CN106410646B - A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method - Google Patents

A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method Download PDF

Info

Publication number
CN106410646B
CN106410646B CN201610975594.7A CN201610975594A CN106410646B CN 106410646 B CN106410646 B CN 106410646B CN 201610975594 A CN201610975594 A CN 201610975594A CN 106410646 B CN106410646 B CN 106410646B
Authority
CN
China
Prior art keywords
turn
turning
switch
motor
check
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610975594.7A
Other languages
Chinese (zh)
Other versions
CN106410646A (en
Inventor
宗亮
卢朝晖
申建新
李屹松
李玉冰
张中建
谭立伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Handan Handan Iron And Steel Group Fengda Metallurgical Raw Materials Co ltd
HBIS Co Ltd Handan Branch
Original Assignee
HBIS Co Ltd Handan Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HBIS Co Ltd Handan Branch filed Critical HBIS Co Ltd Handan Branch
Priority to CN201610975594.7A priority Critical patent/CN106410646B/en
Publication of CN106410646A publication Critical patent/CN106410646A/en
Application granted granted Critical
Publication of CN106410646B publication Critical patent/CN106410646B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B3/00Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Power Engineering (AREA)
  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

The invention discloses a kind of quick judgement of failure of friendship orthogonal high voltage converter and operating method is handled, including auxiliary equipment maintenance, the energized circuit of synchronous motor are overhauled, high-pressure frequency-conversion cabinet overhauls, high voltage converter service entrance switch overhauls, are handled the exceeded alert process of intake air temperature and changed power cell step.The invention provides a kind of breakdown judge of high voltage converter and processing method, and the failure of frequency converter is judged according to the different characteristics of start-up course, processing operation is carried out according to the type of failure, shortens the accident treatment time, create good economic benefit.

Description

A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method
Technical field
Quickly judge the present invention relates to a kind of failure of high voltage converter and handle operating method, more particularly to a kind of friendship The failure of orthogonal high voltage converter quickly judges and processing operating method, belongs to the fault diagnosis technology field of high voltage converter.
Background technology
1,2,3,4, No. 5 high voltage converter is the nucleus equipment of main motor on factory's steel rolling line, their operation quality, The yield of production line is directly affected, high current, the equipment of high-intensity magnetic field, is always operation dimension because high voltage converter is high voltage Difficult point in shield, each failure, which needs to stop production to wait, causes very big production loss, therefore, maintenance and life according to oneself The accident occurred in production, is summarized, so as to allow everybody to have a comparison clearly thinking to accident, according to high voltage variable The characteristics of failure of frequency device, according to different time, difference feedback, summarize the judgement of failure and handle operating method, so as to pole The big processing time for improving accident, equipment utilization rule is improved, ensure that production.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of failure for handing over orthogonal high voltage converter quickly to judge and handle Operating method.
In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method, comprises the following steps:
Step 1:Auxiliary equipment(7)Maintenance:It is made up of step by step following:
Step 1-1:Start the auxiliary equipment for handing over orthogonal high voltage converter(7), judge to start auxiliary equipment(7)Whether can be just Often work, if it is, turning to step 2;Otherwise, step 1-2 is turned to;
Step 1-2:Check whether water cooling unit works, if it is, turning to step 1-4;Otherwise, step 1-3 is turned to;
Step 1-3:Handle water cooling unit failure;Turn to step 1-2;
Step 1-4:Check whether the cooling blower that high-voltage motor (6) two is surveyed works, if it is, turning to step 1-8;It is no Then, step 1-5 is turned to;
Step 1-5:Check whether the power switch of cooling blower trips, and whether contactor control loop is normal, if It is to turn to step 1-6, otherwise turns to step 1-8;
Step 1-6:Cooling blower motor is detected with low pressure megger, if insulation is less than 0.5 megaohm, changes the cooling of damage Blower motor;With low pressure megger detection cooling blower inlet wire insulating resistance of cable if cooling blower insulation is good, check into Whether the insulation against ground of line cable is less than 0.5 megaohm, if turning to step 1-7;Otherwise step 1-8 is turned to;
Step 1-7:Change the inlet wire cable of cooling fan;
Step 1-8:Check whether the cooling fan in frequency conversion tank works, whether air quantity is normal, if turning to step 1, Otherwise step 1-9 is turned to;
Step 1-9:Cooling fan in frequency conversion tank is changed, or checks whether air volume test element damages and wind in frequency conversion tank Whether amount measure loop opens a way, and changes PT100 air volume test elements in time, recovers measuring loop;
Step 2:The energized circuit maintenance of synchronous motor, including step in detail below:
Step 2-1:Check whether the energized circuit of synchronous motor works, and whether field switch TCMLC closes;If It is to turn to step 3, otherwise, turns to step 2-2;
Step 2-2:Check excitation service entrance switch on low-voltage distribution cabinet(1)Whether close, if it is, step 2-4 is turned to, it is no Then, step 2-3 is turned to;
Step 2-3:Close excitation service entrance switch on low-voltage distribution cabinet(1);Turn to step 2-1;
Step 2-4:Check whether switch acts in excitation cubicle, if it is, turning to step 2-6, otherwise, turn to step 2-5;
Step 2-5:The motor-operating mechanism of inspection switch and switch, whether the coil of motor-operating mechanism is short-circuit, opens Road, whether mechanism connection piece is threaded off or is deformed, and the coil of replacement operation mechanism, corrects and recovers motor-operating mechanism Mechanism in flakes, if Switch main body damages, be changed;
Step 2-6:Check excitation rectifier device(2)Whether work, if turning to step 2-8, otherwise turn to step 2- 7;
Step 2-7:Excitation rectifier device is overhauled, whether control power supply has electricity, and whether communication board work is normal, and card is Whether no virtual connection or damage, cooling fan work, and whether have short circuit phenomenon, and whether inside insurance is changed because Damage by Short Circuit Corresponding element;
Step 2-8:Check motor brush whether failure, if turn to step 2-9, otherwise go to step 2-10;
Step 2-9:Brush is changed, contact surface polish corresponding radian before replacing, once changes three no more than sum / mono-;
Step 2-10:Check whether motor sliding ring surface is good, if oxide-film is destroyed, to carry out grinding process, electricity Whether brush brush holder loosens and is retightened, and whether slip ring wiring loosens and fastened;
Step 3:High-pressure frequency-conversion cabinet overhauls:Including step in detail below:
Step 3-1:Check whether high-pressure frequency-conversion cabinet enters line precharge:After 30 second charging interval, DC bus-bar voltage is observed Whether reach 4800V, if it is, turning to step 4, otherwise turn to step 3-2;
Step 3-2:Operate high voltage converter to stop, high pressure inlet wire handcart is withdrawn into testing position, waits dc bus electricity Press after less than 36V, to change pre-charge resistance, change preliminary filling insurance, eliminate all alarms;
Step 3-3:High pressure inlet wire handcart is advanced to running position, turns to step 1;
Step 4:High voltage converter service entrance switch overhauls:Including step in detail below:
Step 4-1:Check high-voltage wire inlet switch(3)Whether close a floodgate, if it is, step 5 is turned to, if not otherwise turning to Step 4-2;
Step 4-2:Operate high voltage converter to stop, high pressure inlet wire handcart is withdrawn into testing position, checks that high-voltage handcart closes Whether lock loop works, if it is, turning to step 4-4, otherwise turns to step 4-3;
Step 4-3:Change the fault element in high-voltage handcart closing coil loop;
Step 4-4:Check whether tank circuit works, if it is, turning to step 4-6, otherwise turn to step 4-5;
Step 4-5:Change the fault element in tank circuit;
Step 4-6:Check whether high-voltage switch gear divide-shut brake auxiliary contact feedback is normal, if it is, step 4-8 is turned to, it is no Then turn to step 4-7;
Step 4-7:Change high-voltage switch gear divide-shut brake auxiliary contact;
Step 4-8:Check whether the motor-operating mechanism of high-voltage switch gear is good, if it is, turning to step 4-10, otherwise turn To step 4-9;
Step 4-9:The operating mechanism of examination and repair for high-pressure switch, inspection operation mechanism powered part and mechanical part, electronic portion Sub-coil whether open a way or short circuit, armature whether jam, whether pin comes off mechanical part, bearing damage, connecting rod deformation, Gear oil starvation, change corresponding damage part;
Step 4-10:High pressure inlet wire handcart is advanced to running position, turns to step 1;
Step 5:Disconnecting switch under motor(5)Maintenance:Including step in detail below:
Step 5-1:Check disconnecting switch under motor(5)Handcart whether normally close a floodgate, it is no if it is, turn to step 5-3 Then, step 5-2 is turned to;
Step 5-2:Lower disconnecting switch(5)Handcart exit and change, the lower disconnecting switch after replacing(5)It is sent to Running position;
Step 5-3:The lower disconnecting switch of operation(5)Close a floodgate;
Step 6:The exceeded alert process of intake air temperature:Including step in detail below:
Step 6-1:Judge whether to show the exceeded alarm of intake air temperature and shut down, if it is, turning to step 6-2;Otherwise, Turn to step 6-3;
Step 6-2:Force F01K13 the or F01K23 relays inside pressing main transmission auxiliary switch board, time 1- 2 minutes, motor cooling fan contactor, motor radiating fan is set to work, alarm eliminates rear steering step 1;
Step 6-3:Confirm that high voltage converter stops, operation high pressure inlet wire handcart is withdrawn into testing position, waits 15 minutes DC bus-bar voltage be less than 36V after, check frequency conversion tank internal power unit module whether alarm, whether judge high-voltage power unit Damage, if it is, turning to step 6-4, otherwise turn to step 7;
Step 6-4:IGCT units are changed, IGCT water inlets and flowing water Valve is closed, opens joint, put below waterpipe jointing Good water-accepting basin, prevents from metalling run out, and takes the dividing plate among cabinet door apart, controls power outage in IGCT power unit cabinets, extract on IGCT 4, triggering grating, dismantle triggering power supply terminal 8,4 foundation bolts of constant power unit, connected with busbar Fixing bolt 2, the connecting bolt of 3 busbars 8,4, the bolt of output, the special Slide tool of both sides 2 is pacified respectively It is attached to above IGCT, notices that each screw is gently hung up.Two exclusive guideways are separately inserted in Slide tool recited above Face, both sides respectively fill one, are then fixed on by full dog point socket set above on cabinet, the bolt for fixing guide rail just now, two Synchronously tightened before and after side, at this moment it can be seen that IGCT modules are slight from firm banking to lift 2-3MM, IGCT power cells Pull out, be put on special lift truck, lifting lift truck, IGCT power cells is not stressed, pull down fixed IGCT power Screw on the slideway of unit, IGCT is unloaded, turn to step 1;
Step 7:Terminate.
Using having technical effect that acquired by above-mentioned technical proposal:
The invention provides a kind of breakdown judge of high voltage converter and processing method, according to the different characteristics of start-up course Judge the failure of frequency converter, processing operation is carried out according to the type of failure, shortens the accident treatment time, creates good warp Ji benefit.
Brief description of the drawings
The present invention is further detailed explanation with reference to the accompanying drawings and detailed description.
Fig. 1 is the flow chart of the present invention;
Fig. 2 is the circuit theory diagrams for handing over orthogonal high voltage converter;
Wherein:1- excitation service entrance switch, 2- excitation rectifier devices, 3- high-voltage wire inlet switchs, 4- high-pressure frequency-conversion cabinets, under 5- every Leave pass, 6- high-voltage motors, 7- auxiliary equipments.
Embodiment
Embodiment 1:
A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method, comprises the following steps:
Step 1:Auxiliary equipment(7)Maintenance:It is made up of step by step following:
Step 1-1:Start the auxiliary equipment for handing over orthogonal high voltage converter(7), judge to start auxiliary equipment(7)Whether can be just Often work, if it is, turning to step 2;Otherwise, step 1-2 is turned to;
Step 1-2:Check whether water cooling unit works, if it is, turning to step 1-4;Otherwise, step 1-3 is turned to;
Step 1-3:Handle water cooling unit failure;Turn to step 1-2;
Step 1-4:Check whether the cooling blower that high-voltage motor (6) two is surveyed works, if it is, turning to step 1-8;It is no Then, step 1-5 is turned to;
Step 1-5:Check whether the power switch of cooling blower trips, and whether contactor control loop is normal, if It is to turn to step 1-6, otherwise turns to step 1-8;
Step 1-6:Cooling blower motor is detected with low pressure megger, if insulation is less than 0.5 megaohm, changes the cooling of damage Blower motor;With low pressure megger detection cooling blower inlet wire insulating resistance of cable if cooling blower insulation is good, check into Whether the insulation against ground of line cable is less than 0.5 megaohm, if turning to step 1-7;Otherwise step 1-8 is turned to;
Step 1-7:Change the inlet wire cable of cooling fan;
Step 1-8:Check whether the cooling fan in frequency conversion tank works, whether air quantity is normal, if turning to step 1, Otherwise step 1-9 is turned to;
Step 1-9:Cooling fan in frequency conversion tank is changed, or checks whether air volume test element damages and wind in frequency conversion tank Whether amount measure loop opens a way, and changes PT100 air volume test elements in time, recovers measuring loop;
Step 2:The energized circuit maintenance of synchronous motor, including step in detail below:
Step 2-1:Check whether the energized circuit of synchronous motor works, and whether field switch TCMLC closes;If It is to turn to step 3, otherwise, turns to step 2-2;
Step 2-2:Check excitation service entrance switch on low-voltage distribution cabinet(1)Whether close, if it is, step 2-4 is turned to, it is no Then, step 2-3 is turned to;
Step 2-3:Close excitation service entrance switch on low-voltage distribution cabinet(1);Turn to step 2-1;
Step 2-4:Check whether switch acts in excitation cubicle, if it is, turning to step 2-6, otherwise, turn to step 2-5;
Step 2-5:The motor-operating mechanism of inspection switch and switch, whether the coil of motor-operating mechanism is short-circuit, opens Road, whether mechanism connection piece is threaded off or is deformed, and the coil of replacement operation mechanism, corrects and recovers motor-operating mechanism Mechanism in flakes, if Switch main body damages, be changed;
Step 2-6:Check excitation rectifier device(2)Whether work, if turning to step 2-8, otherwise turn to step 2- 7;
Step 2-7:Excitation rectifier device is overhauled, whether control power supply has electricity, and whether communication board work is normal, and card is Whether no virtual connection or damage, cooling fan work, and whether have short circuit phenomenon, and whether inside insurance is changed because Damage by Short Circuit Corresponding element;
Step 2-8:Check motor brush whether failure, if turn to step 2-9, otherwise go to step 2-10;
Step 2-9:Brush is changed, contact surface polish corresponding radian before replacing, once changes three no more than sum / mono-;
Step 2-10:Check whether motor sliding ring surface is good, if oxide-film is destroyed, to carry out grinding process, electricity Whether brush brush holder loosens and is retightened, and whether slip ring wiring loosens and fastened;
Step 3:High-pressure frequency-conversion cabinet overhauls:Including step in detail below:
Step 3-1:Check whether high-pressure frequency-conversion cabinet enters line precharge:After 30 second charging interval, DC bus-bar voltage is observed Whether reach 4800V, if it is, turning to step 4, otherwise turn to step 3-2;
Step 3-2:Operate high voltage converter to stop, high pressure inlet wire handcart is withdrawn into testing position, waits dc bus electricity Press after less than 36V, to change pre-charge resistance, change preliminary filling insurance, eliminate all alarms;
Step 3-3:High pressure inlet wire handcart is advanced to running position, turns to step 1;
Step 4:High voltage converter service entrance switch overhauls:Including step in detail below:
Step 4-1:Check high-voltage wire inlet switch(3)Whether close a floodgate, if it is, step 5 is turned to, if not otherwise turning to Step 4-2;
Step 4-2:Operate high voltage converter to stop, high pressure inlet wire handcart is withdrawn into testing position, checks that high-voltage handcart closes Whether lock loop works, if it is, turning to step 4-4, otherwise turns to step 4-3;
Step 4-3:Change the fault element in high-voltage handcart closing coil;
Step 4-4:Check whether tank circuit works, if it is, turning to step 4-6, otherwise turn to step 4-5;
Step 4-5:Change the fault element in tank circuit;
Step 4-6:Check whether high-voltage switch gear divide-shut brake auxiliary contact feedback is normal, if it is, step 4-8 is turned to, it is no Then turn to step 4-7;
Step 4-7:Change high-voltage switch gear divide-shut brake auxiliary contact;
Step 4-8:Check whether the motor-operating mechanism of high-voltage switch gear is good, if it is, turning to step 4-10, otherwise turn To step 4-9;
Step 4-9:The operating mechanism of examination and repair for high-pressure switch, inspection operation mechanism powered part and mechanical part, electronic portion Sub-coil whether open a way or short circuit, armature whether jam, whether pin comes off mechanical part, bearing damage, connecting rod deformation, Gear oil starvation, change corresponding damage part;
Step 4-10:High pressure inlet wire handcart is advanced to running position, turns to step 1;
Step 5:Disconnecting switch under motor(5)Maintenance:Including step in detail below:
Step 5-1:Check disconnecting switch under motor(5)Handcart whether normally close a floodgate, it is no if it is, turn to step 5-3 Then, step 5-2 is turned to;
Step 5-2:Lower disconnecting switch(5)Handcart exit and change, the lower disconnecting switch after replacing(5)It is sent to Running position;
Step 5-3:The lower disconnecting switch of operation(5)Close a floodgate;
Step 6:The exceeded alert process of intake air temperature:Including step in detail below:
Step 6-1:Judge whether to show the exceeded alarm of intake air temperature and shut down, if it is, turning to step 6-2;Otherwise, Turn to step 6-3;
Step 6-2:Force F01K13 the or F01K23 relays inside pressing main transmission auxiliary switch board, time 1- 2 minutes, motor cooling fan contactor, motor radiating fan is set to work, alarm eliminates rear steering step 1;
Step 6-3:Confirm that high voltage converter stops, operation high pressure inlet wire handcart is withdrawn into testing position, waits 15 minutes DC bus-bar voltage be less than 36V after, check frequency conversion tank internal power unit module whether alarm, whether judge high-voltage power unit Damage, if it is, turning to step 6-4, otherwise turn to step 7;
Step 6-4:IGCT units are changed, IGCT water inlets and flowing water Valve is closed, opens joint, put below waterpipe jointing Good water-accepting basin, prevents from metalling run out, and takes the dividing plate among cabinet door apart, controls power outage in IGCT power unit cabinets, extract on IGCT 4, triggering grating, dismantle triggering power supply terminal 8,4 foundation bolts of constant power unit, connected with busbar Fixing bolt 2, the connecting bolt of 3 busbars 8,4, the bolt of output, the special Slide tool of both sides 2 is pacified respectively It is attached to above IGCT, notices that each screw is gently hung up.Two exclusive guideways are separately inserted in Slide tool recited above Face, both sides respectively fill one, are then fixed on by full dog point socket set above on cabinet, the bolt for fixing guide rail just now, two Synchronously tightened before and after side, at this moment it can be seen that IGCT modules are slight from firm banking to lift 2-3MM, IGCT power cells Pull out, be put on special lift truck, lifting lift truck, IGCT power cells is not stressed, pull down fixed IGCT power Screw on the slideway of unit, IGCT is unloaded, turn to step 1;
Step 7:Terminate.
According to this operating method, can be calculated in 12 hours off-times of reduction whole year, i.e., 0.5 day, caused by reduction Loss:* 0.5=2000 tons of daily yield 4000 ton, 200 yuan of ton steel profit.Loss of income reduces 400,000 yuan.
The above-described embodiments are merely illustrative of preferred embodiments of the present invention, not to the structure of the present invention Think and scope is defined.On the premise of design concept of the present invention is not departed from, technology of the ordinary people in the field to the present invention The all variations and modifications that scheme is made, protection scope of the present invention all should be dropped into.

Claims (1)

1. a kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method, it is characterised in that:Including following step Suddenly:
Step 1:Auxiliary equipment(7)Maintenance:It is made up of step by step following:
Step 1-1:Start the auxiliary equipment for handing over orthogonal high voltage converter(7), judge to start auxiliary equipment(7)Whether can normal work Make, if it is, turning to step 2;Otherwise, step 1-2 is turned to;
Step 1-2:Check whether water cooling unit works, if it is, turning to step 1-4;Otherwise, step 1-3 is turned to;
Step 1-3:Handle water cooling unit failure;Turn to step 1-2;
Step 1-4:Check whether the cooling blower of high-voltage motor (6) both sides works, if it is, turning to step 1-8;Otherwise, turn To step 1-5;
Step 1-5:Check whether the power switch of cooling blower trips, and whether contactor control loop is normal, if it is, turning To step 1-6, step 1-8 is otherwise turned to;
Step 1-6:Cooling blower motor is detected with low pressure megger, if insulation is less than 0.5 megaohm, changes the cooling blower of damage Motor;With low pressure megger detection cooling blower inlet wire insulating resistance of cable if cooling blower insulation is good, inlet wire electricity is checked Whether cable insulation against ground is less than 0.5 megaohm, if turning to step 1-7;Otherwise step 1-8 is turned to;
Step 1-7:Change the inlet wire cable of cooling fan;
Step 1-8:Check whether the cooling fan in frequency conversion tank works, whether air quantity is normal, if turning to step 1, otherwise Turn to step 1-9;
Step 1-9:Cooling fan in frequency conversion tank is changed, or checks whether air volume test element is damaged in frequency conversion tank and air quantity is examined Survey time, whether road opened a way, and changes PT100 air volume test elements in time, recovers measuring loop;
Step 2:The energized circuit maintenance of synchronous motor, including step in detail below:
Step 2-1:Check whether the energized circuit of synchronous motor works, and whether field switch TCMLC closes;If it is, turn To step 3, otherwise, step 2-2 is turned to;
Step 2-2:Check excitation service entrance switch on low-voltage distribution cabinet(1)Whether close, if it is, step 2-4 is turned to, otherwise, Turn to step 2-3;
Step 2-3:Close excitation service entrance switch on low-voltage distribution cabinet(1);Turn to step 2-1;
Step 2-4:Check whether switch acts in excitation cubicle, if it is, turning to step 2-6, otherwise, turn to step 2-5;
Step 2-5:The motor-operating mechanism of inspection switch and switch, whether the coil of motor-operating mechanism is short-circuit, open circuit, machine Whether structure connection piece is threaded off or is deformed, and the coil of replacement operation mechanism, corrects and recovers the mechanism of motor-operating mechanism In flakes, if Switch main body damages, to be changed;
Step 2-6:Check excitation rectifier device(2)Whether work, if turning to step 2-8, otherwise turn to step 2-7;
Step 2-7:Excitation rectifier device is overhauled, whether control power supply has electricity, and whether communication board work is normal, and whether card is empty Connect or damage, whether cooling fan works, and whether has short circuit phenomenon, and whether inside insurance is changed corresponding because Damage by Short Circuit Element;
Step 2-8:Check motor brush whether failure, if turn to step 2-9, otherwise go to step 2-10;
Step 2-9:Change brush, contact surface polish corresponding radian before replacing, once change no more than sum three/ One;
Step 2-10:Check whether motor sliding ring surface is good, if oxide-film is destroyed, to carry out grinding process, brush brush Whether frame loosens and is retightened, and whether slip ring wiring loosens and fastened;
Step 3:High-pressure frequency-conversion cabinet overhauls:Including step in detail below:
Step 3-1:Check whether high-pressure frequency-conversion cabinet enters line precharge:After 30 second charging interval, whether observation DC bus-bar voltage Reach 4800V, if it is, turning to step 4, otherwise turn to step 3-2;
Step 3-2:Operate high voltage converter to stop, high pressure inlet wire handcart is withdrawn into testing position, and wait DC bus-bar voltage is After 36V, pre-charge resistance is changed, preliminary filling insurance is changed, eliminates all alarms;
Step 3-3:High pressure inlet wire handcart is advanced to running position, turns to step 1;
Step 4:High voltage converter service entrance switch overhauls:Including step in detail below:
Step 4-1:Check high-voltage wire inlet switch(3)Whether close a floodgate, if it is, step 5 is turned to, if not otherwise turning to step 4-2;
Step 4-2:Operate high voltage converter to stop, high pressure inlet wire handcart is withdrawn into testing position, checks that high-voltage handcart closes a floodgate back Whether road works, if it is, turning to step 4-4, otherwise turns to step 4-3;
Step 4-3:Change the fault element in high-voltage handcart closing circuit;
Step 4-4:Check whether tank circuit works, if it is, turning to step 4-6, otherwise turn to step 4-5;
Step 4-5:Change the fault element in tank circuit;
Step 4-6:Check whether high-voltage switch gear divide-shut brake auxiliary contact feedback is normal, if it is, turning to step 4-8, otherwise turns To step 4-7;
Step 4-7:Change high-voltage switch gear divide-shut brake auxiliary contact;
Step 4-8:Check whether the motor-operating mechanism of high-voltage switch gear is good, if it is, turning to step 4-10, otherwise turn to step Rapid 4-9;
Step 4-9:The operating mechanism of examination and repair for high-pressure switch, inspection operation mechanism powered part and mechanical part, powered part line Circle whether open a way or short circuit, armature whether jam, whether pin comes off mechanical part, bearing damage, connecting rod deformation, gear Oil starvation, change corresponding damage part;
Step 4-10:High pressure inlet wire handcart is advanced to running position, turns to step 1;
Step 5:Disconnecting switch under motor(5)Maintenance:Including step in detail below:
Step 5-1:Check disconnecting switch under motor(5)Handcart whether normally close a floodgate, if it is, turn to step 5-3, otherwise, Turn to step 5-2;
Step 5-2:Lower disconnecting switch(5)Handcart exit and change, the lower disconnecting switch after replacing(5)It is sent to operation Position;
Step 5-3:The lower disconnecting switch of operation(5)Close a floodgate;
Step 6:The exceeded alert process of intake air temperature:Including step in detail below:
Step 6-1:Judge whether to show the exceeded alarm of intake air temperature and shut down, if it is, turning to step 6-2;Otherwise, turn to Step 6-3;
Step 6-2:F01K13 the or F01K23 relays inside pressing main transmission auxiliary switch board are forced, the time is 1-2 points Clock, motor cooling fan contactor, makes motor radiating fan work, and alarm eliminates rear steering step 1;
Step 6-3:Confirm that high voltage converter stops, operation high pressure inlet wire handcart is withdrawn into testing position, waits 15 minutes direct currents Busbar voltage be less than 36V after, check frequency conversion tank internal power unit module whether alarm, judge whether high-voltage power unit damages It is bad, if it is, turning to step 6-4, otherwise turn to step 7;
Step 6-4:IGCT units are changed, IGCT water inlets and flowing water Valve is closed, opens joint, put well and connect below waterpipe jointing Basin, prevent from metalling run out, take the dividing plate among cabinet door apart, power outage is controlled in IGCT power unit cabinets, extract touching on IGCT Luminous grid 4, triggering power supply terminal 8 of dismantling, 4 foundation bolts of constant power unit, the fixation connected with busbar 2, bolt, the connecting bolt of 3 busbars 8,4, the bolt of output, the special Slide tool of both sides 2 is respectively installed to Above IGCT, notice that each screw is gently hung up, two exclusive guideways are separately inserted inside Slide tool recited above, two Side respectively fills one, is then fixed on by full dog point socket set above on cabinet, the bolt for fixing guide rail just now, before and after both sides Synchronously tighten, at this moment it can be seen that IGCT modules are slight from firm banking to lift 2-3MM, IGCT power cells are pulled outwardly Go out, be put on special lift truck, lifting lift truck, IGCT power cells is not stressed, pull down fixed IGCT power cells Screw on slideway, IGCT is unloaded, turn to step 1;
Step 7:Terminate.
CN201610975594.7A 2016-11-07 2016-11-07 A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method Expired - Fee Related CN106410646B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610975594.7A CN106410646B (en) 2016-11-07 2016-11-07 A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610975594.7A CN106410646B (en) 2016-11-07 2016-11-07 A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method

Publications (2)

Publication Number Publication Date
CN106410646A CN106410646A (en) 2017-02-15
CN106410646B true CN106410646B (en) 2018-02-06

Family

ID=58015232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610975594.7A Expired - Fee Related CN106410646B (en) 2016-11-07 2016-11-07 A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method

Country Status (1)

Country Link
CN (1) CN106410646B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109541337A (en) * 2018-10-16 2019-03-29 苏州汇川技术有限公司 Frequency converter failure detection method, system, equipment and computer readable storage medium

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107942153A (en) * 2017-03-31 2018-04-20 大唐三门峡发电有限责任公司 The lookup method of Li Dehuafu frequency converter failures
CN110567740B (en) * 2019-07-31 2021-02-26 邯郸钢铁集团有限责任公司 Operation method for searching and rapidly processing high-voltage variable-frequency starting fault according to time sequence
CN113701809B (en) * 2021-08-20 2024-04-09 株洲华梁电气有限公司 IGCT crimping test device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101051581A (en) * 2007-02-15 2007-10-10 国电南瑞科技股份有限公司 Interlocking reverse overflow relay protective plan
US7948203B2 (en) * 2007-06-29 2011-05-24 Andreas Siemes Device for the control of a smooth starting or ending of a three phase current motor, so-called soft starter
CN103066575A (en) * 2012-12-24 2013-04-24 上海电力学院 Control method of rapidly finding fault
CN103777108A (en) * 2013-10-24 2014-05-07 黄政 Method for quickly searching grounding fault point of electrical equipment
CN104821247A (en) * 2015-04-22 2015-08-05 淮北朔里矿业有限责任公司 Method for debugging and calibrating vacuum contactor in explosion-proof switch

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101051581A (en) * 2007-02-15 2007-10-10 国电南瑞科技股份有限公司 Interlocking reverse overflow relay protective plan
US7948203B2 (en) * 2007-06-29 2011-05-24 Andreas Siemes Device for the control of a smooth starting or ending of a three phase current motor, so-called soft starter
CN103066575A (en) * 2012-12-24 2013-04-24 上海电力学院 Control method of rapidly finding fault
CN103777108A (en) * 2013-10-24 2014-05-07 黄政 Method for quickly searching grounding fault point of electrical equipment
CN104821247A (en) * 2015-04-22 2015-08-05 淮北朔里矿业有限责任公司 Method for debugging and calibrating vacuum contactor in explosion-proof switch

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109541337A (en) * 2018-10-16 2019-03-29 苏州汇川技术有限公司 Frequency converter failure detection method, system, equipment and computer readable storage medium
CN109541337B (en) * 2018-10-16 2021-02-19 苏州汇川技术有限公司 Frequency converter fault detection method, system, equipment and computer readable storage medium

Also Published As

Publication number Publication date
CN106410646A (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN106410646B (en) A kind of failure for handing over orthogonal high voltage converter quickly judges and processing operating method
CN203014361U (en) Traction transformer substation framework protection system of rail transportation line
CN201656549U (en) Automatic switching device of UPS
Shishime Practical applications of the railway static power conditioner (RPC) for conventional railways
CN109782094A (en) A kind of relay protection tripping output clamping in-service monitoring method
RU2496199C2 (en) Complete high-voltage switchgear
CN110098602A (en) A kind of Guangdong power system isolating device and method
CN207066733U (en) A kind of secondary conditioning device of switch cubicle mechanical characteristic test
CN110780120B (en) On-line monitoring system and control method for insulation performance of urban rail transit DC equipment
CN201789272U (en) Relay protection circuit preventing transformer differential protection malfunction
CN109586192A (en) A kind of failure of high-voltage large current high-intensity magnetic field frequency converter quickly judges and processing method
CN109245291A (en) The maintenance safety measure method for arranging of the double sectional power supply systems of substation's double-bus
KR100984115B1 (en) The syn-controller of a pannel of in a generator in case of emergency
CN210222122U (en) Ground wire device for circuit insulation test
KR100985066B1 (en) The digital controller pannel
CN201570889U (en) 10kV system emergent electric supply installation
CN212649106U (en) AC/DC power supply device
TW202019044A (en) Improvement of dc control circuit breaker tripping system
CN103163415B (en) Adopt the DC power system insulation monitoring and warning device of eccentric bridge technology
CN209981083U (en) Outdoor high-voltage isolation switch non-power-off maintenance device
KR100966126B1 (en) The digital controller pannel
Zeggai et al. Power System Analysis of Seawater Desalination Plant in Algeria with Different Load Scenarios.
CN203178394U (en) Direct current source system insulation monitoring device employing eccentric bridge technology
CN202094512U (en) Mechanism enabling medium pressure side of main transformer to be uninterruptible in overhaul
CN108279345B (en) Power substation power transmission testing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190308

Address after: No. 232, Fuxing Road, Fuxing District, Handan, Hebei Province

Co-patentee after: Handan Handan Iron and Steel Group Fengda Metallurgical Raw Materials Co.,Ltd.

Patentee after: Handan Branch of Hegang Co.,Ltd.

Address before: No. 232, Fuxing Road, Fuxing District, Handan, Hebei Province

Patentee before: Handan Branch of Hegang Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206