[go: up one dir, main page]

CN106654991B - It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul - Google Patents

It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul Download PDF

Info

Publication number
CN106654991B
CN106654991B CN201611040845.9A CN201611040845A CN106654991B CN 106654991 B CN106654991 B CN 106654991B CN 201611040845 A CN201611040845 A CN 201611040845A CN 106654991 B CN106654991 B CN 106654991B
Authority
CN
China
Prior art keywords
operating rod
phase
hanging
fixing plate
phase operating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611040845.9A
Other languages
Chinese (zh)
Other versions
CN106654991A (en
Inventor
王骁
何锋
谷剑峰
张翔鸿
沈亮
刘俊
刘鹏
郑城
沈丽雯
贾钘楠
朱赢健
蒋钟
刘勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Anji Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Anji Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Anji Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611040845.9A priority Critical patent/CN106654991B/en
Publication of CN106654991A publication Critical patent/CN106654991A/en
Application granted granted Critical
Publication of CN106654991B publication Critical patent/CN106654991B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

本发明公开了一种用于电力检修时挂设接地线的辅助设备,包括接地线挂设用操作杆组件,操作杆组件包括第一相操作杆、第二相操作杆、第三相操作杆,第一相操作杆、第二相操作杆、第三相操作杆分别用电缆线相互汇合,还包括用于装载所述第一相操作杆、第二相操作杆、第三相操作杆的固定平台,所述固定平台上设有升降杆,第一相操作杆、第二相操作杆、第三相操作杆的电缆线相互汇合成三相合一端,所述升降杆上设有用于挂载所述三相合一端的挂钩。本发明优点在于降低挂设接地线时的人工成本,安全性好。

The invention discloses an auxiliary device for hanging grounding wires during electric power maintenance, which includes an operating rod assembly for hanging the grounding wire, and the operating rod assembly includes a first phase operating rod, a second phase operating rod, and a third phase operating rod , the first phase operating rod, the second phase operating rod, and the third phase operating rod are connected to each other with cables respectively, and the operating rod for loading the first phase operating rod, the second phase operating rod and the third phase operating rod are also included A fixed platform, the fixed platform is provided with a lifting rod, the cables of the first phase operating rod, the second phase operating rod, and the third phase operating rod are merged into one end of three phases, and the lifting rod is provided with a The three-in-one hook at one end. The invention has the advantages of reducing the labor cost when the grounding wire is hung, and has good safety.

Description

一种用于电力检修时挂设接地线的辅助设备An auxiliary device for hanging grounding wires during electric power maintenance

【技术领域】【Technical field】

本发明涉及用于电力检修时挂设接地线的辅助设备,属于电力设备领域。The invention relates to auxiliary equipment for hanging grounding wires during electric power maintenance, and belongs to the field of electric power equipment.

【背景技术】【Background technique】

接地线挂设是电力检修工作中经常用到的工种,其操作过程是将三根用电缆线相互连接的不同相的接地操作杆分别挂设到待检测线路上进行检测,正常地形下挂设接地线难度不大,但是一旦遇到挂设地点的高度超过电缆线相互汇聚端的长度时,挂设困难就明显增加。难度主要在于:接地线的挂设需要分相进行,操作人在进行第一相地线挂设时,另外两相是悬空放置或放置在地面。这样,当接地线挂设地点的高度过高时,操作人员则需要承担整副接线装置的重量反复上下扶梯进行操作。整副接线装置的重量不仅包括接地线操作杆的重量,也包括电缆线的重量,加之受到挂设高度、空间狭窄等因素的影响,人员使用扶梯操作过程中极易发生跌落且易碰触导线。The grounding wire hanging is a type of work often used in electric power maintenance work. The operation process is to hang three grounding operating rods of different phases connected with each other by cables to the line to be tested for testing. It is not difficult to install the cable, but once the height of the installation site exceeds the length of the converging ends of the cables, the difficulty of installation will increase significantly. The main difficulty is that the grounding wires need to be installed in phases. When the operator is installing the ground wires of the first phase, the other two phases are placed in the air or placed on the ground. In this way, when the height of the place where the grounding wire is hung is too high, the operator needs to bear the weight of the entire pair of wiring devices and repeatedly go up and down the escalator to operate. The weight of the entire wiring device includes not only the weight of the ground wire operating rod, but also the weight of the cable wires. In addition, due to the influence of factors such as the height of the installation and the narrow space, it is very easy for personnel to fall and touch the wires during the operation of the escalator. .

以上问题均给接地线的挂设带来了相当大的不安全因素。因此,传统在此类地线的挂设过程中往往需要其他人员帮忙握持剩下的两根操作杆,使得一个挂设工作需要二人或三人配合才可以完成、工作效率低,人工成本高。The above problems have all brought considerable unsafe factors to the hanging of the grounding wire. Therefore, traditionally, in the process of hanging such ground wires, other personnel are often required to help hold the remaining two operating levers, so that a hanging job requires the cooperation of two or three people to complete, the work efficiency is low, and the labor cost is low. high.

【发明内容】【Content of invention】

本发明所要解决的技术问题在于克服现有技术的不足而提供一种用于电力检修时挂设接地线的辅助设备,降低挂设接地线时的人工成本。The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide an auxiliary device for hanging the grounding wire during electric power maintenance, so as to reduce the labor cost when hanging the grounding wire.

解决上述技术问题,本发明采用如下技术方案:To solve the above technical problems, the present invention adopts the following technical solutions:

一种用于电力检修时挂设接地线的辅助设备,包括接地线挂设用的操作杆组件,操作杆组件包括第一相操作杆、第二相操作杆、第三相操作杆,第一相操作杆、第二相操作杆、第三相操作杆分别用电缆线相互汇合,还包括用于装载所述第一相操作杆、第二相操作杆、第三相操作杆的固定平台,所述固定平台上设有升降杆,第一相操作杆、第二相操作杆、第三相操作杆的电缆线相互汇合成三相合一端,所述升降杆上设有用于挂载所述三相合一端的挂钩。An auxiliary device for hanging grounding wires during electric power maintenance, including an operating rod assembly for hanging the grounding wire, the operating rod assembly includes a first phase operating rod, a second phase operating rod, a third phase operating rod, the first The phase operating rods, the second phase operating rods, and the third phase operating rods are respectively connected to each other by cables, and a fixed platform for loading the first phase operating rods, the second phase operating rods, and the third phase operating rods is also included, The fixed platform is provided with a lifting rod, and the cables of the first phase operating rod, the second phase operating rod, and the third phase operating rod are merged into one end of three phases. Hook at one end.

本发明中的挂设接地线的辅助设备,首先本辅助设置包括装载所述第一相操作杆、第二相操作杆、第三相操作杆的固定平台,操作人员在进行挂设工作时,可以将第一相操作杆、第二相操作杆、第三相操作杆先固定放在固定平台上,不会造成凌乱,三根操作杆之间不会换错,能避免重复挂设同一个根操作杆的问题。The auxiliary equipment for hanging the grounding wire in the present invention, first of all, this auxiliary setting includes a fixed platform for loading the first phase operating rod, the second phase operating rod, and the third phase operating rod. When the operator performs the hanging work, The first phase operating rod, the second phase operating rod, and the third phase operating rod can be fixed on the fixed platform first, which will not cause mess, and the three operating rods will not be wrongly replaced, which can avoid repeated hanging of the same root Joystick problem.

另外,本发明中,所述固定平台上设有升降杆,第一相操作杆、第二相操作杆、第三相操作杆的电缆线相互汇合成三相合一端,所述升降杆上设有用于挂载所述三相合一端的挂钩,当挂设高度较高时,操作人员可以将升降杆的高度升高,从而使得三相合一端的高度也相应升高,比如当操作人员需要挂设第一相操作杆时,将三相合一端的高度升高,有助于缩小挂设点与三项合一端之间的距离,保证第一相操作杆与三相合一端之间的电缆线处于松弛状态不受力,故在挂设时,操作人员不需要承担其他两个操作杆的重量和电缆线的重量,操作更省力、方便,而且保证了安全性,不用额外增配人员帮挂设人员握持剩下的两根操作杆,减少了人工成本。In addition, in the present invention, the fixed platform is provided with a lifting rod, and the cables of the first phase operating rod, the second phase operating rod, and the third phase operating rod are merged into one end of three phases, and the lifting rod is provided with a For mounting the hook at the three-phase one end, when the hanging height is high, the operator can raise the height of the lifting rod, so that the height of the three-phase one end is also increased correspondingly, for example, when the operator needs to hang the third When the one-phase operating lever is used, the height of the three-phase one end is raised, which helps to reduce the distance between the hanging point and the three-phase one end, and ensures that the cable between the first-phase operating rod and the three-phase one end is in a loose state No force, so when hanging, the operator does not need to bear the weight of the other two operating levers and the weight of the cable, the operation is more labor-saving and convenient, and safety is guaranteed, and no additional personnel are needed to help the hanging personnel hold Hold the remaining two operating rods, reducing labor costs.

作为优选,所述固定平台包括底座,底座上固定有上固定板,上固定板上设有用于插放所述操作杆组件的插孔。Preferably, the fixed platform includes a base, an upper fixed plate is fixed on the base, and an insertion hole for inserting the operating rod assembly is provided on the upper fixed plate.

作为优选,所述上固定板通过空心立柱固定在所述底座上,所述插孔的位置与空心立柱的内腔位置对应。Preferably, the upper fixing plate is fixed on the base through a hollow column, and the position of the insertion hole corresponds to the position of the inner cavity of the hollow column.

作为优选,所述插孔包括用于插放所述第一相操作杆的第一插孔、插放第二相操作杆的第二插孔、插放第三相操作杆的第三插孔,所述空心立柱包括对应设置在第一插孔下方的第一立柱、对应设置在第二插孔下方的第二立柱、对应设置在第三插孔下方的第三立柱。Preferably, the sockets include a first socket for inserting the operating rod of the first phase, a second socket for inserting the operating rod of the second phase, and a third socket for inserting the operating rod of the third phase The hollow column includes a first column correspondingly arranged below the first socket, a second column correspondingly arranged below the second socket, and a third column correspondingly arranged below the third socket.

作为优选,所述上固定板侧壁上至少设有一个用于临时固定所述操作杆组件的快拆机构。Preferably, at least one quick release mechanism for temporarily fixing the operating rod assembly is provided on the side wall of the upper fixing plate.

作为优选,所述快拆机构包括两片弹性夹片,两片弹性夹片形成用于固定操作杆组件的夹持空腔,该夹持空腔设有开口,所述弹性夹片在开口处设有滚轮。Preferably, the quick release mechanism includes two elastic clips, the two elastic clips form a clamping cavity for fixing the operating rod assembly, the clamping cavity is provided with an opening, and the elastic clip is at the opening Features rollers.

作为优选,所述上固定板和底座之间设有下固定板,所述下固定板上也设有所述快拆机构。Preferably, a lower fixing plate is provided between the upper fixing plate and the base, and the quick release mechanism is also provided on the lower fixing plate.

作为优选,所述上固定板和/或下固定板为弧形板。Preferably, the upper fixing plate and/or the lower fixing plate are arc-shaped plates.

作为优选,所述固定平台下方设有支撑脚和万向轮。Preferably, support feet and universal wheels are provided under the fixed platform.

作为优选,所述上固定板上设有推杆扶手。Preferably, a push rod armrest is provided on the upper fixing plate.

本发明的这些特点和优点将会在下面的具体实施方式、附图中详细的揭露。These characteristics and advantages of the present invention will be disclosed in detail in the following specific embodiments and drawings.

【附图说明】【Description of drawings】

下面结合附图对本发明做进一步的说明:Below in conjunction with accompanying drawing, the present invention will be further described:

图1为本发明中固定平台的结构示意图;Fig. 1 is the structural representation of fixed platform among the present invention;

图2为本发明中固定平台的结构示意图;Fig. 2 is the structural representation of fixed platform among the present invention;

图3为本发明中固定平台安装操作杆组件后的结构示意图;Fig. 3 is a structural schematic diagram after the operating rod assembly is installed on the fixed platform in the present invention;

图4为本发明中操作人员操作时的示意图。Fig. 4 is a schematic diagram of an operator operating in the present invention.

【具体实施方式】【Detailed ways】

下面结合本发明实施例的附图对本发明实施例的技术方案进行解释和说明,但下述实施例仅为本发明的优选实施例,并非全部。基于实施方式中的实施例,本领域技术人员在没有做出创造性劳动的前提下所获得其他实施例,都属于本发明的保护范围。The technical solutions of the embodiments of the present invention will be explained and described below in conjunction with the accompanying drawings of the embodiments of the present invention, but the following embodiments are only preferred embodiments of the present invention, not all of them. Based on the examples in the implementation manners, other examples obtained by those skilled in the art without making creative efforts all belong to the protection scope of the present invention.

参照图1至4,本实施例为一种用于电力检修时挂设接地线的辅助设备,包括接地线挂设用的操作杆组件,操作杆组件包括第一相操作杆11、第二相操作杆12、第三相操作杆13,第一相操作杆11、第二相操作杆12、第三相操作杆13分别用电缆线相互汇合形成通路,挂设时,第一相操作杆11、第二相操作杆12、第三相操作杆13分别单独挂设到待检测的线路上,当其中一根操作杆挂设时,另外两根操作杆不需要挂设,待检测线路高度不高时,另外两根操作杆可直接放置在地上,但是一旦待检测线路过高时,另外两根操作杆则需要被拎至悬空状态,从而对操作人员增加负重,而且也不安全,一旦触碰到悬空的电缆线,容易发生触电事故,故传统的挂设工作,都需要配备其他人帮忙握持另外的操作杆。Referring to Figures 1 to 4, this embodiment is an auxiliary device for hanging grounding wires during power maintenance, including an operating rod assembly for hanging the grounding wire, and the operating rod assembly includes a first phase operating rod 11, a second phase Operating rod 12, the third phase operating rod 13, the first phase operating rod 11, the second phase operating rod 12, and the third phase operating rod 13 merge with each other to form a passage with cables. When hanging, the first phase operating rod 11 1, the second phase operating rod 12, and the third phase operating rod 13 are separately hung on the line to be detected. When one of the operating rods is hung, the other two operating rods do not need to be hung. When it is high, the other two operating rods can be directly placed on the ground, but once the line to be detected is too high, the other two operating rods need to be lifted to a suspended state, which will increase the load on the operator, and it is not safe. When encountering suspended cables, electric shock accidents are prone to occur. Therefore, traditional hanging work requires other people to help hold another operating lever.

本实施例中,增设了固定平台,所述第一相操作杆11、第二相操作杆12、第三相操作杆13可提前装载到固定平台上,操作人员在进行挂设工作时,可以将第一相操作杆11、第二相操作杆12、第三相操作杆13先固定放在固定平台上,不会造成凌乱,三根操作杆之间不会换错,能避免重复挂设同一个根操作杆的问题。In this embodiment, a fixed platform is added, and the first phase operating rod 11, the second phase operating rod 12, and the third phase operating rod 13 can be loaded on the fixed platform in advance, and the operator can Fix the first phase operating rod 11, the second phase operating rod 12, and the third phase operating rod 13 on the fixed platform first, so as not to cause mess, and the three operating rods will not be wrongly replaced, which can avoid repeated hanging of the same A root joystick problem.

所述固定平台上设有升降杆2,第一相操作杆11、第二相操作杆12、第三相操作杆13的电缆线相互汇合成三相合一端101,所述升降杆2上设有用于挂载所述三相合一端101的挂钩21。本实施例中的升降杆2包括外管201和设在外管内的内管202,外管201的侧壁上设有用于锁紧内管202的锁紧螺钉203。The fixed platform is provided with a lifting rod 2, and the cables of the first phase operating rod 11, the second phase operating rod 12, and the third phase operating rod 13 are mutually merged into a three-phase one end 101, and the lifting rod 2 is provided with a It is mounted on the hook 21 of the three-phase-in-one end 101 . The lifting rod 2 in this embodiment includes an outer tube 201 and an inner tube 202 disposed inside the outer tube, and a locking screw 203 for locking the inner tube 202 is provided on the side wall of the outer tube 201 .

本实施例中的挂钩21实则为一个带缺口的圆环,圆环固定在升降杆2的顶部,具体而言是固定在内管202的顶部,带缺口的圆环这种设计对电缆线的限位效果更好。The hook 21 in this embodiment is actually a ring with a notch, and the ring is fixed on the top of the elevating rod 2, specifically the top of the inner tube 202. The limit effect is better.

使用时,当挂设高度较高时,操作人员可以将升降杆2的高度升高,从而使得三相合一端101的高度也相应升高,比如当操作人员需要挂设第一相操作杆11时,将三相合一端101的高度升高,有助于缩小挂设点与三相合一端101之间的距离,保证第一相操作杆11与三相合一端101之间的电缆线处于松弛状态不受力,故在挂设时,操作人员不需要承担其他两个操作杆的重量和电缆线的重量,操作更省力、方便,而且保证了安全性,不用额外增配人员帮挂设人员握持剩下的两根操作杆,减少了人工成本。When in use, when the hanging height is high, the operator can raise the height of the elevating rod 2, so that the height of the three-phase one end 101 is also increased correspondingly, for example, when the operator needs to hang the first phase operating rod 11 , the height of the three-phase combined end 101 is increased, which helps to reduce the distance between the hanging point and the three-phase combined end 101, and ensures that the cable between the first-phase operating rod 11 and the three-phase combined end 101 is in a loose state and is not affected. Therefore, when hanging, the operator does not need to bear the weight of the other two operating levers and the weight of the cable, the operation is more labor-saving and convenient, and the safety is guaranteed, and there is no need for additional personnel to help the hanging personnel hold the rest. The lower two operating levers reduce labor costs.

具体的结构:所述固定平台包括底座3,底座3上固定有上固定板4,上固定板4为弧形板,上固定板4上设有用于插放所述操作杆组件的插孔41,插放的方式,拿取比较方便。插孔41具体包括:用于插放所述第一相操作杆11的第一插孔411、插放第二相操作杆12的第二插孔412、插放第三相操作杆13的第三插孔413。由于一般操作杆均为圆柱形的杆,故本实施例中第一插孔411、第二插孔412、第三插孔413均为圆孔。Concrete structure: the fixed platform includes a base 3 on which an upper fixed plate 4 is fixed, the upper fixed plate 4 is an arc-shaped plate, and the upper fixed plate 4 is provided with a socket 41 for inserting the operating rod assembly , The way of inserting and placing is more convenient to take. The socket 41 specifically includes: a first socket 411 for inserting the first phase operating rod 11 , a second socket 412 for inserting the second phase operating rod 12 , and a second socket 412 for inserting the third phase operating rod 13 . Three jacks 413 . Since the general operating rods are all cylindrical rods, the first insertion hole 411 , the second insertion hole 412 and the third insertion hole 413 in this embodiment are all round holes.

所述上固定板4通过空心立柱5固定在所述底座3上,所述插孔41的位置与空心立柱5的内腔位置对应,具体而言,所述空心立柱5包括对应设置在第一插孔411下方的第一立柱51、对应设置在第二插孔412下方的第二立柱52、对应设置在第三插孔413下方的第三立柱53。本实施例中的空心立柱5起到两个作用,其一,是用于将上固定板4固定在底座3上,起到一个连接固定的作用,其二,空心立柱5利用其内部空心的结构,使得操作杆从插孔41插入后,可稳定容置在空心立柱5的内部,防止操作杆发生晃动。用一个空心立柱5同时完成两个作用,结构简单,体积小,成本也相对较低。The upper fixing plate 4 is fixed on the base 3 through the hollow column 5, and the position of the jack 41 corresponds to the position of the cavity of the hollow column 5. The first column 51 below the insertion hole 411 corresponds to the second column 52 disposed below the second insertion hole 412 , and corresponds to the third column 53 disposed below the third insertion hole 413 . The hollow column 5 in this embodiment plays two roles. One is to fix the upper fixing plate 4 on the base 3 to play a role of connection and fixation. Second, the hollow column 5 utilizes its internal hollow The structure is such that after the operating rod is inserted through the socket 41, it can be stably accommodated inside the hollow column 5, preventing the operating rod from shaking. A hollow column 5 is used to complete two functions at the same time, the structure is simple, the volume is small, and the cost is relatively low.

由于操作杆的长度较长,有时候操作人员将操作杆从空心立柱5内整个抽出时较为繁琐,为了进一步简化操作,本实施例中,所述上固定板4侧壁上至少设有一个用于临时固定所述操作杆组件的快拆机构,本实施例中的快拆机构有三个,均匀设在上固定板4的侧壁上。Due to the long length of the operating rod, sometimes it is cumbersome for the operator to extract the entire operating rod from the hollow column 5. In order to further simplify the operation, in this embodiment, at least one is provided on the side wall of the upper fixing plate 4. In order to temporarily fix the quick-release mechanism of the operating rod assembly, there are three quick-release mechanisms in this embodiment, which are uniformly arranged on the side wall of the upper fixing plate 4 .

本实施例中的快拆机构包括两片弹性夹片42,弹性夹片42一端固定在上固定板4的侧壁上,两片弹性夹片42形成用于固定操作杆组件的夹持空腔43,该夹持空腔43设有开口,所述弹性夹片42在开口处设有滚轮44,固定操作杆时,操作杆从开口处卡入,利用滚轮的滚动效果,操作杆可以轻松卡入到夹持空腔43内,当然,在取出时,也可以从开口处轻松取出,非常方便,不用将操作杆整个从空心立柱5中抽出。The quick release mechanism in this embodiment includes two elastic clips 42, one end of the elastic clips 42 is fixed on the side wall of the upper fixing plate 4, and the two elastic clips 42 form a clamping cavity for fixing the operating rod assembly 43. The clamping cavity 43 is provided with an opening, and the elastic clip 42 is provided with a roller 44 at the opening. When the operating rod is fixed, the operating rod is snapped in from the opening, and the operating rod can be easily locked by using the rolling effect of the roller. into the clamping cavity 43, of course, when taking it out, it can also be easily taken out from the opening, which is very convenient, and it is not necessary to extract the whole operating rod from the hollow column 5.

为了让快拆机构能更稳定地固定操作杆,所述上固定板4和底座3之间设有下固定板6,所述下固定板6上也设有所述快拆机构,而且下固定板6上的快拆机构也相应设置三个。本实施例中下固定板6也为弧形板,与上固定板4形状保持一致,外观上更具整体性。In order to allow the quick release mechanism to fix the operating rod more stably, a lower fixing plate 6 is provided between the upper fixing plate 4 and the base 3, and the lower fixing plate 6 is also provided with the quick release mechanism, and the lower fixing plate 6 is also provided with the quick release mechanism. There are three quick release mechanisms on the board 6 correspondingly. In this embodiment, the lower fixing plate 6 is also an arc-shaped plate, which is consistent with the shape of the upper fixing plate 4 and has a more integrated appearance.

本实施例中,为了更方便的移动整个固定平台,所述固定平台下方设有支撑脚71和万向轮72,本实施例中支撑脚71和万向轮72位于不同侧,支撑脚71的支撑效果好,不至于随便滑动,万向轮72的可移动效果好,当用户需要移动时,只需要将底座3倾斜翘起,就能利用万向轮72进行移动,而在不需要移动时,利用支撑脚71与地面接触,作为优选,本实施例中的万向轮72采用带锁定效果的万向轮72,这种万向轮72在市面上较为常见,结构不作过多阐述,另外,为了方便移动,所述上固定板4上设有推杆扶手45,方便操作人员推动。In this embodiment, in order to move the entire fixed platform more conveniently, a support foot 71 and a universal wheel 72 are provided below the fixed platform. In this embodiment, the support foot 71 and the universal wheel 72 are located on different sides. The supporting effect is good, so that it will not slide casually. The movable effect of the universal wheel 72 is good. When the user needs to move, he only needs to tilt the base 3 to move with the universal wheel 72. When there is no need to move , use the support feet 71 to contact the ground. As a preference, the universal wheel 72 in this embodiment adopts a universal wheel 72 with a locking effect. This universal wheel 72 is relatively common in the market, and the structure will not be elaborated too much. In addition , in order to facilitate the movement, the upper fixed plate 4 is provided with a push rod handrail 45, which is convenient for the operator to push.

以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,熟悉该本领域的技术人员应该明白本发明包括但不限于附图和上面具体实施方式中描述的内容。任何不偏离本发明的功能和结构原理的修改都将包括在权利要求书的范围中。The above is only a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, and those skilled in the art should understand that the present invention includes but is not limited to the accompanying drawings and the description in the above specific embodiments content. Any modifications that do not depart from the functional and structural principles of the present invention will be included in the scope of the claims.

Claims (9)

1.一种用于电力检修时挂设接地线的辅助设备,包括接地线挂设用的操作杆组件,操作杆组件包括第一相操作杆、第二相操作杆、第三相操作杆,所述第一相操作杆、第二相操作杆、第三相操作杆分别用电缆线相互汇合,其特征在于,还包括用于装载所述第一相操作杆、第二相操作杆、第三相操作杆的固定平台,所述固定平台上设有升降杆,第一相操作杆、第二相操作杆、第三相操作杆的电缆线相互汇合成三相合一端,所述升降杆上设有用于挂载所述三相合一端的挂钩,挂钩为一个带缺口的圆环,所述固定平台下方设有支撑脚和万向轮。1. An auxiliary device for hanging grounding wires during electric power maintenance, including an operating rod assembly for hanging the grounding wire, the operating rod assembly includes a first phase operating rod, a second phase operating rod, and a third phase operating rod, The operating rods of the first phase, the operating rods of the second phase and the operating rods of the third phase are respectively connected to each other by cables, and it is characterized in that it also includes a The fixed platform of the three-phase operating rod, the fixed platform is provided with a lifting rod, and the cables of the first phase operating rod, the second phase operating rod, and the third phase operating rod are merged into one end of three phases, and the lifting rod is on the A hook for mounting one end of the three-phase combination is provided, and the hook is a circular ring with a notch. Supporting feet and universal wheels are provided under the fixed platform. 2.如权利要求1所述用于电力检修时挂设接地线的辅助设备,其特征在于,所述固定平台包括底座,底座上固定有上固定板,上固定板上设有用于插放所述操作杆组件的插孔。2. Auxiliary equipment for hanging grounding wires during electric power maintenance as claimed in claim 1, wherein the fixed platform includes a base, an upper fixing plate is fixed on the base, and an upper fixing plate is provided for inserting and placing the auxiliary equipment. socket for the joystick assembly described above. 3.如权利要求2所述用于电力检修时挂设接地线的辅助设备,其特征在于,所述上固定板通过空心立柱固定在所述底座上,所述插孔的位置与空心立柱的内腔位置对应。3. Auxiliary equipment for hanging grounding wires during power maintenance as claimed in claim 2, wherein the upper fixing plate is fixed on the base through a hollow column, and the position of the jack is the same as that of the hollow column. Corresponding to the inner cavity position. 4.如权利要求3所述用于电力检修时挂设接地线的辅助设备,其特征在于,所述插孔包括用于插放所述第一相操作杆的第一插孔、插放第二相操作杆的第二插孔、插放第三相操作杆的第三插孔,所述空心立柱包括对应设置在第一插孔下方的第一立柱、对应设置在第二插孔下方的第二立柱、对应设置在第三插孔下方的第三立柱。4. The auxiliary equipment for hanging the grounding wire during power maintenance according to claim 3, wherein the jack includes a first jack for inserting the first phase operating rod, a second jack for inserting The second socket of the two-phase operating rod and the third socket of the third-phase operating rod are inserted. The hollow column includes a first column correspondingly arranged below the first socket, and a correspondingly arranged below the second socket. The second column corresponds to the third column arranged below the third jack. 5.如权利要求2所述用于电力检修时挂设接地线的辅助设备,其特征在于,所述上固定板侧壁上至少设有一个用于临时固定所述操作杆组件的快拆机构。5. The auxiliary equipment for hanging the grounding wire during electric power maintenance according to claim 2, wherein at least one quick release mechanism for temporarily fixing the operating rod assembly is provided on the side wall of the upper fixing plate . 6.如权利要求5所述用于电力检修时挂设接地线的辅助设备,其特征在于,所述快拆机构包括两片弹性夹片,两片弹性夹片形成用于固定操作杆组件的夹持空腔,该夹持空腔设有开口,所述弹性夹片在开口处设有滚轮。6. The auxiliary equipment for hanging the grounding wire during electric maintenance according to claim 5, characterized in that, the quick release mechanism includes two elastic clips, and the two elastic clips are used to fix the operating rod assembly. The clamping cavity is provided with an opening, and the elastic clip is provided with a roller at the opening. 7.如权利要求6所述用于电力检修时挂设接地线的辅助设备,其特征在于,所述上固定板和底座之间设有下固定板,所述下固定板上也设有所述快拆机构。7. Auxiliary equipment for hanging grounding wires during electric power maintenance as claimed in claim 6, wherein a lower fixing plate is provided between the upper fixing plate and the base, and the lower fixing plate is also provided with the Describe the quick release mechanism. 8.如权利要求7所述用于电力检修时挂设接地线的辅助设备,其特征在于,所述上固定板和/或下固定板为弧形板。8 . The auxiliary equipment for hanging the grounding wire during power maintenance according to claim 7 , wherein the upper fixing plate and/or the lower fixing plate are arc-shaped plates. 9.如权利要求2至8之一所述用于电力检修时挂设接地线的辅助设备,其特征在于,所述上固定板上设有推杆扶手。9. The auxiliary equipment for hanging the grounding wire during electric power maintenance according to any one of claims 2 to 8, characterized in that a push rod armrest is provided on the upper fixing plate.
CN201611040845.9A 2016-11-21 2016-11-21 It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul Active CN106654991B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611040845.9A CN106654991B (en) 2016-11-21 2016-11-21 It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611040845.9A CN106654991B (en) 2016-11-21 2016-11-21 It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul

Publications (2)

Publication Number Publication Date
CN106654991A CN106654991A (en) 2017-05-10
CN106654991B true CN106654991B (en) 2018-11-30

Family

ID=58811436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611040845.9A Active CN106654991B (en) 2016-11-21 2016-11-21 It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul

Country Status (1)

Country Link
CN (1) CN106654991B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107919594B (en) * 2017-07-14 2019-08-06 国网浙江省电力公司湖州供电公司 Wrap-around ground wire auxiliary operating equipment
CN110814490A (en) * 2019-10-19 2020-02-21 秦河新材股份有限公司 Butt welding device for cold-rolled steel bar
CN110752495A (en) * 2019-10-23 2020-02-04 广东电网有限责任公司 A ground wire suspension device
CN112909596B (en) * 2021-01-28 2022-10-18 国网河南省电力公司信阳供电公司 A clamp-pressed flexible cable lap joint

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102315530A (en) * 2011-07-12 2012-01-11 镇江市科捷电器有限公司 Ground wire hitching apparatus
CN202333176U (en) * 2011-11-16 2012-07-11 枣强县电力局 Double-row grounding wire hanging bracket
CN103107428A (en) * 2013-02-27 2013-05-15 绥化电业局 10 kv overhead line targeted installation grounding device and overhead line targeted connection method
CN103474905A (en) * 2013-09-24 2013-12-25 国家电网公司 Auxiliary grounding wire laying device
CN104037582A (en) * 2014-06-19 2014-09-10 国网四川省电力公司成都市新都供电分公司 Labor-saving adjustable ground wire hook mounting mechanism
CN204407843U (en) * 2015-02-05 2015-06-17 国家电网公司 Earth connection draw off gear
CN206195245U (en) * 2016-11-21 2017-05-24 国网浙江省电力公司湖州供电公司 A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102315530A (en) * 2011-07-12 2012-01-11 镇江市科捷电器有限公司 Ground wire hitching apparatus
CN202333176U (en) * 2011-11-16 2012-07-11 枣强县电力局 Double-row grounding wire hanging bracket
CN103107428A (en) * 2013-02-27 2013-05-15 绥化电业局 10 kv overhead line targeted installation grounding device and overhead line targeted connection method
CN103474905A (en) * 2013-09-24 2013-12-25 国家电网公司 Auxiliary grounding wire laying device
CN104037582A (en) * 2014-06-19 2014-09-10 国网四川省电力公司成都市新都供电分公司 Labor-saving adjustable ground wire hook mounting mechanism
CN204407843U (en) * 2015-02-05 2015-06-17 国家电网公司 Earth connection draw off gear
CN206195245U (en) * 2016-11-21 2017-05-24 国网浙江省电力公司湖州供电公司 A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection

Also Published As

Publication number Publication date
CN106654991A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106654991B (en) It is a kind of for hanging the ancillary equipment of ground line when electric power overhaul
CN106348189B (en) The special lifting formula stand arrangement in power distribution station
CN206195245U (en) A auxiliary assembly that hangs when being used for electric power to overhaul and establishes earth connection
CN106025957A (en) Cable supporting device
CN102515033A (en) Single-hook lifting device for switch blade porcelain insulator
CN106365084B (en) Electric power cellar well cover plate switch device suitable for batch switch operation
CN103474905B (en) The device of auxiliary grounding wire installing
CN107293999A (en) A kind of special assistance platform of overhead type bus ceramic insulator
CN105346918B (en) Distribution switchgear cabinet is installed with regard to bit platform
CN204282833U (en) A kind of boom and climbing system thereof
CN107069533A (en) A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool
CN216289873U (en) Overhead transmission line overhauls operation platform
CN116036789A (en) Pressure swing adsorption oxygen generating equipment
CN216762847U (en) Electric power tool placement platform for pole climbing
CN213989851U (en) Hydraulic multi-direction movable hoisting maintenance platform
CN209200526U (en) A bypass operation vehicle quick access overhead line device
CN104237576A (en) Cable terminal test hydraulic support of GIS cable pressure gas chamber
CN211813242U (en) Rigid chain lifting device
CN207878639U (en) A kind of building structure supporting part
CN107221902B (en) A kind of special assistance platform of overhead type busbar ceramic insulator
CN203905435U (en) Multilayer lifting platform for installation of combustor
CN205277277U (en) Insulating companion ladder
CN222029479U (en) Distribution box convenient to overhaul
CN218828776U (en) Interim overhead line device of electric power transmission
CN106793654B (en) A kind of auxiliary device and method for installing equipment in cabinet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant