CN106683004A - Construction material management system in constructional engineering site - Google Patents
Construction material management system in constructional engineering site Download PDFInfo
- Publication number
- CN106683004A CN106683004A CN201710004220.5A CN201710004220A CN106683004A CN 106683004 A CN106683004 A CN 106683004A CN 201710004220 A CN201710004220 A CN 201710004220A CN 106683004 A CN106683004 A CN 106683004A
- Authority
- CN
- China
- Prior art keywords
- module
- information
- building materials
- terminal
- responsible
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a construction material management system in a constructional engineering site. The construction material management system in a constructional engineering site is characterized in that the construction material management system in a constructional engineering site includes a terminal, a positioning module, a first mobile terminal module, a second mobile terminal module, a construction material information entering module, a principal information entering module and a communication module, wherein the terminal is responsible for receiving the information sent from the positioning module, the first mobile terminal module, the second mobile terminal module, the construction material information entering module, the principal information entering module, storing the information, and sending an operating command to the communication module; the positioning module can send out the construction material positioning information in a site in real-time; the first mobile terminal module, the second mobile terminal module and the communication module realize information exchange between a principal of each department of engineering and the general principal for allocating construction materials; and the construction material information entering module is responsible for information acquisition and entering of all the construction materials in the engineering site. The construction material management system in a constructional engineering site can timely know about the usage condition of the construction materials in the site, realize comprehensive usage management of the construction materials in the constructional site, and confirms the usage allocation of the construction materials.
Description
Technical field
The invention belongs to building materials intelligent management field, and in particular to a kind of building materials management system in building engi-neering site
System.
Background technology
Architectural engineering refer to by the construction to all kinds of building constructions and its affiliated facility and the circuit supporting with it, pipeline,
The engineering entity that the installation activity of equipment is formed.Wherein " building construction " refers to top cover, beam column, wall, basis and can
Inner space is formed, the needs such as people's production, inhabitation, study, public activity, including Factory Building, theater, hotel, shop, is met
School, hospital and house etc.;" affiliated facility " refers to the water tower supporting with building construction, pond etc.." circuit, pipeline, the peace of equipment
Dress " refers to circuit, pipeline, the peaces of equipment such as the electric, plumbing, communication, the elevator that match with building construction and its affiliated facility
Dress activity.
With expanding economy, the domestic architectural engineering of China is constantly built, and what is used in architectural engineering builds
Material is various, species is more, and the management to building materials in present engineering ground mostly is manual record, to the management of building materials compared with
It is easily lost, forgets for backwardness, and record information, alloting use and can not be registered in real time to building materials causes building materials
Use whereabouts unknown and using waste.
The content of the invention
It is an object of the invention to provide a kind of building materials management system in building engi-neering site, particular by following
What technical scheme was realized:
A kind of building materials management system in building engi-neering site, including terminal, locating module, the first mobile terminal mould
Block, the second movement end module, construction Information typing module, director's Data Enter module and communication module;
The terminal, is responsible for receiving locating module, mobile end module, construction Information typing module and director's Data Enter
The information that module sends, and information is stored and operating instruction is sent to communication module;
The locating module, sets up separately on the building materials in building engi-neering site, is responsible for implementing to send out the positional information of building materials
Deliver to terminal;
The first movement end module, is carried by each department head in engineering, is responsible for alloting building materials and will be alloted
The species of building materials, quantity and allot destination locations and send to terminal;
The second movement end module, is carried by person in overall, is responsible for receiving the information that communication module sends;
The construction Information typing module, is connected with terminal, is responsible for being transported to the typing of engineering ground construction Information, and will build
Material information sends and is stored to terminal;
Director's Data Enter module, is responsible for name, communication information and the overall responsibility of typing all departments director
The name of people, communication information, and send information to terminal storage;
The communication module, is connected with terminal, the instruction that responsible receiving terminal sends, and by allot building materials information and
The information for alloting building materials department head sends the second movement end module carried to person in overall.
The terminal is PC, and communication module sends the mode of information includes note, multimedia message, the information sender of wechat
Formula, communication module sends information by wireless network.
The communication information of the director of director's Data Enter module typing includes cell-phone number, micro-signal, positions mould
Block is GPS locator, and the first movement end module and the second movement end module are cell phone, and cell phone receives communication module
The information for sending.
The Advantageous Effects of the present invention:
The present invention devises a kind of building materials management system in building engi-neering site, including terminal, locating module,
One movement end module, the second movement end module, construction Information typing module, director's Data Enter module and communication module, it is fixed
Position module realizes sending in real time to the building materials location information in place, and the first movement end module, second are moved end module and lead to
News module realizes the communication for information that engineering all departments director is alloted between building materials and person in overall, construction Information typing module
The information gathering typing of all building materials in responsible engineering ground, by the system the use feelings of building materials in place can be timely understood
Building materials in building yard are realized comprehensively using management, and timely can understand building materials by communicating director and adjusted by condition
Situation about dialling, specify that the use whereabouts of building materials, greatly there is provided the utilization rate of building materials.
Description of the drawings
Fig. 1 is the connection diagram of the present invention.
Specific embodiment
Referring to Fig. 1, a kind of building materials management system in building engi-neering site, including terminal, locating module, the first shifting
Moved end module, the second movement end module, construction Information typing module, director's Data Enter module and communication module;
The terminal, is responsible for receiving locating module, mobile end module, construction Information typing module and director's Data Enter
The information that module sends, and information is stored and operating instruction is sent to communication module;
The locating module, sets up separately on the building materials in building engi-neering site, is responsible for implementing to send out the positional information of building materials
Deliver to terminal;
The first movement end module, is carried by each department head in engineering, is responsible for alloting building materials and will be alloted
The species of building materials, quantity and allot destination locations and send to terminal;
The second movement end module, is carried by person in overall, is responsible for receiving the information that communication module sends;
The construction Information typing module, is connected with terminal, is responsible for being transported to the typing of engineering ground construction Information, and will build
Material information sends and is stored to terminal;
Director's Data Enter module, is responsible for name, communication information and the overall responsibility of typing all departments director
The name of people, communication information, and send information to terminal storage;
The communication module, is connected with terminal, the instruction that responsible receiving terminal sends, and by allot building materials information and
The information for alloting building materials department head sends the second movement end module carried to person in overall.
The terminal is PC, and communication module sends the mode of information includes note, multimedia message, the information sender of wechat
Formula, communication module sends information by wireless network.
The communication information of the director of director's Data Enter module typing includes cell-phone number, micro-signal, positions mould
Block is GPS locator, and the first movement end module and the second movement end module are cell phone, and cell phone receives communication module
The information for sending.
Locating module realization the sending in real time to the building materials location information in place of the present invention, the first movement end module,
Second movement end module and communication module realize the information friendship that engineering all departments director is alloted between building materials and person in overall
Stream, construction Information typing module is responsible for the information gathering typing of all building materials in engineering ground, can be timely by the system
Building materials in building yard are realized comprehensively using management by the service condition of building materials in solution place, and can timely by logical
Interrogate director to understand the situation that building materials are alloted.
Ultimate principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry
Personnel it should be appreciated that the present invention is not restricted to the described embodiments, the simply explanation described in above-described embodiment and description this
The principle of invention, without departing from the spirit and scope of the present invention, the present invention also has various changes and modifications, these changes
Change and improvement is both fallen within scope of the claimed invention.
Claims (3)
1. a kind of building materials management system in building engi-neering site, it is characterised in that:Including terminal, locating module, first
Mobile end module, the second movement end module, construction Information typing module, director's Data Enter module and communication module;
The terminal, is responsible for receiving locating module, mobile end module, construction Information typing module and director's Data Enter module
The information of transmission, and information is stored and operating instruction is sent to communication module;
The locating module, sets up separately on the building materials in building engi-neering site, be responsible for implement by the positional information of building materials send to
Terminal;
The first movement end module, is carried by each department head in engineering, is responsible for alloting building materials and will allot building materials
Species, quantity and allot destination locations and send to terminal;
The second movement end module, is carried by person in overall, is responsible for receiving the information that communication module sends;
The construction Information typing module, is connected with terminal, is responsible for being transported to the typing of engineering ground construction Information, and building materials are believed
Breath sends and is stored to terminal;
Director's Data Enter module, is responsible for name, communication information and the person in overall of typing all departments director
Name, communication information, and send information to terminal storage;
The communication module, is connected with terminal, the instruction that responsible receiving terminal sends, and will allot the information of building materials and allot
The information of building materials department head sends the second movement end module carried to person in overall.
2. a kind of building materials management system in building engi-neering site according to claim 1, it is characterised in that:It is described
Terminal is PC, and communication module sends the mode of information includes note, multimedia message, the information sender formula of wechat, and communication module leads to
Cross wireless network and send information.
3. a kind of building materials management system in building engi-neering site according to claim 1, it is characterised in that:It is described
The communication information of the director of director's Data Enter module typing includes cell-phone number, micro-signal, and locating module is GPS location
Device, the first movement end module and the second movement end module are cell phone, and cell phone receives the information that communication module sends.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710004220.5A CN106683004A (en) | 2017-01-04 | 2017-01-04 | Construction material management system in constructional engineering site |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710004220.5A CN106683004A (en) | 2017-01-04 | 2017-01-04 | Construction material management system in constructional engineering site |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106683004A true CN106683004A (en) | 2017-05-17 |
Family
ID=58849846
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710004220.5A Pending CN106683004A (en) | 2017-01-04 | 2017-01-04 | Construction material management system in constructional engineering site |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106683004A (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202771486U (en) * | 2012-09-29 | 2013-03-06 | 林野 | Constructional engineering material storage information management system |
| CN204155309U (en) * | 2014-11-25 | 2015-02-11 | 浙江华卫智能建筑技术有限公司 | Building ground management system |
| US20150281656A1 (en) * | 2014-03-28 | 2015-10-01 | D-Link Corporation | Safety monitoring system capable of proactively detecting locations of terminal devices |
-
2017
- 2017-01-04 CN CN201710004220.5A patent/CN106683004A/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202771486U (en) * | 2012-09-29 | 2013-03-06 | 林野 | Constructional engineering material storage information management system |
| US20150281656A1 (en) * | 2014-03-28 | 2015-10-01 | D-Link Corporation | Safety monitoring system capable of proactively detecting locations of terminal devices |
| CN204155309U (en) * | 2014-11-25 | 2015-02-11 | 浙江华卫智能建筑技术有限公司 | Building ground management system |
Non-Patent Citations (1)
| Title |
|---|
| 申龙章 等: "RFID技术在建筑工地管理中的应用", 《南华大学学报( 自然科学版)》 * |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Isikdag | BIM and IoT: A synopsis from GIS perspective | |
| CN110188900A (en) | A kind of underground pipe gallery hand-portable information managing and control system | |
| CN104866795B (en) | Location positioning method, system and two-dimentional code encoding method based on Quick Response Code | |
| CN103971538B (en) | Based on the intelligent parking management system of vehicle-carrying communication | |
| CN107889215B (en) | Multilevel positioning method and system based on identification management | |
| CN103790631B (en) | 3G communication location, a kind of mine total management system | |
| CN101902345A (en) | Digital city management system | |
| CN103179212A (en) | Intelligent community management service method and network architecture | |
| CN105336285A (en) | Wisdom tour guiding system based on WLAN (Wireless Local Area Network) LBS (Location-based Service) | |
| CN104820414A (en) | High-voltage power wireless network monitoring, alarming and positioning system | |
| CN102638784A (en) | Enterprise-class ZigBee network seamless roaming method and system | |
| CN113225684A (en) | Dynamic grazing electronic fence system | |
| CN106683004A (en) | Construction material management system in constructional engineering site | |
| CN203708381U (en) | Hardware platform of entrance machine control system | |
| CN106228496A (en) | Cable operation management system | |
| CN103702277A (en) | Data transmission method and electronic equipment | |
| CN202306271U (en) | Remote wireless monitoring system of mine | |
| JP6790381B2 (en) | Information processing equipment, terminal equipment, information processing systems, information processing methods, and programs | |
| CN101854585A (en) | Positioning method of primary and secondary machines with electronic fences and device thereof | |
| Choudhary et al. | Smart Cities Based on Internet of Things (IoT)-A Review | |
| CN104599203B (en) | A kind of community data system | |
| CN204517856U (en) | A kind of SIP intercommunication terminal equipment | |
| CN106097704A (en) | System for reporting emergency vehicle position in real time and vehicle-mounted device | |
| CN104980597A (en) | Housebound elderly emergency call network application system supporting a plurality of communication modes | |
| CN202009403U (en) | Intelligent interactive processing system with geographic location information |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170517 |
|
| RJ01 | Rejection of invention patent application after publication |