CN106284877A - 装配式楼梯及其安装方法 - Google Patents
装配式楼梯及其安装方法 Download PDFInfo
- Publication number
- CN106284877A CN106284877A CN201610635674.8A CN201610635674A CN106284877A CN 106284877 A CN106284877 A CN 106284877A CN 201610635674 A CN201610635674 A CN 201610635674A CN 106284877 A CN106284877 A CN 106284877A
- Authority
- CN
- China
- Prior art keywords
- stair
- interface
- precast
- assembled
- preformed hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
本发明公开了一种装配式楼梯及其安装方法,包括以下步骤:A、搭建支撑体系及模具浇筑楼梯接口;B、养护;C、楼梯接口上设置砂浆找平层;D、吊装预制楼梯;E、校正预制楼梯;F、在上端预留孔中灌注灌浆料并用砂浆封口;G、下端预留孔中固定部件连接对应的连接部件并用砂浆封口;H、成品保护。运用本发明所述的装配式楼梯及其安装方法,通过预制楼梯在施工现场拼接,能够有效解决现有建筑物的结构体系包括其中的楼梯均采用现浇钢筋混凝土,施工现场需要搭建大量支架以及铺设大量浇筑模具、模板,费时费力的问题,同时该方法施工过程简单,结构成型好,大大缩短工期,节约人力物力。
Description
技术领域
本发明涉及一种建筑施工方法,特别涉及一种装配式楼梯及其安装方法。
背景技术
随着我国经济的不断发展和人民生活水平的日益提高,基础设施建设特别是楼宇房屋的建设规模越来越大,现有建筑物的结构体系包括其中的楼梯均采用现浇钢筋混凝土,施工现场需要搭建大量支架以及铺设大量浇筑模具、模板,才能进行楼梯的浇筑成型,这样的楼梯施工方法,费时费力,成本也较高。
发明内容
本发明的目的在于克服现有技术中所存在的现有建筑物的结构体系包括其中的楼梯均采用现浇钢筋混凝土,施工现场需要搭建大量支架以及铺设大量浇筑模具、模板,费时费力的上述不足,提供一种装配式楼梯及其安装方法。
为了实现上述发明目的,本发明提供了以下技术方案:
一种装配式楼梯安装方法,包括以下步骤:
A、预制楼梯成型,按照实际要求成型所述预制楼梯构件,所述预制楼梯的上下两个端分别设有用于安装的预留孔;
搭建楼梯接口成型所需支撑体系及模具,浇筑成型准备与所述预制楼梯两端相连的上下两个所述楼梯接口,并在每个所述楼梯接口中预埋连接部件;
B、养护所有所述楼梯接口强度到达设计要求;
C、在每个所述楼梯接口上,各自与所述预制楼梯的上下接触面处设置砂浆找平层;
D、吊装所述预制楼梯,使其两端部分别设有的所述预留孔适配对应的所述连接部件,每个所述预留孔套接对应的所述连接部件;
E、校正所述预制楼梯的安装位置;
F、在所述预制楼梯上端所述预留孔中灌注灌浆料并用砂浆封口,形成固定铰支座安装节点;
G、所述预制楼梯下端所述预留孔中设有的固定部件连接对应的所述连接部件并用砂浆封口,使下端所述预留孔留有空腔,形成滑移支座安装节点;
H、成品保护,完成所述预制楼梯的装配。
采用本发明所述的装配式楼梯及其安装方法,通过预制楼梯在施工现场拼接,能够有效解决现有建筑物的结构体系包括其中的楼梯均采用现浇钢筋混凝土,施工现场需要搭建大量支架以及铺设大量浇筑模具、模板,费时费力的问题,同时该方法施工过程简单,结构成型好,大大缩短工期,节约人力物力,提高了楼梯装配效率。
优选地,同时实施所述步骤F和G。
优选地,所述步骤C中,每个所述楼梯接口平台上设置吊装控制线,并在对应的墙面上设置标高控制线。
优选地,所述步骤D中,所述预制楼梯的吊装方式如采用平衡梁吊装并手动葫芦来调节。
优选地,所述步骤E中,所述预制楼梯吊装就位后,采用撬棍微调所述预制楼梯的方法校正。
优选地,所述步骤A中,每个所述连接部件设于对应的所述楼梯接口上所述砂浆找平层处。
优选地,每个所述连接部件包括螺栓和锚头,每个所述螺栓连接对应的所述锚头,每个所述锚头设于对应的所述楼梯接口内部,所述螺栓由所述楼梯接口内向上伸出。
优选地,所述步骤G中,所述固定部件包括设于对应的所述预留孔中的连接板和螺母,对应的所述螺栓穿过所述连接板并适配所述螺母。
