[go: up one dir, main page]

CN106196024A - Recirculating fluidized bed compound combustion system - Google Patents

Recirculating fluidized bed compound combustion system Download PDF

Info

Publication number
CN106196024A
CN106196024A CN201610752114.0A CN201610752114A CN106196024A CN 106196024 A CN106196024 A CN 106196024A CN 201610752114 A CN201610752114 A CN 201610752114A CN 106196024 A CN106196024 A CN 106196024A
Authority
CN
China
Prior art keywords
fluidized bed
pulverized coal
circulating fluidized
furnace
conveying pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610752114.0A
Other languages
Chinese (zh)
Inventor
刘众元
邢秀峰
刘建华
梁五洲
武晓俊
张渊
霍慧英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Shanxi Electric Power Co Ltd
Priority to CN201610752114.0A priority Critical patent/CN106196024A/en
Publication of CN106196024A publication Critical patent/CN106196024A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/02Fluidised bed combustion apparatus with means specially adapted for achieving or promoting a circulating movement of particles within the bed or for a recirculation of particles entrained from the bed
    • F23C10/04Fluidised bed combustion apparatus with means specially adapted for achieving or promoting a circulating movement of particles within the bed or for a recirculation of particles entrained from the bed the particles being circulated to a section, e.g. a heat-exchange section or a return duct, at least partially shielded from the combustion zone, before being reintroduced into the combustion zone
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/18Details; Accessories
    • F23C10/20Inlets for fluidisation air, e.g. grids; Bottoms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/18Details; Accessories
    • F23C10/22Fuel feeders specially adapted for fluidised bed combustion apparatus
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C2206/00Fluidised bed combustion
    • F23C2206/10Circulating fluidised bed

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)

Abstract

本发明公开了一种循环流化床复合燃烧系统,解决了循环流化床锅炉负荷响应速率慢的技术问题。包括循环流化床炉膛(1),在循环流化床炉膛(1)中设置有布风板(2),在循环流化床炉膛(1)的外侧壁上设置有返料器,在循环流化床炉膛(1)中设置有入炉煤料,在返料器的回料腿(3)上连接有煤粉输送管(4),煤粉输送管(4)的另一端与煤粉仓(5)连通,在煤粉仓(5)中设置有煤粉,在煤粉输送管(4)上连接有煤粉输送风管(6);循环流化床锅炉的入炉煤料量与煤粉输送管(4)输送的煤粉量的比为9:1。提高了流化床锅炉的负荷响应能力。

The invention discloses a circulating fluidized bed compound combustion system, which solves the technical problem of slow load response rate of a circulating fluidized bed boiler. Including a circulating fluidized bed furnace (1), an air distribution plate (2) is arranged in the circulating fluidized bed furnace (1), and a return device is arranged on the outer wall of the circulating fluidized bed furnace (1), and in the circulation Furnace coal is set in the fluidized bed furnace (1), and the pulverized coal conveying pipe (4) is connected to the return leg (3) of the feeder, and the other end of the pulverized coal conveying pipe (4) is connected with the pulverized coal The bin (5) is connected, and pulverized coal is set in the pulverized coal bin (5), and the pulverized coal conveying pipe (6) is connected to the pulverized coal conveying pipe (4); the amount of coal fed into the circulating fluidized bed boiler The ratio of the amount of pulverized coal transported by the pulverized coal delivery pipe (4) is 9:1. The load response capability of the fluidized bed boiler is improved.

Description

循环流化床复合燃烧系统Circulating fluidized bed compound combustion system

技术领域technical field

本发明涉及一种用于火力发电的循环流化床,特别涉及一种循环流化床的燃烧系统。The invention relates to a circulating fluidized bed used for thermal power generation, in particular to a combustion system of the circulating fluidized bed.

背景技术Background technique

目前,公知的火力发电厂所使用的循环流化床锅炉负荷响应速率都比较慢,很难对电网自动功率控制系统(AGC)做出快速响应,原因是循环流化床锅炉入炉煤的粒径较煤粉炉入炉煤的粒径偏大,燃烧释放热能较慢,热负荷响应速度滞后。随着智能电网的普及和流化床锅炉发电在电网中份额的增加,流化床机组参与电网调峰的占比越来越大,流化床锅炉对电网负荷作出快速响应的缺陷日益凸显。At present, the load response rate of circulating fluidized bed boilers used in known thermal power plants is relatively slow, and it is difficult to make a quick response to the automatic power control system (AGC) of the grid. Compared with the particle size of the coal fed into the pulverized coal furnace, the particle size is larger, the heat energy released by combustion is slower, and the heat load response speed lags behind. With the popularization of smart grid and the increasing share of fluidized bed boiler power generation in the grid, the proportion of fluidized bed units participating in grid peak regulation is increasing, and the defects of fluidized bed boilers' rapid response to grid load have become increasingly prominent.

发明内容Contents of the invention

本发明提供了一种循环流化床复合燃烧系统,解决了循环流化床锅炉负荷响应速率慢的技术问题。The invention provides a circulating fluidized bed compound combustion system, which solves the technical problem of slow load response rate of the circulating fluidized bed boiler.

本发明是通过以下技术方案解决以上技术问题的:The present invention solves the above technical problems through the following technical solutions:

一种循环流化床复合燃烧系统,包括循环流化床炉膛,在循环流化床炉膛中设置有布风板,在循环流化床炉膛的外侧壁上设置有返料器,在循环流化床炉膛中设置有入炉煤料,在返料器的回料腿上连接有煤粉输送管,煤粉输送管的另一端与煤粉仓连通,在煤粉仓中设置有煤粉,在煤粉输送管上连接有煤粉输送风管;循环流化床锅炉的入炉煤料量与煤粉输送管输送的煤粉量的比为9:1。A circulating fluidized bed composite combustion system, comprising a circulating fluidized bed furnace, an air distribution plate is arranged in the circulating fluidized bed furnace, a return device is arranged on the outer wall of the circulating fluidized bed furnace, Furnace coal is set in the hearth of the bed, and a pulverized coal conveying pipe is connected to the return leg of the feeder. The pulverized coal conveying pipe is connected with a pulverized coal conveying air pipe; the ratio of the amount of coal fed into the circulating fluidized bed boiler to the amount of pulverized coal conveyed by the pulverized coal conveying pipe is 9:1.

一种循环流化床复合燃烧系统,包括循环流化床炉膛,在循环流化床炉膛中设置有布风板,在循环流化床炉膛的外侧壁上设置有二次风管,在循环流化床炉膛中设置有入炉煤料,在二次风管上连接有煤粉输送管,煤粉输送管的另一端与煤粉仓连通,在煤粉仓中设置有煤粉,在煤粉输送管上连接有煤粉输送风管;循环流化床锅炉的入炉煤料量与煤粉输送管输送的煤粉量的比为9:1。A circulating fluidized bed composite combustion system, comprising a circulating fluidized bed furnace, an air distribution plate is arranged in the circulating fluidized bed furnace, a secondary air pipe is arranged on the outer wall of the circulating fluidized bed furnace, Furnace coal is set in the chemical bed furnace, and a pulverized coal conveying pipe is connected to the secondary air duct. The pulverized coal conveying air pipe is connected to the conveying pipe; the ratio of the amount of coal fed into the circulating fluidized bed boiler to the amount of pulverized coal conveyed by the pulverized coal conveying pipe is 9:1.

本发明通过从返料器回料腿给炉膛加入煤粉或在二次风管上加入煤粉,提高了流化床锅炉的负荷响应能力。The invention improves the load response capability of the fluidized bed boiler by adding coal powder to the furnace from the return leg of the feeder or adding coal powder to the secondary air pipe.

附图说明Description of drawings

图1是本发明在回料腿3上连接有煤粉输送管4的结构示意图。Fig. 1 is a structural schematic view of the present invention in which a pulverized coal conveying pipe 4 is connected to a return leg 3.

具体实施方式detailed description

下面结合附图对本发明进行详细说明:The present invention is described in detail below in conjunction with accompanying drawing:

一种循环流化床复合燃烧系统,包括循环流化床炉膛1,在循环流化床炉膛1中设置有布风板2,在循环流化床炉膛1的外侧壁上设置有返料器,在循环流化床炉膛1中设置有入炉煤料,在返料器的回料腿3上连接有煤粉输送管4,煤粉输送管4的另一端与煤粉仓5连通,在煤粉仓5中设置有煤粉,在煤粉输送管4上连接有煤粉输送风管6;循环流化床锅炉的入炉煤料与煤粉输送管4输送的煤粉量的比为9:1。A circulating fluidized bed composite combustion system, comprising a circulating fluidized bed furnace 1, an air distribution plate 2 is arranged in the circulating fluidized bed furnace 1, and a feeder is arranged on the outer wall of the circulating fluidized bed furnace 1, In the circulating fluidized bed furnace 1, the furnace coal material is set, and the pulverized coal conveying pipe 4 is connected on the return leg 3 of the feeder, and the other end of the pulverized coal conveying pipe 4 communicates with the pulverized coal bin 5. Pulverized coal is arranged in the powder bin 5, and the pulverized coal conveying air pipe 6 is connected to the pulverized coal conveying pipe 4; :1.

一种循环流化床复合燃烧系统,包括循环流化床炉膛1,在循环流化床炉膛1中设置有布风板2,在循环流化床炉膛1的外侧壁上设置有二次风管,在循环流化床炉膛1中设置有入炉煤料,在二次风管上连接有煤粉输送管4,煤粉输送管4的另一端与煤粉仓5连通,在煤粉仓5中设置有煤粉,在煤粉输送管4上连接有煤粉输送风管6;循环流化床锅炉的入炉煤料与煤粉输送管4输送的煤粉量的比为9:1。A circulating fluidized bed composite combustion system, comprising a circulating fluidized bed furnace 1, an air distribution plate 2 is arranged in the circulating fluidized bed furnace 1, and a secondary air duct is arranged on the outer wall of the circulating fluidized bed furnace 1 , the circulating fluidized bed furnace 1 is provided with the furnace coal, the secondary air pipe is connected with a pulverized coal delivery pipe 4, and the other end of the pulverized coal delivery pipe 4 communicates with the pulverized coal bin 5, and the pulverized coal bin 5 There is pulverized coal in the middle, and the pulverized coal conveying pipe 4 is connected with the pulverized coal conveying air pipe 6; the ratio of the coal feed into the furnace of the circulating fluidized bed boiler to the pulverized coal conveyed by the pulverized coal conveying pipe 4 is 9:1.

循环流化床炉膛1下部是布风板2,在返料器的回料腿3上设置有煤粉输送管4,煤粉输送管4一端和煤粉仓5连接,另一端和回料腿3连接。煤粉输送风管6和煤粉输送管4连接,煤粉通过压缩空气、一次风或者高压流化风输送到回料腿3,最后进入循环流化床炉膛1燃烧。煤粉管和输送风管的相关尺寸通过煤粉量和风量等参数计算。由于回料腿3进入的煤粉比给煤机给煤细度细,着火燃烧迅速,所以能够提高循环流化床的负荷响应速率。The lower part of the circulating fluidized bed furnace 1 is the air distribution plate 2, and the pulverized coal delivery pipe 4 is arranged on the return leg 3 of the feeder. One end of the pulverized coal delivery pipe 4 is connected to the pulverized coal bin 5, and the other end is connected to the return leg 3 connections. The pulverized coal conveying air pipe 6 is connected with the pulverized coal conveying pipe 4, and the pulverized coal is conveyed to the return leg 3 through compressed air, primary air or high-pressure fluidized air, and finally enters the circulating fluidized bed furnace 1 for combustion. The relevant dimensions of the pulverized coal pipe and the conveying air pipe are calculated by parameters such as pulverized coal volume and air volume. Since the fineness of the pulverized coal entered by the return leg 3 is finer than that fed by the coal feeder, it can be ignited and burned quickly, so the load response rate of the circulating fluidized bed can be improved.

Claims (2)

1.一种循环流化床复合燃烧系统,包括循环流化床炉膛(1),在循环流化床炉膛(1)中设置有布风板(2),在循环流化床炉膛(1)的外侧壁上设置有返料器,在循环流化床炉膛(1)中设置有入炉煤料,其特征在于,在返料器的回料腿(3)上连接有煤粉输送管(4),煤粉输送管(4)的另一端与煤粉仓(5)连通,在煤粉仓(5)中设置有煤粉,在煤粉输送管(4)上连接有煤粉输送风管(6);循环流化床锅炉的入炉煤料量与煤粉输送管(4)输送的煤粉量的比为9:1。1. A circulating fluidized bed composite combustion system, comprising a circulating fluidized bed furnace (1), an air distribution plate (2) is arranged in the circulating fluidized bed furnace (1), and a circulating fluidized bed furnace (1) A return feeder is provided on the outer wall of the feeder, and the coal feed into the furnace is provided in the circulating fluidized bed furnace (1). It is characterized in that a pulverized coal conveying pipe ( 4), the other end of the pulverized coal conveying pipe (4) communicates with the pulverized coal bin (5), and pulverized coal is installed in the pulverized coal bin (5), and the pulverized coal conveying pipe (4) is connected with a pulverized coal conveying fan Tube (6); the ratio of the amount of coal fed into the circulating fluidized bed boiler to the amount of pulverized coal transported by the pulverized coal delivery pipe (4) is 9:1. 2.一种循环流化床复合燃烧系统,包括循环流化床炉膛(1),在循环流化床炉膛(1)中设置有布风板(2),在循环流化床炉膛(1)的外侧壁上设置有二次风管,在循环流化床炉膛(1)中设置有入炉煤料,其特征在于,在二次风管上连接有煤粉输送管(4),煤粉输送管(4)的另一端与煤粉仓(5)连通,在煤粉仓(5)中设置有煤粉,在煤粉输送管(4)上连接有煤粉输送风管(6);循环流化床锅炉的入炉煤料量与煤粉输送管(4)输送的煤粉量的比为9:1。2. A circulating fluidized bed composite combustion system, comprising a circulating fluidized bed furnace (1), an air distribution plate (2) is arranged in the circulating fluidized bed furnace (1), and a circulating fluidized bed furnace (1) A secondary air pipe is provided on the outer wall of the circulating fluidized bed furnace (1), and the furnace coal material is provided in the circulating fluidized bed furnace (1). The other end of the conveying pipe (4) communicates with the pulverized coal bin (5), and pulverized coal is set in the pulverized coal bin (5), and the pulverized coal conveying pipe (6) is connected to the pulverized coal conveying pipe (4); The ratio of the amount of coal fed into the circulating fluidized bed boiler to the amount of pulverized coal transported by the pulverized coal delivery pipe (4) is 9:1.
CN201610752114.0A 2016-08-30 2016-08-30 Recirculating fluidized bed compound combustion system Pending CN106196024A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610752114.0A CN106196024A (en) 2016-08-30 2016-08-30 Recirculating fluidized bed compound combustion system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610752114.0A CN106196024A (en) 2016-08-30 2016-08-30 Recirculating fluidized bed compound combustion system

Publications (1)

Publication Number Publication Date
CN106196024A true CN106196024A (en) 2016-12-07

Family

ID=57527552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610752114.0A Pending CN106196024A (en) 2016-08-30 2016-08-30 Recirculating fluidized bed compound combustion system

Country Status (1)

Country Link
CN (1) CN106196024A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118328379A (en) * 2024-06-12 2024-07-12 怀柔实验室山西研究院 Powder feeding system and circulating fluidized bed boiler

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2527866Y (en) * 2002-03-18 2002-12-25 何相助 Composite circulating fluidized bed boiler
US20040261675A1 (en) * 2001-05-11 2004-12-30 Pauli Dernjatin Combined fluidized bed and pulverized coal combustion method
CN104807004A (en) * 2015-04-15 2015-07-29 华南理工大学 Rough and fine coal powder separating and combusting device in coal powder pipe
CN104879748A (en) * 2015-04-16 2015-09-02 哈尔滨工业大学 Device and method for controlling NOx in circulating fluidized bed coupled with air staging and fuel staging
CN205299497U (en) * 2015-11-25 2016-06-08 东方电气集团东方锅炉股份有限公司 Hierarchical sorting combustion system of circulating fluidized bed fuel thickness
CN205979744U (en) * 2016-08-30 2017-02-22 国网山西省电力公司电力科学研究院 Circulating fluidized bed combined combustion system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040261675A1 (en) * 2001-05-11 2004-12-30 Pauli Dernjatin Combined fluidized bed and pulverized coal combustion method
CN2527866Y (en) * 2002-03-18 2002-12-25 何相助 Composite circulating fluidized bed boiler
CN104807004A (en) * 2015-04-15 2015-07-29 华南理工大学 Rough and fine coal powder separating and combusting device in coal powder pipe
CN104879748A (en) * 2015-04-16 2015-09-02 哈尔滨工业大学 Device and method for controlling NOx in circulating fluidized bed coupled with air staging and fuel staging
CN205299497U (en) * 2015-11-25 2016-06-08 东方电气集团东方锅炉股份有限公司 Hierarchical sorting combustion system of circulating fluidized bed fuel thickness
CN205979744U (en) * 2016-08-30 2017-02-22 国网山西省电力公司电力科学研究院 Circulating fluidized bed combined combustion system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118328379A (en) * 2024-06-12 2024-07-12 怀柔实验室山西研究院 Powder feeding system and circulating fluidized bed boiler

Similar Documents

Publication Publication Date Title
CN103216840B (en) Formula of storing up in coal-burning boiler coal pulverizer reduces nitric oxide system
CN203223912U (en) Intermediate storage type super nitrogen reduction system for coal-fired boiler coal mill
CN105864748A (en) Combined combustion system of chain boiler
CN104344398A (en) Middle storage type hot wind powder feeding and pulverizing system
CN107559821A (en) The multiple-pass industrial coal powder boiler of flue gas recirculation and vortex burner overhead
CN205979744U (en) Circulating fluidized bed combined combustion system
CN106196024A (en) Recirculating fluidized bed compound combustion system
CN103697467B (en) Method for coal slime combustion of circulating fluidized bed boiler
CN109114546A (en) A kind of quick load change circulating fluidized bed boiler
CN202132965U (en) Flue gas drying lignite fan mill direct blowing pulverization system
CN104949115B (en) A kind of CFBB
CN203980261U (en) A kind of CFBB
CN203586193U (en) Middle storing bin type hot wind powder feeding and manufacturing system
CN204201880U (en) flue gas recirculation control system
CN102818248A (en) High-chlorine biomass and coal co-utilizing system with low-chlorine-corrosion and low-mercury discharge and method
CN201697119U (en) Coal Slime Feeding Device for Fluidized Bed Boiler
EP2706299A1 (en) Booster air heater for high moisture fuels
CN105782989B (en) The air inlet method and its garbage burning boiler equipment of garbage burning boiler burner hearth
CN207438619U (en) A kind of energy-efficient coal dust combustion system
CN208920042U (en) A kind of quick load change circulating fluidized bed boiler
CN102654283B (en) Coal cinder powder cyclone combustion system
CN101666495A (en) Method for controlling material return quantity of hearth of circulating fluidized bed boiler
CN207584801U (en) A kind of pulverized-coal fired boiler Slagging prevention and control system based on particle condensation
CN204693395U (en) A kind of Anti-blockage fluidized-bed combustion boiler
CN104534463A (en) Material feeding system for circulating fluidized bed boilers and circulating fluidized bed boiler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161207

WD01 Invention patent application deemed withdrawn after publication