CN106400789A - Pile toe formwork fixing process - Google Patents
Pile toe formwork fixing process Download PDFInfo
- Publication number
- CN106400789A CN106400789A CN201610345287.0A CN201610345287A CN106400789A CN 106400789 A CN106400789 A CN 106400789A CN 201610345287 A CN201610345287 A CN 201610345287A CN 106400789 A CN106400789 A CN 106400789A
- Authority
- CN
- China
- Prior art keywords
- formwork
- supports
- support
- pile
- pile toe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000009415 formwork Methods 0.000 title abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 239000011324 bead Substances 0.000 claims description 3
- 238000011017 operating method Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 abstract 2
- 238000005452 bending Methods 0.000 abstract 1
- 238000003754 machining Methods 0.000 abstract 1
- 239000002002 slurry Substances 0.000 abstract 1
- 238000005266 casting Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention provides a pile toe formwork fixing process. The pile toe formwork fixing process comprises the following operating steps of 1, making four supports the same in length from square steel; 2, bending the position, 45mm away from each end, of each support into a 135-degree angle; 3, machining a hole with the diameter being 20mm in the position, 25mm away from each end, of each support, wherein each hole can allow an M16 bolt to pass through smoothly; 4, welding three of the supports to the lower portion, the left side and the right side of a pile toe formwork correspondingly, and welding the remaining support to the upper portion of the pile toe formwork; and 5, fixedly fastening the four supports with the M16 bolts, wherein the specification of the square steel is 30mm*30mm*2.5mm, and the pile toe formwork is located in the center of the four supports. According to the pile toe formwork fixing process, the pile toe formwork is fixed to the middle of a square frame spliced by the square steel and the bolts; support rigidity is enhanced; and the problems that support force is insufficient, the formwork is loosened, and the contact face between a pile toe and a pile body is not tight, so that slurry leakage and slab staggering are caused are solved.
Description
Technical field
The invention belongs to building field, more particularly, to a kind of pile top template technique for fixing.
Background technology
Precast prestressed square pile pile top prefabricated using rear formwork casting craft, traditional pile top formwork support process includes mould
Plate is fixing and support top two parts, template technique for fixing by means of the round steel cuff of a diameter of 20mm of HPB300,
By the timber wedge extruding of four direction, traditional handicraft tedious process, the auxiliary material of employing is more, takes longer
Work quality is difficult to ensure that, round steel cuff is yielding, and timber wedge is fragile, and template is easy with the contact position of timber wedge
Slip, component easily occurs running the Appearance quality defects such as mould, spillage, and bottom adopts flitch supporting process, steadiness
Poor, work progress easily causes pile top skewness, timber wedge often reaches pile top surface, to pile top
Obstacle is caused in surface receipts face, faulting of slab ends or pitted skin easily, more using timber wedge, easily causes live debris
Many, dirty and messy disorder phenomenon, template steadiness is poor, and personnel of vibrating dare not be vibrated, and easily causes leakage is shaken, bubble etc.
Problem, affects pile top density.
Content of the invention
The present invention is exactly directed to above technical problem, provides a kind of pile top template technique for fixing.
The present invention for achieving the above object, employs the following technical solutions:Pile top template technique for fixing, including following
Operating procedure:
(1), square steel is done four isometric supports;
(2), each support is bent into 135 ° of angles at the 45mm of termination;
(3), each support turns the hole of an a diameter of 20mm, this Kong Nengrang M16 at the 25mm of termination
Bolt pass through;
(4), three supports are respectively welded at below pile top template, the left side and the right side, a root bead is connected on stake
Above sharp template;
(5), four supports are fixed tight with the bolt of M16.
The specification of described square steel is 30mm × 30mm × 2.5mm.
Described pile top template is in the center of four supports.
Compared with prior art, the invention has the beneficial effects as follows:
(1), the square bearer that the reinforcing bar cuff improvement of a diameter of for HPB235 20mm is spliced into by square steel bolt,
Increased the rigidity of support, solve that support force is not enough, template loosens, pile top and pile body contact surface imprecision,
Produce the problem of spillage faulting of slab ends;
(2), support and template are welded together, improve template and the rigidity of pile body overall connection, keep away
The problem having exempted to form sand line due to some areas laminating spillage closely not caused in casting process;
(3), the extrusion process of timber wedge is improved square steel bolt tight technique, enhance the adjustability that template fixes
With steadiness it is therefore prevented that because the timber wedge of generation of vibrating loosens, spillage runs the problem of mould in work progress.
Brief description
Fig. 1 is the structural representation of the present invention;
In figure:1st, support;2nd, bolt;3rd, pile top template.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples:
As illustrated, pile top template technique for fixing, including following operating procedure:
(1), square steel is done four isometric supports 1;
(2), each support 1 is bent into 135 ° of angles at the 45mm of termination;
(3), each support 1 turns the hole of an a diameter of 20mm, this Kong Nengrang M16 at the 25mm of termination
Bolt 2 pass through;
(4), three supports 1 are respectively welded at below pile top template 3, the left side and the right side, a root bead connects
Above pile top template 3;
(5), four supports 1 are used the bolt 2 of M16 fixing tight.
The specification of described square steel is 30mm × 30mm × 2.5mm.
Described pile top template 3 is in the center of four supports 1.
Pile top template of the present invention is fixed on the centre position of the square bearer being spliced into by square steel bolt 2, increased and props up
The rigidity of support, solves that support force is not enough, and template loosens, pile top and pile body contact surface imprecision, produces spillage
The problem of faulting of slab ends.
Above in conjunction with accompanying drawing, the present invention is exemplarily described it is clear that the present invention implement be not subject to above-mentioned
The restriction of mode, as long as employing the various improvement that method of the present invention design and technical scheme are carried out, or without
Improve and directly apply to other occasions, all within protection scope of the present invention.
Claims (3)
1. pile top template technique for fixing is it is characterised in that include following operating procedure:
1., square steel is done four isometric supports (1);
2., each support (1) is bent into 135 ° of angles at the 45mm of termination;
3., each support (1) turns the hole of an a diameter of 20mm, this Kong Nengrang at the 25mm of termination
The bolt (2) of M16 passes through;
4., three supports (1) are respectively welded at below pile top template (3), the left side and the right side, one
Root bead is connected on above pile top template (3);
5., four supports (1) are used the bolt (2) of M16 fixing tight.
2. pile top template technique for fixing according to claim 1 is it is characterised in that the rule of described square steel
Lattice are 30mm × 30mm × 2.5mm.
3. pile top template technique for fixing according to claim 1 is it is characterised in that described pile top template
(3) it is in the center of four supports (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610345287.0A CN106400789A (en) | 2016-05-23 | 2016-05-23 | Pile toe formwork fixing process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610345287.0A CN106400789A (en) | 2016-05-23 | 2016-05-23 | Pile toe formwork fixing process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106400789A true CN106400789A (en) | 2017-02-15 |
Family
ID=58006742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610345287.0A Pending CN106400789A (en) | 2016-05-23 | 2016-05-23 | Pile toe formwork fixing process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106400789A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0581688A1 (en) * | 1992-07-31 | 1994-02-02 | Bouygues Offshore | Method and device for forcing a pipe into the soil by ramming, especially for making a pile |
CN102776879A (en) * | 2012-08-01 | 2012-11-14 | 天津建城基业集团有限公司 | Concrete centrifugal square pile and forming mold thereof |
CN203834474U (en) * | 2014-04-30 | 2014-09-17 | 江苏山海建设工程有限公司 | Pile tip special-purpose formwork |
CN104480933A (en) * | 2014-11-14 | 2015-04-01 | 福建建华管桩有限公司 | Manufacturing method of pencil type pipe pile |
CN104695434A (en) * | 2015-02-25 | 2015-06-10 | 洛阳理工学院 | Combined pile toe for steel pipe pile |
-
2016
- 2016-05-23 CN CN201610345287.0A patent/CN106400789A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0581688A1 (en) * | 1992-07-31 | 1994-02-02 | Bouygues Offshore | Method and device for forcing a pipe into the soil by ramming, especially for making a pile |
CN102776879A (en) * | 2012-08-01 | 2012-11-14 | 天津建城基业集团有限公司 | Concrete centrifugal square pile and forming mold thereof |
CN203834474U (en) * | 2014-04-30 | 2014-09-17 | 江苏山海建设工程有限公司 | Pile tip special-purpose formwork |
CN104480933A (en) * | 2014-11-14 | 2015-04-01 | 福建建华管桩有限公司 | Manufacturing method of pencil type pipe pile |
CN104695434A (en) * | 2015-02-25 | 2015-06-10 | 洛阳理工学院 | Combined pile toe for steel pipe pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104594500B (en) | Integrated slab column formwork structure system and construction method | |
CN204703498U (en) | Wall of High-building deformation joint template construction structure | |
CN201627381U (en) | Composite concrete-filled steel tube buckling-resistant bracing member | |
CN102433988A (en) | Wall column formwork on two sides of expansion joint and construction method thereof | |
CN101086184A (en) | Annular closure structure formwork support method | |
CN104264984A (en) | Formwork for concrete structure pouring and pouring construction method | |
CN103603494B (en) | A kind of ultra-thin steel truss sloping core construction method and formwork structure | |
CN103452319A (en) | Chiseling-free device for concrete splicing interface and construction method for chiseling-free device | |
CN205976468U (en) | Shear force wall structural distortion seam construction formwork assembly | |
CN209482709U (en) | A kind of in-situ concrete wall subsiding crack typified form | |
CN206448272U (en) | Roadbed side slope arched framework one-time-shaped mould | |
CN206625553U (en) | For pouring the formwork bracing system of high-low bay structure simultaneously | |
CN202467184U (en) | Novel opposite-pull screw for reinforcing edge beam side form | |
CN106400789A (en) | Pile toe formwork fixing process | |
CN105155838B (en) | A kind of quick detachable high-strength building formwork | |
CN112144865A (en) | Early-dismantling formwork support system | |
CN105317146A (en) | Steel structure earthquake-resistant floor for construction and manufacturing method | |
CN104912333B (en) | wall construction system and construction method | |
CN208235940U (en) | One kind is for reinforcing mold between the sinking of cast-in-situ floor combined type | |
CN213683188U (en) | Early-dismantling formwork support system | |
CN211817957U (en) | Full-automatic hydraulic walking dragging mold | |
CN102587653A (en) | Novel reinforcing tie bolt for side form of side beam | |
CN204703499U (en) | Wall of High-building deformation joint template | |
CN208792765U (en) | The fixed keel of the template of filled wall collar tie beam | |
CN210976608U (en) | Can have enough to meet need latticed beam formwork of stereotyping and prop up and establish system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170215 |
|
RJ01 | Rejection of invention patent application after publication |