本发明还提供了一种装配式楼梯,包括预制楼梯和分别连接于其两端的两个楼梯接口,所有所述楼梯接口均为现浇结构件,所述预制楼梯上设有固定铰支座,连接其上端所述楼梯接口,即所述预制楼梯可以相对其上端所述楼梯接口转动,水平、垂直方向不能移动,所述预制楼梯上设有滑移支座,连接其下端所述楼梯接口,即所述预制楼梯可以相对其下端所述楼梯接口转动、水平方向移动,垂直方向不能移动。
其中,两个所述楼梯接口分别与所述预制楼梯上端固定铰支座连接,下端滑移支座连接,这种连接方式抗震性良好。
采用本发明所述的装配式楼梯,通过预制楼梯与现浇结构的楼梯接口现场拼接,能够有效解决现有建筑物的结构体系包括其中的楼梯均采用现浇钢筋混凝土,施工现场需要搭建大量支架以及铺设大量浇筑模具、模板,费时费力的问题,同时该装配式楼梯施工过程简单,结构成型好,大大缩短工期,节约人力物力。
优选地,所有所述楼梯接口中预埋连接部件,所述预制楼梯两端分别设有与对应的所述连接部件适配的预留孔,每个所述预留孔套接对应的所述连接部件。
优选地,所述预制楼梯与两个所述楼梯接口的横向接触面上设有砂浆找平层。
优选地,每个所述连接部件包括螺栓和锚头,每个所述螺栓连接对应的所述锚头,每个所述锚头设于对应的所述楼梯接口内部,所述螺栓由所述楼梯接口内向上穿过所述砂浆找平层伸出套接于对应的所述预留孔。
优选地,上端所述预留孔中设有灌浆料并用砂浆封口,所述灌浆料包覆其中所述螺栓。
优选地,下端所述预留孔中设有固定部件并用砂浆封口,其中的所述螺栓连接所述固定部件。
优选地,所述固定部件包括设于下端所述预留孔中的连接板和螺母,其中的所述螺栓穿过所述连接板并适配所述螺母,所述连接板螺母一侧灌注砂浆封口。
优选地,每个所述楼梯接口上设有与其纵向切口齐平的楼面,所述楼面与对应的所述预制楼梯端部位于同一水平面。
优选地,每个所述楼梯接口与对应的所述预制楼梯端部的纵向缝隙中设有填充料并注胶封口。
优选地,所述填充料包括EPS(Expanded Polystyrene,发泡聚苯乙烯)板和PE(High Density Polyethylene,高密度聚乙烯)棒,所述EPS板设于所述PE棒下部。
采用这种结构设置,所述EPS板具有质轻、导热率低、吸水性小、电绝缘性能好和防震等优点,所述PE棒具有良好的耐热性、耐寒性,较高的刚性和韧性,机械强度好,耐环境应力开裂性好等优点。
优选地,所述预制楼梯上设有栏杆预埋件和吊装预埋件。
综上所述,由于采用了上述技术方案,本发明的有益效果是:
1、运用本发明所述的装配式楼梯安装方法,通过预制楼梯在施工现场拼接,能够有效解决现有建筑物的结构体系包括其中的楼梯均采用现浇钢筋混凝土,施工现场需要搭建大量支架以及铺设大量浇筑模具、模板,费时费力的问题,同时该方法施工过程简单,结构成型好,大大缩短工期,节约人力物力,提高了楼梯装配效率;
2、运用本发明所述的装配式楼梯安装方法,所述填充料包括EPS板和PE棒,所述EPS板设于所述PE棒下部,采用这种结构设置,所述EPS板具有质轻、导热率低、吸水性小、电绝缘性能好和防震等优点,所述PE棒具有良好的耐热性、耐寒性,较高的刚性和韧性,机械强度好,耐环境应力开裂性好等优点;
3、运用本发明所述的装配式楼梯,通过预制楼梯与现浇结构的楼梯接口现场拼接,能够有效解决现有建筑物的结构体系包括其中的楼梯均采用现浇钢筋混凝土,施工现场需要搭建大量支架以及铺设大量浇筑模具、模板,费时费力的问题,同时该装配式楼梯施工过程简单,结构成型好,大大缩短工期,节约人力物力。
附图说明
图1为本发明所述的装配式楼梯安装方法的流程示意图;
图2为本发明所述的预制楼梯的安装示意图
图3为图2中A的局部放大示意图;
图4为图2中B的局部放大示意图。
图中标记:1-预制楼梯,11-预留孔,12-灌浆料,13-固定部件,2-楼梯接口,21-螺栓,22-锚头,3-砂浆找平层,31-EPS板,32-PE棒,4-楼面,5-支撑体系。
具体实施方式
下面结合试验例及具体实施方式对本发明作进一步的详细描述。但不应将此理解为本发明上述主题的范围仅限于以下的实施例,凡基于本发明内容所实现的技术均属于本发明的范围。
实施例1
如图1-4所示,本发明所述的装配式楼梯安装方法,包括以下步骤:
A、预制楼梯1成型,按照实际要求成型所述预制楼梯1构件,所述预制楼梯1的上下两个端分别设有用于安装的预留孔11;
搭建楼梯接口2成型所需支撑体系5及模具,浇筑成型准备与所述预制楼梯1两端相连的上下两个所述楼梯接口2,并在每个所述楼梯接口2中预埋连接部件;
B、养护所有所述楼梯接口2强度到达设计要求;
C、在每个所述楼梯接口2上,各自与所述预制楼梯1的上下接触面处设置砂浆找平层3;
D、吊装所述预制楼梯1,使其两端部分别设有的所述预留孔11适配对应的所述连接部件,每个所述预留孔11套接对应的所述连接部件;
E、校正所述预制楼梯1的安装位置;
F、在所述预制楼梯1上端所述预留孔11中灌注灌浆料12并用砂浆封口,形成固定铰支座安装节点;
G、所述预制楼梯1下端所述预留孔11中设有的固定部件13连接对应的所述连接部件并用砂浆封口,使下端所述预留孔11留有空腔,形成滑移支座安装节点;
H、成品保护,完成所述预制楼梯1的装配。
作为本实施例的一个优选方案,同时实施所述步骤F和G。
其中,所述步骤C中,每个所述楼梯接口2平台上设置吊装控制线,并在对应的墙面上设置标高控制线;所述步骤D中,所述预制楼梯1的吊装方式如采用平衡梁吊装并手动葫芦来调节。;所述步骤E中,所述预制楼梯1吊装就位后,采用撬棍微调所述预制楼梯1的方法校正。
所述步骤A中,每个所述连接部件设于对应的所述楼梯接口2上所述砂浆找平层3处;每个所述连接部件包括螺栓21和锚头22,每个所述螺栓21连接对应的所述锚头22,每个所述锚头22设于对应的所述楼梯接口2内部,所述螺栓21由所述楼梯接口2内向上伸出;所述步骤G中,所述固定部件13包括设于对应的所述预留孔11中的连接板和螺母,对应的所述螺栓21穿过所述连接板并适配所述螺母。
每个所述楼梯接口2上设有与其纵向切口齐平的楼面4,所述楼面4与对应的所述预制楼梯1端部位于同一水平面;每个所述楼梯接口2与对应的所述预制楼梯1端部的纵向缝隙中设有填充料并注胶封口;所述填充料包括EPS板31和PE棒32,所述EPS板31设于所述PE棒32下部,采用这种结构设置,所述EPS板31具有质轻、导热率低、吸水性小、电绝缘性能好和防震等优点,所述PE棒32具有良好的耐热性、耐寒性,较高的刚性和韧性,机械强度好,耐环境应力开裂性好等优点。
运用本发明所述的装配式楼梯安装方法,通过预制楼梯1在施工现场拼接,能够有效解决现有建筑物的结构体系包括其中的楼梯均采用现浇钢筋混凝土,施工现场需要搭建大量支架以及铺设大量浇筑模具、模板,费时费力的问题,同时该方法施工过程简单,结构成型好,大大缩短工期,节约人力物力,提高了楼梯装配效率。
实施例2
如图2-4所示,本发明所述的装配式楼梯,包括预制楼梯1和分别连接于其两端的两个楼梯接口2。
所有所述楼梯接口2均为现浇结构件,所述预制楼梯1上设有固定铰支座,连接其上端所述楼梯接口2,即所述预制楼梯1可以相对其上端所述楼梯接口2转动,水平、垂直方向不能移动,所述预制楼梯1上设有滑移支座,连接其下端所述楼梯接口2,即所述预制楼梯1可以相对其下端所述楼梯接口2转动、水平方向移动,垂直方向不能移动;其中,两个所述楼梯接口2分别与所述预制楼梯1上端固定铰支座连接,下端滑移支座连接,这种连接方式抗震性良好;所有所述楼梯接口2中预埋连接部件,所述预制楼梯1两端分别设有与对应的所述连接部件适配的预留孔11,每个所述预留孔11套接对应的所述连接部件;所述预制楼梯1与两个所述楼梯接口2的横向接触面上设有砂浆找平层3。
每个所述连接部件包括螺栓21和锚头22,每个所述螺栓21连接对应的所述锚头22,每个所述锚头22设于对应的所述楼梯接口2内部,所述螺栓21由所述楼梯接口2内向上穿过所述砂浆找平层3伸出套接于对应的所述预留孔11;上端所述预留孔11中设有灌浆料12并用砂浆封口,所述灌浆料12包覆其中所述螺栓21;下端所述预留孔11中设有固定部件13并用砂浆封口,其中的所述螺栓21连接所述固定部件13;所述固定部件13包括设于下端所述预留孔11中的连接板和螺母,其中的所述螺栓21穿过所述连接板并适配所述螺母,所述连接板螺母一侧灌注砂浆封口。
每个所述楼梯接口2上设有与其纵向切口齐平的楼面4,所述楼面4与对应的所述预制楼梯1端部位于同一水平面;每个所述楼梯接口2与对应的所述预制楼梯1端部的纵向缝隙中设有填充料并注胶封口;所述填充料包括EPS板31和PE棒32,所述EPS板31设于所述PE棒32下部,采用这种结构设置,所述EPS板31具有质轻、导热率低、吸水性小、电绝缘性能好和防震等优点,所述PE棒32具有良好的耐热性、耐寒性,较高的刚性和韧性,机械强度好,耐环境应力开裂性好等优点;所述预制楼梯1上设有栏杆预埋件和吊装预埋件。
运用本发明所述的装配式楼梯,通过预制楼梯1与现浇结构的楼梯接口2现场拼接,能够有效解决现有建筑物的结构体系包括其中的楼梯均采用现浇钢筋混凝土,施工现场需要搭建大量支架以及铺设大量浇筑模具、模板,费时费力的问题,同时该装配式楼梯施工过程简单,结构成型好,大大缩短工期,节约人力物力。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (10)
1.一种装配式楼梯安装方法,其特征在于,包括以下步骤:
A、预制楼梯(1)成型,按照实际要求成型所述预制楼梯(1)构件,所述预制楼梯(1)的上下两个端分别设有用于安装的预留孔(11);
搭建楼梯接口(2)成型所需支撑体系(5)及模具,浇筑成型准备与所述预制楼梯(1)两端相连的上下两个所述楼梯接口(2),并在每个所述楼梯接口(2)中预埋连接部件;
B、养护所有所述楼梯接口(2)强度到达设计要求;
C、在每个所述楼梯接口(2)上,各自与所述预制楼梯(1)的上下接触面处设置砂浆找平层(3);
D、吊装所述预制楼梯(1),使其两端部分别设有的所述预留孔(11)适配对应的所述连接部件,每个所述预留孔(11)套接对应的所述连接部件;
E、校正所述预制楼梯(1)的安装位置;
F、在所述预制楼梯(1)上端所述预留孔(11)中灌注灌浆料(12)并用砂浆封口;
G、所述预制楼梯(1)下端所述预留孔(11)中设有的固定部件(13)连接对应的所述连接部件并用砂浆封口;
H、成品保护,完成所述预制楼梯(1)的装配。
2.根据权利要求1所述的装配式楼梯安装方法,其特征在于,同时实施所述步骤F和G。
3.根据权利要求1所述的装配式楼梯安装方法,其特征在于,所述步骤C中,每个所述楼梯接口(2)平台上设置吊装控制线,并在对应的墙面上设置标高控制线。
4.根据权利要求1所述的装配式楼梯安装方法,其特征在于,所述步骤E中,所述预制楼梯(1)吊装就位后,采用撬棍微调所述预制楼梯(1)的方法校正。
5.根据权利要求1所述的装配式楼梯安装方法,其特征在于,所述步骤A中,每个所述连接部件设于对应的所述楼梯接口(2)上所述砂浆找平层(3)处。
6.根据权利要求5所述的装配式楼梯安装方法,其特征在于,每个所述连接部件包括螺栓(21)和锚头(22),每个所述螺栓(21)连接对应的所述锚头(22),每个所述锚头(22)设于对应的所述楼梯接口(2)内部,所述螺栓(21)由所述楼梯接口(2)内向上伸出。
7.根据权利要求6所述的装配式楼梯安装方法,其特征在于,所述步骤G中,所述固定部件(13)包括设于对应的所述预留孔(11)中的连接板和螺母,对应的所述螺栓(21)穿过所述连接板并适配所述螺母。
8.一种装配式楼梯,包括预制楼梯(1)和分别连接于其两端的两个楼梯接口(2),其特征在于,所有所述楼梯接口(2)均为现浇结构件,所述预制楼梯(1)上设有固定铰支座,连接其上端所述楼梯接口(2),所述预制楼梯(1)上设有滑移支座,连接其下端所述楼梯接口(2)。
9.根据权利要求8所述的装配式楼梯,其特征在于,每个所述楼梯接口(2)上设有与其纵向切口齐平的楼面(4),所述楼面(4)与对应的所述预制楼梯(1)端部位于同一水平面。
10.根据权利要求8所述的装配式楼梯,其特征在于,所述预制楼梯(1)上设有栏杆预埋件和吊装预埋件。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610635674.8A CN106284877A (zh) | 2016-08-05 | 2016-08-05 | 装配式楼梯及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610635674.8A CN106284877A (zh) | 2016-08-05 | 2016-08-05 | 装配式楼梯及其安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106284877A true CN106284877A (zh) | 2017-01-04 |
Family
ID=57665510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610635674.8A Pending CN106284877A (zh) | 2016-08-05 | 2016-08-05 | 装配式楼梯及其安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284877A (zh) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106930484A (zh) * | 2017-03-15 | 2017-07-07 | 中建三局第建设工程有限责任公司 | 用于装配式混凝土结构的全预制楼梯系统及施工方法 |
CN107288214A (zh) * | 2017-08-08 | 2017-10-24 | 袁建华 | 预制整体混凝土楼梯房的施工方法 |
CN107345439A (zh) * | 2017-07-21 | 2017-11-14 | 中建八局第建设有限公司 | 一种预制楼梯构件的制作及安装方法 |
CN107859255A (zh) * | 2017-10-11 | 2018-03-30 | 武汉科技大学 | 用于pc楼梯与楼梯平台的辅助连接方法、装置及楼梯设备 |
CN108385908A (zh) * | 2018-03-12 | 2018-08-10 | 中国建筑设计院有限公司 | 一种装配式楼梯的连接装置、装配式楼梯及其安装方法 |
CN108947448A (zh) * | 2018-07-20 | 2018-12-07 | 中国建筑设计研究院有限公司 | 一种用于装配式楼梯的柔性灌孔材料及其制备方法 |
CN109025291A (zh) * | 2018-07-25 | 2018-12-18 | 中国十七冶集团有限公司 | 一种分离式预制楼梯的施工方法 |
CN109138300A (zh) * | 2018-09-30 | 2019-01-04 | 杭州江润科技有限公司 | 预制楼梯安装结构的施工方法 |
CN109779166A (zh) * | 2019-02-28 | 2019-05-21 | 中国一冶集团有限公司 | 一种装配式楼梯与现浇结构的连接结构及其安装方法 |
CN110512746A (zh) * | 2019-08-20 | 2019-11-29 | 山东广发建材制品有限公司 | 一种预制楼梯分体式预埋件及其使用方法 |
CN110820511A (zh) * | 2019-12-17 | 2020-02-21 | 广州市市政工程机械施工有限公司 | 一种采用uhpc的城市装配式天桥楼梯及其实施方法 |
CN111088877A (zh) * | 2019-12-25 | 2020-05-01 | 福建建工集团有限责任公司 | 一种全预制组合楼梯 |
CN111927015A (zh) * | 2020-08-13 | 2020-11-13 | 上海宝冶建筑工程有限公司 | 一种预制楼梯结构 |
CN112095942A (zh) * | 2020-09-10 | 2020-12-18 | 安徽新华学院 | 一种碾磨滑移减震型预制楼梯 |
CN112458884A (zh) * | 2020-12-11 | 2021-03-09 | 中国铁路设计集团有限公司 | 一种装配式铁路桥上救援疏散设施及施工方法 |
CN113026959A (zh) * | 2019-12-24 | 2021-06-25 | 成都建工第二建筑工程有限公司 | 预制楼梯的安装方法 |
CN113266117A (zh) * | 2021-05-06 | 2021-08-17 | 浙江省建工集团有限责任公司 | 装配式混凝土梁式楼梯及其安装方法 |
CN113605711A (zh) * | 2021-09-09 | 2021-11-05 | 中铁建工集团有限公司 | 一种建筑结构的施工方法 |
CN115822076A (zh) * | 2023-02-13 | 2023-03-21 | 北京城建北方集团有限公司 | 一种预制组件施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102767288A (zh) * | 2012-01-17 | 2012-11-07 | 中国建筑第四工程局有限公司 | 一种钢筋混凝土预制楼梯的安装方法及结构 |
CN203939199U (zh) * | 2014-03-20 | 2014-11-12 | 天津住宅集团建设工程总承包有限公司 | 一种预制楼梯支座处防地震碰撞破坏的连接安装施工结构 |
CN104179306A (zh) * | 2014-09-03 | 2014-12-03 | 四川华构住宅工业有限公司 | 装配式梁式滑动支座空心楼梯 |
CN204456693U (zh) * | 2014-12-19 | 2015-07-08 | 中国联合工程公司 | 一种上承式踏步板的钢结构梁式楼梯可滑动铰支座 |
CN205012578U (zh) * | 2015-10-14 | 2016-02-03 | 长沙远大住宅工业集团有限公司 | 装配式建筑搁置楼梯连接节点 |
-
2016
- 2016-08-05 CN CN201610635674.8A patent/CN106284877A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102767288A (zh) * | 2012-01-17 | 2012-11-07 | 中国建筑第四工程局有限公司 | 一种钢筋混凝土预制楼梯的安装方法及结构 |
CN203939199U (zh) * | 2014-03-20 | 2014-11-12 | 天津住宅集团建设工程总承包有限公司 | 一种预制楼梯支座处防地震碰撞破坏的连接安装施工结构 |
CN104179306A (zh) * | 2014-09-03 | 2014-12-03 | 四川华构住宅工业有限公司 | 装配式梁式滑动支座空心楼梯 |
CN204456693U (zh) * | 2014-12-19 | 2015-07-08 | 中国联合工程公司 | 一种上承式踏步板的钢结构梁式楼梯可滑动铰支座 |
CN205012578U (zh) * | 2015-10-14 | 2016-02-03 | 长沙远大住宅工业集团有限公司 | 装配式建筑搁置楼梯连接节点 |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106930484A (zh) * | 2017-03-15 | 2017-07-07 | 中建三局第建设工程有限责任公司 | 用于装配式混凝土结构的全预制楼梯系统及施工方法 |
CN107345439A (zh) * | 2017-07-21 | 2017-11-14 | 中建八局第建设有限公司 | 一种预制楼梯构件的制作及安装方法 |
CN107288214A (zh) * | 2017-08-08 | 2017-10-24 | 袁建华 | 预制整体混凝土楼梯房的施工方法 |
CN107859255A (zh) * | 2017-10-11 | 2018-03-30 | 武汉科技大学 | 用于pc楼梯与楼梯平台的辅助连接方法、装置及楼梯设备 |
CN108385908A (zh) * | 2018-03-12 | 2018-08-10 | 中国建筑设计院有限公司 | 一种装配式楼梯的连接装置、装配式楼梯及其安装方法 |
CN108385908B (zh) * | 2018-03-12 | 2020-03-17 | 中国建筑设计研究院有限公司 | 一种装配式楼梯的连接装置、装配式楼梯及其安装方法 |
CN108947448B (zh) * | 2018-07-20 | 2021-10-15 | 中国建筑设计研究院有限公司 | 一种用于装配式楼梯的柔性灌孔材料及其制备方法 |
CN108947448A (zh) * | 2018-07-20 | 2018-12-07 | 中国建筑设计研究院有限公司 | 一种用于装配式楼梯的柔性灌孔材料及其制备方法 |
CN109025291A (zh) * | 2018-07-25 | 2018-12-18 | 中国十七冶集团有限公司 | 一种分离式预制楼梯的施工方法 |
CN109138300A (zh) * | 2018-09-30 | 2019-01-04 | 杭州江润科技有限公司 | 预制楼梯安装结构的施工方法 |
CN109779166A (zh) * | 2019-02-28 | 2019-05-21 | 中国一冶集团有限公司 | 一种装配式楼梯与现浇结构的连接结构及其安装方法 |
CN110512746A (zh) * | 2019-08-20 | 2019-11-29 | 山东广发建材制品有限公司 | 一种预制楼梯分体式预埋件及其使用方法 |
CN110820511A (zh) * | 2019-12-17 | 2020-02-21 | 广州市市政工程机械施工有限公司 | 一种采用uhpc的城市装配式天桥楼梯及其实施方法 |
CN113026959A (zh) * | 2019-12-24 | 2021-06-25 | 成都建工第二建筑工程有限公司 | 预制楼梯的安装方法 |
CN111088877A (zh) * | 2019-12-25 | 2020-05-01 | 福建建工集团有限责任公司 | 一种全预制组合楼梯 |
CN111927015A (zh) * | 2020-08-13 | 2020-11-13 | 上海宝冶建筑工程有限公司 | 一种预制楼梯结构 |
CN112095942A (zh) * | 2020-09-10 | 2020-12-18 | 安徽新华学院 | 一种碾磨滑移减震型预制楼梯 |
CN112458884A (zh) * | 2020-12-11 | 2021-03-09 | 中国铁路设计集团有限公司 | 一种装配式铁路桥上救援疏散设施及施工方法 |
CN113266117A (zh) * | 2021-05-06 | 2021-08-17 | 浙江省建工集团有限责任公司 | 装配式混凝土梁式楼梯及其安装方法 |
CN113605711A (zh) * | 2021-09-09 | 2021-11-05 | 中铁建工集团有限公司 | 一种建筑结构的施工方法 |
CN115822076A (zh) * | 2023-02-13 | 2023-03-21 | 北京城建北方集团有限公司 | 一种预制组件施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284877A (zh) | 装配式楼梯及其安装方法 | |
CN106013811B (zh) | 一种装配式建筑的安装方法 | |
WO2017197853A1 (zh) | 保温预制墙体和装配式房屋 | |
CN101892743B (zh) | 一种永久性住房的建筑方法 | |
CN105804255B (zh) | 预制混凝土梁和复合钢管混凝土柱装配结构及其施工方法 | |
CN106088326B (zh) | 基于3d打印的装配式框架柱结构 | |
CN205776895U (zh) | 保温预制墙体和装配式房屋 | |
CN105464214B (zh) | 钢质混凝土集成建筑制造方法 | |
CN101725259A (zh) | 一种模块化房屋建筑结构及其建造方法 | |
CN107476491A (zh) | 一种预制保温内填充混凝土墙板及其制造方法 | |
CN110805464A (zh) | 一种地铁车站预制轨顶风道及其安装方式 | |
CN109469204A (zh) | 基于叠合梁的装配式型钢混凝土混合框架结构及施工方法 | |
CN108035485A (zh) | 装配式cf蒸压瓷粉加气混凝土剪力墙外墙板及制作方法 | |
CN109083308A (zh) | 一种抗震预制装配式的墙体及其施工方法 | |
CN205875394U (zh) | 一种干法连接的抗震混凝土梁柱 | |
CN104481166A (zh) | 老旧小区外加装配式阳台结构及其施工方法 | |
CN203961014U (zh) | 一种预制混凝土建筑结构 | |
CN105908878A (zh) | 一种外墙板安装节点 | |
CN109853803B (zh) | 装配整体式楼板及制作安装方法 | |
CN208309616U (zh) | 一种拼缝错开的装配式活动房预制基础 | |
CN104018614A (zh) | 预制混凝土组装板及其制备和整体建筑构成方法 | |
CN207959747U (zh) | 一种预制预应力混凝土板式楼梯 | |
CN205894273U (zh) | 混凝土模块拼装式框架房屋结构 | |
CN106368445A (zh) | 既有建筑加固自承重保温一体化系统及施工方法 | |
CN106320569A (zh) | 装配式剪力墙植筋法连接工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 610021 14, 15 floor, friendship B block 55, Zou Ma Street, Chengdu, Sichuan. Applicant after: Chengdu Construction Engineering Fourth Construction Engineering Co., Ltd. Address before: 610021 14, 15 floor, friendship B block 55, Zou Ma Street, Chengdu, Sichuan. Applicant before: Chengdu No.4 Construction Engineering Company |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170104 |