Summary of the invention
The object of the present invention is to provide one kind comprehensively consider seasonal frozen soil region road periphery surface water and groundwater treatment,
Structure type is simple, it is antifreeze to cut the roadbed for the Frozen Area that drainage performance is good, bed course material is few and cuts pumping equipment and construction
Method can prevent destruction of the freeze thawing to subgrade and pavement, convenient for safeguarding during operation.
The technical scheme adopted by the invention is that:
A kind of roadbed suitable for frozen ground regions it is antifreeze and cut pumping equipment, including base under be equipped with by anti-filter
The first order of layer package matches metalling, and roadbed side grooves periphery is laid with loaded filter, has paved in roadbed side grooves loaded filter
Drainage blanket is cut, both sides of the road are equipped with the second level wrapped up by loaded filter with metalling, cut on drainage blanket and be laid with the third level with broken
Then rock layers, the third level are laid with insulating layer, plain soil layer, plain soil layer upper berth are paved on insulating layer with loaded filter is laid on metalling
Build surface vegetation layer.
Another technical solution of the present invention is:
It is a kind of to build the antifreeze construction method with section pumping equipment of the above-mentioned roadbed suitable for frozen ground regions, specifically
It sequentially includes the following steps:
Step 1: being laid with one layer of first order by loaded filter package under base and match metalling, build base, then build
Surface layer;Graded broken stone thickness 20cm;
Step 2: determining the position of the frozen ground regions upper limit, be excavated with certain groove along slope, ditch in roadbed two sides
Groove width 1m gos deep into the frost zone upper limit or less 0.7m;
Step 3: the channel bottom soil body being tamped using small-size vibratory roller, the compactness in channel bottom 30cm depth reaches
92% or more, channel bottom and side wall are laid with non-woven geotextile loaded filter;
Step 4: being laid in the non-woven geotextile loaded filter of laying and cut drainage blanket, be then laid in surface layer and base two sides
Metalling is matched in the second level, and the third level is laid on cutting drainage blanket and matches metalling;
Step 5: in the third level with insulating layer is laid on metalling 5, being laid with and protect with 4 side of metalling and top surface in the second level
Warm layer;
Step 6: at away from earth's surface 20cm, compactness reaches for the backfill of insulating layer higher slice, compaction in layers clay in the trench
90% or more, formin soil layer;
Step 7: the grass planting skin on plain soil layer forms surface vegetation layer.
Roadbed antifreeze bedding course and heat preservation are cut draught engine for the first time by the present invention ought to use the anti-of frozen ground regions roadbed
Freeze in facility, has several advantages that
1. structure type is simple, cuts drainage performance and roadbed resistance to frost is good, the roadbed suitable for frozen ground regions
Antifreeze and section pumping equipment, it is easy for construction.
2. the antifreeze blotter laying depth of roadbed reduces, save material, saves cost.
3. construction technology is simple.
4. section drainage blanket prevents destruction of the surface water and groundwater to roadbed, while soil particle entrance around being avoided to cut again
Drainage blanket.
5. insulating layer plays good insulation effect, the water cut in drainage blanket is made not freeze and smoothly arrange in winter
It walks, and then prevents the freeze-thaw damage of roadbed.
6. roadbed of the invention is antifreeze and cuts pumping equipment stable structure, should not fail, there is simple and practical, maintenance cost
Low advantage.
Specific embodiment
The present invention provides a kind of roadbed suitable for frozen ground regions it is antifreeze and cut pumping equipment and construction method,
The facility includes the loaded filter that the first order matches metalling with metalling and the package first order under base, and pumping equipment is cut in both sides of the road
Loaded filter, cut drainage blanket, rubble loaded filter, insulating layer, plain soil layer and surface vegetation layer.When construction, is laid under base
One gradation metalling excavates the centainly groove along slope in both sides of the road, and channel bottom and side wall are laid with loaded filter, in loaded filter
It paves and cuts drainage blanket and the third level with metalling, be laid with the second level in both sides of the road and match metalling, three parts metalling is connected, will
Water, which is collected to, cuts drainage blanket, is laid with insulating layer with metalling side and top surface in the both sides of the road second level, insulating layer higher slice returns
Fill out plain soil, surface layer grass planting skin.This roadbed is antifreeze to collect draining by graded broken stone layer and a section drainage blanket with pumping equipment, with heat preservation
Layer ensures that the water in drainage blanket will not freeze and drain outside the venue, guarantees that freeze-thaw damage will not occur during operation for roadbed.
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
As shown in Figure 1, roadbed of the present invention is antifreeze and cuts pumping equipment, it is provided under base and is equipped with by loaded filter
The first order of 2 packages matches metalling 1, and roadbed side grooves periphery is laid with loaded filter 2, paves in roadbed side grooves loaded filter 2
Have and cut drainage blanket 3, both sides of the road are equipped with the second level wrapped up by loaded filter 2 with metalling 4, cut on drainage blanket 3 and are laid with third
Graded broken stone layer 5, the third level with loaded filter is laid on metalling 5, be then laid with insulating layer 6 (herein the third level with metalling 5 with
" loaded filter " between insulating layer 6: it is to blacken a circle of overstriking in Fig. 1, only does and illustrate), plain soil layer 7 is paved on insulating layer 6,
Surface vegetation layer 8 is paved on plain soil layer 7.
Another technical solution of the present invention is:
It is a kind of to build the antifreeze construction method with section pumping equipment of the above-mentioned roadbed suitable for frozen ground regions, specifically
It sequentially includes the following steps:
Roadbed of the present invention it is antifreeze and cut a pumping equipment, have structure type should not simply fail, resistance to frost and
The advantages that cutting good drainage performance, low cost, is to maintain the important measures of frozen ground regions road quality, the following are the present invention
Construction method.
1, it in road construction, is excavated under the slot designed elevation of road at 20cm, bottom solum is compacted using vibrated roller,
After so that its lower soil layer compactness is met code requirement, then laying loaded filter excavates 20cm under road bed and is laid under base
For the first order wrapped up by non-woven geotextile loaded filter 2 with metalling 1, compacting builds roadbase and face by design requirement later
Layer, on the one hand the graded broken stone layer of non-woven geotextile package can lead to water cuts drainage blanket, on the one hand can block capillary water
Rise, reduces influence of the frost heave to roadbed when freezing in winter.
2, the position that the frost zone upper limit 9 is determined in conjunction with geological prospecting situation is excavated with certain along slope in both sides of the road
Groove, ditch 1.2~1.5m of groove width goed deep into the frost zone upper limit or less 0.7m, excavated using excavator, and the mound dug out is extremely
Ditch side certain distance, is used when to backfill;
3: the channel bottom soil body being tamped using small-size vibratory roller, the compactness in channel bottom 30cm depth is up to 92%
More than, channel bottom and side wall are laid with non-woven geotextile loaded filter 2;
Anti-filter geotextiles use non-woven geotextile that meet national standards, and geotextiles specification is not less than 300g/m2, tension is strong
Degree is not less than 6kN/m, and infiltration coefficient is 5 × 10-2~5 × 10-1cm/s.Project amount can be saved using geotextiles, effectively prevent soil
Particle, which enters, cuts drainage blanket and graded broken stone layer, and easy for construction;
4: being laid in the non-woven geotextile loaded filter 2 of laying and cut a drainage blanket 3, be then laid with the in surface layer and base two sides
Two metallings 4 are laid with the third level on cutting drainage blanket 3 and match metalling 5;Surface layer and base two sides are laid with non-woven geotextile package
On the one hand water can be led to metalling and cut drainage blanket by the second level, on the one hand can reduce both sides of the road soil frost heave to the side of road
It is destroyed to squeezing;Its role is to be led to water to cut drainage blanket and prevent soil particle from entering to cut draining for the rubble cut on drainage blanket
Layer;
Cut drainage blanket layering pile up compacting it is smooth, it is ensured that its stability, for guarantee drainage effect, cut drainage material select
The biggish big Stone of porosity is laid with, and to guarantee to cut the durability and validity of drainage blanket, selects uniaxial compressive strong
Degree is not less than 25MPa, and the metalling of 7~15cm of partial size forms, and forbids using the building stones for meeting water softening, rubble answer it is hard,
Not easy-weathering, dimming class are middle weathering, gentle breeze, non-weathering;
Graded broken stone layer 1,4 and 5 by gradation uniformly, not easy-weathering, meet water do not soften, the metalling of 2~7cm of partial size and
At lower part is laid with big Stone when paving, and top is laid with small particle rubble.
5, in the third level of non-woven geotextile package with being laid with insulating layer 6 on metalling 5, the of non-woven geotextile package
4 side of graduation two metalling and top surface are laid with insulating layer 6;Thermal insulation thermal insulation board of the insulating layer 6 using 60mm, two layers of staggeredly laying,
Preferable insulation effect can be played.
6, in the trench the backfill of insulating layer higher slice, compaction in layers element soil at away from earth's surface 20cm, compactness up to 90% with
On, formin soil layer 7;
7, the grass planting skin on plain soil layer 7 forms surface vegetation layer 8.
The contents of the present invention give an actual example listed by being not limited to, and example is a kind of form of expression of the invention, the technology of this field
Personnel's up conversion by way of reading description of the invention and taking technical solution of the present invention, such as blotter position under roadbed
Variation is set, all are covered by the claims of the invention.