CN106758883B - 用于钢管桁架混凝土拱桥吊杆更换的钢丝绳临时兜吊装置及其用于吊杆更换的方法 - Google Patents
用于钢管桁架混凝土拱桥吊杆更换的钢丝绳临时兜吊装置及其用于吊杆更换的方法 Download PDFInfo
- Publication number
- CN106758883B CN106758883B CN201710119381.9A CN201710119381A CN106758883B CN 106758883 B CN106758883 B CN 106758883B CN 201710119381 A CN201710119381 A CN 201710119381A CN 106758883 B CN106758883 B CN 106758883B
- Authority
- CN
- China
- Prior art keywords
- steel
- steel wire
- wire rope
- antiskid
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710119381.9A CN106758883B (zh) | 2017-03-02 | 2017-03-02 | 用于钢管桁架混凝土拱桥吊杆更换的钢丝绳临时兜吊装置及其用于吊杆更换的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710119381.9A CN106758883B (zh) | 2017-03-02 | 2017-03-02 | 用于钢管桁架混凝土拱桥吊杆更换的钢丝绳临时兜吊装置及其用于吊杆更换的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106758883A CN106758883A (zh) | 2017-05-31 |
CN106758883B true CN106758883B (zh) | 2018-11-02 |
Family
ID=58960467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710119381.9A Active CN106758883B (zh) | 2017-03-02 | 2017-03-02 | 用于钢管桁架混凝土拱桥吊杆更换的钢丝绳临时兜吊装置及其用于吊杆更换的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106758883B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109162209B (zh) * | 2018-09-04 | 2021-06-01 | 广东和立土木工程有限公司 | 中承式及下承式拱桥吊杆的快速更换施工方法 |
CN109372276B (zh) * | 2018-11-27 | 2024-01-19 | 浙江中南绿建科技集团有限公司 | 一种活动拱形杆临时固定装置及其对拱形杆安装方法 |
CN110158488A (zh) * | 2019-05-24 | 2019-08-23 | 中铁十局集团第一工程有限公司 | 一种吊杆更换软性临时兜吊装置及施工方法 |
CN111441256A (zh) * | 2020-04-21 | 2020-07-24 | 中建桥梁有限公司 | 一种用于带球头拉杆的吊索与底座连接的张拉结构 |
CN119021116B (zh) * | 2024-09-03 | 2025-02-28 | 广州市市政工程设计研究总院有限公司 | 一种吊杆更换装置及更换方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007126848A (ja) * | 2005-11-02 | 2007-05-24 | Mitsubishi Heavy Industries Bridge & Steel Structures Engineering Co Ltd | 既設橋梁の耐震改修工法 |
CN102926332B (zh) * | 2012-11-09 | 2014-08-20 | 武汉二航路桥特种工程有限责任公司 | 钢拱桥吊杆更换用的工具吊杆装置及其更换方法 |
CN105401532B (zh) * | 2015-12-16 | 2017-05-03 | 柳州欧维姆工程有限公司 | 一种牵引摩擦式锚固吊杆更换用装置及其用于钢管拱桥吊杆更换的方法 |
CN106087770B (zh) * | 2016-08-12 | 2017-10-31 | 柳州欧维姆工程有限公司 | 用于钢管桁架混凝土拱桥吊杆更换的抱箍式工具吊杆装置 |
CN206784195U (zh) * | 2017-03-02 | 2017-12-22 | 柳州欧维姆工程有限公司 | 用于钢管桁架混凝土拱桥吊杆更换的钢丝绳临时兜吊装置 |
-
2017
- 2017-03-02 CN CN201710119381.9A patent/CN106758883B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106758883A (zh) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106758883B (zh) | 用于钢管桁架混凝土拱桥吊杆更换的钢丝绳临时兜吊装置及其用于吊杆更换的方法 | |
KR101171039B1 (ko) | 주경간 긴장수단을 이용한 일부 및 전부 타정식 사장교와 그 시공 방법 | |
CN106758882B (zh) | 用于钢管混凝土拱桥吊杆更换的抱箍式自动调平锚固装置及其用于吊杆更换的方法 | |
CN101215824B (zh) | 大跨径连续钢构桥后期挠度调控的体外横张预应力装置 | |
CN104213508A (zh) | 一种利用横撑和体外索控制塔柱位移的方法 | |
CN104005338A (zh) | 一种大跨斜拉桥塔梁三向临时固结结构 | |
CN107190627A (zh) | 部分地锚式悬索桥及其施工方法 | |
CN106087770A (zh) | 用于钢管桁架混凝土拱桥吊杆更换的抱箍式工具吊杆装置 | |
CN206591449U (zh) | 用于钢管混凝土拱桥吊杆更换的抱箍式自动调平锚固装置 | |
CN206784195U (zh) | 用于钢管桁架混凝土拱桥吊杆更换的钢丝绳临时兜吊装置 | |
CN103147405B (zh) | 斜主桁斜拉桥钢梁架设方法 | |
CN105401532B (zh) | 一种牵引摩擦式锚固吊杆更换用装置及其用于钢管拱桥吊杆更换的方法 | |
CN205348010U (zh) | 一种牵引摩擦式锚固吊杆更换用装置 | |
CN214033704U (zh) | 锚索锚垫板 | |
CN114382015A (zh) | 斜拉桥异形钢主塔竖向转体施工工法 | |
CN205445636U (zh) | 具有柔性稳结支撑装置的u型钢支架 | |
CN112376558A (zh) | 锚索锚垫板及锚索施工方法 | |
CN209308433U (zh) | 一种现浇梁钢筋笼绑扎安装多功能台车 | |
CN110761196A (zh) | 可调式猫道锚固连接装置 | |
CN207244425U (zh) | 部分地锚式悬索桥 | |
CN101693501B (zh) | 大偏角吊装的跨缆吊机 | |
CN209619862U (zh) | 一种适用于环境限制大的吊索拱桥拱肋安装支撑架 | |
CN115418967A (zh) | 一种钢箱梁式独塔单索面斜拉桥施工方法 | |
CN106968178A (zh) | 一种斜拉式吊桥主梁施工方法 | |
CN109972531B (zh) | 一种用于提高贝雷梁临时支架跨度的体外预应力装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Dou Yongzhi Inventor after: Zhang Riliang Inventor after: Wei Futang Inventor after: Li Dongping Inventor after: Huang Zhaohui Inventor after: Xiao Chaohui Inventor after: Liu Wei Inventor after: Li Zujin Inventor before: Dou Yongzhi Inventor before: Wei Futang Inventor before: Li Dongping Inventor before: Huang Zhaohui Inventor before: Xiao Chaohui Inventor before: Liu Wei Inventor before: Li Zujin |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |