CN106284362A - 一种单导管灌注大型水下封底混凝土的施工方法 - Google Patents
一种单导管灌注大型水下封底混凝土的施工方法 Download PDFInfo
- Publication number
- CN106284362A CN106284362A CN201610643900.7A CN201610643900A CN106284362A CN 106284362 A CN106284362 A CN 106284362A CN 201610643900 A CN201610643900 A CN 201610643900A CN 106284362 A CN106284362 A CN 106284362A
- Authority
- CN
- China
- Prior art keywords
- conduit
- bottom concrete
- concrete
- perfusion
- plugging hood
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/06—Placing concrete under water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
本发明公开了一种单导管灌注大型水下封底混凝土的施工方法,包括:1.通过导管按水下混凝土浇筑工艺从围堰或钢套箱的一端的初始位置开始压水灌注封底混凝土,直至该初始位置封底混凝土达到设计高度;2.当压水灌注位置封底混凝土达到设计厚度后,用起重设备拔出导管,在导管的底口安装活动的连接封堵罩,然后用天泵往装好封堵罩的导管内泵送些许封底混凝土封堵导管,再用吊车将该导管移至已灌注封底混凝土扩散半径边缘的前移布点位置,……。本发明可以避免泥浆杂物覆盖封底混凝土形成薄弱夹层缺陷,可简化中心储料盆的复杂支架,减少多个溜槽,减少多套钢导管,减少多套起吊设备,施工工艺简单,操作简便,降低施工成本。
Description
技术领域
本发明属于工程建设中围堰、套箱水下封底混凝土灌注方法,具体涉及一种单导管灌注大型水下封底混凝土的施工方法。
技术背景
围堰、钢套箱水下封底混凝土施工是工程建设中常见的关键工序。在大型封底混凝土灌注工艺设计时,为保证封底混凝土不被水冲洗、封底混凝土表面平整、一次灌注完成,以满足封水效果和受力需要,现有方法普遍采用设置中心储料盆,布设多条溜槽,布置多根钢导管浇灌施工。这种施工方法对钢导管、溜槽和中心储料盆支架的投入大,导管起吊设备多,施工组织复杂,施工时,需多次压水,技术风险大,质量控制难点多;特别是多次混凝土压水形成的锥堆接触面间容易形成薄弱夹层缺陷。
发明内容
本发明的目的在于提供一种可降低成本、提高效率、保证质量的单导管灌注大型水下封底混凝土的施工方法。
实现本发明目的采用的技术方案如下:
本发明提供的单导管灌注大型水下封底混凝土的施工方法,包括以下步骤:
步骤1. 通过导管按水下混凝土浇筑工艺从围堰或钢套箱的一端的初始位置开始压水灌注封底混凝土,直至该初始位置封底混凝土达到设计高度。
步骤2. 当压水灌注位置封底混凝土达到设计厚度后,用起重设备拔出导管,在导管的底口安装活动的连接封堵罩,然后用天泵往装好封堵罩的导管内泵送些许封底混凝土封堵导管,再用起重设备将该导管移至已灌注封底混凝土扩散半径边缘的前移布点位置,将装有封堵混凝土的导管插入已灌注封底混凝土内。
步骤3. 将装有封堵混凝土的导管插入已灌注封底混凝土内后,用起重设备将封堵罩与导管底口上的连接打开,同时用天泵向导管泵送封底混凝土,在混凝土压力下所述封堵罩自动脱落。
步骤4. 将所述封堵罩吊出水面,继续通过所述导管不断泵送封底混凝土直至该布点位置封底混凝土达到设计高度。
步骤5. 待该布点位置封底混凝土达到设计高度后再次拔出导管,重新安装封堵罩,重复步骤2至步骤4,通过多次导管前移布点灌注封底混凝土,最后完成整个封底混凝土。
所述步骤2中所述封堵导管的混凝土在导管内的高度大致为1/2封底水深,所述前移布点位置处的已浇封底混凝土厚度为60cm以上。
有益效果
本发明适用于封底面积较大且能在封底混凝土初凝时间内完成灌注封底混凝土工程。本发明方法将原封底混凝土浇筑的多次压水简化为一次,大幅度的降低了施工难度,同时避免封底混凝土形成薄弱夹层,进一步实现了封底混凝土过程中浇筑高度的可调可控,取消了常规封底混凝土施工时中心储料盆、溜槽等临时设施,大幅减少钢导管、起吊设备等设施。该方法简化了常规封底施工工艺,降低了施工成本,极具推广价值。
下面结合附图进一步说明本发明的技术方案。
附图说明
图1是本发明施工装置的结构示意图。
图2至图7是本发明施工方法中各步骤的示意图。
具体实施方式
见图1,本发明采用的施工装置1,包括设插销固定套104的导管108和连在插销固定套104上将导管108的底口密封的封堵罩101,封堵罩101的尖头111通过吊耳110设有回笼钢丝绳109,封堵罩101通过吊耳102、钢丝绳吊环103、活动插销105与所述插销固定套104相连接,导管108上还设有将活动插销105定位的定位环106,活动插销105上连接有拔销钢丝绳107,回笼钢丝绳109与拔销钢丝绳107连接。
参见图1——图7,本发明提供的单导管灌注大型水下封底混凝土的施工方法,采用所述施工装置,包括以下步骤:
步骤1. 灌注围堰(或钢套箱)封底混凝土时,在围堰2一端(角)搭设简易支架3,安装储料盆4,布置有固定漏斗8的钢导管108,用起重设备吊具和吊索7将漏斗8连同钢导管108一起吊起,天泵的送料管5将封底混凝土9先送至储料盆4,储料盆4通过溜槽6将封底混凝土9经漏斗8灌入钢导管108,按水下混凝土水灌工艺从围堰(或钢套箱)2的一端的初始位置开始压水灌注,直至该初始位置封底混凝土9达到设计高度,如图2所示。
步骤2. 当压水灌注位置封底混凝土9达到设计厚度后,用起重设备吊具和吊索7拔出钢导管108,在钢导管108的底口上安装封堵罩101,然后用天泵通过送料管5经漏斗8往装好封堵罩101的钢导管108内泵送些许封底混凝土9(钢导管内混凝土高度大致为1/2封底水深)封堵钢导管108,再用起重设备将该钢导管108移至已灌注封底混凝土扩散半径边缘附近的前移布点位置(要求该位置封底厚度60cm以上),将装有封底混凝土的钢导管108慢慢插入已灌注封底混凝土内,如图3所示。
步骤3. 将安装封堵罩101并装有混凝土的钢导管108插入已灌注封底混凝土后,然后用另一吊具(或小钩)通过向上拉所述拔销钢丝绳107拔出钢导管108上的插销105,解除对钢丝绳吊环103的约束,同时用天泵向钢导管108灌注封底混凝土9,在封底混凝土9压力下所述封堵罩101自动脱落,如图4所示。
步骤4. 继续向上拉拔销钢丝绳107带动回笼钢丝绳109将所述封堵罩101吊出水面,继续不断往所述钢导管108不断泵送封底混凝土9直至该布点位置封底混凝土9达到设计高度,如图5所示。
步骤5. 待该布点位置封底混凝土达到设计高度后再拔出钢导管108,重新安装封堵罩101,再次用天泵往导管108泵送些许封底混凝土9封堵导管108,再次将装有封底混凝土9的钢导管108慢慢插入已灌注封底混凝土9内,如图6所示,重复步骤2至步骤4,通过多次钢导管108前移布点灌注封底混凝土,最后完成整个封底混凝土,如图7所示。
Claims (2)
1.一种单导管灌注大型水下封底混凝土的施工方法,包括以下步骤:
步骤1.通过导管按水下混凝土浇筑工艺从围堰或钢套箱的一端的初始位置开始压水灌注封底混凝土,直至该初始位置封底混凝土达到设计高度;
步骤2.当压水灌注位置封底混凝土达到设计厚度后,用起重设备拔出导管,在导管的底口安装活动的连接封堵罩,然后用天泵往装好封堵罩的导管内泵送些许封底混凝土封堵导管,再用起重设备将该导管移至已灌注封底混凝土扩散半径边缘的前移布点位置,将装有封堵混凝土的导管插入已灌注封底混凝土内;
步骤3. 将装有封堵混凝土的导管插入已灌注封底混凝土内后,用起重设备将封堵罩与导管底口上的连接打开,同时用天泵向导管泵送封底混凝土,在混凝土压力下所述封堵罩自动脱落;
步骤4.将所述封堵罩吊出水面,继续通过所述导管不断泵送封底混凝土直至该布点位置封底混凝土达到设计高度;
步骤5.待该布点位置封底混凝土达到设计高度后再次拔出导管,重新安装封堵罩,重复步骤2至步骤4,通过多次导管前移布点灌注封底混凝土,最后完成整个封底混凝土。
2.根据权利要求1所述的施工方法,其特征是所述步骤2中所述封堵导管的混凝土在导管内的高度大致为1/2封底水深,所述前移布点位置处的已浇封底混凝土厚度为60cm以上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610643900.7A CN106284362B (zh) | 2016-08-09 | 2016-08-09 | 一种单导管灌注大型水下封底混凝土的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610643900.7A CN106284362B (zh) | 2016-08-09 | 2016-08-09 | 一种单导管灌注大型水下封底混凝土的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284362A true CN106284362A (zh) | 2017-01-04 |
CN106284362B CN106284362B (zh) | 2018-03-13 |
Family
ID=57666595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610643900.7A Active CN106284362B (zh) | 2016-08-09 | 2016-08-09 | 一种单导管灌注大型水下封底混凝土的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284362B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724394A (zh) * | 2017-10-10 | 2018-02-23 | 中铁大桥局集团第四工程有限公司 | 管柱围堰水下混凝土灌注系统及施工方法 |
CN108118708A (zh) * | 2017-12-29 | 2018-06-05 | 中交路桥华南工程有限公司 | 深水围堰水下混凝土封底施工方法 |
CN108979161A (zh) * | 2018-09-26 | 2018-12-11 | 中铁十局集团第二工程有限公司 | 一种封底混凝土的施工方法及封底混凝土 |
CN110029662A (zh) * | 2019-05-29 | 2019-07-19 | 沈阳帝铂建筑工程有限公司 | 一种防断桩处理器及其施工方法 |
CN110965556A (zh) * | 2019-11-20 | 2020-04-07 | 中建桥梁有限公司 | 一种大面积水下混凝土浇筑方法 |
CN113404070A (zh) * | 2021-06-28 | 2021-09-17 | 中铁二十局集团第三工程有限公司 | 一种跨海桥水下大体积封底硂连续灌注工艺 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06322764A (ja) * | 1993-05-17 | 1994-11-22 | Ishikawajima Harima Heavy Ind Co Ltd | 水中コンクリート施工法及び装置 |
CN102134852A (zh) * | 2010-01-25 | 2011-07-27 | 宏利国际投资有限公司 | 混凝土灌注设备及方法 |
CN201972153U (zh) * | 2011-01-25 | 2011-09-14 | 中交一公局厦门工程有限公司 | 一种水中钢套箱封底混凝土施工装置 |
CN101725148B (zh) * | 2010-02-04 | 2012-07-25 | 大连阿尔滨集团有限公司 | 一种灌注桩水下混凝土的上料装置及浇注方法 |
-
2016
- 2016-08-09 CN CN201610643900.7A patent/CN106284362B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06322764A (ja) * | 1993-05-17 | 1994-11-22 | Ishikawajima Harima Heavy Ind Co Ltd | 水中コンクリート施工法及び装置 |
CN102134852A (zh) * | 2010-01-25 | 2011-07-27 | 宏利国际投资有限公司 | 混凝土灌注设备及方法 |
CN101725148B (zh) * | 2010-02-04 | 2012-07-25 | 大连阿尔滨集团有限公司 | 一种灌注桩水下混凝土的上料装置及浇注方法 |
CN201972153U (zh) * | 2011-01-25 | 2011-09-14 | 中交一公局厦门工程有限公司 | 一种水中钢套箱封底混凝土施工装置 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724394A (zh) * | 2017-10-10 | 2018-02-23 | 中铁大桥局集团第四工程有限公司 | 管柱围堰水下混凝土灌注系统及施工方法 |
CN108118708A (zh) * | 2017-12-29 | 2018-06-05 | 中交路桥华南工程有限公司 | 深水围堰水下混凝土封底施工方法 |
CN108979161A (zh) * | 2018-09-26 | 2018-12-11 | 中铁十局集团第二工程有限公司 | 一种封底混凝土的施工方法及封底混凝土 |
CN110029662A (zh) * | 2019-05-29 | 2019-07-19 | 沈阳帝铂建筑工程有限公司 | 一种防断桩处理器及其施工方法 |
CN110965556A (zh) * | 2019-11-20 | 2020-04-07 | 中建桥梁有限公司 | 一种大面积水下混凝土浇筑方法 |
CN113404070A (zh) * | 2021-06-28 | 2021-09-17 | 中铁二十局集团第三工程有限公司 | 一种跨海桥水下大体积封底硂连续灌注工艺 |
Also Published As
Publication number | Publication date |
---|---|
CN106284362B (zh) | 2018-03-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106284362B (zh) | 一种单导管灌注大型水下封底混凝土的施工方法 | |
CN206346209U (zh) | 一种快速解决降水井管涌封堵结构 | |
CN205296168U (zh) | 一种水下灌筑混凝土装置 | |
CN103382722B (zh) | 地下水压较大的预留集水井处混凝土基础底板恢复方法 | |
CN206829163U (zh) | 一种高承压水段施工降排水装置 | |
CN203307776U (zh) | 一种混凝土面板堆石坝趾板结构 | |
CN103031848B (zh) | 混凝土灌注施工方法及实施此方法的装置 | |
CN204080839U (zh) | 一种降排水装置 | |
CN104895117B (zh) | Gxj钢橡胶止水带接头箱侧向剥离装置及其施工方法 | |
CN203738963U (zh) | 一种陶瓷定量注浆装置 | |
CN104929085B (zh) | 水利工程施工用自动排水系统的制造方法 | |
CN204282382U (zh) | 一种通过引流减压快速封堵降水管井的设备 | |
CN114197508B (zh) | 一种易封泄水装置、制造方法及其使用方法 | |
CN205557545U (zh) | 一种具有双重止水功能的减压井密封装置 | |
CN101876171B (zh) | 一种水冲、分解桥桩基破桩头的方法 | |
CN109356171A (zh) | 一种利用橡胶袋封堵溶洞的装置及其操作方法 | |
CN203346891U (zh) | 水下混凝土浇筑料斗 | |
CN108517886A (zh) | 一种高水位高水压降水井封堵方法 | |
CN204435330U (zh) | 一种水电水利工程临时生态泄放管封堵系统 | |
CN103526767B (zh) | 一种降水井封堵装置及封堵降水井的方法 | |
CN208328963U (zh) | 一种用于大面积基坑降水的聚水排水器 | |
CN108018859B (zh) | 基坑突涌应急处理方法及结构 | |
CN213417864U (zh) | 一种无需二次封井的基坑降水系统 | |
CN217758891U (zh) | 一种地下室降水井封堵防水解压装置 | |
CN203654265U (zh) | 便于真空降水的抗滑桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |