CN106437493B - Deep hole operation down-the-hole air hammer - Google Patents

Deep hole operation down-the-hole air hammer Download PDF

Info

Publication number
CN106437493B
CN106437493B CN201610933672.7A CN201610933672A CN106437493B CN 106437493 B CN106437493 B CN 106437493B CN 201610933672 A CN201610933672 A CN 201610933672A CN 106437493 B CN106437493 B CN 106437493B
Authority
CN
China
Prior art keywords
top connection
hole
pressure limiting
aeration pipe
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610933672.7A
Other languages
Chinese (zh)
Other versions
CN106437493A (en
Inventor
李保顺
侯磊磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongrui Construction Machinery Co Ltd
Original Assignee
Shandong Zhongrui Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhongrui Construction Machinery Co Ltd filed Critical Shandong Zhongrui Construction Machinery Co Ltd
Priority to CN201610933672.7A priority Critical patent/CN106437493B/en
Publication of CN106437493A publication Critical patent/CN106437493A/en
Application granted granted Critical
Publication of CN106437493B publication Critical patent/CN106437493B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B4/00Drives for drilling, used in the borehole
    • E21B4/06Down-hole impacting means, e.g. hammers

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Portable Nailing Machines And Staplers (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses deep hole operation down-the-hole air hammer, including top connection, outer tube and drill bit, central aeration pipe air distributing device and piston are installed in outer tube, central aeration pipe air distributing device connects top connection with piston, non-return valve positioner and multigroup pressure limiting device for being used to control operating pressure are provided with top connection, the end of central aeration pipe air distributing device is provided with the throughput self-checking device for letting cinder control air quantity, and gases at high pressure realize that the high-frequency high-speed of piston back and forth does work motion by top connection and central aeration pipe air distributing device.The present invention uses piston from distribution principle, design without inner casing, the i.e. replaceable corresponding annex such as non-return valve and spring of top connection need not be dismantled by new type check valve positioner, machine need not be torn open by throughput self-checking device and change automatically adjusting for the i.e. achievable delivery of bailing air of regulating the qi flowing in the channels plug, can be with releasing pressure automatically by pressure limiting device, ensure that impactor works under rational operating pressure, it is compact-sized simple, it is easy to safeguard, improved gas efficiency, and interior plenum system also to water well operation when obstruction have a certain degree of avoid, expand use range, add the service life of impactor.

Description

Deep hole operation down-the-hole air hammer
Technical field
The present invention relates to a kind of down-the-hole air hammer, is dived more particularly to a kind of highly reliable easy care deep hole operation
Hole impactor, belong to mining machinery technical field.
Background technology
The quick down-the-hole air hammer of Vehicles Collected from Market is mainly used in mine blasting, water well earth source, hill excavating and offshore filling engineering etc.,
Efficiency requirements more and more higher of the market to product.
The impactor of conventional type realizes that the impact of impactor is done work mainly by the distribution effect of inner casing and piston, with routine Exemplified by A series, piston in addition to a middle through hole, itself without other holes exist among piston, piston move up and down according to Inner cylinder coordinates with outside piston air flue, so that piston forms reciprocating motion, the gases at high pressure of piston movement between front and rear room Enter the front and rear room of piston by the cavity between inner casing and outer tube.
Surveyed in addition, the non-return valve of conventional impactor is typically mounted in top connection, need to such as change non-return valve and spring portion Part, top connection can only be removed, and be acted on using the top connection of process kind by revolving force, close, dismounting difficulty is coordinated with outer tube;This Outside, the regulating the qi flowing in the channels plug of conventional impactor is single part, adjusted tolerance and need to take out and changed, and equally wasted time and energy;Furthermore often Impactor is advised without pressure limiting device, once user's makes
With hypertonia, impactor piston spoilage is added significantly to, causes larger economic loss and duration to influence.
The content of the invention
The problem to be solved in the present invention is to provide a kind of simple and compact for structure, is easy to safeguard, improved gas efficiency,
And interior plenum system also to water well operation when obstruction have a certain degree of highly reliable easy care deep hole avoided Operation down-the-hole air hammer.
In order to solve the above problems, the present invention uses following technical scheme:
Deep hole operation down-the-hole air hammer, including top connection, outer tube and drill bit, central aeration pipe distribution dress is installed in outer tube Put and piston, central aeration pipe air distributing device connect top connection with piston, be provided with top connection non-return valve positioner and Multigroup pressure limiting device for being used to control operating pressure, the end of central aeration pipe air distributing device is provided with for letting cinder control air quantity Throughput self-checking device, gases at high pressure realize the high-frequency high-speed of piston by top connection and central aeration pipe air distributing device Reciprocal acting motion.
It is further optimization of the present invention to such scheme below:
Non-return valve positioner includes being arranged on long-channel in top connection, close to the position of taper thread end face in long-channel Non-return valve is provided with, the position corresponding with non-return valve end is provided with cooperation step in long-channel, coordinates and is provided with step The obturating cup seat coordinated with non-return valve.
Further optimization:The other end of non-return valve is arranged with check valve spring, and extend into spring base, is set on spring base Multiple gas passage, spring bases excessively for being used for gas are equipped with to be positioned in long-channel by step.
Further optimization:Pressure limiting device includes the step for being set with certain angle of inclination and connecting outside with long-channel Hole, stepped hole is interior to be depressed into ball sealer at step by pressure limiting spring, and the other end of pressure limiting spring is entered by pressure limiting spring base Row positioning and regulation elastic force;
Further optimization:It is connected through a screw thread between pressure limiting spring base and top connection, pressure limiting spring base is provided centrally with Central small hole, the internal circlip for preventing pressure limiting spring base from loosening is provided with the outside of pressure limiting spring base.
Further optimization:The central axis of pressure limiting device and the angle of impactor axis between 30-50 degree, discharge Gas can be used for secondary auxiliary deslagging.
Further optimization:Throughput self-checking device includes being internally provided with location hole of the spring section for the close of U-shaped Valve is sealed, one end of sealing valve is provided with step, and the other end of sealing valve is located in spring base.
Further optimization:The outer circumference surface of sealing valve is the face of cylinder coordinated with spring base, is provided with the face of cylinder multiple rows of Hole.
Further optimization:The end set of Packing spring seat has the back-up ring for location sealing spring base.
Further optimization:Central aeration pipe air distributing device stretched into top connection including one end to be fixedly connected by bearing pin Heart breather pipe, to be fitted close between central aeration pipe and top connection, fit clearance is less than 0.1mm, the top connection and outer tube For non-threaded section of inwall to be fitted close, fit clearance is less than 0.1mm.
The non-return valve positioner and pressure limiting device when in use, gases at high pressure enter top connection after, gases at high pressure pressure The spring of contracting non-return valve, non-return valve is opened, gases at high pressure enter central aeration pipe by multiple gas passages of crossing of spring base afterwards Interior, when the pressure of gases at high pressure is not less than allowable pressure, pressure limiting device is located at sealing state;When the pressure of gases at high pressure exceedes During allowable pressure, ball sealer is open, and gases at high pressure discharge impactor by the side gap of ball sealer and the aperture of spring base Outside, it is depressured.
The throughput self-checking device when in use, when gases at high pressure enter central aeration pipe, when gas pressure surpasses When crossing setting value, it need not now increase delivery of bailing air, for gases at high pressure compression seal valve completely into Packing spring seat, gas is complete The discharge of gas passage is crossed from strip entirely, with being continuously increased for drilling well rice number, the actual use pressure of impactor gradually reduces;Work as drop As little as certain phase, using pressure be less than spring at this stage thrust when, spring promote sealing valve displacement certain distance, now reveal Go out the first round, gases at high pressure divide gas to carry out deslagging by the first round distributary division;It is reduced to necessarily when using pressure again During the stage, spring continues to press on sealing valve displacement, exposes second row, the 3rd round etc. according to displacement, indirectly the row of increasing The gas passing area of cinder hole, reach the purpose for increasing tolerance.
For the present invention using piston from distribution principle, the design of no inner casing need not dismounting by new type check valve positioner Top connection is the replaceable corresponding annex such as non-return valve and spring, and need not tear machine open by throughput self-checking device changes regulating the qi flowing in the channels plug Automatically adjusting for delivery of bailing air can be achieved, with releasing pressure automatically impactor can be ensured in rational work pressure by pressure limiting device Worked under power, it is compact-sized simple, be easy to safeguard, improved gas efficiency, and interior plenum system also to water well operation when resistance Be plugged with it is a certain degree of avoid, expand use range, add the service life of impactor.
The invention will be further described with reference to the accompanying drawings and examples.
Brief description of the drawings
Accompanying drawing 1 is the structural representation of down-the-hole air hammer of the embodiment of the present invention;
Accompanying drawing 2 is the structural representation of non-return valve of embodiment of the present invention positioner and pressure limiting device;
Accompanying drawing 3 is the sealing state figure of pressure limiting device of the embodiment of the present invention;
Accompanying drawing 4 is the pressure release state diagram of pressure limiting device of the embodiment of the present invention;
Accompanying drawing 5 is the structural representation of throughput self-checking device of the embodiment of the present invention;
Accompanying drawing 6 is the high pressure conditions figure of throughput self-checking device of the embodiment of the present invention;
Accompanying drawing 7 is the low-pressure state figure of throughput self-checking device of the embodiment of the present invention;
Accompanying drawing 8 is the low-pressure state figure of throughput self-checking device of the embodiment of the present invention;
Accompanying drawing 9 is the low-pressure state figure of throughput self-checking device of the embodiment of the present invention.
In figure:1- top connections;2- non-return valves;3- check valve springs;4- spring bases;5- central aeration pipes;6- throughputs are certainly Dynamic adjusting means;7- pistons;8- outer tubes;9- cups;10- rear chambers;11- drill bits;12- bearing pins;13- guide sleeves;14- snap rings;15- Lower contact;16- pressure limiting devices;51- strips cross gas passage;The gas distribution channels of 71- first;The gas distribution channels of 72- second;73- centers lead to Road;101- circlips;102- obturating cup seats;103-O shape sealing rings;104- coordinates step;105- steps;106- crosses gas and led to Road;201- internal circlips;202- pressure limiting spring bases;203- pressure limiting springs;204- ball sealers;205- stepped holes;601- is close Seal valve;602- Packing springs;603- Packing spring seats;604- back-up rings;The 605- faces of cylinder;606- holes.
Embodiment
Embodiment, as shown in Figure 1, Figure 2, Figure 5, deep hole operation down-the-hole air hammer, including top connection 1, outer tube 8 and drill bit 11, central aeration pipe air distributing device and piston 7 be installed, central aeration pipe air distributing device is by top connection 1 and piston 7 in outer tube 8 Connect, non-return valve positioner and multigroup pressure limiting device 16 for being used to control operating pressure, central aeration are provided with top connection 1 The end of pipe air distributing device is provided with the throughput self-checking device for letting cinder control air quantity, and gases at high pressure pass through top connection 1 realizes that the high-frequency high-speed of piston 7 back and forth does work motion with central aeration pipe air distributing device.
The non-return valve positioner includes being arranged on long-channel in top connection 1, close to taper thread end face in long-channel Position be provided with the non-return valve 2 being coaxially disposed with top connection 1, the position corresponding with the end of non-return valve 2 setting in long-channel Have and coordinate step 104, coordinate the obturating cup seat 102 for being provided with step 104 and coordinating with non-return valve 2, obturating cup seat 102 and length are logical Sealed between road by O-ring seals 103.
Position in the long-channel on the outside of obturating cup seat 102 is provided with the elasticity for position limiting sealed bowl seat 102 Back-up ring 101.
The other end of the non-return valve 2 is arranged with check valve spring 3, and extend into spring base 4, is set on spring base 4 There are multiple gas passages 106 excessively for being used for gas, spring base 4 is positioned in long-channel by step 105.
The gas passage 106 of crossing is groove milling formula or through-hole type passage.
When changing, need to only dismantle the non-return valve 2 circlip 101, then take out obturating cup seat 102, check successively Valve 2, check valve spring 3 and spring base 4, it is convenient and swift without removing top connection 1.
The pressure limiting device 16 includes the stepped hole 205 for being set with certain angle of inclination and connecting outside with long-channel, Ball sealer 204 is depressed at step by pressure limiting spring 203 in stepped hole 205, the other end of pressure limiting spring 203 passes through pressure limiting Spring base 202 is positioned and adjusted elastic force.
It is connected through a screw thread between the pressure limiting spring base 202 and top connection 1, pressure limiting spring base 202 is provided centrally with Central small hole, the outside of pressure limiting spring base 202 are provided with the internal circlip 201 for preventing pressure limiting spring base 202 from loosening.
The central axis of the pressure limiting device 16 and the angle of impactor axis are between 30-50 degree, the gas of discharge Available for secondary auxiliary deslagging.
The central aeration pipe air distributing device includes one end and stretches into top connection 1 what is be fixedly connected by bearing pin 12
Central aeration pipe 5, the other end of central aeration pipe 5 are stretched into the central passage 73 of piston 7, and throughput is adjusted automatically On the end of the centrally disposed breather pipe 5 of regulating device.
The throughput self-checking device includes being internally provided with the sealing valve 601 that location hole of the spring section is U-shaped, One end of sealing valve 601 is provided with step, and the other end of sealing valve 601 is located in spring base 603.
The outer circumference surface of the sealing valve 601 is the face of cylinder 605 coordinated with spring base 603, is provided with the face of cylinder 605 More rounds 606,
Packing spring 602 is provided with the location hole of the spring, between sealing valve 601 and Packing spring seat 603.
The aperture in the hole 606, quantity, row can adjust use according to requirements.
The end set of the Packing spring seat 603 has the back-up ring 604 for location sealing spring base 603.
The position of throughput self-checking device is provided with multiple strips on the central aeration pipe 5 and crosses gas passage 51。
To be fitted close between the central aeration pipe 5 and top connection 1, fit clearance is less than 0.1mm, the top connection 1 With non-threaded section of the inwall of outer tube 8 to be fitted close, fit clearance is less than 0.1mm, can so be effectively ensured central aeration pipe and The axiality that piston coordinates meets the requirements.
Rear chamber 10 is formed in the outer tube 8 between top connection 1 and piston 7, is set in outer tube 8 positioned at the position of the side of piston 7 Guide sleeve 13 is equipped with, cup 9 is formed between piston 7 and guide sleeve 13.
It is spaced apart on the piston 7 to be tiltedly installed with for the first distribution duct 71 of distribution and the second air distribution hole Road 72, and connected respectively with central passage 73.
The axial length that the strip crosses gas passage 51 is less than the first distribution duct 71 and the second distribution duct 72 in piston 7 Between axial distance.
The guide sleeve 13 is steel part, and O-ring seals groove of the outer surface provided with 4-6 roads of guide sleeve 13 is easy to guide sleeve Positioning and sealing, the axially position of guide sleeve 13 is steel wire clamping ring formula.
The lower end of the piston 7 is contacted by guide sleeve 13 with drill bit 11, and card is provided between guide sleeve 13 and drill bit 11 Ring 14, drill bit 11 are arranged in outer tube 8 by lower contact 15.
For the snap ring 14 to be double semi-circular, inner ring is two-sided convex structure, has more preferable fiting effect with drill bit 11.
Be separately provided for the central passage 73 blown by force on the piston 7 and the axle center of drill bit 11, and piston 7 it is descending with Drill bit 11 connects when contacting.
The both ends of the outer tube 8 and internal symmetry design, changeable above-below direction uses when wearing larger at one end, carries To the service life of entirety.
When in use, as shown in Figure 3, Figure 4, gases at high pressure, which enter, above to be connect for the non-return valve positioner and pressure limiting device 16 After first 1, gases at high pressure compress the spring 3 of non-return valve 2, open non-return valve 2, multiple mistakes that gases at high pressure pass through spring base 4 afterwards Gas passage 106 enters in central aeration pipe 5, and when the pressure of gases at high pressure is not less than allowable pressure, pressure limiting device 16 is positioned at close Envelope state;When the pressure of gases at high pressure exceedes allowable pressure, ball sealer 204 is open, and gases at high pressure pass through ball sealer 204 Outside the aperture of side gap and spring base 202 discharge impactor, it is depressured.
When in use, as shown in Fig. 6, Fig. 7, Fig. 8, Fig. 9, gases at high pressure enter center to the throughput self-checking device During breather pipe 5, when gas pressure exceedes setting value, it need not now increase delivery of bailing air, gases at high pressure compression seal valve 601 is complete Enter entirely in Packing spring seat 603, gas is crossed gas passage 51 from strip completely and discharged, with being continuously increased for drilling well rice number, punching The actual use pressure for hitting device gradually reduces;When being reduced to certain phase, it is less than the thrust of spring 602 at this stage using pressure When, spring 602 promotes the displacement certain distance of sealing valve 601, now exposes the first round, gases at high pressure are shunted by the first round Portion gas carries out deslagging;When pressure is again lowered to certain phase, spring 602 continues to press on the displacement of sealing valve 601, according to Displacement exposes second row, the 3rd round etc., increases the gas passing area of mud hole indirectly, reaches the mesh for increasing tolerance 's.
In use, after gases at high pressure enter top connection 1, gases at high pressure compress the spring 3 of non-return valve 2, open for normal operation Non-return valve 2 is opened, gases at high pressure are entered in central aeration pipe 5 by multiple gas passages 106 of crossing of spring base 4 afterwards, are passed through simultaneously Pressure limiting device 16 carries out automatic Regulation, and the position that throughput self-checking device 6 adjusts sealing valve 601 by the pressure of gas is entered Row deslagging, while gases at high pressure cross gas passage 51 into the first distribution duct on piston 7 by the strip of central aeration pipe 5 71st, in the second distribution duct 72;When piston 7 is descending, when strip crosses gas passage 51 and is located at 7 upper end of piston, strip crosses gas passage 51 Being connected with the second distribution duct 72, gases at high pressure enter cup 9 by the second distribution duct 72, so as to promote piston 7 up, when Piston 7 is up, and when strip crosses gas passage 51 and is located at 7 middle part of piston, gases at high pressure pass through the first distribution duct 71 and enter rear chamber 10 It is interior, so as to promote piston 7 descending, move in circles, using piston 7 positioned at the diverse location in outer tube 8, realize that gases at high pressure lead to Cross the first distribution duct 71, the second distribution duct 72 and enter the cup 9 and rear chamber 10 of piston distribution, realize the high-frequency high-speed of piston Reciprocal acting motion.
When need it is strong blow operation when, impactor lift-off hole is low, and drill bit 11 is fallen, and piston 7 follows drill bit 11 to drop down onto to blow position by force Put, now, strip is crossed gas passage 51 and is located in rear chamber 10, and gases at high pressure cross gas passage 51 by strip and are directly entered rear chamber 10, Central passage 73 is entered by the first distribution duct 71 of piston 7 afterwards, is expelled directly out outside impactor, realization blows function by force.
The present invention can be matched somebody with somebody by changing four parts such as guide sleeve 13, outer tube 8, snap ring 14, lower contact 15 With the drill bit of different connection form, such as DHD series, QL series, SD series, Mission series, have good accessory general Property and operability, realize a kind of gas distribution structure adapted plurality of specifications drill bit, expand use range.
For the present invention using piston from distribution principle, the design of no inner casing need not dismounting by new type check valve positioner Top connection is the replaceable corresponding annex such as non-return valve and spring, and need not tear machine open by throughput self-checking device changes regulating the qi flowing in the channels plug Automatically adjusting for delivery of bailing air can be achieved, with releasing pressure automatically impactor can be ensured in rational work pressure by pressure limiting device Worked under power, it is compact-sized simple, be easy to safeguard, improved gas efficiency, and interior plenum system also to water well operation when resistance Be plugged with it is a certain degree of avoid, expand use range, add the service life of impactor.

Claims (9)

1. deep hole operation down-the-hole air hammer, including top connection(1), outer tube(8)And drill bit(11), it is characterised in that:Outer tube(8)It is interior Central aeration pipe air distributing device and piston are installed(7), central aeration pipe air distributing device is by top connection(1)With piston(7)Connection, Top connection(1)Non-return valve positioner and multigroup pressure limiting device for being used to control operating pressure are inside provided with, central aeration pipe is matched somebody with somebody The end of device of air is provided with the throughput self-checking device for letting cinder control air quantity, and gases at high pressure pass through top connection(1) Piston is realized with central aeration pipe air distributing device(7)High-frequency high-speed back and forth do work motion;
Non-return valve positioner includes being arranged on top connection(1)Interior long-channel, pressure limiting device include setting with certain angle of inclination The stepped hole put and connect outside with long-channel(205), stepped hole(205)It is interior to pass through pressure limiting spring(203)By ball sealer (204)It is depressed at step, pressure limiting spring(203)The other end pass through pressure limiting spring base(202)Positioned and adjusted elastic force Size.
2. deep hole operation down-the-hole air hammer according to claim 1, it is characterised in that:Close to taper thread end face in long-channel Position be provided with non-return valve(2), in long-channel and non-return valve(2)The corresponding position in end is provided with cooperation step(104), Coordinate step(104)Place is provided with and non-return valve(2)The obturating cup seat of cooperation(102).
3. deep hole operation down-the-hole air hammer according to claim 2, it is characterised in that:Non-return valve(2)The other end be arranged There is check valve spring(3), and it extend into spring base(4)It is interior, spring base(4)On be provided with it is multiple be used for gas cross gas passages (106), spring base(4)Pass through step(105)It is positioned in long-channel.
4. deep hole operation down-the-hole air hammer according to claim 1, it is characterised in that:Pressure limiting spring base(202)With above connecing Head(1)Between be connected through a screw thread, pressure limiting spring base(202)Be provided centrally with central small hole, pressure limiting spring base(202)It is outer Side is provided with for preventing pressure limiting spring base(202)The internal circlip of loosening(201).
5. deep hole operation down-the-hole air hammer according to claim 4, it is characterised in that:The central axis of pressure limiting device and punching The angle of device axis is hit between 30-50 degree, the gas of discharge can be used for secondary auxiliary deslagging.
6. deep hole operation down-the-hole air hammer according to claim 5, it is characterised in that:Throughput self-checking device includes It is internally provided with the sealing valve of location hole of the spring(601), sealing valve(601)One end be provided with step, sealing valve(601)It is another One end is located at Packing spring seat(603)It is interior.
7. deep hole operation down-the-hole air hammer according to claim 6, it is characterised in that:Sealing valve(601)Outer circumference surface For with Packing spring seat(603)The face of cylinder of cooperation(605), the face of cylinder(605)On be provided with more rounds(606).
8. deep hole operation down-the-hole air hammer according to claim 7, it is characterised in that:Packing spring seat(603)End It is provided with and is used for location sealing spring base(603)Back-up ring(604).
9. deep hole operation down-the-hole air hammer according to claim 1, it is characterised in that:Central aeration pipe air distributing device includes Top connection is stretched into one end(1)Inside pass through bearing pin(12)The central aeration pipe being fixedly connected(5), central aeration pipe(5)With top connection (1)Between to be fitted close, fit clearance is less than 0.1mm, the top connection(1)With outer tube(8)Non-threaded section of inwall is close Coordinate, fit clearance is less than 0.1mm.
CN201610933672.7A 2016-11-01 2016-11-01 Deep hole operation down-the-hole air hammer Active CN106437493B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610933672.7A CN106437493B (en) 2016-11-01 2016-11-01 Deep hole operation down-the-hole air hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610933672.7A CN106437493B (en) 2016-11-01 2016-11-01 Deep hole operation down-the-hole air hammer

Publications (2)

Publication Number Publication Date
CN106437493A CN106437493A (en) 2017-02-22
CN106437493B true CN106437493B (en) 2018-01-02

Family

ID=58178923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610933672.7A Active CN106437493B (en) 2016-11-01 2016-11-01 Deep hole operation down-the-hole air hammer

Country Status (1)

Country Link
CN (1) CN106437493B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642327B (en) * 2017-10-30 2023-09-15 吉林大学 Closed positive and negative circulation impactor
CN107859494B (en) * 2017-11-30 2023-10-20 宜昌钻山甲科技有限责任公司 Transition joint with spiral slag discharging and flow dividing functions, down-the-hole impactor and drill rod
CN111911065B (en) * 2020-08-24 2025-03-25 湖北五环欧科制造技术有限公司 A new type of check valve and impactor
CN111927306B (en) * 2020-09-03 2022-06-28 长沙天和钻具机械有限公司 Large-aperture impactor with adjustable air inflow

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203321313U (en) * 2013-06-28 2013-12-04 宜昌市五环钻机具有限责任公司 Down-hole hammer
CN104265154A (en) * 2014-09-19 2015-01-07 宜昌市五环钻机具有限责任公司 Novel down-the-hole impactor
CA2750810C (en) * 2009-01-28 2015-02-24 Center Rock Inc. Down-the-hole drill reverse exhaust system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130292182A1 (en) * 2010-10-28 2013-11-07 Bernard Lionel Glen Down-the-hole hammer drill assembly
CN206129144U (en) * 2016-11-01 2017-04-26 山东中瑞工程机械有限公司 Deep hole operation downhole air hammer

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2750810C (en) * 2009-01-28 2015-02-24 Center Rock Inc. Down-the-hole drill reverse exhaust system
CN203321313U (en) * 2013-06-28 2013-12-04 宜昌市五环钻机具有限责任公司 Down-hole hammer
CN104265154A (en) * 2014-09-19 2015-01-07 宜昌市五环钻机具有限责任公司 Novel down-the-hole impactor

Also Published As

Publication number Publication date
CN106437493A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN106437493B (en) Deep hole operation down-the-hole air hammer
JPS5950837B2 (en) Fluid operated impact tools
CN104405280B (en) Stroke differential type high energy surges down-the-hole air hammer
US8544566B2 (en) Fluid actuated impact tool with solid piston-standard bit arrangement and water seal
CN102966327A (en) Expansion pipe
CA2627488A1 (en) Backhead and drill assembly with backhead
CN113389485B (en) Internal cylinder-free reverse circulation impactor
CN206129144U (en) Deep hole operation downhole air hammer
CN206129142U (en) Energy -efficient compact downhole air hammer
CN118273649B (en) Pneumatic impactor with multiple distribution channel structure
CN208057053U (en) A kind of geological reamer
CN108468508A (en) A kind of jumbolter
CN206129146U (en) Downhole air hammer's top connection device
CN206129143U (en) Downhole air hammer's amount of wind automatically regulated distributor
US4278135A (en) Variable volume pneumatic drill
CN206129145U (en) Inner casing formula downhole air hammer with automatically regulated discharge of fumes and gas function
CN106246098B (en) With the inner casing formula down-the-hole air hammer for automatically adjusting capacity function
CN212689910U (en) A large-diameter combined air reverse circulation DTH hammer
AU2015101848A4 (en) Down-the-Hole Impactor
CN111075348A (en) Combined rotary impactor
CN106246097B (en) The top connection device of down-the-hole air hammer
CN204804688U (en) It changes integrative hydraulic pressure down -hole drill to dash
CN106285457B (en) The air quantity of down-the-hole air hammer automatically adjusts distributor
CN211287508U (en) Combined rotary down-the-hole impacting device
CN201016271Y (en) Pneumatic hammer for well drilling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant