[go: up one dir, main page]

CN106321046B - A kind of low air permeability coal seam underground water sand pressure break gas pumping method - Google Patents

A kind of low air permeability coal seam underground water sand pressure break gas pumping method Download PDF

Info

Publication number
CN106321046B
CN106321046B CN201610792384.4A CN201610792384A CN106321046B CN 106321046 B CN106321046 B CN 106321046B CN 201610792384 A CN201610792384 A CN 201610792384A CN 106321046 B CN106321046 B CN 106321046B
Authority
CN
China
Prior art keywords
pressure
hole
fluid
coal seam
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610792384.4A
Other languages
Chinese (zh)
Other versions
CN106321046A (en
Inventor
李子长
张文清
梁爱堂
郑鹗
贾永斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SNANXI HONGSHA 1ST CONSTRUCTION CO Ltd
Original Assignee
SNANXI HONGSHA 1ST CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SNANXI HONGSHA 1ST CONSTRUCTION CO Ltd filed Critical SNANXI HONGSHA 1ST CONSTRUCTION CO Ltd
Priority to CN201610792384.4A priority Critical patent/CN106321046B/en
Publication of CN106321046A publication Critical patent/CN106321046A/en
Application granted granted Critical
Publication of CN106321046B publication Critical patent/CN106321046B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/006Production of coal-bed methane
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/261Separate steps of (1) cementing, plugging or consolidating and (2) fracturing or attacking the formation
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/267Methods for stimulating production by forming crevices or fractures reinforcing fractures by propping
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of low air permeability coal seam underground water sand pressure break gas pumping method, it is therefore an objective to make gas cavity section communicate with each other, improve gas permeability of coal seam;The method of the present invention is to carry out extraction of drilling again after carrying out water sand pressure break from the lane floor rock Yu Chou to return airway construction water sand fracturing borehole;If maximum pressure is in 35MPa hereinafter, carrying out sealing of hole by the way of capsule sealing of hole;After starting fracturing pump, prepad fluid is injected into construction coal;Start to inject load fluid after coal seam fracture is formed and reaches requirement, stops injection when operation pressure rapid increase;Continue to inject prepad fluid and carry out coal seam pressure compensation again, drop to 10Mp to liquid operation pressure, re-inject load fluid, when operation pressure rapid increase stops injection;It is then poured into displacement fluid;After closing well head etc. to coal seam pressure slow release, hole flushing is carried out to pressure break hole with high pressure water;Region draining;Capsule sealing of hole is used when such as pressure break, is taken out capsule and is carried out sealing of hole, access extraction pipeline carries out extraction.

Description

A kind of low air permeability coal seam underground water sand pressure break gas pumping method
Technical field
The present invention relates to one kind to be pressed into coal seam for high pressure fracture liquid and proppant by fracturing technology in underground, enhances coal Layer gas permeability, the method for improving gas drainage under suction effect.
Background technique
For a long time, coal mine gas disaster is always an important factor for restricting coal enterprise's safe and efficient production.Because of gas The number of death by accident accounts for 70% or more of coal mine total toll, and it is great, serious accident is mostly related with gas.Now with China's coal-mine is gradually to deep mining, and mine gas pressure, gas bearing capacity constantly increase, shared by highly gassy mine and projecting mine Ratio is continuously increased.From the point of view of current technology, gas control most efficient method is first to take out to adopt afterwards, however, low-permeable coal Layer seriously constrains gas pumping effect, affects Safety of Coal Mine Production.Therefore, implement water sand pressure break to low air permeability coal seam to apply Work technical research, carries out that this coal bed fracturing is anti-reflection, forms new extraction technique, and it is significant to improve coal bed gas extraction effect.
Summary of the invention
Object of the present invention is to overcome the shortcomings of above-mentioned prior art, one kind is provided gas cavity section can be made to communicate with each other and reach To water conservancy diversion purpose, improve the gas permeability in coal seam and the low air permeability coal seam underground water sand pressure break gas pumping method of extracting result.
The method of the present invention is:
(1) drill pattern and construction: it constructs water sand fracturing borehole from the lane floor rock Yu Chou to return airway, into Extraction of drilling is carried out again after row water sand pressure break;The lane floor rock Yu Chou (rock gangway) section sealing of hole effect is better than coal road section;
(2) sealing of hole: if construction maximum working pressure is in 35MPa hereinafter, carrying out sealing of hole, capsule by the way of capsule sealing of hole Hole packer requires compression strength to reach 40MPa or more, and flare factor is greater than 150%, and single-unit packing element length is not less than 1 m;If wearing layer The rock section of drilling is greater than 20 m and operation pressure is more than 35MPa, then uses cement mortar sealing of hole, cement mortar sealing of hole segment length Not less than 20 m;
(3) prepad fluid injects: after starting fracturing pump, prepad fluid being injected construction coal, liquid injection rate far surpasses it in coal Leakage rate in layer, so slowly boosting, after the liquid pump injection pressure power of fracturing pump discharge reaches coal seam reservoirs geology fracture pressure, It forces coal seam to be softened to form crack, continues pump note fracturing fluid, crack can be expanded until reaching the ideal penetration of fracture and width Spend range;Prepad fluid injection rate is generally 80-100m3
The prepad fluid is clear water or active water fracturing fluid, the proportion of active water fracturing fluid by mass percentage are as follows: living Property agent 0.04-0.07%, thickener 0.04-0.07%, KCl 0.3-0.7%, remaining is clear water;
(4) load fluid injects: after coal seam fracture is formed and reach requirement, fluid pressure it is steady after start that injection is initial to take sand Liquid;Weight ratio shared by quartz sand is 3%-5% in initial load fluid;Quartz sand uses partial size for 0.15-0.30 mm quartz sand;When Occur that injection initial load fluid should be temporarily ceased when operation pressure rapid increase;
(5) prepad fluid and load fluid are re-injected: continuing to inject prepad fluid carrying out coal seam pressure compensation again and split with expanded support Seam, when liquid operation pressure drops to 10MPa and keeps stablizing, injects secondary load fluid;Quartz sand used in secondary load fluid It is the middle grain quartz sand that partial size is 0.45-0.9mm, weight ratio shared by quartz sand is 8-11% in secondary load fluid;If operation pressure Occur stopping injecting secondary load fluid when rapid increase;
(5) displacement fluid injects: load fluid, which has filled, followed by continues to inject displacement fluid, injection pressure 15-18MPa, note Entering liquid measure is 2-3m3;To enter remaining sand grains in equipment pipe and pressure break hole in the coal body crack pressed off, it is unlikely to The extracting result in plug-hole influence later period;After displacement fluid injection, fracturing work is completed;
(6) it hole flushing: after closing well head etc. to coal seam pressure slow release, is carried out with the high pressure water of 1-2MPa using pressure break hole Hole flushing operation;Stop hole flushing when there was only a small amount of coal grain or sand grains is discharged;The general hole flushing time is 5-8 minutes;
(7) drain: because the fracturing borehole constructed in the lane bottom plate Yu Chou is elevation angle hole, high pressure water can be from coal hole freely Outflow, need to carry out the drainage works of pressure break hole region, and as necessary by constructing, dedicated drainage ditch is drained;
(8) sealing of hole union extraction: if when pressure break use capsule sealing of hole, need take out capsule after by existing extraction borehole sealing of hole Mode carries out sealing of hole, it is ensured that access extraction pipeline carries out extraction after sealing of hole is qualified;There are connect accordingly on the drainage tube of aperture Mouthful, the test of the parameters such as extraction concentration, flow can be carried out;If it is cement mortar sealing of hole, accessed by reducer union existing Extraction pipeline carries out extraction.
It is 35 MPa of pressing crack construction pressure limiting, it cannot termination of pumping without reason in fracturing pump injection process.If gone out during adding sand Existing load fluid pressure oscillation is excessive, need to adjust weight ratio shared by quartz sand in injection load fluid, the weight ratio of sand is made to reduce or use Clear water is counter to be arranged;If pressure break pump discharge head continuous high-pressure in fracturing process, load fluid injection rate but very little then reduces sand ratio, It is repeated multiple times to build the pressure under fracturing pump maximum working pressure;If still amount of liquid is discharged in high pressure and fracturing pump to pressure break pump discharge head Very little then considers that termination of pumping checks whether pipeline blocks, dredges pipeline pressure break again if blocking, otherwise, carries out union extraction.
Once discovery gas density transfinites in fracturing process, then stop operation immediately, relevant staff dismisses from the post safety Place.(5 minutes) periodic sample at regular intervals monitors the silt concertation of load fluid, presses to analyze and determine in time The reason of fluctuation or continuous high-pressure.
High pressure fracture liquid and proppant are pressed into coal seam by the present invention, overcome minimum principal stress, the rupture pressure more than coal petrography Power and clossing pressure cause crack and extend, so that gas cavity section is communicated with each other and reach so that original plane of weakness opens in coal seam To the purpose of water conservancy diversion, the gas permeability and extracting result in coal seam are improved, eliminates Gas Disaster to greatest extent.
Specific embodiment
One, prepare before pressure break
1, the installation, debugging of fracturing unit and material prepare;Water sand pressure break equipment is made of equipment train, there is pump respectively Several equipment trains such as sled, mulling sled, motor are prized, match crowbar, shifting becomes sled, tool is prized, water tank is prized and sand loading is prized.Water sand pressure break Equipment is mounted in the intake of underground, is no less than 200 m away from pressure break place, and the tunnel of installation site will have enough skies Between and exit passageway, tunnel it is as gentle as possible.
Equipment operation inspection must be carried out before pressing crack construction.Aperture pipe valve is closed, to all construction pipes Line carries out highest pressure limiting test.Under highest pressure limiting, pressure, which is stablized, is at least up to the time that technique initialization requires, and system equipment does not have There is leakage, just illustrates that equipment and injected system are qualified, can construct, otherwise must be fastened or be replaced associated components. Fracturing fluid needed for preparing enough pressure break before construction, proppant and equipment operation tool.
2, observation and parameter testing before pressure break;It, can be according to pressure break place difference, selection before pressure break to investigate fracturing effect Property test hundred meters of drilling gas flows, drilling flux depression coefficient, Permeability Coefficent in Coal Seam, K1 value, coal powder quantity of bore, a, b value examination, △ P, the relevant parameters such as f value.Conscientiously observe the pattern in 100 tunnels m of pressure break hole or so, the construction especially more developed nearby and Coal body fracture development area.Meanwhile roof and floor support conditions are conscientiously observed, forbid to carry out pressure break in empty top zone.
3, drill pattern and construction;According to pressure break place difference and gas region difference is administered using different pressure breaks Pattern is applied using the lane floor rock Yu Chou (rock gangway) to return airway because rock gangway section sealing of hole effect is better than coal road section Work water sand fracturing borehole carries out extraction of drilling after carrying out water sand pressure break again.
4, sealing of hole;Sealing of hole is carried out with capsule hole or cement mortar, capsule hole requires compression strength to reach 40MPa More than, flare factor is greater than 150%, and single-unit packing element length is not less than 1 m.Project under construction design maximum working pressure 35MPa with Under operation it is tentative by the way of capsule sealing of hole.If when layer-through drilling rock section is greater than 20 m, and operation pressure is more than 35MPa Construction operation, then use cement mortar sealing of hole;Drilling carries out cement mortar sealing of hole, cement mortar sealing of hole segment length in petrosal foramen Not less than 20 m.
Two, pressure break is implemented
1, the selection of fracturing fluid;Fracturing unit is exactly formed by highly pressurised liquid energy transmission by the main function of fracturing fluid Into coal seam reservoirs, new crack is caused in coal seam reservoirs, is strutted or is expanded primary fracture, proppant is then added to crack In, cancelling rear support agent when pressure ensure that crack will not be closed.In fracturing process, fracturing fluid is pressed into the program point in coal seam It Wei not prepad fluid, load fluid, displacement fluid.
The basic principle of fracturing fluid selection has:
(1) good with the compatibility of water source and coal seam reservoirs;
(2) leak-off is low, fluid efficiency is high, can make slit;
(3) prop-carrying capacity is strong;
(4) frictional resistance is low, has good stability;
(5) residue is low, is easy the row of returning;
(6) source of goods is wide, and price is low.
By comparing to active water fracturing fluid, gelled fracturing fluid and clean fracturing fluid, the adaptability of different fracturing fluids is obtained; Comprehensively considered, select active water as fracturing fluid, its advantage is that simple with liquid, low, at low cost to coal seam injury etc..
2, the selection of proppant;The purpose of hydraulic fracturing is to become to be connected with pit shaft by the radial flow for coming together in pit shaft Water conservancy diversion crack in linear flow, the flow conductivity in crack must be far longer than the flow conductivity in stratum, to obtain hypertonic The crack of saturating rate, it is necessary to proppant be added, the effect of proppant is two walls of supporting crack, to terminate in pressing crack construction Afterwards, bottom pressure drops to less than coal seam fracture clossing pressure, and the water conservancy diversion crack that wellbore is led to caused by fracturing work is still protected Hold opening.The flow conductivity in crack, which will at least arrive greatly, can eliminate most of radial flows of underground and linear flow is allowed to enter from reservoir Into crack, to reach this purpose, it is necessary to make the orders of magnitude several greatly of the permeability ratio reservoir permeability in supporting crack.It is used Proppant be broadly divided into three categories: natural siliceous sand, artificial porcelain granule and resin covering processing proppant.
(1) quartz sand;Quartz sand is the natural stability mineral that a kind of distribution is wide, hardness is big, main chemical compositions For silica, desert, river shoal or coastal area are mainly originated in, mineral constituent is based on quartz, and quartz content is generally 80% Or so, quartz content is up to 98% or more in external high grade quartz sand.Quartz sand particle relative density is about 2.65 or so, volume Density is about in 1.75 g/cm3.For the reservoir of low clossing pressure, quartz sand is used to achieve one as pressure break with proppant Fixed effect of increasing production.The relative density of quartz sand is lower, and cheap convenient for construction pumping, thus in shallow well so far still It is widely used.
(2) haydite;It can be made with electrolysis or firing, have compression strength big, be mainly used for clossing pressure in 34-59 Pressing crack construction operation in MPa can guarantee the flow conductivity with higher under high clossing pressure.But relative density is also larger, There is higher requirement to the performance (such as viscosity, rheological characteristic) and pumping conditions (such as discharge capacity, plant capacity etc.) of fracturing fluid, separately The production cost of outer haydite is relatively high.Both factors cause the pressing crack construction of haydite expensive, limit making extensively for it With.
(3) resin covering sand;The proppant that, flow conductivity low for natural siliceous sand compression strength is poor and develops uses Special process wraps up modified phenol formaldehyde resin onto the surface of quartz sand, and is made through thermosetting processing.Generally its particle Density is 2.55 g/cm3, slightly lighter than quartz sand.Due to having wrapped up one layer of high-intensity resin in sand surface, make clossing pressure point Cloth reduces point load, its forced area diameter of the particle of no resin film is particle diameter on the area of biggish resin layer 10% or smaller, and have its forced area diameter of the particle of resin film close to the 40% of particle diameter;Use electron microscope observation It was found that the contact area of deformable proppant increases 16 times than the contact area of easy fragmentation proppant.Accordingly even when having crushed packet Fragment, particle can be still bundled together by the sand in layer, the resin layer of outside, prevent them from migrating or blocking proppant band Hole, maintain crack compared with high flow conductivity.
The characteristics of resin covering sand: the resistant to breakage ability of sand grains is improved, and sand grains is bonded together, and not only forms One has the filter layer of penetrating power, and the phenomenon that prevent proppant to spue, reduce proppant embedment stratum.Due to Every granule grain has one layer of tough and tensile resin enclosure, therefore, generated if sand grains is crushed under certain closure stress Clast, fine silt are but coated in resin shell, to prevent the migration of clast, fine silt.Even if being thus crushed in sand grains In the case where, which still has certain flow conductivity.
Which kind of specifically used proppant will according to the coal bed texture of project under construction, condition, etc. factors comprehensively considered progress Detail design, recommendation select to use quartz sand (partial size has particulate, middle grain and coarse grain respectively) as proppant material, its advantage is that Moderate performance, the cheap and source of goods are wide etc..
3, prepad fluid injects;After starting fracturing pump, by the active water fracturing fluid injection construction target coal seam of configuration, liquid pressure Power is slowly boosted, after pump injection pressure power, which reaches fracture pressure, forms crack, continue pump note, fluid pressure keeps high pressure or appearance Several minor peaks, until pump fluence reaches design requirement dosage, about 80-100m3, pump pressure meeting is in a slight decrease and keeps stable;It is living The proportion of property water fracturing fluid by mass percentage are as follows: activating agent 0.04-0.07%, thickener 0.04-0.07%, KCl 0.3- 0.7%, remaining is clear water.Low foaming surfactant can be selected in activating agent, and water-based thickener can be selected in thickener.
4, load fluid injects;The prepad fluid later period is injected, after formation fracture is formed, starts to inject load fluid, partial size, which is added, is 0.15-0.30 mm quartz sand, sand ratio are 3% ~ 5%.If operation pressure rapid increase, bird's eye gravel sand was both stopped and has added sand, had continued Active water fracturing fluid is injected, when pressure to be onstructed drops to 10Mp and keeps stablizing, restarts to add sand.Quartzy sand grains at this time Diameter should be the middle grain quartz sand of 0.45-0.9mm, and average sand ratio is advisable for 10% or so.In the injection load fluid later period, if construction pressure Power rapid increase need to carry out stopping adding sand or flushing.
5, displacement fluid injects;After flushing, starting to inject displacement fluid, injection pressure is tentatively set to 15-18MPa, so as to Enter remaining sand grains in hole in the coal body crack pressed off, being unlikely to plug-hole influences the extracting result in later period.Inject liquid measure For 2-3m3
6, hole flushing;After displacement fluid injection, well head is closed, is waited after slowly unloading release to coal seam pressure, with the high pressure of 1 ~ 2MPa Water conservancy carries out hole flushing operation with pressure break hole.Stop hole flushing when there was only a small amount of coal grain or sand grains is discharged, the general hole flushing time is 5-8 min。
7, it drains;Because being elevation angle hole in the fracturing borehole that the lane bottom plate Yu Chou is constructed, high pressure water can be from coal hole freely Outflow, need to carry out the drainage works of pressure break hole region, the dedicated drainage ditch that can construct when necessary is drained.
8, data inputting;It is stringent to record pressure break pump discharge head, flow, liquid measure, sand to each stage in fracturing process The data such as amount, sand ratio, time, and fill in special record form.
9, abnormality processing:
(1) 35 MPa of pressing crack construction pressure limiting, mustn't termination of pumping without reason in fracturing pump injection process;
(2) it is fluctuated if there is pressure break pump discharge head, then adjusts injection sand ratio, make sand than reducing or being arranged with clear water is counter;
(3) if pressure break pump discharge head continuous high-pressure, fracturing fluid injection rate very little then reduce sand ratio in fracturing process, It is repeated multiple times to build the pressure under maximum working pressure.If pressure break pump discharge head still high pressure and injection rate very little, consider that termination of pumping is examined It checks whether road blocks, dredges pipeline pressure break again if blocking, otherwise, carry out union extraction;
(4) once discovery gas density transfinites in fracturing process, then termination of pumping immediately, correlation test personnel withdraw to safely Point;
(5), there is pressure wave to analyze in time in the silt concertation for wanting periodic sample (every 5 minutes) monitoring fracturing fluid The reason of situations such as dynamic, continuous high-pressure.
Three, pressure break terminates
1, observation and parameter testing after pressure break;Test after pressure break with Gas explosion burns corresponding before pressure break, meanwhile, observe The pattern in 100 tunnel m of pressure break hole or so after pressure break, the construction especially more developed nearby and coal body fracture development area, see Survey whether coal wall has situations such as water outlet, roadway deformation.And with compared before pressure break, primarily determine fracturing effect and pressure break radius.Such as Fruit need to investigate pressure break radius, then construction drill is tested in pressure break range areas, the Gas explosion burns before comparing pressure break, thus Accurately determine pressure break radius.
2, sealing of hole union extraction;When pressure break if capsule sealing of hole then need take out capsule after by existing extraction borehole sealing of hole mode Carry out sealing of hole, it is ensured that sealing of hole is qualified, accesses extraction pipeline later and carries out extraction.Meanwhile there are corresponding on the drainage tube of aperture Interface can carry out the test of the parameters such as extraction concentration, flow;If it is cement mortar sealing of hole, accessed by reducer union existing Extraction pipeline carries out extraction.
3, extraction parameter testing;Gas density, extraction negative pressure, extraction stream in detail after record fracturing borehole union extraction The related extraction parameter such as amount, compares the extraction situation of the non-fracturing borehole in proximate region, investigates extracting result.By investigating different pressures The extraction situation of drilling is split, the final qualitative and quantification for realizing fracturing parameter and extracting result is expressed, and is mentioned for pressure break in the future For guidance.

Claims (6)

1. a kind of low air permeability coal seam underground water sand pressure break gas pumping method, it is characterized in that:
(1) drill pattern and construction: from the lane floor rock Yu Chou to return airway construction water sand fracturing borehole, carrying out water Extraction of drilling is carried out after sand pressure break again;The lane floor rock Yu Chou section sealing of hole effect is better than coal road section;
(2) sealing of hole: if construction maximum working pressure in 35MPa hereinafter, carry out sealing of hole by the way of capsule sealing of hole, capsule sealing of hole Device requires compression strength to reach 40MPa or more, and flare factor is greater than 150%, and single-unit packing element length is not less than 1 m;If layer-through drilling Rock section to be greater than 20 m and operation pressure be more than 35MPa, then using cement mortar sealing of hole, cement mortar sealing of hole segment length is not small In 20 m;
(3) prepad fluid injects: after starting fracturing pump, prepad fluid being injected construction coal, liquid injection rate far surpasses it in coal seam Leakage rate, so slowly boosting, when fracturing pump discharge liquid pump injection pressure power reach coal seam reservoirs geology fracture pressure after, force Coal seam is softened to form crack, continues pump note fracturing fluid, expands crack until reaching the ideal penetration of fracture and width range;Before Setting liquid injection rate is 80-100m3;The prepad fluid is clear water or active water fracturing fluid;
(4) load fluid injects: after coal seam fracture is formed and reach requirement, fluid pressure it is steady after start to inject initial load fluid; Weight ratio shared by quartz sand is 3%-5% in initial load fluid;Quartz sand uses partial size for 0.15-0.30 mm quartz sand;Work as appearance Injection initial load fluid should be temporarily ceased when operation pressure rapid increase;
(5) prepad fluid and load fluid are re-injected: continuing to inject prepad fluid and carries out coal seam pressure compensation again with expanded support crack, to When liquid operation pressure drops to 10MPa and keeps stablizing, secondary load fluid is injected;Quartz sand used in secondary load fluid is partial size For the middle grain quartz sand of 0.45-0.9mm, weight ratio shared by quartz sand is 8-11% in secondary load fluid;If operation pressure occurs fast Stop injecting secondary load fluid when speed rises;
(5) displacement fluid injects: load fluid, which has filled, followed by continues to inject displacement fluid, and injection pressure 15-18MPa injects liquid Amount is 2-3m3;To enter remaining sand grains in equipment pipe and pressure break hole in the coal body crack pressed off, it is unlikely to plug-hole Influence the extracting result in later period;After displacement fluid injection, fracturing work is completed;
(6) hole flushing: after closing well head etc. to coal seam pressure slow release, hole flushing is carried out using pressure break hole with the high pressure water of 1-2MPa Operation;Stop hole flushing when there was only a small amount of coal grain or sand grains is discharged;The hole flushing time is 5-8 min;
(7) drain: because the fracturing borehole constructed in the lane bottom plate Yu Chou is elevation angle hole, high pressure water is freely flowed out from coal hole, The drainage works that pressure break hole region need to be carried out are drained by construction drainage canal;
(8) sealing of hole union extraction: if when pressure break use capsule sealing of hole, need take out capsule after by existing extraction borehole sealing of hole mode Carry out sealing of hole, it is ensured that access extraction pipeline carries out extraction after sealing of hole is qualified;There are corresponding interface on the drainage tube of aperture, into The test of row extraction concentration, flow parameter;If it is cement mortar sealing of hole, by reducer union access existing extraction pipeline into Row extraction.
2. water sand pressure break gas pumping method in low air permeability coal seam underground as described in claim 1, it is characterized in that the activity The proportion of water fracturing fluid by mass percentage are as follows: activating agent 0.04-0.07%, thickener 0.04-0.07%, KCl 0.3- 0.7%, remaining is clear water.
3. water sand pressure break gas pumping method in low air permeability coal seam underground as claimed in claim 1 or 2, it is characterized in that adding sand It is excessive if there is load fluid pressure oscillation in the process, weight ratio shared by quartz sand in injection load fluid need to be adjusted, the weight of sand is made Amount is than reducing or being arranged with clear water is counter;If pressure break pump discharge head continuous high-pressure in fracturing process, load fluid injection rate is small, then reduces Sand ratio, it is repeated multiple times to build the pressure under fracturing pump maximum working pressure;If still high pressure and fracturing pump are discharged pressure break pump discharge head Amount of liquid is small, then considers that termination of pumping checks whether pipeline blocks, dredge pipeline pressure break again if blocking, otherwise, carry out union pumping It adopts.
4. water sand pressure break gas pumping method in low air permeability coal seam underground as claimed in claim 1 or 2, it is characterized in that in pressure break In the process once discovery gas density transfinites, then stop operation immediately, relevant staff withdraws safety place to.
5. water sand pressure break gas pumping method in low air permeability coal seam underground as claimed in claim 1 or 2, it is characterized in that will be every There is pressure oscillation or continuous high-pressure to analyze and determine in time in the silt concertation of time period sampling monitoring load fluid The reason of.
6. water sand pressure break gas pumping method in low air permeability coal seam underground as claimed in claim 1 or 2, it is characterized in that pressure break is applied 35 MPa of work pressure limiting, cannot termination of pumping without reason in fracturing pump injection process.
CN201610792384.4A 2016-08-31 2016-08-31 A kind of low air permeability coal seam underground water sand pressure break gas pumping method Active CN106321046B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610792384.4A CN106321046B (en) 2016-08-31 2016-08-31 A kind of low air permeability coal seam underground water sand pressure break gas pumping method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610792384.4A CN106321046B (en) 2016-08-31 2016-08-31 A kind of low air permeability coal seam underground water sand pressure break gas pumping method

Publications (2)

Publication Number Publication Date
CN106321046A CN106321046A (en) 2017-01-11
CN106321046B true CN106321046B (en) 2019-01-29

Family

ID=57789476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610792384.4A Active CN106321046B (en) 2016-08-31 2016-08-31 A kind of low air permeability coal seam underground water sand pressure break gas pumping method

Country Status (1)

Country Link
CN (1) CN106321046B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868871B (en) * 2018-05-18 2024-03-29 河南能源化工集团研究总院有限公司 Method for quickly balancing stress after hydraulic punching
CN108999636A (en) * 2018-07-20 2018-12-14 中铁十九局集团矿业投资有限公司 A kind of pressure break and the softening hard difficulty of underground coal mine collapse the constructing device and method of top plate
CN111237007A (en) * 2020-02-19 2020-06-05 中煤科工集团重庆研究院有限公司 Hydraulic fracturing method for underground deep low-permeability coal reservoir
CN112228002B (en) * 2020-09-09 2022-11-15 大庆康盛石油节能科技开发有限公司 Plugging device for near wellbore zone of perforated oil layer
CN112377242B (en) * 2020-11-16 2022-05-13 中煤科工集团重庆研究院有限公司 Method for synchronously extracting and displacing gas in soft coal seam by repeated hydraulic fracturing
CN113338883B (en) * 2021-05-06 2022-08-19 山东科技大学 Fracturing fluid reinforced flowback method based on ultrasonic cavitation effect

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2166072C2 (en) * 1997-07-24 2001-04-27 Трубецкой Климент Николаевич Method of forming methane technogenic reservoir in coal seam
WO2011000089A1 (en) * 2009-07-02 2011-01-06 Gasfrac Energy Services Inc . Methods of fracturing hydrocarbon reservoirs
CN102287176A (en) * 2011-05-09 2011-12-21 河南理工大学 Coal bed pressing crack liquid system
CN102352747A (en) * 2011-10-21 2012-02-15 中国石油天然气股份有限公司 Pressure-control injection yield-increasing method for coal-bed gas well
CN102562022A (en) * 2012-03-02 2012-07-11 陕西延长石油(集团)有限责任公司研究院 Process technology suitable for deep coal bed gas fracturing
CN102852509A (en) * 2012-09-04 2013-01-02 中国石油天然气股份有限公司 Method for fracturing high-order coal bed gas reservoir
CN105317417A (en) * 2014-07-31 2016-02-10 中国石油天然气股份有限公司 Fracturing method for medium-high-order coal bed gas reservoir
CN105604534A (en) * 2016-01-24 2016-05-25 廊坊开发区中油化油气技术服务有限公司 Hydraulically affected fracturing process method for increasing production of coal-bed gas reservoir

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2166072C2 (en) * 1997-07-24 2001-04-27 Трубецкой Климент Николаевич Method of forming methane technogenic reservoir in coal seam
WO2011000089A1 (en) * 2009-07-02 2011-01-06 Gasfrac Energy Services Inc . Methods of fracturing hydrocarbon reservoirs
CN102287176A (en) * 2011-05-09 2011-12-21 河南理工大学 Coal bed pressing crack liquid system
CN102352747A (en) * 2011-10-21 2012-02-15 中国石油天然气股份有限公司 Pressure-control injection yield-increasing method for coal-bed gas well
CN102562022A (en) * 2012-03-02 2012-07-11 陕西延长石油(集团)有限责任公司研究院 Process technology suitable for deep coal bed gas fracturing
CN102852509A (en) * 2012-09-04 2013-01-02 中国石油天然气股份有限公司 Method for fracturing high-order coal bed gas reservoir
CN105317417A (en) * 2014-07-31 2016-02-10 中国石油天然气股份有限公司 Fracturing method for medium-high-order coal bed gas reservoir
CN105604534A (en) * 2016-01-24 2016-05-25 廊坊开发区中油化油气技术服务有限公司 Hydraulically affected fracturing process method for increasing production of coal-bed gas reservoir

Also Published As

Publication number Publication date
CN106321046A (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN106321046B (en) A kind of low air permeability coal seam underground water sand pressure break gas pumping method
CN106761740B (en) A coupling fracturing method for hard coal seam roof
CN110374497B (en) A drilling device and drilling method for underground gas hole
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN105239984B (en) A method for controlling the expansion of coal mine fracturing cracks
CN108240234A (en) A kind of Along Railway underlies coal mine gob Grouting method
CN108952760B (en) Intelligent circulating pressure increasing-discharging type dynamic grouting system and method
CN108952796A (en) Comb-shaped bottom plate through-layer drilling fracturing permeability-increasing-based modular extraction method
CN101775977B (en) Dual-tube injection well safety production string
CN104775787A (en) Hydraulic fracturing crossing hole pitchup hole sealing method of broken surrounding rock
CN104153753A (en) Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN102200002A (en) method and device for sealing upward hole at high pressure by sections
CN114382453B (en) Ground horizontal well staged fracturing technology for preventing coal mine rock burst
CN110952953A (en) Pressure-maintaining plugging device for horizontal directional drilling hole and water burst treatment method using same
CN110397451B (en) A construction method for pre-reinforcement of excavated caverns by using deep soft rock to form cavities
CN110424892A (en) A kind of gushing water administering method of the nearly horizontal orientation drilling of mine
CN114718502B (en) Abandoned well plugging method
CN111520096B (en) Orifice closing device
WO2019184147A1 (en) Method for efficiently preventing impact ground pressure for low gas-permeability coal seam
CN111520100B (en) Drilling method adopting common weighted mud under high-head flowing water condition
CN113175316A (en) New method for plugging underground or underground old crack
CN108843371B (en) It is a kind of based on the coal seam subregion Dynamic Water Injection process for adopting release
CN109372488B (en) Swing type continuous proppant filling device for coal mine hydraulic fracturing and filling method
CN107842342B (en) Simulation experiment system and method for flow security assurance of on-site scale hydrate exploitation well shaft
CN212927815U (en) Dual medium oil reservoir horizontal well completion structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant