[go: up one dir, main page]

CN106563918A - Machining technology of integrated triangular drill pipe - Google Patents

Machining technology of integrated triangular drill pipe Download PDF

Info

Publication number
CN106563918A
CN106563918A CN201510655000.XA CN201510655000A CN106563918A CN 106563918 A CN106563918 A CN 106563918A CN 201510655000 A CN201510655000 A CN 201510655000A CN 106563918 A CN106563918 A CN 106563918A
Authority
CN
China
Prior art keywords
steel pipe
rhizoma sparganii
heating
equipment
sparganii steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510655000.XA
Other languages
Chinese (zh)
Inventor
王学章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Meitong Drill Pipe Manufacturing Co Ltd
Original Assignee
Chongqing Meitong Drill Pipe Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Meitong Drill Pipe Manufacturing Co Ltd filed Critical Chongqing Meitong Drill Pipe Manufacturing Co Ltd
Priority to CN201510655000.XA priority Critical patent/CN106563918A/en
Publication of CN106563918A publication Critical patent/CN106563918A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Heat Treatment Of Articles (AREA)
  • Earth Drilling (AREA)

Abstract

The invention belongs to the field of machining technologies of drilling tools for mines and particularly relates to a machining technology of an integrated triangular drill pipe. The technology comprises steps as follows: step A: various parameters of a triangular steel pipe are detected; step B: the triangular steel pipe is blanked to the required length; step C: the blanked triangular steel pipe is fixed by a fixture and is kept in an open state; step D: the male thread end and the female thread end of the triangular steel pipe are heated for the first time by medium-frequency heating equipment respectively and are evenly heated to 1,100-1,200 DEG C; step E: the heated triangular steel pipe is quickly placed in finish forging equipment, and the automatic finish forging equipment is started for first-time finish forging; step F: the male thread end and the female thread end of the triangular steel pipe are heated for the second time by the medium-frequency heating equipment respectively and are evenly heated to 1,100-1,200 DEG C; step G: the heated triangular steel pipe is subjected to second-time finish forging by the finish forging equipment; and step H: the steel pipe with two ends subjected to finish forging is subjected to overall hardening and tempering treatment.

Description

The processing technology of monoblock type Three-edged drill stem
Technical field
The invention belongs to mining drilling tool processing technology field, more particularly to a kind of processing technology of monoblock type Three-edged drill stem.
Background technology
Drilling rod is one of main equipment of oilfield prospecting developing engineering and mining, and to the drilling mining of oil gas vital effect is played.With the intensification of drilling depth, the difficulty of probing is increasing, common API drilling rods can not deep oil well and ultra-deep oil well mining demand, petroleum industry and mining need high intensity, high torque, anti-thorn to leak the drilling rod of contour performance.At present the standard technology of common standard drilling rod is individually processed to be formed using drilling rod with joint, then by drilling rod and joint friction welding, then weld seam is carried out into subsequent treatment, such as austenitizing, high tempering etc..The processing technology of this kind of drilling rod is complicated, and process equipment has high demands.But cause material structure difference larger at the drilling rod and weld of this Split type welded, cause to be welded as overall most weak part, be so easy to accident in use.Also there are the processing technology of some stem formulas, such as a kind of processing technology of integral drill rod in the patent publication of Patent No. ZL200810025356.5 now;It is characterized in that:The tool joint of the integral drill rod and drill pipe body are carried out direct-connected using box and pin, and drill pipe body structure thicker, tool joint outer wall and inwall are monoblock type structure thicker, and its processing technology adopts the following steps:A) pin end heating in medium frequency, first time jumping-up thickeies;B) heating in medium frequency, second jumping-up thickeies;C) polish;D) heating in medium frequency, third time jumping-up thickeies;E) heating in medium frequency, the 4th time jumping-up thickeies;F) turn round workpiece;G) box end heating in medium frequency, first time jumping-up thickeies;H) heating in medium frequency, second jumping-up thickeies;I) polish;J) heating in medium frequency, third time jumping-up thickeies;K) reconditioning;L) screw thread is processed.Explanation simply very general in the file jumping-up processing method of simple stem is disclosed, this processing for belonging to more conventional is taken precautions against, and especially data parameters in process are not open.More problems to be measured can not be solved so during reality processing.Simultaneously.Secondary processing technology adopts three jumping-ups, but in actual use, we need not simultaneously increase so many wall thickness, and in addition three jumping-ups expend material very much.
The content of the invention
The problem to be solved in the present invention is that the standard technology of existing common standard drilling rod is adopted drilling rod and joint friction welding, is welded as overall most weak part;Monoblock type processing method is too simple, it is impossible to solve the problems, such as reality processing.
In order to solve above-mentioned technical problem, the present invention provides following scheme:The processing technology of monoblock type Three-edged drill stem, including step A:Inspection Rhizoma Sparganii steel pipe parameters;Step B:By Rhizoma Sparganii steel pipe blanking to the length for needing;Step C:Rhizoma Sparganii steel pipe after blanking is fixed using fixture, makes the Rhizoma Sparganii steel pipe after blanking keep the state opened;Step D:The pin end and box end of Rhizoma Sparganii steel pipe carries out first time heating with induction heating equipment of medium frequency respectively, is uniformly heated to 1100 DEG C -1200 DEG C;Step E:The Rhizoma Sparganii steel pipe for heating is put into rapidly in finish forge equipment, starting automatic finish forge equipment carries out first time finish forge;Step F:The pin end and box end of Rhizoma Sparganii steel pipe carries out second heating with induction heating equipment of medium frequency respectively, is uniformly heated to 1100 DEG C -1200 DEG C;Step G:The Rhizoma Sparganii steel pipe Jing finish forges equipment for heating carries out second finish forge;Step H:The steel pipe at the good two ends of finish forge is carried out into overall modifier treatment;Step I:The effective straightener of three-edged steel after quenched carries out alignment;Step J:Lathe in machining screw thread is used, is tested with screw thread checking device;Step K:Nitrizing Treatment is carried out to tool joint part;Step L:Anti-twisting property selective examination is carried out with moment of torsion test device, by drilling rod mark, surface antirust treatment.Using above-mentioned processing technology, orderly processing can be can be carried out from the inspection of Rhizoma Sparganii steel pipe to last detection, the tool joint of the Three-edged drill stem processed by above-mentioned processing technology and the body of rod are the integral forms of identical material, are welded or mechanical connection form without any, avoid the generation of various defects, drilling rod integral rigidity is good, torsional strength is high, and the split type Three-edged drill stem than welding improves more than 30 percent.Because drilling rod is processed by same drilling rod special steel pipe through two ends finish forge, tool joint part structure is more accurate, again butt joint part carries out the Nitrizing Treatment of special process to drilling rod Jing after integrally quenched, the intensity and wearability of the so body of rod and blank area is greatly improved, and greatlys save the drilling rod consumption of user.By same steel pipe, the Jing two ends finish forge under the parcel of same straight line fixture is formed drilling rod, and drilling rod linearity is good, and the life-span is good, and pore-forming size is good, and gas sealing of hole difficulty is low.The temperature range of heating is clearly given in this processing technology, main in the process of whole integral drill rod is also most important data, because what the two ends of Rhizoma Sparganii steel pipe required machining for, the technique such as preheating, the finish forge at two ends can affect the institutional framework of whole Rhizoma Sparganii steel pipe.
Further, in step D, the pin end and box end of Rhizoma Sparganii steel pipe carry out first time heating with induction heating equipment of medium frequency respectively, are preferably heated to 1150 DEG C, it is ensured that the stability of the crystalline phase tissue of Rhizoma Sparganii steel pipe, while Rhizoma Sparganii steel pipe now also allows for shaping.
Further, in step F, the pin end and box end of Rhizoma Sparganii steel pipe carry out second heating with induction heating equipment of medium frequency respectively, are preferably heated to 1050 DEG C, it is ensured that the stability of the crystalline phase tissue of Rhizoma Sparganii steel pipe, while Rhizoma Sparganii steel pipe now also allows for shaping.
Further, in step D and step F, the pin end and box end of Rhizoma Sparganii steel pipe length heating respectively away from termination 220mm in heating process.Because this segment distance is used for shaped joint, so this part must be heated uniformly, while needing to adjust its crystalline phase institutional framework, it is ensured that the stability of joint.
Specific embodiment
Embodiment 1
The processing technology of monoblock type Three-edged drill stem, including step A:Inspection Rhizoma Sparganii steel pipe parameters;Step B:By Rhizoma Sparganii steel pipe blanking to the length for needing;Step C:Rhizoma Sparganii steel pipe after blanking is fixed using fixture, makes the Rhizoma Sparganii steel pipe after blanking keep the state opened;Step D:The pin end and box end of Rhizoma Sparganii steel pipe carries out first time heating with induction heating equipment of medium frequency respectively, is uniformly heated to 1100 DEG C -1200 DEG C;Step E:The Rhizoma Sparganii steel pipe for heating is put into rapidly in finish forge equipment, starting automatic finish forge equipment carries out first time finish forge;Step F:The pin end and box end of Rhizoma Sparganii steel pipe carries out second heating with induction heating equipment of medium frequency respectively, is uniformly heated to 1100 DEG C -1200 DEG C;Step G:The Rhizoma Sparganii steel pipe Jing finish forges equipment for heating carries out second finish forge;Step H:The steel pipe at the good two ends of finish forge is carried out into overall modifier treatment;Step I:The effective straightener of three-edged steel after quenched carries out alignment;Step J:Lathe in machining screw thread is used, is tested with screw thread checking device;Step K:Nitrizing Treatment is carried out to tool joint part;Step L:Anti-twisting property selective examination is carried out with moment of torsion test device, by drilling rod mark, surface antirust treatment.In step D and step F, the pin end and box end of Rhizoma Sparganii steel pipe length heating respectively away from termination 220mm in heating process.
In the present embodiment, orderly processing can be can be carried out from the inspection of Rhizoma Sparganii steel pipe to last detection, the tool joint of the Three-edged drill stem processed by above-mentioned processing technology and the body of rod are the integral forms of identical material, are welded or mechanical connection form without any, avoid the generation of various defects, drilling rod integral rigidity is good, torsional strength is high, and the split type Three-edged drill stem than welding improves more than 30 percent.Because drilling rod is processed by same drilling rod special steel pipe through two ends finish forge, tool joint part structure is more accurate, again butt joint part carries out the Nitrizing Treatment of special process to drilling rod Jing after integrally quenched, the intensity and wearability of the so body of rod and blank area is greatly improved, and greatlys save the drilling rod consumption of user.By same steel pipe, the Jing two ends finish forge under the parcel of same straight line fixture is formed drilling rod, and drilling rod linearity is good, and the life-span is good, and pore-forming size is good, and gas sealing of hole difficulty is low.The temperature range of heating is clearly given in this processing technology, main in the process of whole integral drill rod is also most important data, because what the two ends of Rhizoma Sparganii steel pipe required machining for, the technique such as preheating, the finish forge at two ends can affect the institutional framework of whole Rhizoma Sparganii steel pipe.In step D and step F, the pin end and box end of Rhizoma Sparganii steel pipe length heating respectively away from termination 220mm in heating process.Because this segment distance is used for shaped joint, so this part must be heated uniformly, while needing to adjust its crystalline phase institutional framework, it is ensured that the stability of joint.
Embodiment 2
The processing technology of monoblock type Three-edged drill stem, including step A:Inspection Rhizoma Sparganii steel pipe parameters;Step B:By Rhizoma Sparganii steel pipe blanking to the length for needing;Step C:Rhizoma Sparganii steel pipe after blanking is fixed using fixture, makes the Rhizoma Sparganii steel pipe after blanking keep the state opened;Step D:The pin end and box end of Rhizoma Sparganii steel pipe carries out first time heating with induction heating equipment of medium frequency respectively, is uniformly heated to 1050 DEG C;Step E:The Rhizoma Sparganii steel pipe for heating is put into rapidly in finish forge equipment, starting automatic finish forge equipment carries out first time finish forge;Step F:The pin end and box end of Rhizoma Sparganii steel pipe carries out second heating with induction heating equipment of medium frequency respectively, is uniformly heated to 1050 DEG C;Step G:The Rhizoma Sparganii steel pipe Jing finish forges equipment for heating carries out second finish forge;Step H:The steel pipe at the good two ends of finish forge is carried out into overall modifier treatment;Step I:The effective straightener of three-edged steel after quenched carries out alignment;Step J:Lathe in machining screw thread is used, is tested with screw thread checking device;Step K:Nitrizing Treatment is carried out to tool joint part;Step L:Anti-twisting property selective examination is carried out with moment of torsion test device, by drilling rod mark, surface antirust treatment.In step D and step F, the pin end and box end of Rhizoma Sparganii steel pipe length heating respectively away from termination 220mm in heating process.
In the present embodiment, orderly processing can be can be carried out from the inspection of Rhizoma Sparganii steel pipe to last detection, the tool joint of the Three-edged drill stem processed by above-mentioned processing technology and the body of rod are the integral forms of identical material, are welded or mechanical connection form without any, avoid the generation of various defects, drilling rod integral rigidity is good, torsional strength is high, and the split type Three-edged drill stem than welding improves more than 30 percent.Because drilling rod is processed by same drilling rod special steel pipe through two ends finish forge, tool joint part structure is more accurate, again butt joint part carries out the Nitrizing Treatment of special process to drilling rod Jing after integrally quenched, the intensity and wearability of the so body of rod and blank area is greatly improved, and greatlys save the drilling rod consumption of user.By same steel pipe, the Jing two ends finish forge under the parcel of same straight line fixture is formed drilling rod, and drilling rod linearity is good, and the life-span is good, and pore-forming size is good, and gas sealing of hole difficulty is low.The temperature range of heating is clearly given in this processing technology, main in the process of whole integral drill rod is also most important data, because what the two ends of Rhizoma Sparganii steel pipe required machining for, the technique such as preheating, the finish forge at two ends can affect the institutional framework of whole Rhizoma Sparganii steel pipe.In step D, the pin end and box end of Rhizoma Sparganii steel pipe carry out first time heating with induction heating equipment of medium frequency respectively, are preferably heated to 1150 DEG C, it is ensured that the stability of the crystalline phase tissue of Rhizoma Sparganii steel pipe, while Rhizoma Sparganii steel pipe now also allows for shaping.In step F, the pin end and box end of Rhizoma Sparganii steel pipe carry out second heating with induction heating equipment of medium frequency respectively, are preferably heated to 1050 DEG C, it is ensured that the stability of the crystalline phase tissue of Rhizoma Sparganii steel pipe, while Rhizoma Sparganii steel pipe now also allows for shaping.In step D and step F, the pin end and box end of Rhizoma Sparganii steel pipe length heating respectively away from termination 220mm in heating process.Because this segment distance is used for shaped joint, so this part must be heated uniformly, while needing to adjust its crystalline phase institutional framework, it is ensured that the stability of joint.
Above-described is only the preferred embodiment of the present invention; it should be understood that; for a person skilled in the art; on the premise of without departing from present configuration; some deformations and improvement can also be made; also protection scope of the present invention should be considered as, these are all without the effect and practical applicability for affecting the present invention to implement.

Claims (4)

1. the processing technology of monoblock type Three-edged drill stem, it is characterised in that include
Step A:Inspection Rhizoma Sparganii steel pipe parameters;
Step B:By Rhizoma Sparganii steel pipe blanking to the length for needing;
Step C:Rhizoma Sparganii steel pipe after blanking is fixed using fixture, makes the Rhizoma Sparganii steel pipe after blanking keep the state opened;
Step D:The pin end and box end of Rhizoma Sparganii steel pipe carries out first time heating with induction heating equipment of medium frequency respectively, is uniformly heated to 1100 DEG C -1200 DEG C;
Step E:The Rhizoma Sparganii steel pipe for heating is put into rapidly in finish forge equipment, starting automatic finish forge equipment carries out first time finish forge;
Step F:The pin end and box end of Rhizoma Sparganii steel pipe carries out second heating with induction heating equipment of medium frequency respectively, is uniformly heated to 1100 DEG C -1200 DEG C;
Step G:The Rhizoma Sparganii steel pipe Jing finish forges equipment for heating carries out second finish forge;
Step H:The steel pipe at the good two ends of finish forge is carried out into overall modifier treatment;
Step I:The effective straightener of three-edged steel after quenched carries out alignment;
Step J:Lathe in machining screw thread is used, is tested with screw thread checking device;
Step K:Nitrizing Treatment is carried out to tool joint part;
Step L:Anti-twisting property selective examination is carried out with moment of torsion test device, by drilling rod mark, surface antirust treatment.
2. the processing technology of monoblock type Three-edged drill stem according to claim 1, it is characterised in that in step D, the pin end and box end of Rhizoma Sparganii steel pipe carry out first time heating with induction heating equipment of medium frequency respectively, are preferably heated to 1150 DEG C.
3. the processing technology of monoblock type Three-edged drill stem according to claim 1, it is characterised in that in step F, the pin end and box end of Rhizoma Sparganii steel pipe carry out second heating with induction heating equipment of medium frequency respectively, are preferably heated to 1050 DEG C.
4. the processing technology of monoblock type Three-edged drill stem according to claim 1, it is characterised in that in step D and step F, the pin end and box end of Rhizoma Sparganii steel pipe length heating respectively away from termination 220mm in heating process.
CN201510655000.XA 2015-10-12 2015-10-12 Machining technology of integrated triangular drill pipe Pending CN106563918A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510655000.XA CN106563918A (en) 2015-10-12 2015-10-12 Machining technology of integrated triangular drill pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510655000.XA CN106563918A (en) 2015-10-12 2015-10-12 Machining technology of integrated triangular drill pipe

Publications (1)

Publication Number Publication Date
CN106563918A true CN106563918A (en) 2017-04-19

Family

ID=58507892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510655000.XA Pending CN106563918A (en) 2015-10-12 2015-10-12 Machining technology of integrated triangular drill pipe

Country Status (1)

Country Link
CN (1) CN106563918A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113308599A (en) * 2021-04-23 2021-08-27 江阴市好运来石油机械有限公司 Triangular drill rod and machining process thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010004792A1 (en) * 1999-12-23 2001-06-28 Carvalho Jose De Sousa Manufacture process of coupling handle for coupling the drilling rod in the mandrel of blast furnace taphole drill
CN101988370A (en) * 2009-07-31 2011-03-23 上海西重所重型机械成套有限公司 Short-process flexible drill rod producing equipment and process
CN102059511A (en) * 2009-11-13 2011-05-18 中原特钢股份有限公司 Production process of integral kelly stem
CN102172817A (en) * 2011-01-26 2011-09-07 上海海隆石油管材研究所 Method for machining ultrahigh thickening ratio controlled forming pipe and joint directly forging type drill rod
CN202000918U (en) * 2011-04-29 2011-10-05 重庆富强华威环保工程有限公司 Coal drill pipe
CN104959504A (en) * 2015-07-21 2015-10-07 河南龙腾新型钻具制造有限公司 Forging technology of integrated triangular drilling rod

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010004792A1 (en) * 1999-12-23 2001-06-28 Carvalho Jose De Sousa Manufacture process of coupling handle for coupling the drilling rod in the mandrel of blast furnace taphole drill
CN101988370A (en) * 2009-07-31 2011-03-23 上海西重所重型机械成套有限公司 Short-process flexible drill rod producing equipment and process
CN102059511A (en) * 2009-11-13 2011-05-18 中原特钢股份有限公司 Production process of integral kelly stem
CN102172817A (en) * 2011-01-26 2011-09-07 上海海隆石油管材研究所 Method for machining ultrahigh thickening ratio controlled forming pipe and joint directly forging type drill rod
CN202000918U (en) * 2011-04-29 2011-10-05 重庆富强华威环保工程有限公司 Coal drill pipe
CN104959504A (en) * 2015-07-21 2015-10-07 河南龙腾新型钻具制造有限公司 Forging technology of integrated triangular drilling rod

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113308599A (en) * 2021-04-23 2021-08-27 江阴市好运来石油机械有限公司 Triangular drill rod and machining process thereof
CN113308599B (en) * 2021-04-23 2024-01-09 江阴市好运来石油机械有限公司 Triangular drill rod and processing technology thereof

Similar Documents

Publication Publication Date Title
CN101581200A (en) 120 steel grade drill pipe and manufacturing process method thereof
EP1726861B1 (en) Screw joint for oil well pipe, and method of producing the same
CN106956108B (en) A kind of process for producing welded pipe method
CN101934469A (en) Manufacturing method of pup joint
CN103452491B (en) Production process of drilling tubing and casing for oilfields
CN104070330A (en) Processing technology for improved drill stems
CN103452492B (en) A kind of forming method and drilling rod of the high station structure of drilling rod that makes a trip fast
CN104099527B (en) A kind of super 13Cr thickeies the manufacture method of drilling rod
CN100408905C (en) Manufacturing method of seamless steel pipe for pressure pipeline
Shen et al. Failure analysis of S135 drill pipe body fracture in a well
CN106563918A (en) Machining technology of integrated triangular drill pipe
CN104070271A (en) Dissimilar steel welding method of 15 Cr1Mo1V valve body and WB 36 piping
CN101988372A (en) Processing technology for manufacturing insulated tubing
CN105695714A (en) Processing technology for preparing thermal insulated tubing from structural alloy steel
CN104894432A (en) 110 ksi-level titanium alloy oil pipe and preparation method thereof
CN104931321B (en) Sample for testing seamless steel pipe Z-direction performance and preparation method thereof
CN107931961A (en) A kind of split flange presss from both sides processing method
CN101988370A (en) Short-process flexible drill rod producing equipment and process
CN103470191B (en) A kind of jackrod structure and manufacture method with high station structure
CN103775002A (en) Large-specification drill pipe and manufacturing method thereof
CN103614613B (en) Drill pipe joint and preparation method thereof
CN103481038A (en) Machining method for high-station structure of drill rod
CN107185996A (en) A kind of manufacture method of stainless steel tube
CN1194328A (en) Technology for producing non-standard size integrated-joint petroleum casing
CN100349686C (en) Friction welding method for making short tie-in oil pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170419