CN106761577A - Oil field separates adopts technology tubular column - Google Patents

Oil field separates adopts technology tubular column Download PDF

Info

Publication number
CN106761577A
CN106761577A CN201611206494.4A CN201611206494A CN106761577A CN 106761577 A CN106761577 A CN 106761577A CN 201611206494 A CN201611206494 A CN 201611206494A CN 106761577 A CN106761577 A CN 106761577A
Authority
CN
China
Prior art keywords
valve
oil
ball
standing valve
packing element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611206494.4A
Other languages
Chinese (zh)
Inventor
刘江波
王尚卫
王效明
张雄涛
白小佩
胡相君
李旭梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201611206494.4A priority Critical patent/CN106761577A/en
Publication of CN106761577A publication Critical patent/CN106761577A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/126Packers; Plugs with fluid-pressure-operated elastic cup or skirt
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/127Packers; Plugs with inflatable sleeve
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/12Valve arrangements for boreholes or wells in wells operated by movement of casings or tubings

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The oil field separate production process tubular column can be designed to be sequentially connected from top to bottom by an oil pipe, an oil well pump, an overflowing and overpressure fixed valve, a plurality of oil pipes, a long rubber sleeve packer, an eye tube, a tail tube and a dead plug; the packer can also be designed to be sequentially connected from top to bottom by an oil pipe, a long rubber sleeve packer, a plurality of oil pipes, an oil well pump, a blowout-preventing oil drain device, an eye tube, a tail tube and a dead plug; the packer in the process pipe column can be designed to be large in drift diameter due to the fact that the expansion principle is adopted, the packer in the process can be designed on a pump and under the pump, the process requirements of two modes of top-mining and bottom-mining can be met, the design convention of the packer in the existing separation mining process is broken, the long rubber sleeve sealing surface after setting is adopted to anchor with the friction force of a sleeve, slips which easily cause the risk of blocking a drill when deblocking are removed, the potential safety hazard is eliminated from the process source, and the risk of seal-knowing and fishing is reduced.

Description

A kind of oil field is every excavating technology tubing string
Technical field
The present invention relates to oil field every adopting technical field, and in particular to one kind be applied to cased hole completion and the water outlet of reservoir top and The oil field of the run-down place's water outlet of sleeve pipe is every excavating technology tubing string.
Background technology
With the continuity of oil field development time, down-hole casing breaks because set occur successively in the reasons such as corrosion, causes stratum with oil Layer UNICOM, have impact on oil field normally exploitation even pollution stratum water source welding, add up to surpass 20,000 muzzles to current petrochina Broken well.The technique more common for the broken well of set has casing patching, chemical plugging, secondary well cementation, packer every adopting, wherein insulating Device is every excavating technology is simple, convenient construction, low cost account for covering brokenly more than the 80% of well improvement.Currently used for every the packer master for adopting There are two kinds, one is traditional Y111, Y211, Y341 etc. conventional every packer is adopted, and its potted component is sat using compression Envelope compression travel is short, it is poor to compress smaller packing effect;Secondly be the long-life such as Y141, Y453, Y445 every packer is adopted, it is such Packer needs to enter to be set under supporting special setting tool is leading, then enters down after flow string band intubation is docked just Often production using specific purpose tool when rising, it is necessary to carry out brill mill, complicated construction technique, high cost.
Generally carried out every adopting every excavating technology using packer for the broken well of oil field set (upper strata sleeve pipe run-down or upper strata water outlet), Existing patent family product such as Water-isolation oil production packer ZL200520141928.8 etc., its potted component is sat using compression Envelope indoor design positioning hydraulic cavities more long cause that sealing unit compression travel is short, it is poor to compress smaller packing effect;Packing Device inside Aided design unidirectional self-lock mechanism (being locked with self-fastening button), corresponding solution sealing mechanism etc., by oil jacket annular space space Limit such packer often body dimension relatively thin deblocking when easy-to-draw dropout or break and, while self-locking mechanism after long-term work Unblock difficulty itself increased salvaging difficulty;Packing is set using what shaft bottom support can not realize optional position, for artificial well Bottom is apart from oil well of the liquid level distance more than more than 20m and the well of artificial bottom of a well operating mode poor (there are settling sand or small falling object in shaft bottom) It is inapplicable.Therefore, need badly and develop a kind of novel oilfield every excavating technology.
The content of the invention
It is an object of the invention to provide a kind of oil field every excavating technology tubing string, the process pipe string is adopted in construction is adopted first Set without constraint expanding with potted component, and friction grappling is carried out using the sealing surface long for setting rear and casing-contact, it is real Show the design without anchor packer, eliminated every the potential safety hazard for adopting tubing string bit freezing from technique source, realize one-trip string Completion sets, produces, and does not influence normal oil recovery during packing, with longer effective with conventional Water-isolation oil production packer compared with Packing face, and upper lifting pipe post is to be capable of achieving to unseal the oil field salvaged every excavating technology tubing string.
The technical solution adopted in the present invention is as follows:
A kind of oil field is every excavating technology tubing string, including the oil pipe, oil well pump, tail pipe, dead stifled being sequentially connected from top to bottom, described Oil well pump and tail pipe between be also connected with overcurrent-overvoltage standing valve, the first long packing element packer and eye pipe in turn from top to bottom.
A kind of oil field is every excavating technology tubing string, including the tube oil pump tail pipe being sequentially connected from top to bottom is extremely blocked up, described Oil pipe and oil well pump are connected with the second long packing element packer, are connected with blowout prevention draining between oil well pump and tail pipe in turn from top to bottom Device and eye pipe.
Described overcurrent-overvoltage standing valve in push the ball mechanism, draining pin, standing valve top connection, standing valve at least including connecing Head, valve ball, ball-handling snap, valve cover body, valve seat and standing valve lower contact composition, described standing valve center tap top connect It is connected to and is connected with standing valve lower contact, is set in the cavity of standing valve top connection with standing valve top connection, standing valve center tap bottom Mechanism of pushing the ball is equipped with, standing valve top connection top is extended on mechanism top of pushing the ball, and valve ball is provided with standing valve center tap, all You are fixed on valve cover body top by ball by snap of controlling ball, and valve cover body bottom is provided with valve seat, and the diameter of valve ball is less than Footpath in valve cover body, and more than valve seat middle through-hole internal diameter, the inside top of standing valve top connection is provided with blind hole, on standing valve Joint middle part side is additionally provided with the oil leak hole of outer chamber in connection standing valve top connection, and oil leak hole is blocked by draining pin.
Described mechanism of pushing the ball is made up of pole cap, normal dog and push rod of pushing the ball, and push rod of pushing the ball is placed in standing valve top connection Cavity in, push rod of pushing the ball is connected by the external screw thread on the outside of top with the internal thread of pole cap bottom inside, pole cap bottom outside It is provided with normal dog.
The upper end outer wall that described standing valve center tap lower end inner wall has internal thread, standing valve lower contact has external screw thread, Gu Determine valve center tap to be connected through a screw thread with standing valve lower contact, standing valve lower contact upper end inwall has internal thread, valve cover body leads to The external screw thread for crossing its outer wall is connected with the internal thread of standing valve lower contact upper end inwall, under the upper end internal thread of standing valve lower contact Step of the side with clamping valve seat, valve seat is connected between the upper end internal thread of standing valve lower contact and step.
The first described long packing element packer at least includes top connection, central tube, adapter sleeve, connector, piston switch, bullet Spring abutment set, intermediate rubber cartridge module, slip cap, lower contact, steel ball, shear pin and ball seat are set, the upper end of described central tube passes through Top connection is threaded with, the lower end of central tube has been connected through a screw thread lower contact, has been socketed with successively from top to bottom on central tube Adapter sleeve, connector, spring socket sleeve, intermediate rubber cartridge module and slip cap, the upper end of adapter sleeve is by unsealing shear pin and top connection It is connected, the lower end of adapter sleeve is connected with connector upper end periphery, and connector lower end inner headed face is connected with piston switch, connection Head lower end periphery is threadedly coupled with the upper end inner headed face of spring socket sleeve, and vulcanization has Rubber cap-like outer cover for closure on described piston switch, living The inside for filling in switch is equipped with sealing ring, is clamped with back-moving spring between piston switch and spring socket sleeve, the lower end of spring socket sleeve with Intermediate rubber cartridge module upper end connects, and the lower end of intermediate rubber cartridge module is connected with slip cap, positioning step is provided with lower contact, institute The ball seat stated is fixed at described positioning step by setting shear pin, and steel ball is provided with ball seat.
The second described long packing element packer at least includes top connection, central tube, adapter sleeve, connector, piston switch, bullet Spring abutment set, intermediate rubber cartridge module, slip cap and lower contact, the upper end of described central tube have been connected through a screw thread top connection, in The lower end of heart pipe has been connected through a screw thread lower contact, is socketed with adapter sleeve, connector, spring base on central tube successively from top to bottom Set, intermediate rubber cartridge module and slip cap, the upper end of adapter sleeve are connected by unsealing shear pin with top connection, the lower end of adapter sleeve and company Upper end of joint periphery is connected, and connector lower end inner headed face is connected with piston switch, connector lower end periphery and spring base The upper end inner headed face threaded connection of set, vulcanization has Rubber cap-like outer cover for closure on described piston switch, and the inside of piston switch is equipped with sealing Circle, is clamped with back-moving spring between piston switch and spring socket sleeve, the lower end of spring socket sleeve is connected with intermediate rubber cartridge module upper end, The lower end of intermediate rubber cartridge module is connected with slip cap.
Described intermediate rubber cartridge module includes upper jacket, upper packing element fixed seat, sets packing element, lower jacket and lower rubber cylinder and fix Seat, the upper end of described upper jacket is threadedly coupled with spring socket sleeve, and the lower end of upper jacket is threadedly coupled with upper packing element fixed seat, on Vulcanization is fixed with and sets packing element between packing element fixed seat and lower rubber cylinder fixed seat, and steel belt framework, steel band bone are set with sealing cylinder The outer round surface vulcanization of frame is fixed with cartridge, and the periphery of lower rubber cylinder fixed seat is connected with the upper end of lower jacket, lower jacket Lower end be threadedly coupled with slip cap, the interior circular groove of slip cap is built with sealing ring.
Described oil well pump is directly connected to overcurrent-overvoltage standing valve, connects with the first long packing element packer again after spacer tubing Connect, described tail pipe is generally 3~4 oil pipes.
Described oil pipe is directly connected to the second long packing element packer, is connected with oil well pump again after being spaced some oil pipes.
Beneficial effects of the present invention are as follows:
1st, the present invention is first every the packer set using potted component expanding in excavating technology, and utilization packing long Device packing element forms big section and effectively insulates face, on the premise of realizing that one-trip string completes to set, produce, greatly improved and insulates into Power;
2nd, the packer in the technique without any position constraint there is longer compression travel can obtain larger compression ratio, It is enough to ensure that sealing unit fully sets and produces effective contact seal section long, good sealing effect with sleeve pipe;
3rd, the packer in the technique controls locking, the gas pressure relief slot control deblocking on central tube using piston switch, Design difficulty of processing is greatly reduced on the premise of realizing electrodeless differential self-locking, while ensure that packer bulk strength, is dropped Accident rate is salvaged in low whole process pipe string later stage deblocking;
4th, the technique is supported and set without shaft bottom and do not influenceed by casing coupling, is capable of achieving the seat of optional position in pit shaft Envelope, deblocking, pit shaft strong adaptability;
5th, the packer in the technique is simple as a result of extension Principle internal structure, therefore may be designed as big orifice, Packer in technique can design can be designed under pump again on pump, can meet every above adopting down and adopt under upper two ways Technological requirement, i.e. present invention process tubing string can be designed as (from top to bottom):Oil pipe+oil well pump+overcurrent-overvoltage standing valve+oil pipe Some+long packing element packer+eye pipe+tail pipe+dead stifled;It is also designed to (from top to bottom):Oil pipe+long packing element packer (is needed Remove the steel ball of inside, set shear pin, ball seat)+oil pipe is some+oil well pump+blowout control drip+eye pipe+tail pipe+dead stifled;
6th, the technique broken first early stage every in excavating technology design packer " sealing unit+slips " design it is normal Rule, employ packing element sealing surface long after setting carries out grappling with sleeve friction power, and bit freezing wind is easily caused when eliminating deblocking The slips of danger, potential safety hazard is eliminated from technique source, is significantly reduced deblocking and is salvaged risk, while reducing design processing Difficulty, simplify working procedure, improve efficiency of construction.
Brief description of the drawings
Fig. 1 is a kind of structural representation one of oil field every excavating technology tubing string;
Fig. 2 is a kind of structural representation two of oil field every excavating technology tubing string;
Fig. 3 is the structural representation of overcurrent-overvoltage standing valve;
Fig. 4 is the structural representation of long packing element packer.
Description of reference numerals
1- oil pipes, 2- oil well pumps, 3- overcurrent-overvoltages standing valve, the long packing element packers of 4.1- first, the long packing element types of 4.2- second Packer, 5- pipe, 6- tail pipes, 7- are extremely blocked up, 301- pole caps, 302- normal dogs, 303- push the ball push rod, 304- drainings pin, The top connection of 305- standing valves, 306- standing valves center tap, 307- valve balls, 308- ball-handlings snap, 309- valves cover body, 310- are all That seat, the lower contact of 311- standing valves, 401- top connections, 402- central tubes, 403- deblockings shear pin, 404- adapter sleeves, 405- connections Head, 406-O types circle, 407- Rubber cap-like outer cover for closure, 408- piston switch, 409- back-moving springs, 410- spring socket sleeves, 411- upper jackets, The upper packing element fixed seats of 412-, 413- set packing element, 414- steel belt frameworks, 415- cartridges, 416- lower jackets, 417- lower rubber cylinders Fixed seat, 418- slip caps, 419- sealing rings, 420- lower contacts, 421- steel balls, 422- set shear pin, 423- ball seats.
Explanation is further explained to the present invention below in conjunction with the accompanying drawings:
Specific embodiment
Embodiment 1:
As shown in figure 1, the invention provides a kind of oil field every excavating technology tubing string, including the oil pipe being sequentially connected from top to bottom 1st, oil well pump 2, tail pipe 6, extremely stifled 7, are also connected with overcurrent-overvoltage in turn and consolidate from top to bottom between described oil well pump 2 and tail pipe 6 Determine the long packing element packer 4.1 of valve 3 first and eye pipe 5.
As shown in figure 3, described overcurrent-overvoltage standing valve 3 is at least including on mechanism of pushing the ball, draining pin 304, standing valve Under joint 305, standing valve center tap 306, valve ball 307, ball-handling snap 308, valve cover body 309, valve seat 310 and standing valve Joint 311 is constituted, and the described top of standing valve center tap 306 is connected with and standing valve top connection 305, standing valve center tap 306 Bottom is connected with standing valve lower contact 311, and mechanism of pushing the ball is provided with the cavity of standing valve top connection 305, mechanism top of pushing the ball Extend the top of standing valve top connection 305, valve ball 307 is provided with standing valve center tap 306, valve ball 307 is by ball-handling Snap 308 is fixed on the top of valve cover body 309, and the bottom of valve cover body 309 is provided with valve seat 310, and the diameter of valve ball 307 is small In the internal diameter of valve cover body 309, and more than the middle through-hole internal diameter of valve seat 310, the inside top of standing valve top connection 305 is provided with blind Hole, the middle part side of standing valve top connection 305 is additionally provided with the oil leak hole of outer chamber in connection standing valve top connection 305, oil leak hole Blocked by draining pin 304.
As shown in figure 4, the first described long packing element packer 4.1 at least includes top connection 401, central tube 402, adapter sleeve 404th, connector 405, piston switch 408, spring socket sleeve 410, intermediate rubber cartridge module, slip cap 418, lower contact 420, steel ball 421st, shear pin 422 and ball seat 423 are set, the upper end of described central tube 402 has been connected through a screw thread top connection 401, central tube 402 lower end has been connected through a screw thread lower contact 420, is socketed with adapter sleeve 404, connection on central tube 402 successively from top to bottom First 405, spring socket sleeve 410, intermediate rubber cartridge module and slip cap 418, the upper end of adapter sleeve 404 by unseal shear pin 403 with it is upper Joint 401 is connected, and the lower end of adapter sleeve 404 is connected with the upper end periphery of connector 405, the lower end inner headed face of connector 405 and work Plug switch 408 is connected, and the lower end periphery of connector 405 is threadedly coupled with the upper end inner headed face of spring socket sleeve 410, described work The inside that vulcanization has Rubber cap-like outer cover for closure 407, piston switch 408 on plug switch 408 is equipped with sealing ring, piston switch 408 and spring base Back-moving spring 409 is clamped between set 410, the lower end of spring socket sleeve 410 is connected with intermediate rubber cartridge module upper end, middle packing element group The lower end of part is connected with slip cap 418, and positioning step is provided with lower contact 420, and described ball seat 423 is by setting shear pin 422 are fixed at described positioning step, and steel ball 421 is provided with ball seat 423.
Described intermediate rubber cartridge module includes upper jacket 411, upper packing element fixed seat 412, sets packing element 413, lower jacket 416 With lower rubber cylinder fixed seat 417, the upper end of described upper jacket 411 is threadedly coupled with spring socket sleeve 410, the lower end of upper jacket 411 It is threadedly coupled with upper packing element fixed seat 412, vulcanization is fixed with and sets between upper packing element fixed seat 412 and lower rubber cylinder fixed seat 417 Packing element 413, is set with steel belt framework 414 in sealing cylinder 413, the outer round surface vulcanization of steel belt framework 414 is fixed with cartridge 415, the upper end of the cylindrical and lower jacket 416 of lower rubber cylinder fixed seat 417 is connected, lower end and the screw thread of slip cap 418 of lower jacket 416 Connection, the interior circular groove of slip cap 418 is built with sealing ring 419.
During construction, only need to be by this packer with being connected in oil extraction in oil field tubing string, its tubing string may be designed as (from well head extremely Underground):The some 4.1+ pipe 5+ tail pipes 6+ of+the first long packing element packer of oil pipe 1+ oil well pump 2+ overcurrent-overvoltage standing valve 3+ oil pipes Dead stifled 7, standing valve of the prior art is replaced by can excessively stream, over-pressed overcurrent-overvoltage standing valve 3;Oil pipe is suppressed, and works as pressure Start to packer during 5MPa, 10MPa when packer setting, 15MPa when set shear pin 422 and cut, steel ball 421 and ball seat 423 Fall into tail pipe, lower oil well pump, sucker rod simultaneously touch pump, and now overcurrent-overvoltage standing valve is seated on ball seat, install production wellhead and Can start after oil pumper it is normal recover the oil, without any position constraint there is longer compression travel can obtain inside the packer Larger compression ratio, it is sufficient to ensure that sealing unit fully sets, good sealing effect;The adapter sleeve 404 of the packer upper end passes through Deblocking shear pin 403 is threadedly coupled with top connection 401, deblocking shear pin is cut when needing to salvage, by putting on joint in continuation 401, the first described long packing element packer is risen with flow string, you can complete inspection pump or fishing.
Embodiment 2:
As shown in Fig. 2 a kind of oil field is every excavating technology tubing string, including the tail pipe of 1 oil well pump of oil pipe 2 being sequentially connected from top to bottom 6 dead stifled 7, described oil pipe 1 and oil well pump 2 is connected with the second long packing element packer 4.2, from upper between oil well pump 2 and tail pipe 6 Under be connected with blowout control drip and eye pipe 5 in turn.
The second described long packing element packer 4.2 at least includes top connection 401, central tube 402, adapter sleeve 404, connector 405th, piston switch 408, spring socket sleeve 410, intermediate rubber cartridge module, slip cap 418 and lower contact 420, described central tube 402 Upper end be connected through a screw thread top connection 401, the lower end of central tube 402 has been connected through a screw thread lower contact 420, central tube It is socketed with adapter sleeve 404, connector 405, spring socket sleeve 410, intermediate rubber cartridge module and slip cap on 402 successively from top to bottom 418, the upper end of adapter sleeve 404 is connected by unsealing shear pin 403 with top connection 401, lower end and the connector 405 of adapter sleeve 404 Upper end periphery connection, the lower end inner headed face of connector 405 is connected with piston switch 408, the lower end periphery of connector 405 and bullet The upper end inner headed face threaded connection of spring abutment set 410, vulcanization has Rubber cap-like outer cover for closure 407, piston switch on described piston switch 408 408 inside is equipped with sealing ring, and back-moving spring 409, spring socket sleeve 410 are clamped between piston switch 408 and spring socket sleeve 410 Lower end be connected with intermediate rubber cartridge module upper end, the lower end of intermediate rubber cartridge module is connected with slip cap 418;Described middle packing element Component includes upper jacket 411, upper packing element fixed seat 412, sets packing element 413, lower jacket 416 and lower rubber cylinder fixed seat 417, described The upper end of upper jacket 411 be threadedly coupled with spring socket sleeve 410, the lower end of upper jacket 411 connects with the upper screw thread of packing element fixed seat 412 Connect, vulcanization is fixed with and sets packing element 413 between upper packing element fixed seat 412 and lower rubber cylinder fixed seat 417, suit in sealing cylinder 413 The outer round surface vulcanization for having steel belt framework 414, steel belt framework 414 is fixed with cartridge 415, outside lower rubber cylinder fixed seat 417 Circle is connected with the upper end of lower jacket 416, and the lower end of lower jacket 416 is threadedly coupled with slip cap 418, the interior circular groove of slip cap 418 Built with sealing ring 419.
During construction, only need to be by this packer with being connected in oil extraction in oil field tubing string, its tubing string may be designed as (from well head extremely Underground):Oil pipe 1+ the second long packing element packer 4.2+ oil pipes are some+and oil well pump 2+ blowout control drips+eye pipe 5+ tail pipes 6+ extremely blocks up 7, the technique has broken the design routine of the existing packer " sealing unit+slips " every in excavating technology design, employs and sets Packing element sealing surface long carries out grappling with sleeve friction power afterwards, the slips of bit freezing risk is easily caused when eliminating deblocking, from work Skill source eliminates potential safety hazard, significantly reduces deblocking and salvages risk, while reducing design difficulty of processing, simplifying and apply Work operation, improve efficiency of construction.
Embodiment 3:
On the basis of embodiment 1, described mechanism of pushing the ball is by pole cap 301, normal dog 302 and 303 groups of push rod of pushing the ball Into push rod 303 of pushing the ball is placed in the cavity of standing valve top connection 305, and push rod 303 of pushing the ball is by the external screw thread and bar on the outside of top The internal thread connection of the bottom inside of cap 301, the bottom outside of pole cap 301 is provided with normal dog 302.
The upper end outer wall that the described lower end inner wall of standing valve center tap 306 has internal thread, standing valve lower contact 311 has outer spiral shell Line, standing valve center tap 306 is connected through a screw thread with standing valve lower contact 311, and the upper end inwall of standing valve lower contact 311 has interior spiral shell Line, valve cover body 309 is connected by the external screw thread of its outer wall with the internal thread of the upper end inwall of standing valve lower contact 311, standing valve The upper end internal thread lower section of lower contact 311 has the step of clamping valve seat 310, and valve seat 310 is connected to standing valve lower contact Between 311 upper end internal thread and step.
The assembling process of overcurrent-overvoltage standing valve 3 of the present invention is:
The upper end of push rod 303 (threaded) that will push the ball is threadedly coupled with pole cap 301, then from the top of standing valve top connection 305 Endoporus is inserted, and will be positioned using special dress snap instrument when the lower surface of pole cap 301 is concordant with the upper surface of standing valve top connection 305 Underthrust is further continued in the press-in peripheral groove of pole cap 301 of snap 302, until normal dog 302 blocks to the top of standing valve top connection 305 In the groove of side, the draining pin 304 that sealing ring will be loaded onto thereafter is screwed in from the side opening of standing valve top connection 305, is now completed Install part.
First valve seat 310 is loaded in its medial center hole from the top of standing valve lower contact 311, then valve cover body The upper internal threaded of 309 screw-in standing valve lower contact 311 is compacted up to valve seat 310, thereafter will using special dress snap instrument Ball-handling snap 308 loads the upper inner hole of valve cover body 309, now completes lower part and installs.
Standing valve center tap 306 is threadedly coupled with standing valve lower contact 311, then valve ball 307 from standing valve The top of joint 306 is put into, and now valve ball 307 is stopped by ball-handling snap 308;Then by standing valve top connection 305 and standing valve Center tap 306 is threadedly coupled, that is, complete all installation processes.
Embodiment 4:
On the basis of embodiment 1, the first described long packing element packer 4.1 at least includes top connection 401, central tube 402nd, adapter sleeve 404, connector 405, piston switch 408, spring socket sleeve 410, intermediate rubber cartridge module, slip cap 418, lower contact 420th, steel ball 421, set shear pin 422 and ball seat 423, the upper end of described central tube 402 has been connected through a screw thread top connection 401, the lower end of central tube 402 has been connected through a screw thread lower contact 420, is socketed with connection on central tube 402 successively from top to bottom Set 404, connector 405, spring socket sleeve 410, intermediate rubber cartridge module and slip cap 418, the upper end of adapter sleeve 404 is cut by deblocking Nail 403 is connected with top connection 401, and the lower end of adapter sleeve 404 is connected with the upper end periphery of connector 405, in the lower end of connector 405 Disc is connected with piston switch 408, and the lower end periphery of connector 405 is threadedly coupled with the upper end inner headed face of spring socket sleeve 410, The inside that vulcanization has Rubber cap-like outer cover for closure 407, piston switch 408 on described piston switch 408 is equipped with sealing ring, piston switch 408 Back-moving spring 409 is clamped between spring socket sleeve 410, the lower end of spring socket sleeve 410 is connected with intermediate rubber cartridge module upper end, in Between the lower end of packing element component be connected with slip cap 418, positioning step is provided with lower contact 420, described ball seat 423 is by sitting Envelope shear pin 422 is fixed at described positioning step, and steel ball 421 is provided with ball seat 423;Described intermediate rubber cartridge module includes Upper jacket 411, upper packing element fixed seat 412, set packing element 413, lower jacket 416 and lower rubber cylinder fixed seat 417, described upper jacket 411 upper end is threadedly coupled with spring socket sleeve 410, and the lower end of upper jacket 411 is threadedly coupled with upper packing element fixed seat 412, gluing Vulcanization is fixed with and sets packing element 413 between cylinder fixed seat 412 and lower rubber cylinder fixed seat 417, and steel band bone is set with sealing cylinder 413 Frame 414, the outer round surface vulcanization of steel belt framework 414 is fixed with cartridge 415, the cylindrical and lower shield of lower rubber cylinder fixed seat 417 The upper end connection of set 416, the lower end of lower jacket 416 is threadedly coupled with slip cap 418, and the interior circular groove of slip cap 418 is built with close Seal 419.
The assembling process of the first long packing element packer 4.1 of the present invention is:
First adapter sleeve 404 is set with from the top of central tube 402, then top connection 401 is threadedly coupled with central tube 402, Deblocking shear pin 403 is screwed in behind alignment adapter sleeve 404 and the shear pin hole of top connection 401;O-ring 406 is first loaded into connector 405 , from the bottom of central tube 402 be set with connector 405 again then and be threadedly coupled with adapter sleeve 404 by interior groove;Rubber cap-like outer cover for closure 407 Cure on piston switch 408, sealing ring is first loaded onto inside piston switch 408 and then from the bottom of central tube 402 suit, it is stagnant Afterwards again successively from the bottom of central tube 402 suit back-moving spring 409, spring socket sleeve 401, and by spring socket sleeve 401 and connector 405 Threaded connection, now completes upper part and installs.
First by steel belt framework 414 (typically about 100 or so) in sequence one by one cylindric frock (with set packing element 413 grade external diameters) cylindrical place arrange blend rubber bar binding, then welded at two ends;Packing element 413 will be set (not cold But) in upper packing element fixed seat 412 and lower rubber cylinder fixed seat 417,414 sets of the steel belt framework that then will be welded loads to be sat for vulcanization Sealing cylinder 413, finally again respectively by upper jacket 411 and upper packing element fixed seat 412, lower jacket 416 and the spiral shell of lower rubber cylinder fixed seat 417 Line is connected;Wait sets after packing element 413 is cooled down and cartridge 415 is vulcanized into position corresponding in the outer round surface of steel belt framework 414 again Put, now complete the installation of intermediate rubber cartridge module.
Sealing ring first is loaded onto in the outer surface of ball seat 423, is then loaded to positioning step from the endoporus of lower contact 420, then Shear pin 422 will be set to be screwed in from the hole of lower contact 420 up to withstanding in the outer surface groove of ball seat 423, lower part is now completed and installed.
Again by mounted packing element component under central tube 402 after the external screw thread root of spring socket sleeve 401 loads sealing ring Portion is set with, and upper jacket 411 is threadedly coupled with spring socket sleeve 401;First load sealing ring in the interior circular groove of slip cap 418 419th, external screw thread root loads sealing ring, is then set with and is threadedly coupled with lower jacket 416 from the bottom of central tube 402 again;Finally Lower contact 420 is threadedly coupled with central tube 402 and is put into steel ball from the top of central tube 402 and completes all installation processes.
Embodiment 5:
First long packing element packer 4.1 of the present invention, the second long packing element packer 4.2 use piston switch 408 It is internal to control locking (piston switch 408 is opened when tubing pressure is more than 5MPa), the gas pressure relief slot on central tube to control deblocking Without positioning hydraulic cavities, self-locking mechanism and solution sealing mechanism etc., design is greatly reduced on the premise of electrodeless differential self-locking is realized Difficulty of processing, while ensure that packer bulk strength, reduces later stage deblocking and salvages accident rate.
Packer of the present invention is supported and set without shaft bottom not to be influenceed by casing coupling, is capable of achieving to appoint in pit shaft Meaning position sets, unseals, pit shaft strong adaptability;The packer has been broken every adopting class packer " sealing unit+card first simultaneously Watt " design routine, employ after setting packing element sealing surface (can reach more than 1m) long carries out grappling with sleeve friction power, goes The slips of bit freezing risk is easily caused when having fallen deblocking, potential safety hazard is eliminated from design source, significantly reduced deblocking and beat Risk is dragged for, working procedure is simplified, efficiency of construction is improve.
Embodiment 6:
On the basis of embodiment 1, oil field of the present invention may be designed as (from top to bottom) every excavating technology tubing string:Oil pipe Some 4.1+ pipe 5+ tail pipes 6+ of+the first long packing element packer of 1+ oil well pump 2+ overcurrent-overvoltage standing valve 3+ oil pipes extremely stifled 7;According to The run-down position of sleeve pipe and can set packer effectively set section and calculate and decide tubing length, it is ensured that long packing element packer 4 is sat It is encapsulated in specified location.Described oil well pump 2 is directly connected to overcurrent-overvoltage standing valve 3, after spacer tubing again with the first long packing element type Packer 4.1 is connected, and described tail pipe 6 is generally 3~4 oil pipes.
The operation process of the process pipe string is following (with 51/2As a example by the broken well construction of the set of 〞 oil pipe completions):
1st, connection and under enter process pipe string
Carry out engineering log first, determine the run-down position of sleeve pipe and can set packer effectively set section, then calculate And decide tubing length, it is ensured that long packing element packer 4 is set in specified location.Then using 118mm gauguste cutters drifting to packing Below device setting position at 20m~30m, by accompanying drawing 1 connect and under enter process pipe string to design attitude.
2nd, set packer
Connection pump truck is suppressed from oil pipe, when pressurization reaches 5MPa, the quilt of piston switch 408 in long packing element packer 4 Hydraulic coupling promotes compression reseting spring 409 to move downward, while Rubber cap-like outer cover for closure 407 also leaves taper hole slot with piston switch 408, Liquid passes sequentially through piston switch 408 and enters middle with the gap of central tube 402 with the gap of spring socket sleeve 410 and spring socket sleeve 410 Packing element component, causes and sets packing element 413, steel belt framework 414, cartridge 415 bulging together, then drive lower jacket 416, under The constantly sliding upwards of packing element fixed seat 417, slip cap 418;As the cartridge 415 that gradually rises of pressure constantly expands finally It is close to internal surface of sleeve pipe, completes to set when pressure reaches 10MPa;Now continue to improve pressure, set when pressure is to 15MPa and cut Nail 422 is cut, and steel ball 421 and ball seat 423 fall into tail pipe, now the reduction of oil pipe instantaneous pressure, shows that instrument sets and will completely Oil jacket annular space is completely separated in setting position.
3rd, it is normal to recover the oil
Lower oil well pump, sucker rod simultaneously touch pump, and now the pole cap 301 of overcurrent-overvoltage standing valve 3 is collided descending compressing positioning Snap 302 bounces back, and now pole cap 301, push rod 303 of pushing the ball, normal dog 302 are descending together until the lower surface of pole cap 301 connects The upper blind bore end face of standing valve top connection 305 is touched, normal dog 302 enters the lower channel of the upper blind bore of standing valve top connection 305 Interior, push rod 303 of pushing the ball in the process promotes valve ball 307 to press off ball-handling snap 308 and falls into valve after being contacted with valve ball 307 On seat 310, now overcurrent-overvoltage standing valve 3 is equivalent to conventional standing valve.Can start just after production wellhead and oil pumper are installed Often recover the oil, the oil of bottom oil layer is plucked out of after passing through the design long packing element packer 4 into oil pipe through eye pipe 5 into oil well pump 2.
4th, pump or salvaging are examined
When needing inspection pump or salvaging, oil pumper and production wellhead are laid down, act sucker rod, then above carried flow string and first cut The disconnected deblocking of long packing element packer 4 shear pin 403, then proceedes to propose now top connection 401, central tube 402 and constantly moves up, when The bottom gas pressure relief slot of central tube 402 is by sealing ring 419 and enters intermediate rubber cartridge module internal pressure after slip cap walks endoporus 418 times Laid down, set packing element 413, steel belt framework 414, cartridge 415 and bounce back together, when the outer surface of upper step of central tube 402 When operation is at the interior step of adapter sleeve 404, drive adapter sleeve 404, connector 405, spring socket sleeve 410, back-moving spring 409, Piston switch 408, Rubber cap-like outer cover for closure 407, upper jacket 411, upper packing element fixed seat 412, set packing element 413, steel belt framework 414, close Sealing cylinder 415, lower jacket 416, lower rubber cylinder fixed seat 417, slip cap 418 are up together, realize deblocking packer overall process, The design long packing element packer 4.1 is risen with whole process pipe string, completes inspection pump or fishing.
Described long packing element packer 4.1 is designed below oil well pump 2, can meet the technological requirement under above adopting.
Embodiment 7:
On the basis of embodiment 2, oil field of the present invention may be designed as (from top to bottom) every excavating technology tubing string:Oil pipe 1+ the second long packing element packer 4.2+ oil pipes are some+and oil well pump 2+ blowout control drips+eye pipe 5+ tail pipes 6+ extremely stifled 7, removes described The first long packing element packer 4.1 inside steel ball 421, set the second described long packing element type be after shear pin 422, ball seat 423 Packer 4.2;According to the run-down position of sleeve pipe and can set packer effectively set section and calculate and decide tubing length, it is ensured that it is long Tubing Packer 4 is set in specified location.Described oil pipe 1 is directly connected to the second long packing element packer 4.2, if interval drier oil Guan Houzai is connected with oil well pump 2.
The second described long packing element packer 4.2 is designed in the top of oil well pump 2, can meet the technological requirement adopted under.

Claims (10)

1. a kind of oil field is every excavating technology tubing string, including the oil pipe (1), oil well pump (2), tail pipe (6), dead being sequentially connected from top to bottom Stifled (7), it is characterised in that:Overcurrent-overvoltage is also connected with turn from top to bottom between described oil well pump (2) and tail pipe (6) to fix Valve (3), the first long packing element packer (4.1) and eye pipe (5).
2. a kind of oil field is every excavating technology tubing string, including the oil pipe (1), oil well pump (2), tail pipe (6), dead being sequentially connected from top to bottom Stifled (7), it is characterised in that:Described oil pipe (1) and oil well pump (2) is connected with the second long packing element packer (4.2), oil well pump (2) blowout control drip and eye pipe (5) are connected with turn from top to bottom and tail pipe (6) between.
3. a kind of oil field according to claim 1 is every excavating technology tubing string, it is characterised in that:Described overcurrent-overvoltage standing valve (3) push the ball mechanism, draining pin (304), standing valve top connection (305), standing valve center tap (306), valve ball are at least included (307), ball-handling snap (308), valve cover body (309), valve seat (310) and standing valve lower contact (311) composition, described consolidates Determine to be connected with the top of valve center tap (306) and be connected with fixation with standing valve top connection (305), standing valve center tap (306) bottom Valve lower contact (311), mechanism of pushing the ball is provided with the cavity of standing valve top connection (305), and fixation is extended on mechanism top of pushing the ball Valve top connection (305) top, is provided with valve ball (307) in standing valve center tap (306), valve ball (307) is locked by controlling ball Spring (308) is fixed on valve cover body (309) top, and valve cover body (309) bottom is provided with valve seat (310), valve ball (307) Diameter be less than valve cover body (309) internal diameter, and more than valve seat (310) middle through-hole internal diameter, standing valve top connection (305) Inside top is provided with blind hole, and standing valve top connection (305) middle part side is additionally provided with connection standing valve top connection (305) interior exocoel The oil leak hole of body, oil leak hole is blocked by draining pin (304).
4. a kind of oil field according to claim 3 is every excavating technology tubing string, it is characterised in that:Described mechanism of pushing the ball is by pole cap (301), normal dog (302) and push rod of pushing the ball (303) are constituted, and push rod of pushing the ball (303) is placed in the chamber of standing valve top connection (305) In body, push rod of pushing the ball (303) is connected by the external screw thread on the outside of top with the internal thread of pole cap (301) bottom inside, pole cap (301) bottom outside is provided with normal dog (302).
5. a kind of oil field according to claim 3 is every excavating technology tubing string, it is characterised in that:Described standing valve center tap (306) lower end inner wall has an internal thread, and the upper end outer wall of standing valve lower contact (311) has an external screw thread, standing valve center tap (306) with Standing valve lower contact (311) is connected through a screw thread, and standing valve lower contact (311) upper end inwall has internal thread, valve cover body (309) It is connected with the internal thread of standing valve lower contact (311) upper end inwall by the external screw thread of its outer wall, standing valve lower contact (311) Upper end internal thread lower section has the step of clamping valve seat (310), and valve seat (310) is connected to standing valve lower contact (311) Between upper end internal thread and step.
6. a kind of oil field according to claim 1 is every excavating technology tubing string, it is characterised in that:Described the first long packing element type packing Device (4.1) at least include top connection (401), central tube (402), adapter sleeve (404), connector (405), piston switch (408), Spring socket sleeve (410), intermediate rubber cartridge module, slip cap (418), lower contact (420), steel ball (421), set shear pin (422) and Ball seat (423), the upper end of described central tube (402) has been connected through a screw thread top connection (401), the lower end of central tube (402) Lower contact (420) has been connected through a screw thread, adapter sleeve (404), connector has been socketed with central tube (402) successively from top to bottom (405), spring socket sleeve (410), intermediate rubber cartridge module and slip cap (418), the upper end of adapter sleeve (404) is by unsealing shear pin (403) it is connected with top connection (401), the lower end of adapter sleeve (404) is connected with connector (405) upper end periphery, connector (405) lower end inner headed face is connected with piston switch (408), and connector (405) lower end periphery is upper with spring socket sleeve (410) End inner headed face threaded connection, vulcanization has Rubber cap-like outer cover for closure (407), the inside of piston switch (408) on described piston switch (408) Equipped with sealing ring, back-moving spring (409), spring socket sleeve (410) are clamped between piston switch (408) and spring socket sleeve (410) Lower end be connected with intermediate rubber cartridge module upper end, the lower end of intermediate rubber cartridge module is connected with slip cap (418), lower contact (420) Positioning step is inside provided with, described ball seat (423) is fixed at described positioning step by setting shear pin (422), ball seat (423) steel ball (421) is provided with.
7. a kind of oil field according to claim 2 is every excavating technology tubing string, it is characterised in that:Described the second long packing element type packing Device (4.2) at least include top connection (401), central tube (402), adapter sleeve (404), connector (405), piston switch (408), Spring socket sleeve (410), intermediate rubber cartridge module, slip cap (418) and lower contact (420), the upper end of described central tube (402) lead to Cross and be threaded with top connection (401), the lower end of central tube (402) has been connected through a screw thread lower contact (420), central tube (402) be socketed with successively from top to bottom on adapter sleeve (404), connector (405), spring socket sleeve (410), intermediate rubber cartridge module and Slip cap (418), the upper end of adapter sleeve (404) is connected by unsealing shear pin (403) with top connection (401), adapter sleeve (404) Lower end is connected with connector (405) upper end periphery, and connector (405) lower end inner headed face is connected with piston switch (408), even Joint (405) lower end periphery is threadedly coupled with the upper end inner headed face of spring socket sleeve (410), on described piston switch (408) The inside that vulcanization has Rubber cap-like outer cover for closure (407), piston switch (408) is equipped with sealing ring, piston switch (408) and spring socket sleeve (410) back-moving spring (409) is clamped between, the lower end of spring socket sleeve (410) is connected with intermediate rubber cartridge module upper end, intermediate rubber The lower end of cartridge module is connected with slip cap (418).
8. a kind of oil field according to claim 6 or 7 is every excavating technology tubing string, it is characterised in that:Described middle packing element group Part includes upper jacket (411), upper packing element fixed seat (412), sets packing element (413), lower jacket (416) and lower rubber cylinder fixed seat (417), the upper end of described upper jacket (411) is threadedly coupled with spring socket sleeve (410), the lower end of upper jacket (411) and gluing Cylinder fixed seat (412) threaded connection, vulcanization is fixed with and sets between upper packing element fixed seat (412) and lower rubber cylinder fixed seat (417) Packing element (413), is set with steel belt framework (414) in sealing cylinder (413), the outer round surface vulcanization of steel belt framework (414) is fixed with Cartridge (415), the upper end of the cylindrical and lower jacket (416) of lower rubber cylinder fixed seat (417) is connected, under lower jacket (416) End is threadedly coupled with slip cap (418), and the interior circular groove of slip cap (418) is built with sealing ring (419).
9. a kind of oil field according to claim 1 is every excavating technology tubing string, it is characterised in that:Described oil well pump (2) and mistake Flow through pressure standing valve (3) to be directly connected to, be connected with the first long packing element packer (4.1) again after spacer tubing, described tail pipe (6) Generally 3~4 oil pipes.
10. a kind of oil field according to claim 2 is every excavating technology tubing string, it is characterised in that:Described oil pipe (1) and second Long packing element packer (4.2) is directly connected to, and is connected with oil well pump (2) again after being spaced some oil pipes.
CN201611206494.4A 2016-12-23 2016-12-23 Oil field separates adopts technology tubular column Pending CN106761577A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611206494.4A CN106761577A (en) 2016-12-23 2016-12-23 Oil field separates adopts technology tubular column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611206494.4A CN106761577A (en) 2016-12-23 2016-12-23 Oil field separates adopts technology tubular column

Publications (1)

Publication Number Publication Date
CN106761577A true CN106761577A (en) 2017-05-31

Family

ID=58919766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611206494.4A Pending CN106761577A (en) 2016-12-23 2016-12-23 Oil field separates adopts technology tubular column

Country Status (1)

Country Link
CN (1) CN106761577A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013190A (en) * 2017-06-03 2017-08-04 中国石油化工股份有限公司 Steam flooding well flow string and implementation
CN109854201A (en) * 2019-04-01 2019-06-07 华鼎鸿基石油工程技术(北京)有限公司 One kind is every adopting packer and every adopting construction method
CN110735607A (en) * 2019-12-02 2020-01-31 延长油田股份有限公司南泥湾采油厂 A kind of oil well pump cross bridge pressure setting packer device and application method
CN112283361A (en) * 2020-11-21 2021-01-29 阜宁县石油机械有限公司 Oil drainage overpressure fixed valve
CN112761596A (en) * 2021-01-13 2021-05-07 孙伟峰 Pressure guide structure of pump

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2608679Y (en) * 2003-03-03 2004-03-31 杨朝杰 Expansion type packer
CN2861470Y (en) * 2005-12-13 2007-01-24 中国石化胜利油田有限公司采油工艺研究院 Airtight power expansion packer
CN203808920U (en) * 2013-12-26 2014-09-03 中国石油天然气股份有限公司 Small-diameter long rubber sleeve expansion type packer
WO2016078181A1 (en) * 2014-11-17 2016-05-26 杰瑞能源服务有限公司 Coiled tubing velocity string and method for gas recovery by liquid unloading
CN206693997U (en) * 2016-12-23 2017-12-01 中国石油天然气股份有限公司 Oil field separates adopts technology tubular column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2608679Y (en) * 2003-03-03 2004-03-31 杨朝杰 Expansion type packer
CN2861470Y (en) * 2005-12-13 2007-01-24 中国石化胜利油田有限公司采油工艺研究院 Airtight power expansion packer
CN203808920U (en) * 2013-12-26 2014-09-03 中国石油天然气股份有限公司 Small-diameter long rubber sleeve expansion type packer
WO2016078181A1 (en) * 2014-11-17 2016-05-26 杰瑞能源服务有限公司 Coiled tubing velocity string and method for gas recovery by liquid unloading
CN206693997U (en) * 2016-12-23 2017-12-01 中国石油天然气股份有限公司 Oil field separates adopts technology tubular column
CN207080207U (en) * 2016-12-23 2018-03-09 中国石油天然气股份有限公司 Oil field separates adopts technology tubular column

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马志鑫等: "一种新型油井隔采工艺", 《石油化工应用》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013190A (en) * 2017-06-03 2017-08-04 中国石油化工股份有限公司 Steam flooding well flow string and implementation
CN109854201A (en) * 2019-04-01 2019-06-07 华鼎鸿基石油工程技术(北京)有限公司 One kind is every adopting packer and every adopting construction method
CN110735607A (en) * 2019-12-02 2020-01-31 延长油田股份有限公司南泥湾采油厂 A kind of oil well pump cross bridge pressure setting packer device and application method
CN112283361A (en) * 2020-11-21 2021-01-29 阜宁县石油机械有限公司 Oil drainage overpressure fixed valve
CN112761596A (en) * 2021-01-13 2021-05-07 孙伟峰 Pressure guide structure of pump

Similar Documents

Publication Publication Date Title
CN206693997U (en) Oil field separates adopts technology tubular column
CN103015955B (en) Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof
CN106761577A (en) Oil field separates adopts technology tubular column
CN105804680B (en) A kind of oil gas field workover operation device with pressure and method
CN108166965A (en) A kind of abrasive perforating, pressure break and packing integrated apparatus
CN105507845B (en) Long-acting oil-separating packer for oil field
CN105545255B (en) Novel long-acting oil-separating production pipe column for oil field
CN101929318A (en) Stage cementing device
CN106437605A (en) Packer
CN106761538A (en) Long packing element packer for oil field isolation
CN109441399A (en) One kind can sand washing bridge plug
CN102536183A (en) Underground gas injection pipe column
CN102777148A (en) Double-function releasing bridge plug for horizontal well
CN201826805U (en) Tubing plug for oil and gas field
CN205605156U (en) Workover device is pressed in oil gas field area
CN206376810U (en) Long packing element packer for oil field isolation
CN208734311U (en) A kind of permanent type well completion packer that mechanical can be given up
CN209179726U (en) One kind can sand washing bridge plug
RU128896U1 (en) DEVICE FOR TRANSFER OF WELLS, INCLUDING WATERFILLED, TO OPERATION ON TWO LIFT COLUMNS
RU2533470C2 (en) Procedure for recovery of tightness in flow strings
CN202596695U (en) Downhole gas-injection tubular column
CN116816308A (en) Oil-free pipe paraffin removal lifting device for small-bore shale oil well
CN105134121A (en) Screw pump blowout prevention supporting slips anchoring tool
CN110566450B (en) Hydraulic control blowout prevention device for oil pipe under pump
CN208816087U (en) A kind of Operating Pressure blowout prevention valve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication