CN106285571B - A kind of pre- mining system of water resources in coal mines subregion and method - Google Patents

A kind of pre- mining system of water resources in coal mines subregion and method Download PDF

Info

Publication number
CN106285571B
CN106285571B CN201610867837.5A CN201610867837A CN106285571B CN 106285571 B CN106285571 B CN 106285571B CN 201610867837 A CN201610867837 A CN 201610867837A CN 106285571 B CN106285571 B CN 106285571B
Authority
CN
China
Prior art keywords
water
coal
underground
coal mining
subregion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610867837.5A
Other languages
Chinese (zh)
Other versions
CN106285571A (en
Inventor
陈凤
王小军
董阿忠
陈文猛
张华�
陈少颖
王同顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Province Institute Of Hydro-Technical Research
Original Assignee
Jiangsu Province Institute Of Hydro-Technical Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Province Institute Of Hydro-Technical Research filed Critical Jiangsu Province Institute Of Hydro-Technical Research
Priority to CN201610867837.5A priority Critical patent/CN106285571B/en
Publication of CN106285571A publication Critical patent/CN106285571A/en
Application granted granted Critical
Publication of CN106285571B publication Critical patent/CN106285571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/08Screens or liners
    • E21B43/082Screens comprising porous materials, e.g. prepacked screens

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Water Treatment By Sorption (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of pre- mining system of water resources in coal mines subregion and method, the pre- mining system of water resources in coal mines subregion includes water resource mining system and water resource irrigation and drainage system;The water resource mining system includes for protruding into the pipe well of water resource production zone, the first water pump and pumping conduit, and the water resource irrigation and drainage system includes water space, the second water pump and drainage pipeline;One end of the pumping conduit is located in the pipe well, and the water inlet of the other end and first water pump is in fluid communication, and first water pump is located at outside the pipe well;The water space is located at the downstream of first pump outlet;One end of the drainage pipeline is located in the water space, and the water inlet of the other end and second water pump is in fluid communication;Second water pump is located at outside the water space.System and method of the invention are prevented, are developed, protected and are repaired to the water resource in coal mining region according to the actual situation, realize that water resource is protected in advance.

Description

A kind of pre- mining system of water resources in coal mines subregion and method
Technical field
The invention belongs to coal mining technology fields and water resources comprehensive utilization field, are related to a kind of water resources in coal mines subregion Pre- mining system and method.
Background technique
The amount of storage of the coal in China accounts for the first in the world, is coal production, all very huge country of consumption.With coal The rising of demand, coal mining are also correspondingly improved.It is domestic at present there are mainly two types of coal mining form, including outdoor open It adopts and underground mining.The mode of underground mining coal is very easy to appearance sinking, top plate and country rock and is caving, and causes water-bearing layer broken Bad, all kinds of water-bearing layers underground water quickly leaks and the problem of ground surface collapses even occurs in outlet.Have an opencast mining of the side of coal Formula is segmented into removing soil and destroys, and causes the subsidence and ground fissure of minery and surrounding area, leads to river water Leakage, river deformation, are dried up at cutout, to influence farming and the plant growth in soil, or even existing landslide, mud-rock flow The problems such as.Groundwater flow can be largely destroyed during coal mining, under causing level of ground water to occur quickly Drop, makes a big impact to the hydrology, coal mining also polluted underground water and surface water to a certain extent.In the mistake of coal mining Cheng Zhong, since drainage sunk well expense is relatively high, most of enterprise is all expelled directly out untreated sewage, to lead There are groundwater resources and is destroyed in cause.There are two types of water-retaining production modes at present, are jacking of floor and reduction leeding water rent respectively Band height etc..Jacking of floor is that the place weak to bottom plate water proof carries out slip casting reinforcing, reduces permeability and improves anti-pressure ability, Realize the purpose reinforced and blocked;The height for reducing leaking crevice belt can pass through separate zone production, filling mining, overlying strata separation layer grouting The modes such as method and Striping noise are realized.Existing water-retaining production is that counter-measure is taken in progress of coal mining, is belonged to Passive Defence is inevitably polluted and is lost to local water resource.Coal mining influences to destroy water resource to be visitor Reality is seen, how to control, mitigates the key technology difficulty that influence of the coal mining to water resource destroys.
Summary of the invention
The purpose of the present invention is to provide a kind of pre- mining system of water resources in coal mines subregion and method, system of the invention and Method is prevented, is developed, protected and is repaired to the water resource in coal mining region according to the actual situation, realizes that water resource shifts to an earlier date Protection, the multiple target for reducing coal mine mine pit water discharge, reducing drainage sunk well expense, quickly repairing local environment.
To achieve the above object, the present invention provides a kind of pre- mining system of water resources in coal mines subregion, the coal mine water moneys The pre- mining system of source partition includes water resource mining system and water resource irrigation and drainage system;The water resource mining system includes being used for The pipe well, the first water pump and pumping conduit of water resource production zone are protruded into, the water resource irrigation and drainage system includes water space, Two water pumps and drainage pipeline;One end of the pumping conduit is located in the pipe well, and the other end enters water with first water pump Mouth is in fluid communication, and first water pump is located at outside the pipe well;The water space is located at first pump outlet Downstream;One end of the drainage pipeline is located in the water space, and the water inlet fluid of the other end and second water pump connects It is logical;The water outlet of second water pump is located at outside the water space.
Preferably, for the depth of the pipe well less than 200 meters, the nozzle diameter of pipe well is 50-1000 millimeters.
Preferably, the pipe well include wall casing, in the wall casing filter of middle and lower part and be located at the well Sediment tube below filter described in wall pipe.
Preferably, one of material selection steel, cast iron, concrete, ceramics and engineering plastics of the wall casing or several Kind.
Preferably, the filter includes filtering skeleton and the filtrate that is filled in filtering skeleton.
Preferably, the filtering skeleton is bar material, and the hole of the circle or bar shaped that are in fluid communication up and down is arranged inside Road, the filtrate are filled in the duct, and the filtrate is porous material or sand gravel or cobble with gradation.
Preferably, the material of the sediment tube is selected from one of steel, cast iron, concrete, ceramics and engineering plastics or more Kind.
The present invention also provides a kind of pre- recovery method of water resources in coal mines subregion, this method includes:
1), coal mining region is detected, to determine water resources in coal mines thickness, area, recharge of ground water channel and lead Aquaporin developmental state;
2), according to the mining sequence in coal mining region, coal mining region is divided into Z1, Z2, Z3..., Zn, and to coal Conduit pipe and underground water circulating area between mine production zone carry out boring grouting reinforcing;
3), to coal mining region Z1Underground latent water layer and artesian aquifer use water resources in coal mines provided by the present invention The pre- mining system groundwater abstraction of subregion is simultaneously delivered to the water space, then digs up mine;Wherein, the pumping of the underground water Taken amount is W1, W1=W11+W12;W11For coal mining region Z1Underground latent water layer groundwater run off, W1111·F11·h11, μ11For the specific yield of underground latent water layer, F11For the area of underground latent water layer, h11For the thickness of underground latent water layer;W12It is opened for coal mine Exploiting field domain Z1Artesian aquifer groundwater run off, W1212·F12·h12, μ12For water storage coefficient, F12For the face of artesian aquifer Product, h12The pressure head height counted for artesian aquifer from top plate;
4), to coal mining region Z2Underground latent water layer and artesian aquifer use water resources in coal mines provided by the present invention The pre- mining system groundwater abstraction of subregion is simultaneously delivered to the coal mining region Z1Underground latent water layer and artesian aquifer in, so After dig up mine, superfluous water is delivered to the water space, and inadequate water is delivered to the coal mining from the water space Region Z1;Wherein, the extraction amount of the underground water is W2, W2=W21+W22;W21For coal mining region Z2Underground latent water layer Groundwater run off, W2121·F21·h21, μ21For the specific yield of underground latent water layer, F21For the area of underground latent water layer, h21For ground The thickness of lower water table aquifer;W22For coal mining region Z2Artesian aquifer groundwater run off, W2222·F22·h22, μ22For storage Water coefficient, F22For the area of artesian aquifer, h12The pressure head height counted for artesian aquifer from top plate;
5) according to Z1, Z2, Z3..., ZnSequence carry out exploiting the coal mining region, to the coal mining region Zn Exploitation finishes, and is delivered to the water of the water space using the pre- mining system of water resources in coal mines subregion provided by the present invention described Coal mining region ZnIn.
Preferably, to coal mining region Z described in step 3)1Underground latent water layer and artesian aquifer use institute of the present invention The pre- mining system groundwater abstraction of the water resources in coal mines subregion of offer and the step of being delivered to the water space includes:
Pipe well is squeezed into the coal mining region Z1Underground latent water layer and artesian aquifer, pumping is passed through using the first water pump Underground water in water table aquifer and artesian aquifer is extracted out and is delivered to the water space by waterpipe;
To coal mining region Z described in step 4)2Underground latent water layer and artesian aquifer using provided by the present invention The pre- mining system groundwater abstraction of water resources in coal mines subregion is simultaneously delivered to the coal mining region Z1Underground latent water layer and hold Pressure water layer in step include:
Pipe well is squeezed into the coal mining region Z2Underground latent water layer and artesian aquifer, pumping is passed through using the first water pump Underground water in water table aquifer and artesian aquifer is extracted out and by the coal mining region Z by waterpipe1Pipe well be delivered to institute State coal mining region Z1Underground latent water layer and artesian aquifer in;
Use the pre- mining system of water resources in coal mines subregion provided by the present invention by the water space described in step 5) Water be delivered to the coal mining region ZnIn step include:
Pipe well is squeezed into the coal mining region ZnUnderground latent water layer and artesian aquifer, row is passed through using the second water pump The water of the water space is delivered to the coal mining region Z by waterpipenIn.
The invention has the advantages that:
1. the underground water supplement channel that isolation coal mining region is related to, the groundwater abstraction before coal mine digging can be effective Mine pit water discharge in mining process, sewage treatment, drainage works amount in reduction mining process are reduced, while it is dirty to greatly reduce leakage Dye deep phreatic water and outlet Mine waste water polluted surface water even pass through the possibility of the underground water around leakage pollution mining area Property.
2. pollution of the underground water without coal mining extracted, the production and living that can be used for coal mine after detection is qualified are used Water can also supply water to surrounding and carry out useful supplement.
3. by pipe well recharge underground water after exploitation of coal resources, descend over the ground in time water table aquifer and underground bearing water into Row supplement, restores the cycling condition of original groundwater resources, mitigates influence of the coal mining to water resource and destroys, is effectively improved Region environment.
Detailed description of the invention
Fig. 1 is a kind of knot of a kind of specific embodiment of the pre- mining system of water resources in coal mines subregion disclosed by the invention Structure schematic diagram.
Fig. 2 is the process of specific embodiment in the one of a kind of pre- recovery method of water resources in coal mines subregion disclosed by the invention Schematic diagram.
Specific embodiment
The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention..
As shown in Figure 1, a kind of pre- mining system of water resources in coal mines subregion provided by the invention, the water resources in coal mines subregion Pre- mining system includes water resource mining system and water resource irrigation and drainage system;The water resource mining system includes for protruding into water The pipe well 1 in resource exploitation region, the first water pump 2 and pumping conduit 3, the water resource irrigation and drainage system include water space 4, second Water pump 5 and drainage pipeline 6;One end of the pumping conduit 3 is located in the pipe well 1, and the other end enters with first water pump 2 The mouth of a river is in fluid communication, and it is external that first water pump (2) is located at the pipe well (1);The water space 4 is located at first water pump The downstream of 2 water outlets;One end of the drainage pipeline 6 is located in the water space 4, the other end and second water pump 5 Water inlet connection;Second water pump 5 is located at outside the water space 4.
The depth of the pre- mining system of water resources in coal mines subregion, pipe well 1 stores the ground dive being related to by underground coal mine The depth of water layer and artesian aquifer determines that depth is generally within 200m, nozzle diameter 50-1000mm, and pipe well 1 includes wall casing 10, filter 11 and sediment tube 12.Steel, cast iron, concrete, ceramics and engineering plastics etc. can be selected in 10 material of wall casing, are used for The water-bearing layer that Reinforcing Shaft and isolation coal mining are not involved with;Filter 11 includes filtering skeleton and filtrate, is mounted on water-bearing layer Section, for collecting underground water and water-bearing layer being kept to stablize, wherein may include framework of steel reinforcement, circular hole or hole filter, in filtrate The sand gravel cobble of object porous material or certain gradation can be filled in portion.Sediment tube 12 is placed on 11 lower section of filter, for precipitating Steel, cast iron, concrete, ceramics and engineering plastics etc. can be used in the tiny grains of sand, material.
As shown in Fig. 2, the present invention also provides a kind of pre- recovery method of water resources in coal mines subregion, this method includes:
1), coal mining region is detected, to determine water resources in coal mines thickness, area, recharge of ground water channel and lead Aquaporin developmental state;Such as it can be using underground water combined detection technologies such as nuclear magnetic resonance;
2), according to the mining sequence in coal mining region, coal mining region is divided into Z1, Z2, Z3..., Zn, and to coal Conduit pipe and underground water circulating area between mine production zone carry out boring grouting reinforcing;
3), to coal mining region Z1The underground latent water layer and artesian aquifer in (first exploiting field) use coal provided by the present invention The pre- mining system groundwater abstraction of mineral water resource partitioning is simultaneously delivered to the water space, then digs up mine;Wherein, describedly The extraction amount being lauched is W1, W1=W11+W12;W11For coal mining region Z1Underground latent water layer groundwater run off, W1111· F11·h11, μ11For the specific yield of underground latent water layer, F11For the area of underground latent water layer, h11For the thickness of underground latent water layer;W12 For coal mining region Z1Artesian aquifer groundwater run off, W1212·F12·h12, μ12For water storage coefficient, F12For artesian water The area of layer, h12The pressure head height counted for artesian aquifer from top plate;The underground water of extraction can also be used for coal mining Production and living water;
4), to coal mining region Z2Underground latent water layer and artesian aquifer are using water resources in coal mines provided by the present invention point The pre- mining system groundwater abstraction in area is simultaneously delivered to the coal mining region Z1In underground latent water layer and artesian aquifer, then into Row mining, superfluous water are delivered to the water space, and inadequate water is delivered to the coal mining region from the water space Z1;Wherein, the extraction amount of the underground water is W2, W2=W21+W22;W21For coal mining region Z2Underground latent water layer underground Water, W2121·F21·h21, μ21For the specific yield of underground latent water layer, F21For the area of underground latent water layer, h21For ground dive The thickness of water layer;W22For coal mining region Z2Artesian aquifer groundwater run off, W2222·F22·h22, μ22For water storage system Number, F22For the area of artesian aquifer, h12The pressure head height counted for artesian aquifer from top plate;The underground water of extraction can also Production and living water for coal mining;
5) according to Z1, Z2, Z3..., ZnSequence carry out exploiting the coal mining region, to the coal mining region Zn Exploitation finishes, and the water of the water space is delivered to institute using the pre- mining system of water resources in coal mines subregion provided by the present invention State coal mining region ZnIn.Wherein, the underground water W that each coal mining region is extracted2, W3, W4..., WnIt circuits sequentially back One coal mining region, W1Water be recycled back to coal mining region Zn
A kind of specific embodiment, to coal mining region Z described in step 3)1Underground latent water layer and artesian aquifer adopt The step of with the pre- mining system groundwater abstraction of water resources in coal mines subregion provided by the present invention and being delivered to the water space Including:
Pipe well 1 is squeezed into the coal mining region Z1Underground latent water layer and artesian aquifer, passed through using the first water pump 2 Underground water in water table aquifer and artesian aquifer is extracted out and is delivered to the water space 4 by pumping conduit 3;
To coal mining region Z described in step 4)2Underground latent water layer and artesian aquifer using provided by the present invention The pre- mining system groundwater abstraction of the water resources in coal mines subregion is simultaneously delivered to the coal mining region Z1Underground latent water Layer and artesian aquifer in step include:
Pipe well 1 is squeezed into the coal mining region Z2Underground latent water layer and artesian aquifer, passed through using the first water pump 2 Underground water in water table aquifer and artesian aquifer is extracted out and by the coal mining region Z by pumping conduit 31Pipe well 1 convey To the coal mining region Z1Underground latent water layer and artesian aquifer in;
Use the pre- mining system of water resources in coal mines subregion provided by the present invention by the water space described in step 5) Water be delivered to the coal mining region ZnIn step include:
Pipe well 1 is squeezed into the coal mining region ZnUnderground latent water layer and artesian aquifer, passed through using the second water pump 5 The water of the water space 4 is delivered to the coal mining region Z by drainage pipeline 6nIn.
The irrigation and drainage system, water space refer to the retention volume >=exploiting field head Z1Groundwater mining amount pond or existing Reservoir facility.
If it is extra that the water in each coal mining region has, it is sent into water space, water is inadequate, then it is taken from water space, The water of water space can be used for domestic water.
Although above having used general explanation and specific embodiment, the present invention is described in detail, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, These modifications or improvements without departing from theon the basis of the spirit of the present invention are fallen within the scope of the claimed invention.

Claims (8)

1. a kind of pre- recovery method of water resources in coal mines subregion, which is characterized in that this method includes:
1), coal mining region is detected, to determine that water resources in coal mines thickness, area, recharge of ground water channel and water guide are logical Road developmental state;
2), according to the mining sequence in coal mining region, coal mining region is divided into Z1, Z2, Z3..., Zn, and to coal mining Conduit pipe and underground water circulating area between region carry out boring grouting reinforcing;
3), to coal mining region Z1Underground latent water layer and artesian aquifer extracted using the pre- mining system of water resources in coal mines subregion Underground water is simultaneously delivered to water space, then digs up mine;Wherein, the pre- mining system of water resources in coal mines subregion includes water money Source mining system and water resource irrigation and drainage system;The water resource mining system includes the pipe well for protruding into water resource production zone (1), the first water pump (2) and pumping conduit (3), the water resource irrigation and drainage system include water space (4), the second water pump (5) and Drainage pipeline (6);One end of the pumping conduit (3) is located in the pipe well (1), the other end and first water pump (2) Water inlet is in fluid communication, and it is external that first water pump (2) is located at the pipe well (1);The water space (4) is located at described first The downstream of water pump (2) water outlet;One end of the drainage pipeline (6) is located in the water space (4), the other end and described the The water inlet of two water pumps (5) is in fluid communication;It is external that second water pump (5) is located at the water space (4);The underground water Extraction amount is W1, W1=W11+W12;W11For coal mining region Z1Underground latent water layer groundwater run off, W1111·F11· h11, μ11For the specific yield of underground latent water layer, F11For the area of underground latent water layer, h11For the thickness of underground latent water layer;W12For coal Mine production zone Z1Artesian aquifer groundwater run off, W1212·F12·h12, μ12For water storage coefficient, F12For artesian aquifer Area, h12The pressure head height counted for artesian aquifer from top plate;
4), to coal mining region Z2Underground latent water layer and artesian aquifer exploit in advance using the water resources in coal mines subregion and be System groundwater abstraction is simultaneously delivered to the coal mining region Z1Underground latent water layer and artesian aquifer in, then dig up mine, Superfluous water is delivered to the water space, and inadequate water is delivered to the coal mining region Z from the water space1;Wherein, The extraction amount of the underground water is W2, W2=W21+W22;W21For coal mining region Z2Underground latent water layer groundwater run off, W2121·F21·h21, μ21For the specific yield of underground latent water layer, F21For the area of underground latent water layer, h21For the thickness of underground latent water layer Degree;W22For coal mining region Z2Artesian aquifer groundwater run off, W2222·F22·h22, μ22For water storage coefficient, F22For The area of artesian aquifer, h12The pressure head height counted for artesian aquifer from top plate;
5) according to Z1, Z2, Z3..., ZnSequence carry out exploiting the coal mining region, to the coal mining region ZnExploitation It finishes, the water of the water space is delivered to by the Coal Mining Area using the pre- mining system of water resources in coal mines subregion Domain ZnIn.
2. the pre- recovery method of water resources in coal mines subregion according to claim 1, which is characterized in that coal described in step 3) Mine production zone Z1Underground latent water layer and artesian aquifer underground extracted using the pre- mining system of the described water resources in coal mines subregion Water and the step of being delivered to the water space includes:
Pipe well (1) is squeezed into the coal mining region Z1Underground latent water layer and artesian aquifer, passed through using the first water pump (2) Underground water in water table aquifer and artesian aquifer is extracted out and is delivered to the water space (4) by pumping conduit (3);
To coal mining region Z described in step 4)2Underground latent water layer and artesian aquifer use the water resources in coal mines subregion Pre- mining system groundwater abstraction is simultaneously delivered to the coal mining region Z1Underground latent water layer and artesian aquifer in step Including:
Pipe well (1) is squeezed into the coal mining region Z2Underground latent water layer and artesian aquifer, passed through using the first water pump (2) Underground water in water table aquifer and artesian aquifer is extracted out and by the coal mining region Z by pumping conduit (3)1Pipe well (1) It is delivered to the coal mining region Z1Underground latent water layer and artesian aquifer in;
The water of the water space is delivered to by institute using the pre- mining system of water resources in coal mines subregion described in step 5) State coal mining region ZnIn step include:
Pipe well (1) is squeezed into the coal mining region ZnUnderground latent water layer and artesian aquifer, passed through using the second water pump (5) The water of the water space (4) is delivered to the coal mining region Z by drainage pipeline (6)nIn.
3. the pre- recovery method of water resources in coal mines subregion according to claim 1, which is characterized in that the depth of the pipe well (1) For degree less than 200 meters, the nozzle diameter of pipe well (1) is 50-1000 millimeters.
4. the pre- recovery method of water resources in coal mines subregion according to claim 1, which is characterized in that the pipe well (1) includes Wall casing (10), be located at the wall casing (10) interior middle and lower part filter (11) and be located at the wall casing (10) in described in Sediment tube (12) below filter (11).
5. the pre- recovery method of water resources in coal mines subregion according to claim 4, which is characterized in that the wall casing (10) One or more of material selection steel, cast iron, concrete, ceramics and engineering plastics.
6. the pre- recovery method of water resources in coal mines subregion according to claim 4, which is characterized in that filter (11) packet The filtrate for including filtering skeleton and being filled in filtering skeleton.
7. the pre- recovery method of water resources in coal mines subregion according to claim 6, which is characterized in that the filtering skeleton is steel The duct of the circle or bar shaped that are in fluid communication up and down is arranged inside in muscle material, and the filtrate is filled in the duct, described Filtrate is porous material or sand gravel or cobble with gradation.
8. the pre- recovery method of water resources in coal mines subregion according to claim 4, which is characterized in that the sediment tube (12) Material is selected from one of steel, cast iron, concrete, ceramics and engineering plastics or a variety of.
CN201610867837.5A 2016-09-29 2016-09-29 A kind of pre- mining system of water resources in coal mines subregion and method Active CN106285571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610867837.5A CN106285571B (en) 2016-09-29 2016-09-29 A kind of pre- mining system of water resources in coal mines subregion and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610867837.5A CN106285571B (en) 2016-09-29 2016-09-29 A kind of pre- mining system of water resources in coal mines subregion and method

Publications (2)

Publication Number Publication Date
CN106285571A CN106285571A (en) 2017-01-04
CN106285571B true CN106285571B (en) 2018-11-30

Family

ID=57716678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610867837.5A Active CN106285571B (en) 2016-09-29 2016-09-29 A kind of pre- mining system of water resources in coal mines subregion and method

Country Status (1)

Country Link
CN (1) CN106285571B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112963199A (en) * 2021-02-03 2021-06-15 中煤水文局集团有限公司 Mine underground water regulation and storage method and regulation and storage system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4069867A (en) * 1976-12-17 1978-01-24 The United States Of America As Represented By The United States Department Of Energy Cyclic flow underground coal gasification process
US5332036A (en) * 1992-05-15 1994-07-26 The Boc Group, Inc. Method of recovery of natural gases from underground coal formations
CN101176400A (en) * 2006-11-08 2008-05-14 中国矿业大学(北京) A new method of land reclamation in mine subsidence area
CN101298945A (en) * 2008-06-18 2008-11-05 刘娇娜 Ground water back pouring cyclic utilization method
CN102767302A (en) * 2012-07-23 2012-11-07 中国神华能源股份有限公司 Distributed underground reservoir and construction method thereof
CN204040012U (en) * 2014-08-18 2014-12-24 安徽水文地质工程地质公司南京分公司 A kind of water recharge system structure
CN205536681U (en) * 2016-02-25 2016-08-31 青岛地质工程勘察院 Pressure system of recharging of granite area vein structure type geothermal field
CN206129244U (en) * 2016-09-29 2017-04-26 江苏省水利科学研究院 Colliery water resources regionalization is mining system in advance

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4069867A (en) * 1976-12-17 1978-01-24 The United States Of America As Represented By The United States Department Of Energy Cyclic flow underground coal gasification process
US5332036A (en) * 1992-05-15 1994-07-26 The Boc Group, Inc. Method of recovery of natural gases from underground coal formations
CN101176400A (en) * 2006-11-08 2008-05-14 中国矿业大学(北京) A new method of land reclamation in mine subsidence area
CN101298945A (en) * 2008-06-18 2008-11-05 刘娇娜 Ground water back pouring cyclic utilization method
CN102767302A (en) * 2012-07-23 2012-11-07 中国神华能源股份有限公司 Distributed underground reservoir and construction method thereof
CN204040012U (en) * 2014-08-18 2014-12-24 安徽水文地质工程地质公司南京分公司 A kind of water recharge system structure
CN205536681U (en) * 2016-02-25 2016-08-31 青岛地质工程勘察院 Pressure system of recharging of granite area vein structure type geothermal field
CN206129244U (en) * 2016-09-29 2017-04-26 江苏省水利科学研究院 Colliery water resources regionalization is mining system in advance

Also Published As

Publication number Publication date
CN106285571A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN102865103B (en) A Distributed Utilization Method of Mine Groundwater
CN100480475C (en) Controllable one-well lamina precipitation construction method
RU2448216C2 (en) Dehydration method of mineral deposit
CN104594327B (en) A kind of Ground Water Pumping during Excavation Bao Quan recharges integrated apparatus
CN101176400B (en) A new method of land reclamation in mine subsidence area
CN103031850B (en) Low-permeability sludge claypan ultra-vacuum dual-pipe unwatering well and construction technology
CN107246019A (en) A kind of slope underground water drilling self-starting drainage by suction system and method
CN107489159A (en) Deep & thick silt matter Soft Soil Layer vacuum tube well dewatering construction structure and its construction
CN106285683B (en) Openpit or Subsidence Area bottom store water pumping method in mine reclamation
CN104652413B (en) A New Treatment Method for Tidal Flat Silt Subgrade
CN109209481A (en) Crack grouting charge for remittance method is developed around a kind of goaf
CN109593957A (en) A kind of active method for extracting of in-situ leaching ion type rareearth ore
CN112921173A (en) South ionic rare earth in-situ leaching system and method
CN108266912A (en) A kind of recharge system and recharge method using shallow layer geothermal energy
CN206129244U (en) Colliery water resources regionalization is mining system in advance
CN107131002A (en) Adopt the water-retaining method of leakage water resource recharge earth's surface unconsolidated formation in a kind of underground
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN106285571B (en) A kind of pre- mining system of water resources in coal mines subregion and method
CN113027522A (en) Coal mine drainage same-layer recharging method
CN103556641A (en) Grooving assisting method for in-pit underground diaphragm wall of existing basement
CN104846917B (en) Gravel cobble permeable layer in thin silt and construction process thereof
CN204435350U (en) A kind of Ground Water Pumping during Excavation Bao Quan recharges integrated apparatus
CN103334443A (en) Mud cement pebble layer composite geological impacting hole forming dewatering well construction method
CN104878801B (en) Convenient gravel cobble permeable layer, its construction process and the cleaning method thereof cleaned
CN110344389A (en) Tower groundwater pressure recharge equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant