[go: up one dir, main page]

CN106640160B - A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology - Google Patents

A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology Download PDF

Info

Publication number
CN106640160B
CN106640160B CN201610937567.0A CN201610937567A CN106640160B CN 106640160 B CN106640160 B CN 106640160B CN 201610937567 A CN201610937567 A CN 201610937567A CN 106640160 B CN106640160 B CN 106640160B
Authority
CN
China
Prior art keywords
hole
handed
rod body
anchor rod
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610937567.0A
Other languages
Chinese (zh)
Other versions
CN106640160A (en
Inventor
王伸
李化敏
李东印
刘文超
冯军发
李回贵
张广杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201610937567.0A priority Critical patent/CN106640160B/en
Publication of CN106640160A publication Critical patent/CN106640160A/en
Application granted granted Critical
Publication of CN106640160B publication Critical patent/CN106640160B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08KUse of inorganic or non-macromolecular organic substances as compounding ingredients
    • C08K13/00Use of mixtures of ingredients not covered by one single of the preceding main groups, each of these compounds being essential
    • C08K13/02Organic and inorganic ingredients
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/025Grouting with organic components, e.g. resin

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Medicinal Chemistry (AREA)
  • Polymers & Plastics (AREA)
  • Organic Chemistry (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology, it is related to Roadway Support Technology field, it includes pallet (1), nut (2), head bolts (3), left-handed anchor rod body (4), explosive valve (7) and slow resins powder stick (8), the pallet (1) is equipped with anchor rod body and passes through hole, pallet (1) is fixedly mounted at the hole of armature boring (10), one end of the left-handed anchor rod body (4) is equipped with head bolts (3), and longitudinal hole (5) and one group of cross through hole (6) are equipped in left-handed anchor rod body (4);Application of the invention can effectively avoid during the installation process because cause under left hand thread stirring action it is solidifying fastly be mutually mixed with slow hardening Anchor Agent, rapid hardening taking off of anchorage length the problem of, so as to apply high pre-stress to anchor pole, enhance diffusion of the prestressing force in country rock, improves the control action to high stress soft and broken surrounding rocks.

Description

A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology
Technical field
The present invention relates to Roadway Support Technology fields, and in particular to a kind of left-handed nothing indulge muscle overall length high pre-stress anchor pole and its Construction technology.
Background technique
Safe and efficient, economic Roadway Support Technology is the necessary condition for guaranteeing mine safety, efficiently producing.Anchor pole branch Shield technology is widely applied in external important producing coal country, wherein the most typical with the U.S., Australia, this and they Coal seam geological condition is fairly simple, it is closely related to bury shallow and national attention this technology, forms from design of its support, mating Construction equipment, suitable for the complete support technology body such as the serial bolting and rope support product of different condition and reliable monitoring means System, whole system are more scientific, safe and reliable.According to incompletely statistics, the lane that the state-owned large and medium-sized coal mine in China newly tunnels every year Road total length is up to kilometers up to ten thousand, wherein 80% or more is coal road and half-coal rock roadway.Suspension roof support has become China's coal-mine lane Road first choice, safe and efficient main support form, for buried high stress soft and broken surrounding rocks roadway bolting support, prestressing force The application value the high more can significant deformation controlling for rock surrounding gateways.
It is the main anchor rod body form that current colliery tunnel support uses that left-handed nothing, which indulges muscle screw-thread steel, it is based on building It is further transformed with screw-thread steel profile.Left-handed nothing indulges the characteristics of muscle twisted steel anchor rod are as follows: since the body of rod uses left hand thread, During the rotation forces of roof bolting equipment, resin curing agent is constantly pushed forward, may make that resin fill is closely knit.But There is also following deficiencies: rockbolt installation process for the vertical muscle full-length prestress anchor pole of left-handed nothing used in Roadway Support Technology at present In, quick hardening resin powder stick and slow resins powder stick are sequentially placed into drilling in advance, for drilling machine when pushing anchor pole, lever front end head is first It is contacted with slow resins powder stick, after the slow resins powder stick in front of lever front end head is stirred brokenly, stirs push in left hand thread and make Under, the slow hardening Anchor Agent for being broken packaging will be flowed to drilling deep, so that slow hardening Anchor Agent and fast solidifying Anchor Agent are mutual Mixing causes actual fast solidifying Anchor Agent in the taking off of anchorage length in drilling front end portion.At the same time, it is pushed away in anchor pole left hand thread It sending under effect, the intra-segment for being originally used for the anchoring of quick hardening resin Anchor Agent divides the resin ring for closing on the body of rod to be replaced by slow resins, If applying compared with high pre-stress, cause high stress concentrations at screw thread cross rib, more than then causing front end slow after resin material intensity Solidifying, rapid hardening hybrid resin Anchor Agent destroys, and further weakens anchorage effect.In short, before the prerequisite for applying high pre-stress is The quick hardening resin of end should have enough anchorage lengths and anchoring strength;But lead to solidifying tree fastly under the stirring action of left hand thread Rouge valid bonding length shortens, front end anchoring strength reduces, and is unfavorable for the application of high pre-stress.
It is can preventing from causing during the installation process front end fastening invalidation therefore, it is necessary to one kind and can apply and high answer in advance The left-handed non-longitudinal rib prestressed anchor pole and construction technology of power, to be suitable for the roadway support of high stress soft broken.
Summary of the invention
The purpose of the present invention is mainly to solve above-mentioned technical problem, and a kind of left-handed nothing is provided and indulges that muscle overall length is high to answer in advance Power anchor pole and its construction technology.
It includes pallet, nut, head bolts, left-handed anchor pole bar that a kind of left-handed nothing of the present invention, which indulges muscle overall length high pre-stress anchor pole, Body, explosive valve and slow resins powder stick, the pallet are equipped with anchor rod body and pass through hole, and pallet is fixedly mounted on the hole of armature boring At mouthful, one end of the left-handed anchor rod body is equipped with head bolts, and longitudinal hole is equipped in left-handed anchor rod body and one group lateral Through-hole, one group of cross through hole are connected with longitudinal hole respectively, and the head bolts of left-handed anchor rod body pass through the anchor of pallet Club shaft passes through hole, and by nut check, the left-handed anchor rod body is located in armature boring, left-handed anchor rod body and anchor It is resin anchoring agent between bar drill hole, the two sides port of one group of cross through hole is respectively fitted with explosive valve.
The slow resins powder stick 8 is made of materials A and material B, and the materials A is resin-bonded mastic, by unsaturated polyester (UP) 80-100 parts of resin, 0.0025-0.015 parts of cobalt naphthenate, 300-600 parts of inorganic filler mixed according to weight ratio, The material B is common slow hardening curing agent, by 0.04-0.12 parts of methyl ethyl ketone peroxide, repefral 0.01-0.05 Part, 0.03-0.15 parts of talcum powder ratio by weight form.
A kind of left-handed nothing indulges the construction technology of muscle overall length high pre-stress anchor pole, comprising the following steps:
1. measurement, positioning armature boring;
2. is drilled eye with jumbolter by design size;
3. high pressure water wash boring;
4. several slow resins powder sticks are pushed into left-handed anchor rod body and are drilled by, guarantee that resin explosive roll quantity can be realized Full length fastening;
5. installs left hand thread steel pole body with jumbolter;
6. when left-handed 4 front end of anchor rod body pierces bottom hole completely, by 5, one groups of cross through hole 6 of longitudinal hole and Explosive valve 7 injects anchoring material C, and anchoring material C forms fast-set resin powder stick after mixing with the slow resins powder stick 8 being stirred 11, realize end rapid hardening, external resin liquid is flowed into one group of cross through hole 6 and resulted in blockage, and explosive valve is unidirectional unlatching, when one Group cross through hole (6) in injection pressure be more than explosion valve opening pressure after, explosive valve 7 open, anchoring material C flow into the body of rod with Between drilling, the rapid hardening of anchor pole front end is realized;
7. stopping stirring after accelerates stirring Anchor Agent to reach scheduled stirring resistance;
8. waits for that the resin of left-handed anchor rod body front end is fully cured, pallet and nut are installed;
9. passes through longitudinal hole filler D into the hole of longitudinal hole and one group of cross through hole.
The anchoring material C is by DMT0.6-1.5 parts of dimethyl-p-toluidine, DMA0.2-1.5 parts of dimethylaniline, solvent 0.5-3 parts mix according to weight ratio;The material D is by 80-120 parts of unsaturated polyester resin, inorganic filler 200-300 Part, 5-10 parts of BPO powder mixed according to weight ratio.
The invention has the advantages that: application of the invention can effectively avoid during the installation process because leading under left hand thread stirring action The problem of cause is coagulated fastly and slow hardening Anchor Agent is mutually mixed, rapid hardening taking off of anchorage length, so as to apply high pre-stress, increasing to anchor pole The strength prestressed diffusion in country rock improves the control action to high stress soft and broken surrounding rocks, has application well Promotional value.
Detailed description of the invention
Fig. 1 is a kind of vertical muscle overall length high pre-stress anchor pole addition anchoring material C formation fast-set resin powder stick structure of left-handed nothing Schematic diagram.
Fig. 2 is left-handed anchor rod body and explosive valve assembly structure diagram.
Fig. 3 is a kind of construction flow chart of vertical muscle overall length high pre-stress anchor pole of left-handed nothing.
Fig. 4 is slow hardening Anchor Agent component schematic diagram.
Fig. 5 is rapid solidification anchor agent component schematic diagram.
In figure: 1, pallet;2, nut;3, head bolts;4, left-handed anchor rod body;5, longitudinal hole;6, laterally lead to for one group Hole;7, explosive valve;8, slow resins powder stick;9, Anchor Agent;10, armature boring;11, fast-set resin powder stick.
Specific embodiment
The present invention will be further described with reference to the accompanying drawing.
As shown in Fig. 1,2,3,4,5, it includes pallet 1, nut that a kind of left-handed nothing of the present invention, which indulges muscle overall length high pre-stress anchor pole, 2, head bolts 3, left-handed anchor rod body 4, explosive valve 7 and slow resins powder stick 8, the pallet 1 are equipped with anchor rod body and pass through hole, Pallet 1 is fixedly mounted at the hole of armature boring 10, and one end of the left-handed anchor rod body 4 is equipped with head bolts 3, left-handed anchor Longitudinal hole 5 and one group of cross through hole 6 are equipped in club shaft 4, one group of cross through hole 6 is connected with longitudinal hole 5 respectively, The anchor rod body that the head bolts 3 of left-handed anchor rod body 4 pass through pallet 1 passes through hole, and is locked by nut 2, the left-handed anchor Club shaft 4 is located in armature boring 10, is resin anchoring agent between left-handed anchor rod body 4 and armature boring 10, and one group laterally logical The two sides port in hole 6 is respectively fitted with explosive valve 7.
The slow resins powder stick 8 is made of materials A and material B, and the materials A is resin-bonded mastic, by unsaturated polyester (UP) 80-100 parts of resin, 0.0025-0.015 parts of cobalt naphthenate, 300-600 parts of inorganic filler mixed according to weight ratio, The material B is common slow hardening curing agent, by 0.04-0.12 parts of methyl ethyl ketone peroxide, repefral 0.01-0.05 Part, 0.03-0.15 parts of talcum powder ratio by weight form.
A kind of left-handed nothing indulges the construction technology of muscle overall length high pre-stress anchor pole, comprising the following steps:
1. measurement, positioning armature boring;
2. is drilled eye with jumbolter by design size;
3. high pressure water wash boring;
4. several slow resins powder sticks 8 are pushed into left-handed anchor rod body 4 and are drilled by, guarantee that resin explosive roll quantity can be real Existing full length fastening;
5. installs left hand thread steel pole body with jumbolter;
6. when left-handed 4 front end of anchor rod body pierces bottom hole completely, by 5, one groups of cross through hole 6 of longitudinal hole and Explosive valve 7 injects anchoring material C, and anchoring material C forms fast-set resin powder stick after mixing with the slow resins powder stick 8 being stirred 11, realize end rapid hardening, external resin liquid is flowed into one group of cross through hole 6 and resulted in blockage, and explosive valve is unidirectional unlatching, when one Group cross through hole (6) in injection pressure be more than explosion valve opening pressure after, explosive valve 7 open, anchoring material C flow into the body of rod with Between drilling, the rapid hardening of anchor pole front end is realized;
7. stopping stirring after accelerates stirring Anchor Agent to reach scheduled stirring resistance;
8. waits for that the resin of left-handed 4 front end of anchor rod body is fully cured, pallet 1 and nut 2 are installed;
9. passes through the filler D into the hole of longitudinal hole 5 and one group of cross through hole 6 of longitudinal hole 5.
The anchoring material C is by DMT0.6-1.5 parts of dimethyl-p-toluidine, DMA0.2-1.5 parts of dimethylaniline, solvent 0.5-3 parts mix according to weight ratio;The material D is by 80-120 parts of unsaturated polyester resin, inorganic filler 200-300 Part, 5-10 parts of BPO powder mixed according to weight ratio.
Working method and principle: installation anchor pole when, into drilling fill slow resins powder stick, then by longitudinal hole, To anchor pole front end injection anchoring material C, the effect of explosive valve is prevented in installation anchor pole mistake for one group of cross through hole and explosive valve External resin powder stick liquid flows into one group of cross through hole when agitating resin powder stick in journey, when rockbolt installation to predetermined position, The pressure for injecting anchoring material C is more than explosive valve unlatching after explosion valve opening pressure, C inflow drilling front end, and and slow resins Front end rapid hardening can be achieved after powder stick mixing;
Carrying out construction according to process above step can effectively avoid during the installation process because leading under left hand thread stirring action The problem of cause is coagulated fastly and slow hardening Anchor Agent is mutually mixed, rapid hardening taking off of anchorage length, so as to apply high pre-stress, increasing to anchor pole The strength prestressed diffusion in country rock improves the control action to high stress soft and broken surrounding rocks.
The above embodiments are only used to illustrate the present invention, and not limitation of the present invention, in relation to the common of technical field Technical staff can also make a variety of changes and modification without departing from the spirit and scope of the present invention, therefore all Equivalent technical solution also belongs to scope of the invention, and scope of patent protection of the invention should be defined by the claims.

Claims (4)

1. the construction technology that a kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole, it is characterised in that the following steps are included:
1. measurement, positioning armature boring;
2. is drilled eye with jumbolter by design size;
3. high pressure water wash boring;
4. several slow resins powder sticks (8) are pushed into left-handed anchor rod body (4) and are drilled by, guarantee that resin explosive roll quantity can be real Existing full length fastening;
5. installs left hand thread steel pole body with jumbolter;
6. when left-handed anchor rod body (4) front end pierces bottom hole completely, passes through longitudinal hole (5), one group of cross through hole (6) And explosive valve (7) injects anchoring material C, anchoring material C forms rapid hardening tree after mixing with the slow resins powder stick (8) being stirred Rouge powder stick (11) realizes end rapid hardening, and external resin liquid is flowed into one group of cross through hole (6) and resulted in blockage, and explosive valve is single To unlatching, after the injection pressure in one group of cross through hole (6) is more than explosion valve opening pressure, explosive valve (7) is opened, and anchors material Expect that C is flowed between the body of rod and drilling, realizes the rapid hardening of anchor pole front end;
7. stopping stirring after accelerates stirring Anchor Agent to reach scheduled stirring resistance;
8. waits for that the resin of left-handed anchor rod body (4) front end is fully cured, pallet (1) and nut (2) are installed;
9. passes through longitudinal hole (5) filler D into the hole of longitudinal hole (5) and one group of cross through hole (6).
2. the construction technology that a kind of left-handed nothing according to claim 1 indulges muscle overall length high pre-stress anchor pole, it is characterised in that The anchoring material C is by DMT0.6-1.5 parts of dimethyl-p-toluidine, DMA0.2-1.5 parts of dimethylaniline, 0.5-3 parts of solvent It is mixed according to weight ratio;The material D is by 80-120 parts of unsaturated polyester resin, 200-300 parts of inorganic filler, BPO powder Last 5-10 parts mixes according to weight ratio.
3. the construction technology that a kind of left-handed nothing according to claim 1 indulges muscle overall length high pre-stress anchor pole, it is characterised in that It includes pallet (1), nut (2), head bolts (3), left-handed anchor rod body that the left-handed nothing, which indulges muscle overall length high pre-stress anchor pole, (4), explosive valve (7) and slow resins powder stick (8), the pallet (1) are equipped with anchor rod body and pass through hole, and pallet (1) is fixedly mounted At the hole of armature boring (10), one end of the left-handed anchor rod body (4) is equipped with head bolts (3), left-handed anchor rod body (4) in be equipped with longitudinal hole (5) and one group of cross through hole (6), one group of cross through hole (6) respectively with longitudinal hole (5) phase Connection, the anchor rod body that the head bolts (3) of left-handed anchor rod body (4) pass through pallet (1) passes through hole, and is locked by nut (2) Tightly, the left-handed anchor rod body (4) is located in armature boring (10), is between left-handed anchor rod body (4) and armature boring (10) Resin anchoring agent, the two sides port of one group of cross through hole (6) are respectively fitted with explosive valve (7).
4. the construction technology that a kind of left-handed nothing according to claim 3 indulges muscle overall length high pre-stress anchor pole, it is characterised in that The slow resins powder stick (8) is made of materials A and material B, and the materials A is resin-bonded mastic, by unsaturated polyester resin 80- 100 parts, 0.0025-0.015 parts of cobalt naphthenate, 300-600 parts of inorganic filler mixed according to weight ratio, the material B is common slow hardening curing agent, by 0.04-0.12 parts of methyl ethyl ketone peroxide, 0.01-0.05 parts of repefral, talcum 0.03-0.15 parts of powder ratio by weight forms.
CN201610937567.0A 2016-10-24 2016-10-24 A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology Expired - Fee Related CN106640160B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610937567.0A CN106640160B (en) 2016-10-24 2016-10-24 A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610937567.0A CN106640160B (en) 2016-10-24 2016-10-24 A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology

Publications (2)

Publication Number Publication Date
CN106640160A CN106640160A (en) 2017-05-10
CN106640160B true CN106640160B (en) 2019-03-29

Family

ID=58820425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610937567.0A Expired - Fee Related CN106640160B (en) 2016-10-24 2016-10-24 A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology

Country Status (1)

Country Link
CN (1) CN106640160B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829768B (en) * 2017-10-23 2023-07-18 山东建筑大学 A large-deformation support device and technology for blasting and automatically expanding anchorage structures
CN108374680B (en) * 2018-03-12 2019-10-29 中国矿业大学 A kind of single hole is double to anchor assembled bolt and application method
CN109779665A (en) * 2019-03-29 2019-05-21 攀枝花学院 Drill-anchor integrated bolt

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0033246A1 (en) * 1980-01-29 1981-08-05 Fosroc International Limited Capsules containing cementitious compositions
US4295760A (en) * 1978-04-21 1981-10-20 Warner Clifford C Rock bolt anchor
US4313697A (en) * 1979-09-17 1982-02-02 Rozanc Richard C Mine roof support plate bolt
CN101949294A (en) * 2010-08-13 2011-01-19 山西潞安环保能源开发股份有限公司常村煤矿 Prestressed full-length anchorage support method
CN102926700A (en) * 2012-11-23 2013-02-13 平顶山市安泰华矿用安全设备制造有限公司 Grouting bag type hole packer with multi-section seal
CN103061790A (en) * 2013-01-23 2013-04-24 中国矿业大学 Prestressed full-anchor squeezed anchoring device and method thereof
CN203214082U (en) * 2013-05-06 2013-09-25 高原 Novel hollow grouting anchor bolt
CN103485349A (en) * 2013-09-20 2014-01-01 兰州理工大学 Lime nail composite frame prestressed anchor tube structure and construction method for reinforcing weak slope
CN105484782A (en) * 2016-01-08 2016-04-13 河南理工大学 Anchor rod for achieving high-prestress total-length anchoring through double-fluid grouting cartridges and use method of anchor rod

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4295760A (en) * 1978-04-21 1981-10-20 Warner Clifford C Rock bolt anchor
US4313697A (en) * 1979-09-17 1982-02-02 Rozanc Richard C Mine roof support plate bolt
EP0033246A1 (en) * 1980-01-29 1981-08-05 Fosroc International Limited Capsules containing cementitious compositions
CN101949294A (en) * 2010-08-13 2011-01-19 山西潞安环保能源开发股份有限公司常村煤矿 Prestressed full-length anchorage support method
CN102926700A (en) * 2012-11-23 2013-02-13 平顶山市安泰华矿用安全设备制造有限公司 Grouting bag type hole packer with multi-section seal
CN103061790A (en) * 2013-01-23 2013-04-24 中国矿业大学 Prestressed full-anchor squeezed anchoring device and method thereof
CN203214082U (en) * 2013-05-06 2013-09-25 高原 Novel hollow grouting anchor bolt
CN103485349A (en) * 2013-09-20 2014-01-01 兰州理工大学 Lime nail composite frame prestressed anchor tube structure and construction method for reinforcing weak slope
CN105484782A (en) * 2016-01-08 2016-04-13 河南理工大学 Anchor rod for achieving high-prestress total-length anchoring through double-fluid grouting cartridges and use method of anchor rod

Also Published As

Publication number Publication date
CN106640160A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN106640160B (en) A kind of left-handed nothing indulges muscle overall length high pre-stress anchor pole and its construction technology
US9175561B2 (en) Resin injection apparatus for drilling apparatus for installing a ground anchor
CN103758549B (en) Anchor prestressing force full-length anchorage support method after a kind of first filling based on ointment material
CN104500115B (en) A kind of prestressing force Bolt method for protecting support
CN103161484B (en) A kind of lotion fixed length anchoring support method
CN103061790B (en) A prestressed full anchor extrusion type anchoring device and method
CN109578033A (en) Coal mine roadway anchor and its implementation method
CN102776881B (en) Recyclable post-tensioned prestressing anchor cable pile and construction method thereof
CN201924356U (en) Detachable anchor rod
CN205895284U (en) Anchor pipe and anchor support system
CN102003194B (en) Rapid Installation Technology and Device of Resin Anchor Rod
CN107676120A (en) A kind of Anchor Agent feeder and application method
CN102392661A (en) Grouting construction method for high pressure and rich water zone of tunnel and orifice pipe component
DE102010014612A1 (en) Hollow rod shear connector e.g. two-phase anchor, for use in e.g. inclined roadway construction, has armature tube coated with addition mixed filling material, where clamping path is affiliated with anchor member through clamping sleeve
CN207111145U (en) A kind of new type resin Anchor Agent encapsulating structure
CN109184766A (en) A kind of high-strength mixed anchor rod/anchor rope in prestressing force diffused large aperture and construction method
CN109024622A (en) A kind of slope reinforcement rod piece and its application method
CN107269304A (en) Disjunctor two-speed resin Anchor Agent
AU2019216876B2 (en) Rock bolt
CN109252881A (en) Steel pipe cement mortar prestress anchorage cable and its method for protecting support
CN115492527A (en) Drill bit assembly for anchor rod, anchor rod structure and using method of anchor rod structure
JP2937661B2 (en) Grout injection method
CN116677436A (en) A multi-hole yielding pressure bolt device capable of segmental grouting and its application method
CN104818718B (en) A kind of hot melt self-tipping type anchor head for reclaiming anchor cable
CN109083665A (en) Bolt device and its anchoring construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329

Termination date: 20191024