CN106604600A - Container-type data center - Google Patents

Container-type data center Download PDF

Info

Publication number
CN106604600A
CN106604600A CN201510657950.6A CN201510657950A CN106604600A CN 106604600 A CN106604600 A CN 106604600A CN 201510657950 A CN201510657950 A CN 201510657950A CN 106604600 A CN106604600 A CN 106604600A
Authority
CN
China
Prior art keywords
data center
power supply
groups
supply equipment
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510657950.6A
Other languages
Chinese (zh)
Inventor
毛之成
张志鸿
傅彦钧
张耀廷
魏钊科
詹弘州
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongfujin Precision Electronics Tianjin Co Ltd
Original Assignee
Hongfujin Precision Industry Shenzhen Co Ltd
Hon Hai Precision Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongfujin Precision Industry Shenzhen Co Ltd, Hon Hai Precision Industry Co Ltd filed Critical Hongfujin Precision Industry Shenzhen Co Ltd
Priority to CN201510657950.6A priority Critical patent/CN106604600A/en
Publication of CN106604600A publication Critical patent/CN106604600A/en
Pending legal-status Critical Current

Links

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

一种集装箱式数据中心,包括一箱体,该箱体内靠近两端分别设有一服务器机柜组,该箱体内于所述两服务器机柜组之间设置有一供电设备组,该集装箱式数据中心内部的热量分配更均衡,有利于散热及除湿。

A container-type data center, comprising a box body, a server cabinet group is respectively arranged near two ends of the box body, a power supply equipment group is arranged between the two server cabinet groups in the box body, and the inside of the container-type data center The heat distribution is more balanced, which is conducive to heat dissipation and dehumidification.

Description

集装箱式数据中心Containerized Data Center

技术领域 technical field

本发明涉及一种集装箱式数据中心。 The invention relates to a container data center.

背景技术 Background technique

目前的集装箱式数据中心内,装有服务器设备的机柜通常都集中设置于数据中心的一端,而供电设备通常都集中设置于数据中心的另一端。由于服务器设备的发热量较供电设备的发热量大,数据中心内的热量分配不均衡,从而导致为数据中心散热的多个空调机的负载不均衡,空调机不能被有效地利用并进行充分地散热;而对于自然进气解决低温高湿问题时,供电设备区域因发热量低而无法有效地升温除湿。 In the current container data center, the cabinets equipped with server equipment are usually arranged at one end of the data center, and the power supply equipment is usually arranged at the other end of the data center. Since the calorific value of the server equipment is greater than that of the power supply equipment, the heat distribution in the data center is unbalanced, resulting in unbalanced loads of multiple air conditioners cooling the data center, and the air conditioners cannot be used effectively and fully Heat dissipation; when natural air intake is used to solve the problem of low temperature and high humidity, the power supply equipment area cannot effectively heat up and dehumidify due to low heat generation.

发明内容 Contents of the invention

鉴于以上,有必要提供一种内部设置更合理的集装箱式数据中心。 In view of the above, it is necessary to provide a containerized data center with more reasonable internal settings.

一种集装箱式数据中心,包括一箱体,该箱体内靠近两端分别设有一服务器机柜组,该箱体内于所述两服务器机柜组之间设置有一供电设备组。 A container-type data center includes a box body, a server cabinet group is respectively arranged near two ends of the box body, and a power supply equipment group is arranged in the box body between the two server cabinet groups.

该集装箱式数据中心的服务器机柜分布在两端,供电设备位于中部,使得数据中心内部的热量分配更均衡,有利于散热及除湿。 The server cabinets of the containerized data center are distributed at both ends, and the power supply equipment is located in the middle, which makes the heat distribution inside the data center more balanced, which is conducive to heat dissipation and dehumidification.

附图说明 Description of drawings

图1是本发明集装箱式数据中心的较佳实施方式的俯视示意图。 Fig. 1 is a schematic top view of a preferred embodiment of a containerized data center of the present invention.

图2是本发明集装箱式数据中心的较佳实施方式于一使用状态的侧视示意图。 FIG. 2 is a schematic side view of a preferred embodiment of the container data center of the present invention in a use state.

主要元件符号说明 Description of main component symbols

如下具体实施方式将结合上述附图进一步说明本发明。 The following specific embodiments will further illustrate the present invention in conjunction with the above-mentioned drawings.

具体实施方式 detailed description

请参照图1,本发明集装箱式数据中心10的较佳实施方式,包括一箱体20、两服务器机柜组30、一供电设备组40及若干空调机50。 Referring to FIG. 1 , a preferred embodiment of a containerized data center 10 of the present invention includes a box body 20 , two server cabinet groups 30 , a power supply equipment group 40 and several air conditioners 50 .

该箱体20包括一第一侧壁21、与该第一侧壁21平行相对的一第二侧壁22及连接该第一侧壁21与第二侧壁22的两相对的端壁23。该第一侧壁21的中部设有一排水平间隔的可开闭的通风窗25(参见图2)。 The box body 20 includes a first side wall 21 , a second side wall 22 parallel to and opposite to the first side wall 21 , and two opposite end walls 23 connecting the first side wall 21 and the second side wall 22 . The middle part of the first side wall 21 is provided with a row of horizontally spaced openable and closable ventilation windows 25 (see FIG. 2 ).

该两服务器机柜组30设置于该箱体20内并分别靠近或贴靠该两端壁23。该每一服务器机柜组30包括若干贴紧或间隔排列的服务器机柜31。 The two server cabinet groups 30 are disposed in the box body 20 and close to or lean against the two end walls 23 respectively. Each server cabinet group 30 includes several server cabinets 31 arranged closely or at intervals.

该供电设备组40设置于该箱体20内并位于该两服务器机柜组30之间。该供电设备组40包括一电池柜41、一UPS柜42及一配电柜43。该电池柜41、UPS柜42及配电柜43相互之间及与邻近的服务器机柜31之间贴紧或间隔。该供电设备组40与该两服务器机柜组30排成一列,该列供电设备组40及服务器机柜组30与该第一侧壁21及第二侧壁22平行并间隔。每一服务器机柜31与该配电柜43之间连接有电源线60。 The power supply equipment group 40 is disposed in the box body 20 and between the two server cabinet groups 30 . The power supply equipment group 40 includes a battery cabinet 41 , a UPS cabinet 42 and a power distribution cabinet 43 . The battery cabinet 41 , the UPS cabinet 42 and the power distribution cabinet 43 are close to or spaced from each other and the adjacent server cabinet 31 . The power supply equipment group 40 and the two server cabinet groups 30 are arranged in a row, and the power supply equipment group 40 and the server cabinet group 30 are parallel to and spaced apart from the first side wall 21 and the second side wall 22 . A power cable 60 is connected between each server cabinet 31 and the power distribution cabinet 43 .

这些空调机50设置于该第二侧壁22的外侧,可为箱体20的内部制冷及除湿。在本实施方式中,空调机50有三个,分别正对该两服务器机柜组30及该供电设备组40;该列供电设备组40及服务器机柜组30的顶部与该第二侧壁22之间连接有一挡板70(参见图2),可将冷空气与热空气隔离。 The air conditioners 50 are disposed outside the second side wall 22 to cool and dehumidify the inside of the box body 20 . In this embodiment, there are three air conditioners 50, facing the two server cabinet groups 30 and the power supply equipment group 40 respectively; A baffle 70 (see Figure 2) is attached to separate the cold air from the hot air.

该集装箱式数据中心10在使用时,当外部温度较高时,通风窗25关闭,空调机50开启制冷模式,将冷空气从下部吹入箱体20内,冷空气与该两服务器机柜组30及该供电设备组40进行热交换,之后热空气由该列供电设备组40及服务器机柜组30与该第一侧壁21之间的通道上升并由第二侧壁22位于挡板70上方的部分进入空调机50。由于发热量较大的该两服务器机柜组30分别设置于箱体20内部的两端,位于中部的空调机50的负载较小,该中部的空调机50在为供电设备组40进行散热的同时还可为两边的服务器机柜组30进行散热。 When the containerized data center 10 is in use, when the external temperature is high, the ventilation window 25 is closed, the air conditioner 50 turns on the cooling mode, and the cold air is blown into the box body 20 from the bottom, and the cold air and the two server cabinet groups 30 and the power supply equipment group 40 for heat exchange, and then the hot air rises from the channel between the column power supply equipment group 40 and the server cabinet group 30 and the first side wall 21 and is positioned above the baffle plate 70 by the second side wall 22 Some enter the air conditioner 50. Since the two server cabinet groups 30 with large heat generation are respectively arranged at both ends of the box body 20, the load of the air conditioner 50 in the middle is relatively small. It can also dissipate heat for the server cabinet groups 30 on both sides.

请参照图2,当外部温度较低而湿度较大时,通风窗25开启,空调机50开启除湿模式,将外部进入空调机50内的冷空气与由挡板70的上侧进入空调机50内的热空气混合升温除湿变为较冷的空气并导入箱体20内,较冷的空气与该两服务器机柜组30及该供电设备组40进行热交换,之后热空气的一部分通过开启的通风窗25排出箱体20,另一部分热空气由该列供电设备组40及服务器机柜组30与该第一侧壁21之间的通道上升并由第二侧壁22位于挡板70上方的部分进入空调机50。由于发热量较小的供电设备组40设置于箱体20内部的中间,位于该供电设备组40两端的服务器机柜组30可提供热空气给位于中部的空调机50进行升温除湿。 Please refer to FIG. 2 , when the outside temperature is low and the humidity is high, the ventilation window 25 is opened, and the air conditioner 50 turns on the dehumidification mode, and the cold air entering the air conditioner 50 from the outside enters the air conditioner 50 from the upper side of the baffle plate 70 The hot air inside is mixed with temperature and dehumidified to become cooler air and introduced into the box body 20. The cooler air exchanges heat with the two server cabinet groups 30 and the power supply equipment group 40, and then part of the hot air passes through the open ventilation The window 25 is discharged from the box body 20, and another part of the hot air rises from the channel between the power supply equipment group 40 and the server cabinet group 30 and the first side wall 21 and enters from the part of the second side wall 22 above the baffle plate 70. Air conditioner 50. Since the power supply equipment group 40 with low heat generation is arranged in the middle of the box body 20, the server cabinet groups 30 located at both ends of the power supply equipment group 40 can provide hot air to the air conditioner 50 located in the middle for heating and dehumidification.

该集装箱式数据中心10的内部设置合理,热量分布均衡,便于热量与湿度的管理。另外,由于供电设备组40位于箱体20内部的中间,两端的服务器机柜31连接至供电设备组40的电源线60的长度较现有技术中的电源线的长度减少,从而可降低电力损耗,并可避免电源线集中排布挡住热风回流。 The internal setting of the container data center 10 is reasonable, the heat distribution is balanced, and the management of heat and humidity is convenient. In addition, since the power supply equipment group 40 is located in the middle of the box body 20, the length of the power cord 60 connecting the server cabinets 31 at both ends to the power supply equipment group 40 is reduced compared with the length of the power cord in the prior art, thereby reducing power loss. And it can avoid the centralized arrangement of power cords to block the return flow of hot air.

Claims (10)

1.一种集装箱式数据中心,包括一箱体,该箱体内靠近两端分别设有一服务器机柜组,该箱体内于所述两服务器机柜组之间设置有一供电设备组。 1. A containerized data center, comprising a box body, a server cabinet group is respectively arranged near two ends of the box body, and a power supply equipment group is arranged in the box body between the two server cabinet groups. 2.如权利要求1所述的集装箱式数据中心,其特征在于:该供电设备组与该两服务器机柜组排成一列。 2. The containerized data center according to claim 1, wherein the power supply equipment group is arranged in a row with the two server cabinet groups. 3.如权利要求2所述的集装箱式数据中心,其特征在于:该箱体包括一第一侧壁及与该第一侧壁平行相对的一第二侧壁,该列供电设备组及服务器机柜组与该第一侧壁及第二侧壁平行。 3. The containerized data center according to claim 2, wherein the box body includes a first side wall and a second side wall parallel to and opposite to the first side wall, and the row of power supply equipment groups and servers The cabinet group is parallel to the first side wall and the second side wall. 4.如权利要求3所述的集装箱式数据中心,其特征在于:该集装箱式数据中心还包括设置于该第二侧壁外的与该箱体内部连通的若干空调机。 4. The containerized data center according to claim 3, characterized in that: the containerized data center further comprises a plurality of air conditioners arranged outside the second side wall and communicating with the inside of the box. 5.如权利要求4所述的集装箱式数据中心,其特征在于:所述空调机有三个,分别正对该两服务器机柜组及该供电设备组。 5 . The containerized data center according to claim 4 , wherein there are three air conditioners, which are respectively facing the two server cabinet groups and the power supply equipment group. 5 . 6.如权利要求4所述的集装箱式数据中心,其特征在于:该第一侧壁设有一排水平间隔的能够开闭的通风窗。 6. The containerized data center according to claim 4, characterized in that: the first side wall is provided with a row of horizontally spaced ventilation windows that can be opened and closed. 7.如权利要求6所述的集装箱式数据中心,其特征在于:该第一侧壁与该列供电设备组及服务器机柜组相间隔。 7 . The containerized data center according to claim 6 , wherein the first side wall is spaced apart from the row of power supply equipment groups and server cabinet groups. 8 . 8.如权利要求7所述的集装箱式数据中心,其特征在于:该第二侧壁与该列供电设备组及服务器机柜组相间隔,该列供电设备组及服务器机柜组的顶部与该第二侧壁之间连接有一挡板,空调机内的冷空气从第二侧壁位于挡板下方的部分进入箱体内,箱体内的热空气由该列供电设备组及服务器机柜组与该第一侧壁之间的通道上升并由第二侧壁位于挡板上方的部分进入空调机。 8. The containerized data center according to claim 7, wherein the second side wall is spaced from the row of power supply equipment groups and server cabinet groups, and the top of the row of power supply equipment groups and server cabinet groups is in contact with the row of power supply equipment groups and server cabinet groups. A baffle is connected between the two side walls, and the cold air in the air conditioner enters the box from the part of the second side wall below the baffle, and the hot air in the box is connected by the row of power supply equipment groups and server cabinet groups and the first The channel between the side walls rises and enters the air conditioner from the portion of the second side wall above the baffle. 9.如权利要求1所述的集装箱式数据中心,其特征在于:每一服务器机柜组包括若干服务器机柜,每一服务器机柜与该供电设备组之间连接有电源线。 9. The containerized data center according to claim 1, wherein each server cabinet group includes several server cabinets, and a power line is connected between each server cabinet and the power supply equipment group. 10.如权利要求9所述的集装箱式数据中心,其特征在于:该供电设备组包括一电池柜、一UPS柜及一配电柜,所述电源线连接于配电柜与服务器机柜之间。 10. The containerized data center according to claim 9, wherein the power supply equipment group includes a battery cabinet, a UPS cabinet and a power distribution cabinet, and the power line is connected between the power distribution cabinet and the server cabinet .
CN201510657950.6A 2015-10-14 2015-10-14 Container-type data center Pending CN106604600A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510657950.6A CN106604600A (en) 2015-10-14 2015-10-14 Container-type data center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510657950.6A CN106604600A (en) 2015-10-14 2015-10-14 Container-type data center

Publications (1)

Publication Number Publication Date
CN106604600A true CN106604600A (en) 2017-04-26

Family

ID=58552745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510657950.6A Pending CN106604600A (en) 2015-10-14 2015-10-14 Container-type data center

Country Status (1)

Country Link
CN (1) CN106604600A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110418547A (en) * 2019-02-26 2019-11-05 腾讯科技(深圳)有限公司 Data center
CN113660820A (en) * 2020-05-12 2021-11-16 鸿富锦精密电子(天津)有限公司 Containerized Data System
RU211647U1 (en) * 2021-12-15 2022-06-16 Антон Владимирович Костенко Cargo container for mobile data center

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060082263A1 (en) * 2004-10-15 2006-04-20 American Power Conversion Corporation Mobile data center
US20090031148A1 (en) * 2007-07-26 2009-01-29 Brian Richard Densham Distributed Electrical Power System for Computer Rooms
US20100165565A1 (en) * 2008-12-31 2010-07-01 Hellriegal Stephen V R Data center
CN103047723A (en) * 2012-12-25 2013-04-17 北京百度网讯科技有限公司 Cooling system for server in machine room
TW201405289A (en) * 2012-07-16 2014-02-01 Hon Hai Prec Ind Co Ltd Container data center
CN104204998A (en) * 2012-03-29 2014-12-10 富士通株式会社 Modular datacenter and method for controlling same
CN104566641A (en) * 2014-10-10 2015-04-29 深圳市共济科技有限公司 Energy-saving air conditioning system in data center and heat dissipation method of energy-saving air conditioning system
CN104684339A (en) * 2013-11-30 2015-06-03 鸿富锦精密工业(深圳)有限公司 Containerized data center
CN104781749A (en) * 2012-11-16 2015-07-15 富士通株式会社 Module-type data center and control method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060082263A1 (en) * 2004-10-15 2006-04-20 American Power Conversion Corporation Mobile data center
US20090031148A1 (en) * 2007-07-26 2009-01-29 Brian Richard Densham Distributed Electrical Power System for Computer Rooms
US20100165565A1 (en) * 2008-12-31 2010-07-01 Hellriegal Stephen V R Data center
CN104204998A (en) * 2012-03-29 2014-12-10 富士通株式会社 Modular datacenter and method for controlling same
TW201405289A (en) * 2012-07-16 2014-02-01 Hon Hai Prec Ind Co Ltd Container data center
CN104781749A (en) * 2012-11-16 2015-07-15 富士通株式会社 Module-type data center and control method thereof
CN103047723A (en) * 2012-12-25 2013-04-17 北京百度网讯科技有限公司 Cooling system for server in machine room
CN104684339A (en) * 2013-11-30 2015-06-03 鸿富锦精密工业(深圳)有限公司 Containerized data center
CN104566641A (en) * 2014-10-10 2015-04-29 深圳市共济科技有限公司 Energy-saving air conditioning system in data center and heat dissipation method of energy-saving air conditioning system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110418547A (en) * 2019-02-26 2019-11-05 腾讯科技(深圳)有限公司 Data center
CN110418547B (en) * 2019-02-26 2023-09-15 腾讯科技(深圳)有限公司 data center
CN113660820A (en) * 2020-05-12 2021-11-16 鸿富锦精密电子(天津)有限公司 Containerized Data System
CN113660820B (en) * 2020-05-12 2024-08-20 富联精密电子(天津)有限公司 Containerized Data System
US12513862B2 (en) 2020-05-12 2025-12-30 Fulian Precision Electronics (Tianjin) Co., Ltd. Containerized data system
RU211647U1 (en) * 2021-12-15 2022-06-16 Антон Владимирович Костенко Cargo container for mobile data center

Similar Documents

Publication Publication Date Title
CN109728226B (en) Battery cabinet
AU2017228655B2 (en) Cabinet, and cooling control system, method and apparatus thereof
TWI608333B (en) Combined data center and its heat dissipation method
CN102339108B (en) Machine cabinet, machine cabinet radiating system and movable data center
CN204796024U (en) A high-density micro-module data center
CN204651716U (en) A kind of outdoor power cabinet and outdoor power system system
WO2015186343A1 (en) Battery room
CN103220895B (en) Cabinet system and exhaust equipment thereof
TW201714042A (en) Container data center
CN205747179U (en) Air-conditioning between a kind of and cabinet type cold and hot passage totally enclosed row
CN204145936U (en) A kind of sealed electrical source cabinet
CN203177364U (en) Column type chilled-water air conditioner and equipment cabinet cooling system
CN106604600A (en) Container-type data center
CN204155199U (en) A kind of heat-radiating chassis for computer
CN203761736U (en) Frame internal circulation cabinet and downward air supply data machine room heat radiation device
CN112582897B (en) Energy storage cabinet
CN208425102U (en) Under-floor air supply data center micromodule structure
CN102404975B (en) Data center
JP2016205688A (en) Duct and data center
CN108346987A (en) A cooling switch cabinet
JP5239430B2 (en) Server device
CN210112437U (en) A detachable electrical cabinet
CN219181964U (en) Energy storage cabinet
CN203340505U (en) Cabinet temperature control system
CN207471890U (en) A kind of refrigeration equipment and its interior heat exchanger assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180207

Address after: The 300457 Tianjin economic and Technological Development Zone Haiyun Street No. 80

Applicant after: Hongfujin Precision Electronics (Tianjin) Co., Ltd.

Address before: 518109 Guangdong city of Shenzhen province Baoan District Longhua Town Industrial Zone tabulaeformis tenth East Ring Road No. 2 two

Applicant before: Hongfujin Precise Industry (Shenzhen) Co., Ltd.

Applicant before: Hon Hai Precision Industry Co., Ltd.

TA01 Transfer of patent application right
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170426

WD01 Invention patent application deemed withdrawn after publication