[go: up one dir, main page]

CN106391742A - Extruder pull rod structure and installation method - Google Patents

Extruder pull rod structure and installation method Download PDF

Info

Publication number
CN106391742A
CN106391742A CN201611027389.4A CN201611027389A CN106391742A CN 106391742 A CN106391742 A CN 106391742A CN 201611027389 A CN201611027389 A CN 201611027389A CN 106391742 A CN106391742 A CN 106391742A
Authority
CN
China
Prior art keywords
pull bar
extruder
locking member
header board
back plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611027389.4A
Other languages
Chinese (zh)
Inventor
孟亚平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOSHAN KAOMAITUO INDUSTRY MACHINERY Co Ltd
Original Assignee
FOSHAN KAOMAITUO INDUSTRY MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOSHAN KAOMAITUO INDUSTRY MACHINERY Co Ltd filed Critical FOSHAN KAOMAITUO INDUSTRY MACHINERY Co Ltd
Priority to CN201611027389.4A priority Critical patent/CN106391742A/en
Publication of CN106391742A publication Critical patent/CN106391742A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C23/00Extruding metal; Impact extrusion
    • B21C23/21Presses specially adapted for extruding metal
    • B21C23/212Details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Extrusion Moulding Of Plastics Or The Like (AREA)

Abstract

The invention discloses an extruder pull rod structure which comprises a front plate, a rear plate, an extruder sleeve, pull rods and locking parts. Installation holes are formed in the extruder sleeve. The pull rods penetrate the installation holes, and the two ends of each pull rod are fixedly connected with the front plate and the rear plate correspondingly, wherein fixed connection at least one end of each pull rod is achieved through the corresponding locking part. An axial blind hole is formed in the center position of the end face of each pull rod. The invention further discloses an installation method of the extruder pull rod structure. The extruder pull rod structure can be prevented from being stretched and pre-tightened through external mechanical equipment in the installation process, instead, the additionally arranged blind holes and a heating device used in cooperation are adopted, the pull rods are fixed to the locking parts in the thermal expansion extension state, and therefore set of pre-tightening force is achieved. The extruder pull rod structure and the installation method can be applied to metal section extrusion equipment.

Description

A kind of extruder Tiebar structure and installation method
Technical field
The present invention relates to metal extrusion profile technical field, particularly a kind of extruder Tiebar structure and installation method.
Background technology
Conventional shape extrusion equipment all can be provided with many pull bars, to undertake in extrusion metal charge to extrusion The pressure of mould.Traditional Tiebar structure includes header board, back plate and pull bar, and pull bar two ends connect front and rear panels respectively, and lead to Cross nut to fix.Hole in the middle part of metal charge bar the past plate enters in shape extrusion equipment, then the mould extrusion from back plate.By The pulling force that pull bar bears in extrusion is larger, so needing when pull bar is installed to install with mechanical tension, i.e. pull bar one end After being fixedly connected with front or rear panel, the other end need to stretch through plant equipment, is locked while producing a certain degree of extension Tightly so that pull bar produces pretightning force with respect to front and rear panels.This traditional installation method needs other heavy mechanical equipments Intervention, installation process takes time and effort, and all brings huge burden to equipment manufacturer and equipment user.
Content of the invention
The invention provides a kind of extruder Tiebar structure, its structure simply, can be complete with relatively simple auxiliary equipment Become the installation of pull bar, and surrounding enviroment are required low, significantly reduce the burden of equipment manufacturer and equipment user.
A kind of extruder Tiebar structure, including header board, back plate, extruder sleeve, pull bar and locking member, described extruding mantle Cylinder is provided with installing hole, and described pull bar passes through installing hole and two ends are fixedly connected with front and rear panels respectively, wherein at least one end Being fixedly connected is to be realized by locking member, and the center of described pull bar end face is provided with axial blind hole.
Pull bar can achieve, the front end as described pull bar is provided with boss with the various ways that are fixedly connected with of front and rear panels, Described boss and extruder sleeve clamp header board jointly, and back plate is clamped and fastened on pull bar by described extruder sleeve and locking member Rear end;Or the rear end of described pull bar is provided with boss, described boss and extruder sleeve clamp back plate jointly, described extruding mantle Header board is clamped and fastened on the front end of pull bar by cylinder and locking member;And or described pull bar with being fixedly connected of header board/back plate is all Realized by extruder sleeve and the common clamping of locking member.
The depth of blind hole of the present invention is more than the 30% of pull bar length.
Locking member of the present invention is locking nut, and described locking nut is connected with pull rod screw.
The invention also discloses extruder Tiebar structure installation method, comprise the following steps:
1)Pull bar two ends are respectively fixing end and keyed end, be provided with blind hole, pull bar is passed through at the end face center of described keyed end Front and rear panels, and fixing end is fixedly connected with header board/back plate;
2)The heater being adapted with blind hole is inserted in the blind hole of keyed end, pull bar is heated, so that pull bar is heated swollen Swollen and extend;
3)Keyed end under extended state of being heated is coordinated with locking member, so that keyed end is achieved a fixed connection with back plate/header board;
4)Extract heater out, pull bar is cooled to room temperature.
Extruder Tiebar structure disclosed by the invention can remove plant equipment using peripheral hardware to it in installation process Carry out stretching pretension, but using setting up blind hole and matching used heater, make pull bar in the state of heat expansion extension with Locking member is fixed, thus realizing the setting of pretightning force.Present invention can apply to shape extrusion equipment.
Brief description
For the technical scheme being illustrated more clearly that in the embodiment of the present invention, will make to required in embodiment description below Accompanying drawing is briefly described.Obviously, described accompanying drawing is a part of embodiment of the present invention, rather than whole enforcement Example, those skilled in the art's on the premise of not paying creative work, other designs can also be obtained according to these accompanying drawings Scheme and accompanying drawing.
Fig. 1 is the structural representation of the present invention.
Specific embodiment
Technique effect below with reference to the design, concrete structure and generation to the present invention of embodiment and accompanying drawing is carried out clearly Chu, it is fully described by, to be completely understood by the purpose of the present invention, feature and effect.Obviously, described embodiment is this Bright a part of embodiment, rather than whole embodiments, based on embodiments of the invention, those skilled in the art is not paying The other embodiment being obtained on the premise of creative work, belongs to the scope of protection of the invention.In addition, be previously mentioned in literary composition All connection/annexations, not singly refer to component and directly connect, and refer to be added deduct by adding according to the situation that is embodied as Couple auxiliary less, to form more excellent draw bail.Each technical characteristic in the invention, in not conflicting conflict Under the premise of can be with combination of interactions.
As shown in figure 1, a kind of extruder Tiebar structure, including header board 1, back plate 2, extruder sleeve 3, pull bar 4 and locking Part 5, described extruder sleeve 3 is provided with installing hole, and described pull bar 4 passes through installing hole and two ends are fixing with header board 1 and back plate 2 respectively Connect, being fixedly connected of wherein at least one end is to be realized by locking member 5, the center of described pull bar 4 end face is provided with axial Blind hole 6.The front end of described pull bar 4 is provided with boss, and described boss and extruder sleeve 3 clamp header board 1, described extruding mantle jointly Back plate 2 is clamped and fastened on the rear end of pull bar 4 by cylinder 3 and locking member 5.Blind hole 6 is for being inserted the heater of peripheral hardware, So that pull bar 2 is quickly and uniformly heated up and expand extension, thus substituting original scheme stretching by force with machinery.
As further preferred embodiment, the rear end of described pull bar 4 is provided with boss, described boss and extruder sleeve Header board 1 is clamped and fastened on the front end of pull bar 4 by 3 common clamping back plate 2, described extruder sleeve 3 and locking member 5.
As further preferred embodiment, described pull bar 4 is all by extruding with being fixedly connected of header board 1/ back plate 2 Mantle cylinder 3 and locking member 5 jointly clamp and realize.
As further preferred embodiment, the depth of described blind hole 6 is more than the 30% of pull bar 4 length.
As further preferred embodiment, described locking member 5 is locking nut, described locking nut and pull bar 3 spiral shell Line connects.
The installation method of above-mentioned extruder Tiebar structure comprises the following steps:
1)Pull bar two ends are respectively fixing end and keyed end, be provided with blind hole, pull bar is passed through at the end face center of described keyed end Front and rear panels, and fixing end is fixedly connected with header board/back plate;
2)The heater being adapted with blind hole is inserted in the blind hole of keyed end, pull bar is heated, so that pull bar is heated swollen Swollen and extend;
3)Keyed end under extended state of being heated is coordinated with locking member, so that keyed end is achieved a fixed connection with back plate/header board;
4)Extract heater out, pull bar is cooled to room temperature.
Above the better embodiment of the present invention is illustrated, but the invention is not limited to described enforcement Example, those of ordinary skill in the art also can make a variety of equivalent modifications without prejudice on the premise of present invention spirit or replace Change, these equivalent modifications or replacement are all contained in the application claim limited range.

Claims (7)

1. a kind of extruder Tiebar structure, including header board(1), back plate(2), extruder sleeve(3), pull bar(4)And locking member (5), described extruder sleeve(3)It is provided with installing hole, described pull bar(4)Through installing hole and two ends respectively with header board(1)With rear Plate(2)It is fixedly connected, being fixedly connected of wherein at least one end is by locking member(5)Realize it is characterised in that:Described pull bar (4)The center of end face is provided with axial blind hole(6).
2. extruder Tiebar structure according to claim 1 it is characterised in that:Described pull bar(4)Front end be provided with boss, Described boss and extruder sleeve(3)Common clamping header board(1), described extruder sleeve(3)And locking member(5)By back plate(2) It is clamped and fastened on pull bar(4)Rear end.
3. extruder Tiebar structure according to claim 1 it is characterised in that:Described pull bar(4)Rear end be provided with boss, Described boss and extruder sleeve(3)Common clamping back plate(2), described extruder sleeve(3)And locking member(5)By header board(1) It is clamped and fastened on pull bar(4)Front end.
4. extruder Tiebar structure according to claim 1 it is characterised in that:Described pull bar(4)With header board(1)/ back plate (2)To be fixedly connected be all by extruder sleeve(3)And locking member(5)Jointly clamp and realize.
5. the extruder Tiebar structure according to any one of Claims 1 to 4 it is characterised in that:Described blind hole(6)Depth For pull bar(4)More than the 30% of length.
6. the extruder Tiebar structure according to any one of Claims 1 to 4 it is characterised in that:Described locking member(5)It is lock Jack panel, described locking nut and pull bar(3)Threaded.
7. extruder Tiebar structure installation method is it is characterised in that comprise the following steps:
1)Pull bar two ends are respectively fixing end and keyed end, be provided with blind hole, pull bar is passed through at the end face center of described keyed end Front and rear panels, and fixing end is fixedly connected with header board/back plate;
2)The heater being adapted with blind hole is inserted in the blind hole of keyed end, pull bar is heated, so that pull bar is heated swollen Swollen and extend;
3)Keyed end under extended state of being heated is coordinated with locking member, so that keyed end is achieved a fixed connection with back plate/header board;
4)Extract heater out, pull bar is cooled to room temperature.
CN201611027389.4A 2016-11-21 2016-11-21 Extruder pull rod structure and installation method Pending CN106391742A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611027389.4A CN106391742A (en) 2016-11-21 2016-11-21 Extruder pull rod structure and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611027389.4A CN106391742A (en) 2016-11-21 2016-11-21 Extruder pull rod structure and installation method

Publications (1)

Publication Number Publication Date
CN106391742A true CN106391742A (en) 2017-02-15

Family

ID=58068748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611027389.4A Pending CN106391742A (en) 2016-11-21 2016-11-21 Extruder pull rod structure and installation method

Country Status (1)

Country Link
CN (1) CN106391742A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3838434A1 (en) * 2019-12-16 2021-06-23 Unterschütz Sondermaschinenbau GmbH Extruder

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD141134A1 (en) * 1979-02-05 1980-04-16 Siegfried Schreiter CYLINDER CONNECTION, ESPECIALLY FOR DOUBLE-SCREW EXTRUDERS
CN2717680Y (en) * 2004-06-28 2005-08-17 天津市天锻压力机有限公司 Precompact electric heating device for hydraulic press drawing rod
CN102230490A (en) * 2011-06-27 2011-11-02 无锡西姆莱斯石油专用管制造有限公司 Bolt convenient to pre-compress and dedicated pre-compressing method
CN202388821U (en) * 2011-11-30 2012-08-22 广东科达机电股份有限公司 Electrical heating stretching pre-tightening device for pull rod
CN202752795U (en) * 2012-07-17 2013-02-27 上海中油天宝巴圣钢管有限公司 Heating pre-tightening device for combined connection of large-scale equipment
CN104475472A (en) * 2014-08-28 2015-04-01 太原重工股份有限公司 Container assembly positioner
CN105485138A (en) * 2014-10-09 2016-04-13 遵义遵宏螺杆厂 Pre-tightening bolt assembly
CN206286340U (en) * 2016-11-21 2017-06-30 考迈托(佛山)挤压科技股份有限公司 A kind of extruder Tiebar structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DD141134A1 (en) * 1979-02-05 1980-04-16 Siegfried Schreiter CYLINDER CONNECTION, ESPECIALLY FOR DOUBLE-SCREW EXTRUDERS
CN2717680Y (en) * 2004-06-28 2005-08-17 天津市天锻压力机有限公司 Precompact electric heating device for hydraulic press drawing rod
CN102230490A (en) * 2011-06-27 2011-11-02 无锡西姆莱斯石油专用管制造有限公司 Bolt convenient to pre-compress and dedicated pre-compressing method
CN202388821U (en) * 2011-11-30 2012-08-22 广东科达机电股份有限公司 Electrical heating stretching pre-tightening device for pull rod
CN202752795U (en) * 2012-07-17 2013-02-27 上海中油天宝巴圣钢管有限公司 Heating pre-tightening device for combined connection of large-scale equipment
CN104475472A (en) * 2014-08-28 2015-04-01 太原重工股份有限公司 Container assembly positioner
CN105485138A (en) * 2014-10-09 2016-04-13 遵义遵宏螺杆厂 Pre-tightening bolt assembly
CN206286340U (en) * 2016-11-21 2017-06-30 考迈托(佛山)挤压科技股份有限公司 A kind of extruder Tiebar structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3838434A1 (en) * 2019-12-16 2021-06-23 Unterschütz Sondermaschinenbau GmbH Extruder

Similar Documents

Publication Publication Date Title
DE102011054750B4 (en) Cooling and holding body for heating elements, heater and method for producing a cooling and holding body
CN106391742A (en) Extruder pull rod structure and installation method
CN206286340U (en) A kind of extruder Tiebar structure
CN107968370A (en) A kind of device for preventing cable from sliding
DE69702386T2 (en) METHOD FOR SHAPING A SLEEVE ON A BIAXIAL-ORIENTED POLYVINYL CHLORIDE TUBE
CN207504473U (en) A kind of cable clamping device
CN202752795U (en) Heating pre-tightening device for combined connection of large-scale equipment
CN204691158U (en) Decorative panel Components installation syndeton
CN112376780B (en) Adjustable telescopic module applied to assembled decoration suspended ceiling
CN213396590U (en) Connecting structure of ceramic pipe steel sleeve fixing clamp and furnace wall
CN105714220B (en) A kind of Technology for Heating Processing of overlength aluminum alloy extrusion section bar
CN103753089A (en) Welding disc fixing tool
CN110635406A (en) Cable fixing frame convenient to assemble
CN210450352U (en) Open-close type hot extrusion die
CN204739319U (en) Pipe fitting pipe clamp
CN113028839A (en) Connecting structure of ceramic pipe steel sleeve fixing clamp and furnace wall
CN218868400U (en) Electric heating equipment with high temperature aging resistance function
CN105120539B (en) A kind of special-shaped form heater having no abnormal sound
CN201850299U (en) Lining plate nitrogen treatment anti-deformation tooling
CN104308501B (en) The method that notebook computer panel upper copper sheathing is fixed
CN105834391A (en) Die-casting machine feeding barrel heating device
CN220686756U (en) Aluminum template disassembling pull piece
CN210215979U (en) Plasticizing drying tunnel for air duct cloth production
CN204082618U (en) Installation structure of a bathroom fan
CN106972339B (en) A frock clamp for generating line is connected

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170215

RJ01 Rejection of invention patent application after publication