的误差,使锚杆打锚精确地打出预设偏转角度,从而提高井下支护效果。Aiming at the problems existing in the prior art, the present invention provides a hand-held bolt angle correction device for mine support and its use method. Bolt bolts are accurately drilled to a preset deflection angle, thereby improving the underground support effect.

实现本发明目的的矿井支护手持式锚杆角度矫正装置由刚性紧固主体、矩形滑道、刚性支撑板和360度量角器组成;其中所述的刚性紧固主体形状是与锚杆机尺寸相匹配的侧面开口的空心圆柱体,在开口的一侧设有主体紧固螺丝,所述的360度量角器焊接在刚性紧固主体上;所述的矩形滑道一端连接刚性紧固主体,另一端连接刚性支撑板,矩形滑道上设有矩形滑片,矩形滑片位置被紧固螺栓固定,矩形滑道通过连接杆与刚性紧固主体部件相连。The mine support hand-held bolt angle correction device for realizing the purpose of the present invention is composed of a rigid fastening body, a rectangular slideway, a rigid support plate and a 360-degree protractor; wherein the shape of the rigid fastening body is the same as the size of the bolter A matching hollow cylinder with a side opening, with a main body fastening screw on one side of the opening, the 360-degree protractor is welded on the rigid fastening main body; one end of the rectangular slideway is connected to the rigid fastening main body, and the other end The rigid support plate is connected, and a rectangular sliding piece is arranged on the rectangular sliding track, and the position of the rectangular sliding piece is fixed by fastening bolts, and the rectangular sliding track is connected with the rigid fastening main part through a connecting rod.

其中,所述的刚性紧固主体和刚性支撑板采用刚性不易变形的铸铁、钢或防爆防冲击防静电的轻质硬性ABS材料、TPU材料,矩形滑道和360度量角器采用钢铁部件。Wherein, the rigid fastening body and the rigid support plate are made of rigid and non-deformable cast iron, steel, or explosion-proof, impact-proof and anti-static lightweight hard ABS material, TPU material, and the rectangular slideway and 360-degree protractor are made of steel components.

所述的矩形滑道采用钢筋槽,槽内滑片是厚钢板矩形滑片。The rectangular slideway adopts a steel reinforcement groove, and the sliding pieces in the groove are thick steel plate rectangular sliding pieces.

所述的矩形滑道与刚性紧固主体和刚性支撑板之间的连接方式为刚性连接,与连接杆的连接方式是铰接。待紧固螺栓拧紧后整个体系将不发生松动变形。The connection between the rectangular slideway and the rigid fastening body and the rigid support plate is a rigid connection, and the connection with the connecting rod is a hinge. After the fastening bolts are tightened, the whole system will not loosen and deform.

所述的360度量角器上设有可缠起或收起的自由铅锤。The 360-degree protractor is provided with a free plumb weight that can be wrapped or retracted.

上述矿井支护手持式锚杆角度矫正装置的使用方法按照以下步骤进行:The method of using the above-mentioned hand-held bolt angle correction device for mine support is carried out according to the following steps:

(1)装置前期绑固准备:将手持式锚杆机机身擦拭干净,防止煤块杂质造成锚杆机身不平整,影响安装的稳定性;(1) Pre-binding preparation of the device: wipe the body of the hand-held bolter clean to prevent coal impurities from causing the body of the bolt to be uneven and affecting the stability of the installation;

(2)装置绑固:根据现场工人身高及使用习惯,将矿井支护手持式锚杆角度矫正装置固定在锚杆机的机身平整处,调整主体紧固螺丝,使矿井支护手持式锚杆角度矫正装置和锚杆机刚性紧密连接;(2) Device binding: According to the height and usage habits of the workers on site, fix the mine support hand-held bolt angle correction device on the flat part of the body of the bolter, adjust the main fastening screw, so that the mine support hand-held anchor The rod angle correction device is rigidly and tightly connected with the bolter;

(3)绑固后装置检查:绑固后的矿井支护手持式锚杆角度矫正装置的刚性支撑板与未加锚杆的锚杆机的端部保持在同一水平位置,将锚杆机正立放在平整位置时,360度量角器的自由铅垂自由垂下指示的角度为0度;(3) Device inspection after binding: The rigid support plate of the hand-held bolt angle correction device for mine support after binding is kept at the same horizontal position as the end of the bolt machine without a bolt, and the bolt machine is aligned When standing on a flat position, the angle indicated by the free plumb of the 360-degree protractor is 0 degrees;

(4)调整锚杆打入岩体角度:将锚杆机水平或倒立放置,此时矿井支护手持式锚杆角度矫正装置的刚性支撑板紧贴平整的墙壁或地面,支撑板紧贴平整墙壁或平整地面后保持不动,松开矩形滑道上的紧固螺栓,滑动滑片,使锚杆机发生角度偏转,从自由垂摆的铅垂处读出360度量角器偏转的角度,直至偏转到锚杆机设计的偏转角度后,拧紧矩形滑道的紧固螺栓,此时的矿井支护手持式锚杆角度矫正装置和锚杆机组成一个不松动、变形的刚性整体;(4) Adjust the angle of the bolt driven into the rock mass: place the bolter horizontally or upside down, at this time, the rigid support plate of the hand-held bolt angle correction device for mine support is close to the flat wall or ground, and the support plate is close to the flat Keep still after the wall or the ground is leveled, loosen the fastening bolts on the rectangular slide, and slide the slide to make the bolter deflect at an angle, and read the deflection angle of the 360-degree protractor from the vertical point of the free pendulum until the deflection After reaching the designed deflection angle of the bolter, tighten the fastening bolts of the rectangular slideway. At this time, the mine support hand-held bolt angle correction device and the bolter form a rigid whole that is not loose or deformed;

(5)打锚杆:检查确认矿井支护手持式锚杆角度矫正装置和锚杆机之间无松动,缠起自由铅垂,开始进行施工,打出预先设计角度的锚杆;(5) Bolting: Check and confirm that there is no looseness between the mine support hand-held bolt angle correction device and the bolter, wrap the free plumb, start construction, and drill the bolt with a pre-designed angle;

(6)施工结束或调整角度:施工结束时,调节刚性紧固主体上的紧固螺丝将矿井支护手持式锚杆角度矫正装置拆下;当需要调整新的角度时,按照步骤(1)重新进行角度设计调整。(6) End of construction or angle adjustment: At the end of construction, adjust the fastening screw on the rigid fastening body to remove the angle correction device for the mine support hand-held bolt; when a new angle needs to be adjusted, follow step (1) Re-adjust the angle design.

与现有技术相比,本发明的特点和有益效果是:Compared with prior art, feature and beneficial effect of the present invention are:

(1)与现有技术的固定式大型锚杆机相比,在要求锚杆钻进角度的煤矿井下施工中,本发明的矿井支护手持式锚杆角度矫正装置结构更加简单,可操作性高,装置涉及到的材料都是生活中常见材料,成本低廉,更换方便;(1) Compared with the fixed large-scale bolter of the prior art, in the underground construction of coal mines where the drilling angle of the bolt is required, the structure of the hand-held bolt angle correction device for mine support of the present invention is simpler in structure and more operable. High, the materials involved in the device are common materials in daily life, low cost and easy to replace;

(2)与现有技术的固定式大型锚杆机相比,大型钻机多数要轨道运输,要求运输的道路较为平坦。本发明的矿井支护手持式锚杆角度矫正装置,能够满足所有人员可进入的井下空间及隧道工程现场,该装置绑固于手持锚杆机上,人抬、手推车、矿车、电车这些方法都可运输到施工区域,运输方式较为灵活;(2) Compared with the fixed large bolter in the prior art, most of the large drilling rigs need to be transported by rail, and the transportation road is required to be relatively flat. The hand-held bolt angle correction device for mine support of the present invention can meet the needs of all personnel in the underground space and tunnel engineering site. It can be transported to the construction area, and the transportation mode is more flexible;

(3)与传统需要精确角度的大型固定式锚杆机相比,本发明的矿井支护手持式锚杆角度矫正装置可以根据人员数量,现场活动空间需要,布置多个作业点同时作业。布置数量灵活无限制;(3) Compared with the traditional large-scale fixed bolter that requires precise angles, the hand-held bolt angle correction device for mine support of the present invention can arrange multiple operating points to operate simultaneously according to the number of personnel and the need for on-site activity space. The number of layouts is flexible and unlimited;

(4)多数固定式锚杆机一处只能打一个方向,而本发明的矿井支护手持式锚杆角度矫正装置能够在一处上部顶板、左部帮壁、右部帮壁同时布置,同时进行角度矫正;(4) Most fixed bolters can only drill in one direction at one place, but the hand-held bolt angle correction device for mine support of the present invention can be arranged on the upper roof, left side wall, and right side wall at the same time, Simultaneously perform angle correction;

(5)本发明的矿井支护手持式锚杆角度矫正装置使用时在调整好角度后,将矫正器的刚性支撑板稳妥地贴在要施工的煤壁或岩壁上,就能打出设计的偏转角度,并可根据设计随时进行角度调整,精准灵活;(5) When using the hand-held bolt angle correcting device for mine support of the present invention, after the angle is adjusted, the rigid support plate of the corrector is firmly attached to the coal wall or rock wall to be constructed, and the designed angle can be produced. The deflection angle can be adjusted at any time according to the design, precise and flexible;

(6)本发明的矿井支护手持式锚杆角度矫正装置在井下、隧道工程、地下空间工程中,安装简单,运输灵活,拆卸方便,不易出现故障,现场可随时拆卸、更换,可靠性极高。(6) The hand-held bolt angle correction device for mine support of the present invention is easy to install, flexible to transport, easy to disassemble, and not prone to failure in underground, tunnel engineering, and underground space engineering. It can be disassembled and replaced at any time on site, and is extremely reliable. high.

附图说明Description of drawings

图1是本发明的矿井支护手持式锚杆角度矫正装置结构主视图;Fig. 1 is the front view of the structure of the hand-held bolt angle correction device for mine support of the present invention;

图2是本发明的矿井支护手持式锚杆角度矫正装置结构俯视图;Fig. 2 is a structural top view of the mine support hand-held bolt angle correction device of the present invention;

图3是本发明的矿井支护手持式锚杆角度矫正装置结构左视图;Fig. 3 is a left view of the structure of the hand-held bolt angle correction device for mine support of the present invention;

图4是图1~3中的矩形滑道的细节结构图;Fig. 4 is the detailed structural diagram of the rectangular slideway in Fig. 1~3;

图5是本发明实施例1中在侧壁煤体/岩体施工时量角器偏转5度的装置示意图;Fig. 5 is a schematic diagram of the device in which the protractor deflects 5 degrees during the construction of the sidewall coal mass/rock mass in Embodiment 1 of the present invention;

图6是本发明实施例2中在顶部煤体/岩体施工时量角器偏转5度的装置示意图;Fig. 6 is a schematic diagram of a device in which the protractor deflects 5 degrees during construction of the top coal mass/rock mass in Example 2 of the present invention;

图7是本发明实施例3中工人将装置倒立在地面对装置进行角度调节示意图;Fig. 7 is a schematic diagram of the worker standing the device upside down on the ground to adjust the angle of the device in Example 3 of the present invention;

图8是本发明实施例1中工人将装置靠在竖直墙面对装置进行角度调节示意图;Fig. 8 is a schematic diagram of angle adjustment by a worker leaning against a vertical wall to face the device in Example 1 of the present invention;

图中:1:刚性紧固主体;2:矩形滑道;3:刚性支撑板;4:360度量角器;5:主体紧固螺丝;6:连接杆;7:紧固螺栓;8:锚杆机;9:自由铅锤;10:矩形滑片;11: 施工人员。In the figure: 1: rigid fastening body; 2: rectangular slideway; 3: rigid support plate; 4: 360 protractor; 5: main body fastening screw; 6: connecting rod; 7: fastening bolt; 8: anchor rod machine; 9: free plumb; 10: rectangular slide; 11: construction workers.

具体实施方式Detailed ways

本发明实施例的矿井支护手持式锚杆角度矫正装置,区图1~图8所示,由刚性紧固主体1、矩形滑道2、刚性支撑板3和360度量角器4组成;其中所述的刚性紧固主体1形状是与锚杆机8尺寸相匹配的侧面开口的空心圆柱体,在开口的一侧设有主体紧固螺丝5,所述的360度量角器4焊接在刚性紧固主体1上;所述的矩形滑道2一端连接刚性紧固主体1,另一端连接刚性支撑板3,矩形滑道2上设有矩形滑片9,矩形滑片9位置被紧固螺栓7固定,矩形滑道2通过连接杆6与刚性紧固主体1相连。The mine support hand-held bolt angle correction device of the embodiment of the present invention, as shown in Figures 1 to 8, is composed of a rigid fastening body 1, a rectangular slideway 2, a rigid support plate 3 and a 360° angle measuring device 4; wherein The shape of the rigid fastening body 1 described above is a hollow cylinder with a side opening matching the size of the bolter 8, and a main body fastening screw 5 is provided on one side of the opening, and the 360° protractor 4 is welded on the rigid fastening body. On the main body 1; one end of the rectangular slideway 2 is connected to the rigid fastening main body 1, and the other end is connected to the rigid support plate 3. The rectangular slideway 2 is provided with a rectangular sliding piece 9, and the position of the rectangular sliding piece 9 is fixed by the fastening bolt 7 , the rectangular slideway 2 is connected with the rigid fastening main body 1 through the connecting rod 6 .

其中,所述的刚性紧固主体1和刚性支撑板3采用刚性不易变形的铸铁、钢或硬性塑料,如防爆防冲击防静电的轻质硬性ABS材料、TPU材料,矩形滑道和360度量角器采用钢铁部件,矩形滑道2和360度量角器4采用钢铁部件。Wherein, the rigid fastening body 1 and the rigid support plate 3 are made of cast iron, steel or rigid plastics that are not easily deformed, such as explosion-proof, impact-proof and anti-static light rigid ABS material, TPU material, rectangular slideway and 360 degree protractor Steel parts are adopted, and the rectangular slideway 2 and the 360 protractor 4 adopt steel parts.

所述的矩形滑道2采用钢筋槽,矩形滑片9是厚钢板刚性滑片。Described rectangular slideway 2 adopts steel bar groove, and rectangular sliding piece 9 is the rigid sliding piece of thick steel plate.

所述的矩形滑道2与刚性紧固主体1和刚性支撑板3之间的连接方式为刚性连接,与连接杆6的连接方式是铰接。The connection between the rectangular slideway 2 and the rigid fastening body 1 and the rigid support plate 3 is a rigid connection, and the connection with the connecting rod 6 is a hinge.

所述的360度量角器4上设有可缠起或收起的自由铅锤。The 360° protractor 4 is provided with a free plumb weight that can be wound up or retracted.

实施例1Example 1

本实施例采用图中所示矿井支护手持式锚杆角度矫正装置,对在煤体或岩体侧壁施工的锚杆进行偏转5°打入煤岩壁,如图5工程效果和图8角度调整所示,按照以下步骤进行:In this embodiment, the hand-held bolt angle correction device for mine support shown in the figure is used to deflect the bolt constructed on the side wall of the coal mass or rock mass by 5° and drive into the coal rock wall, as shown in Figure 5 for the engineering effect and Figure 8 Angle adjustment shown, follow the steps below:

(1)装置前期绑固准备:将手持式锚杆机机身擦拭干净,防止煤块等杂质造成锚杆机身不平整,影响安装的稳定性;(1) Pre-binding preparation of the device: wipe the body of the hand-held bolter clean to prevent impurities such as coal from causing the body of the bolt to be uneven and affect the stability of the installation;

(2)装置绑固:根据现场工人身高及使用习惯,将矿井支护手持式锚杆角度矫正装置固定在锚杆机的机身平整处,调整主体紧固螺丝,使矿井支护手持式锚杆角度矫正装置和锚杆机刚性连接;(2) Device binding: According to the height and usage habits of the workers on site, fix the mine support hand-held bolt angle correction device on the flat part of the body of the bolter, adjust the main fastening screw, so that the mine support hand-held anchor The rod angle correction device is rigidly connected with the bolter;

(3)绑固后装置检查:绑固后的矿井支护手持式锚杆角度矫正装置的刚性支撑板与未加锚杆的锚杆机的端部保持在同一水平位置,将锚杆机正立放在平整位置时,360度量角器的自由铅垂自由垂下指示的角度为0度;(3) Device inspection after binding: The rigid support plate of the hand-held bolt angle correction device for mine support after binding is kept at the same horizontal position as the end of the bolt machine without a bolt, and the bolt machine is aligned When standing on a flat position, the angle indicated by the free plumb of the 360-degree protractor is 0 degrees;

(4)调整锚杆打入岩体角度:将锚杆机水平放置,此时矿井支护手持式锚杆角度矫正装置的刚性支撑板紧贴平整的侧壁煤体/岩体壁面,支撑板紧贴平整墙面后保持不动,松开矩形滑道上的紧固螺栓,滑动滑片,使锚杆机发生角度偏转,从自由垂摆的铅垂处读出360度量角器偏转的角度,直至偏转到锚杆机设计的偏转角度5度后,拧紧矩形滑道的紧固螺栓,此时的矿井支护手持式锚杆角度矫正装置和锚杆机组成一个刚性整体;(4) Adjust the angle of the bolt driving into the rock mass: place the bolter horizontally, at this time, the rigid support plate of the hand-held bolt angle correction device for mine support is close to the flat side wall coal/rock mass wall, and the support plate Keep still after clinging to the flat wall, loosen the fastening bolts on the rectangular slideway, and slide the slide to make the bolter deflect at an angle. After deflecting to the designed deflection angle of the bolter 5 degrees, tighten the fastening bolts of the rectangular slideway. At this time, the mine support hand-held bolt angle correction device and the bolter form a rigid whole;

(5)打锚杆:检查确认矿井支护手持式锚杆角度矫正装置和锚杆机之间无松动,缠起自由铅垂,开始进行施工,打出设计角度的锚杆;(5) Bolting: Check and confirm that there is no looseness between the mine support hand-held bolt angle correction device and the bolter, wrap the free plumb, start construction, and drill the bolt at the designed angle;

(6)施工结束或调整角度:施工结束时,调节刚性紧固主体上的紧固螺丝将矿井支护手持式锚杆角度矫正装置拆下;当需要调整角度时,按照步骤(1)重新进行角度设计调整。(6) End of construction or angle adjustment: At the end of construction, adjust the fastening screws on the rigid fastening body to remove the mine support hand-held bolt angle correction device; when it is necessary to adjust the angle, follow step (1) again Angle design adjustments.

实施例2Example 2

本实施例采用图中所示矿井支护手持式锚杆角度矫正装置,对在煤体或岩体顶板施工的锚杆进行偏转5°角度打入煤岩壁,如图6所示,按照以下步骤进行:In this embodiment, the hand-held bolt angle correction device for mine support shown in the figure is used to deflect the anchor bolt constructed on the roof of the coal body or rock mass at an angle of 5° and drive into the coal rock wall, as shown in Figure 6, according to the following Steps to proceed:

(1)装置前期绑固准备:将手持式锚杆机机身擦拭干净,防止煤块等杂质造成锚杆机身不平整,影响安装的稳定性;(1) Pre-binding preparation of the device: wipe the body of the hand-held bolter clean to prevent impurities such as coal from causing the body of the bolt to be uneven and affect the stability of the installation;

(2)装置绑固:根据现场工人身高及使用习惯,将矿井支护手持式锚杆角度矫正装置固定在锚杆机的机身平整处,调整主体紧固螺丝,使矿井支护手持式锚杆角度矫正装置和锚杆机刚性连接;(2) Device binding: According to the height and usage habits of the workers on site, fix the mine support hand-held bolt angle correction device on the flat part of the body of the bolter, adjust the main fastening screw, so that the mine support hand-held anchor The rod angle correction device is rigidly connected with the bolter;

(3)绑固后装置检查:绑固后的矿井支护手持式锚杆角度矫正装置的刚性支撑板与未加锚杆的锚杆机的端部保持在同一水平位置,将锚杆机倒立放在平整位置时,360度量角器的自由铅垂自由垂下指示的角度为0度;(3) Device inspection after binding: the rigid support plate of the hand-held bolt angle correction device for mine support after binding is kept at the same horizontal position as the end of the bolt machine without a bolt, and the bolt machine is turned upside down When placed in a flat position, the angle indicated by the free plumb of the 360-degree protractor is 0 degrees;

(4)调整锚杆打入岩体角度:将锚杆机倒立放置,此时矿井支护手持式锚杆角度矫正装置的刚性支撑板紧贴平整的顶板壁面,支撑板紧贴顶板壁面后保持不动,松开矩形滑道上的紧固螺栓,滑动滑片,此时锚杆机发生角度偏转,从自由垂摆的铅垂处读出360度量角器偏转的角度,直至偏转到锚杆机设计的偏转角度5度后,拧紧矩形滑道的紧固螺栓,此时的矿井支护手持式锚杆角度矫正装置和锚杆机组成一个刚性整体;(4) Adjust the angle of the bolt driven into the rock mass: place the bolter upside down, at this time, the rigid support plate of the hand-held bolt angle correction device for mine support is close to the flat roof wall, and the support plate is kept close to the roof wall. Do not move, loosen the fastening bolts on the rectangular slideway, and slide the slide. At this time, the bolter will deflect at an angle. Read the deflection angle of the 360-degree protractor from the vertical point of the free pendulum until the deflection reaches the design of the bolter. After the deflection angle is 5 degrees, tighten the fastening bolts of the rectangular slideway. At this time, the mine support hand-held bolt angle correction device and the bolt machine form a rigid whole;

(5)打锚杆:检查确认矿井支护手持式锚杆角度矫正装置和锚杆机之间无松动,缠起自由铅垂,开始进行施工,打出设计角度的锚杆;(5) Bolting: Check and confirm that there is no looseness between the mine support hand-held bolt angle correction device and the bolter, wrap the free plumb, start construction, and drill the bolt at the designed angle;

(6)施工结束或调整角度:施工结束时,调节刚性紧固主体上的紧固螺丝将矿井支护手持式锚杆角度矫正装置拆下;当需要调整角度时,按照步骤(1)重新进行新的角度设计调整。(6) End of construction or angle adjustment: At the end of construction, adjust the fastening screws on the rigid fastening body to remove the mine support hand-held bolt angle correction device; when it is necessary to adjust the angle, follow step (1) again New angle design tweaks.

实施例3Example 3

本实施例采用图中所示矿井支护手持式锚杆角度矫正装置,对在煤体或岩体顶板施工的锚杆进行角度矫正,如图7所示,按照以下步骤进行:In this embodiment, the hand-held bolt angle correction device for mine support shown in the figure is used to correct the angle of the bolt constructed on the roof of the coal body or rock mass, as shown in Figure 7, according to the following steps:

(1)装置前期绑固准备:将手持式锚杆机机身擦拭干净,防止煤块等杂质造成锚杆机身不平整,影响安装的稳定性;(1) Pre-binding preparation of the device: wipe the body of the hand-held bolter clean to prevent impurities such as coal from causing the body of the bolt to be uneven and affecting the stability of the installation;

(2)装置绑固:根据现场工人身高及使用习惯,将矿井支护手持式锚杆角度矫正装置固定在锚杆机的机身平整处,调整主体紧固螺丝,使矿井支护手持式锚杆角度矫正装置和锚杆机刚性连接;(2) Device binding: According to the height and usage habits of the workers on site, fix the mine support hand-held bolt angle correction device on the flat part of the body of the bolter, adjust the main fastening screw, so that the mine support hand-held anchor The rod angle correction device is rigidly connected with the bolter;

(3)绑固后装置检查:绑固后的矿井支护手持式锚杆角度矫正装置的刚性支撑板与未加锚杆的锚杆机的端部保持在同一水平位置,将锚杆机正立放在平整位置时,360度量角器的自由铅垂自由垂下指示的角度为0度;(3) Device inspection after binding: The rigid support plate of the hand-held bolt angle correction device for mine support after binding is kept at the same horizontal position as the end of the bolt machine without a bolt, and the bolt machine is aligned When standing on a flat position, the angle indicated by the free plumb of the 360-degree protractor is 0 degrees;

(4)调整锚杆打入岩体角度:将锚杆机倒立放置,此时矿井支护手持式锚杆角度矫正装置的刚性支撑板紧贴平整的地面,支撑板紧贴地面后保持不动,松开矩形滑道上的紧固螺栓,滑动滑片,此时锚杆机发生角度偏转,从自由垂摆的铅垂处读出360度量角器偏转的角度,直至偏转到锚杆机设计的偏转角度5度后,拧紧矩形滑道的紧固螺栓,此时的矿井支护手持式锚杆角度矫正装置和锚杆机组成一个刚性整体;(4) Adjust the angle of the bolt driven into the rock mass: place the bolter upside down, at this time, the rigid support plate of the hand-held bolt angle correction device for mine support is close to the flat ground, and the support plate remains motionless after being close to the ground , loosen the fastening bolts on the rectangular slideway, and slide the sliding piece. At this time, the bolter will deflect at an angle. Read the deflection angle of the 360-degree protractor from the vertical point of the free pendulum until the deflection reaches the design deflection of the bolter. After the angle is 5 degrees, tighten the fastening bolts of the rectangular slideway. At this time, the mine support hand-held bolt angle correction device and the bolter form a rigid whole;

(5)打锚杆:检查确认矿井支护手持式锚杆角度矫正装置和锚杆机之间无松动,缠起自由铅垂,开始进行施工,打出设计角度的锚杆;(5) Bolting: Check and confirm that there is no looseness between the mine support hand-held bolt angle correction device and the bolter, wrap the free plumb, start construction, and drill the bolt at the designed angle;

(6)施工结束或调整角度:施工结束时,调节刚性紧固主体上的紧固螺丝将矿井支护手持式锚杆角度矫正装置拆下;当需要调整角度时,按照步骤(1)重新进行角度设计调整。(6) End of construction or angle adjustment: At the end of construction, adjust the fastening screws on the rigid fastening body to remove the mine support hand-held bolt angle correction device; when it is necessary to adjust the angle, follow step (1) again Angle design adjustments.

Claims (6)

1. a kind of mine support hand-held anchor pole angle correction device, it is characterised in that by rigidly fasten main body, rectangle slideway, just Property support plate and 360 degree of protractors composition;The wherein described rigidity fastening body shape is the side to match with roof-bolter size The hollow cylinder of face opening is equipped with main body fastening screw in the side of opening, and it is tight that described 360 degree of protractors are welded on rigidity Gu in main body;Rectangle slideway one end connection rigidity fastening main body, the other end connect rigid support plate, are set on rectangle slideway There are rectangle slide plate, rectangle slide plate position to be fixed by fastening bolt, rectangle slideway fastens main element phase by connecting rod and rigidity Even.
2. a kind of mine support hand-held anchor pole angle correction device according to claim 1, it is characterised in that described Rigidity fastening main body and rigid support plate are rigid using the lightweight of the on-deformable cast iron of rigidity, steel or explosion-proof protecting against shock antistatic ABS material, TPU materials, rectangle slideway and 360 degree of protractors use iron and steel parts.
3. a kind of mine support hand-held anchor pole angle correction device according to claim 1, it is characterised in that described Rectangle slideway uses steel bar groove, and slide plate is steel plate rectangle slide plate in slot.
4. a kind of mine support hand-held anchor pole angle correction device according to claim 1, it is characterised in that described Connection type between rectangle slideway and rigidity fastening main body and rigid support plate is rigid connection, the connection type with connecting rod It is hinged, bolt to be tightened, which tightens rear whole system, will not occur to loosen deformation.
5. a kind of mine support hand-held anchor pole angle correction device according to claim 1, it is characterised in that described 360 degree of protractors are equipped with the free plummet that can have been twined or pack up.
6. a kind of application method of mine support hand-held anchor pole angle correction device as described in claim 1, feature exist In following the steps below:
(1)Device strapped preparation early period:By hand-held roof-bolter fuselage wiped clean, prevent coal cinder impurity from causing anchor pole fuselage not It is smooth, influence the stability of installation;
(2)Device is strapped:According to field worker height and use habit, mine support hand-held anchor pole angle correction device is consolidated It is scheduled on the smooth place of fuselage of roof-bolter, main body fastening screw is adjusted, makes mine support hand-held anchor pole angle correction device and anchor Bar machine is rigidly connected;
(3)Device inspection after strapped:The rigid support plate of mine support hand-held anchor pole angle correction device after strapped with not Add the end of the roof-bolter of anchor pole to be maintained at the same horizontal position, by roof-bolter is upright be placed on smooth position when, 360 degree of protractors Free vertical freely hang down instruction angle be 0 degree;
(4)Adjustment anchor pole squeezes into rock mass angle:Roof-bolter level or handstand are placed, at this time mine support hand-held anchor pole angle The rigid support plate of apparatus for correcting is close to smooth wall or ground, and support plate is kept not after being close to smooth wall or ground grading It is dynamic, the fastening bolt on rectangle slideway is unclamped, slide plate is slided, makes roof-bolter that angular deflection occur, from the vertical of free pendulum The angle of 360 degree of protractors deflection is read, until after deflecting into the deflection angle of roof-bolter design, tightens the fastening of rectangle slideway Bolt, mine support hand-held anchor pole angle correction device at this time and roof-bolter form one do not loosen, the rigidity that deforms it is whole Body;
(5)Beat anchor pole:It checks and confirms non-loosening between mine support hand-held anchor pole angle correction device and roof-bolter, twined certainly By vertical, construction is proceeded by, gets the anchor pole for being pre-designed angle;
(6)Construction terminates or adjusts the angle:At the end of construction, the rigid fastening screw fastened in main body is adjusted by mine support hand Formula anchor pole angle correction device is held to remove;When needing to adjust new angle, according to step(1)Re-start angle design tune It is whole.
CN201710135194.XA 2017-03-08 2017-03-08 A kind of mine support hand-held anchor pole angle correction device and its application method Expired - Fee Related CN106761863B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710135194.XA CN106761863B (en) 2017-03-08 2017-03-08 A kind of mine support hand-held anchor pole angle correction device and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710135194.XA CN106761863B (en) 2017-03-08 2017-03-08 A kind of mine support hand-held anchor pole angle correction device and its application method

Publications (2)

Publication Number Publication Date
CN106761863A CN106761863A (en) 2017-05-31
CN106761863B true CN106761863B (en) 2018-10-19

Family

ID=58961052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710135194.XA Expired - Fee Related CN106761863B (en) 2017-03-08 2017-03-08 A kind of mine support hand-held anchor pole angle correction device and its application method

Country Status (1)

Country Link
CN (1) CN106761863B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2270219Y (en) * 1996-05-23 1997-12-10 张俊霞 Anchor angle tester
JP3612251B2 (en) * 1999-10-26 2005-01-19 日本車輌製造株式会社 Slope anchoring machine
CN101046143A (en) * 2006-03-31 2007-10-03 永城煤电集团有限责任公司 Directional unit for roof bolt boring
CN102619474A (en) * 2012-02-16 2012-08-01 山东华泰矿业有限公司 Universal adjustable anchor bolt and rope drilling machine
CN203271739U (en) * 2013-05-03 2013-11-06 山东科技大学 Support for electric coal drill
CN203783453U (en) * 2014-01-22 2014-08-20 郑州神利达钻采设备有限公司 Multipurpose hydraulic drilling rig for coal mine
CN203856416U (en) * 2014-05-14 2014-10-01 淮南矿业(集团)有限责任公司 Slideway-type multi-angle adjustable anchor cable drilling machine bracket
CN204703776U (en) * 2015-06-12 2015-10-14 赤峰山金红岭有色矿业有限责任公司 A kind of drilling cramp being applied to medium-length hole down-the-hole drill

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2270219Y (en) * 1996-05-23 1997-12-10 张俊霞 Anchor angle tester
JP3612251B2 (en) * 1999-10-26 2005-01-19 日本車輌製造株式会社 Slope anchoring machine
CN101046143A (en) * 2006-03-31 2007-10-03 永城煤电集团有限责任公司 Directional unit for roof bolt boring
CN102619474A (en) * 2012-02-16 2012-08-01 山东华泰矿业有限公司 Universal adjustable anchor bolt and rope drilling machine
CN203271739U (en) * 2013-05-03 2013-11-06 山东科技大学 Support for electric coal drill
CN203783453U (en) * 2014-01-22 2014-08-20 郑州神利达钻采设备有限公司 Multipurpose hydraulic drilling rig for coal mine
CN203856416U (en) * 2014-05-14 2014-10-01 淮南矿业(集团)有限责任公司 Slideway-type multi-angle adjustable anchor cable drilling machine bracket
CN204703776U (en) * 2015-06-12 2015-10-14 赤峰山金红岭有色矿业有限责任公司 A kind of drilling cramp being applied to medium-length hole down-the-hole drill

Also Published As

Publication number Publication date
CN106761863A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN209011621U (en) Adjustable supporting mechanism and support system
WO2010092405A3 (en) Securing method for horizontal and inclined workings
US20150084247A1 (en) System and apparatus for ensuring a level cut of a pipe
KR101360935B1 (en) Elasticity connection apparatus of tunnel support girder
CN106761863B (en) A kind of mine support hand-held anchor pole angle correction device and its application method
CN103924931B (en) The pneumatic drill support cribbing of the accurate pore-forming of a kind of multi-angle
CN105444925B (en) For installing the device and method of borehole stressmeter
CN207905364U (en) A kind of attached vibrator Simple fixing device
CN209761464U (en) Supporting safety protection device for underground mining
CN106246112B (en) Angular adjustment frame and its application method for side slope drilling device
CN102733830A (en) Support for mine concrete support engineering and support method thereof
CN201802434U (en) Mining hydraulic support capable of adjusting underground conveying height
CN105351006B (en) Without the soft curtain sealing device of coal column gob side entry retaining and its application method
CN115522872A (en) Portable rock bolt drilling construction angle control device and construction technology
CN211818258U (en) Temporary support frame for beam string
CN208650906U (en) A kind of attachment device between Coal Transportation machine and coal mine cleaning machine
CN208766386U (en) Coal mine digging laneway Plane of rotation reflective mirror
CN208154033U (en) A kind of underground survey instrument foot prop
CN207582468U (en) One kind builds a bridge pile foundation concrete high efficiency construction equipment
CN203808855U (en) Pneumatic-leg type frame of rock drill capable of accurately drilling holes in multiple angles
CN208668480U (en) A kind of hydroelectric project cubic metre of earth and stone fills out digging observation device
CN204941360U (en) Side hole servicing unit made by a kind of top jumbolter
CN206269815U (en) A kind of coal mine underground laser fixed mount
CN108302295A (en) Horizontal adjustment bracket for installing test apparatus and its installation and application
CN214196355U (en) Arched shock-absorbing support frame structure for coal mine tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

CF01 Termination of patent right due to non-payment of annual fee