[go: up one dir, main page]

CN106149681A - Combined type pile foundation construction treatment of the earth and combined type pile foundation construction process - Google Patents

Combined type pile foundation construction treatment of the earth and combined type pile foundation construction process Download PDF

Info

Publication number
CN106149681A
CN106149681A CN201610750995.2A CN201610750995A CN106149681A CN 106149681 A CN106149681 A CN 106149681A CN 201610750995 A CN201610750995 A CN 201610750995A CN 106149681 A CN106149681 A CN 106149681A
Authority
CN
China
Prior art keywords
mud
stake holes
external pipeline
pile foundation
foundation construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610750995.2A
Other languages
Chinese (zh)
Inventor
周凤中
彭品艳
王如如
包兴钗
董景建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAICH CONSTRUCTION Co Ltd
Original Assignee
TAICH CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAICH CONSTRUCTION Co Ltd filed Critical TAICH CONSTRUCTION Co Ltd
Priority to CN201610750995.2A priority Critical patent/CN106149681A/en
Publication of CN106149681A publication Critical patent/CN106149681A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a kind of combined type pile foundation construction treatment of the earth, including the first stake holes, mud-settling pit, mud standby pool and the second stake holes, oblique groove is used to turn between first stake holes and mud-settling pit, mud-settling pit and mud standby pool use the first external pipeline to connect, first external pipeline is configured with pump and filter screen, described mud standby pool is connected with the second external pipeline, second external pipeline is configured with pump, second Puncture Tube road has the outlet towards the second stake holes, second stake holes and mud-settling pit are configured with the 3rd external pipeline, 3rd external pipeline is configured with pump.Present invention also offers the construction technology using combined type pile foundation construction treatment of the earth to implement.This programme can reduce the outer freight volume of the waste residue that boring is formed, and accelerates stake holes clear hole speed, uses the impact sludge slurry clear hole of direct circulation, and retaining wall effect is good, and sediment at the bottom of hole can effectively control, and can be substantially reduced cost.

Description

Combined type pile foundation construction treatment of the earth and combined type pile foundation construction process
Technical field
The present invention relates to a kind of combined type pile foundation construction treatment of the earth.The invention still further relates to a kind of employing combined type pile foundation to execute The construction technology that workshop ground structure is implemented.
Background technology
Needing in the construction of conventional overhead road surface or overpass to set stake holes in a large number, these stake holes go out in pore forming process Now a large amount of waste residues need carrying, and the waste residue in stake holes is often difficult to remove, and causes the quality of pile foundation to go wrong.
Content of the invention
In view of the deficiency of prior art, the technical problem to be solved is to provide one can reduce waste residue, quickening The combined type pile foundation construction treatment of the earth of speed of application.Present invention also offers employing combined type pile foundation construction treatment of the earth to implement Construction technology.
To this end, the technical scheme is that the first stake holes, the mud including the impact drilling being laterally sequentially distributed and being formed Slurry sedimentation basin, mud standby pool and churning driven boring form the second stake holes, use between described first stake holes and mud-settling pit Oblique groove turns on, and oblique groove is in high, the low distribution of the other end near first stake holes one end, and described mud-settling pit is standby with mud Being connected by the passage of pond employing configuration filter screen, described first stake holes is turned on by the first external pipeline with mud-settling pit, and first External pipeline configures by the pump by mud-water conveying to the first stake holes, and described mud standby pool is connected with the second external pipeline, and second External pipeline is configured with pump, and the second Puncture Tube road has the outlet towards the second stake holes, described second stake holes and mud-settling pit Being configured with the 3rd external pipeline, the 3rd external pipeline is configured with pump.
Present invention also offers the combined type pile foundation construction process using combined type pile foundation construction treatment of the earth to implement, including A, impact are bored and churning driven is placed in the position of need to construct described first stake holes and the second stake holes, dig out mud-settling pit and mud Slurry standby pool;Excavation the first stake holes is bored in B, employing impact, uses churning driven to excavate the second stake holes;Excavation the first stake holes is bored in C, impact When inject water, promote water and excavation formed earth be mixed to form mud, the mud of spilling enters mud along described oblique groove Slurry sedimentation basin, mud is through being transported to mud standby pool by configuring the passage of filter screen after precipitation, and period mud passed through The filtration of filter screen, impact bores excavation to using after certain depth the first external pipeline that the muddy water in mud standby pool is pumped into the One stake holes carries out clear hole;When D, churning driven excavation the second stake holes are to certain depth, extract churning driven drilling rod, then external by second Pipeline inserts bottom the second stake holes, and the 3rd external pipeline is connected mud-settling pit and the second stake holes, starts pump and promotes mud standby Inject muddy water with pond bottom the second stake holes, and the second stake holes by the 3rd external pipeline to mud-settling pit slurry conveyed, by This completes clear hole to the second stake holes;E, concrete perfusion complete pile foundation construction.
The present invention can reduce the outer freight volume of the waste residue that boring is formed, and accelerates stake holes clear hole speed, uses impact sludge just to starch Circulation cleaning hole, retaining wall effect is good, and sediment at the bottom of hole can effectively control, and can be substantially reduced cost.
Brief description
The structural representation of the combined type pile foundation construction treatment of the earth that Fig. 1 provides for the present invention.
Detailed description of the invention
Shown in reference Fig. 1, the combined type pile foundation construction treatment of the earth that the present invention provides, including the impact being laterally sequentially distributed The first stake holes the 1st, mud-settling pit the 2nd, mud standby pool 3 that boring is formed and churning driven boring form the second stake holes 4, and described the Using oblique groove 5 to turn between one stake holes 1 and mud-settling pit 2, oblique groove 5 is high in close first stake holes 1 one end, another Holding low distribution, described mud-settling pit 2 and mud standby pool 3 use the passage of configuration filter screen to connect, described first stake holes 1 and mud Slurry sedimentation basin 2 is turned on by the first external pipeline 6, and the first external pipeline 6 configures by the pump by mud-water conveying to the first stake holes 1, Described mud standby pool 3 is connected with the second external pipeline 7, and the second external pipeline 7 is configured with pump, and the second external pipeline 7 has court To the outlet of the second stake holes 4, described second stake holes 4 is configured with the 3rd external pipeline 8, the 3rd external pipeline 8 with mud-settling pit 2 It is configured with pump.
The combined type pile foundation construction process using above-mentioned combined type pile foundation construction treatment of the earth enforcement that the present invention provides, bag Include A, impact is bored and churning driven is placed in the position of need to construct described first stake holes 1 and the second stake holes 4, digs out mud-settling pit 2 and mud standby pool 3;Excavation the first stake holes 1 is bored in B, employing impact, uses churning driven to excavate the second stake holes 4;Excavation is bored in C, impact Injecting water during the first stake holes 1, the earth promoting water and excavation to be formed is mixed to form mud, and the mud of spilling is along described oblique ditch Groove 5 enters mud-settling pit 2, mud through precipitation after through being transported to mud standby pool 3, period by configuring the passage of filter screen Mud is through the filtration of screen pack, and impact is bored excavation and used the first external pipeline 6 by mud standby pool 3 after certain depth Muddy water is pumped into the first stake holes 1 and carries out clear hole;When D, churning driven excavation the second stake holes 4 arrive certain depth, extract churning driven drilling rod, Then the second external pipeline 7 is inserted bottom the second stake holes 4, the 3rd external pipeline 8 is connected mud-settling pit 2 and the second stake holes 4, start pump and promote mud standby pool 3 to inject muddy water bottom the second stake holes 4, and the second stake holes 4 pass through the 3rd external pipeline 8 to Mud-settling pit 2 slurry conveyed, thus completes clear hole to the second stake holes 4;E, concrete perfusion complete pile foundation construction.

Claims (2)

1. a combined type pile foundation construction treatment of the earth, is characterized in that: include what the impact drilling being laterally sequentially distributed was formed First stake holes, mud-settling pit, mud standby pool and churning driven boring form the second stake holes, described first stake holes and mud sediment Using oblique groove to turn between pond, oblique groove is in high, the low distribution of the other end, described mud sediment near first stake holes one end Pond and mud standby pool use the passage of configuration filter screen to connect, and described first stake holes passes through the first external pipeline with mud-settling pit Conducting, the first external pipeline configures by the pump by mud-water conveying to the first stake holes, and it is external that described mud standby pool is connected with second Pipeline, the second external pipeline is configured with pump, and the second Puncture Tube road has the outlet towards the second stake holes, described second stake holes and mud Slurry sedimentation basin is configured with the 3rd external pipeline, and the 3rd external pipeline is configured with pump.
2. use the combined type pile foundation construction process that combined type pile foundation construction treatment of the earth described in claim 1 is implemented, its Feature is: includes that A, impact bore and churning driven is placed in the position of need to construct described first stake holes and the second stake holes, digs out mud Slurry sedimentation basin and mud standby pool;Excavation the first stake holes is bored in B, employing impact, uses churning driven to excavate the second stake holes;C, impact are bored Injecting water when excavating the first stake holes, the earth promoting water and excavation to be formed is mixed to form mud, the mud of spilling along described tiltedly Enter mud-settling pit to groove, mud through precipitation after through being transported to mud standby pool, phase by configuring the passage of filter screen Between mud through the filtration of screen pack, impact is bored excavation and is used the first external pipeline by mud standby pool after certain depth Muddy water is pumped into the first stake holes and carries out clear hole;When D, churning driven excavation the second stake holes are to certain depth, extract churning driven drilling rod, so After insert the second external pipeline bottom the second stake holes, the 3rd external pipeline is connected mud-settling pit and the second stake holes, starts Pump promotes mud standby pool to inject muddy water bottom the second stake holes, and the second stake holes passes through the 3rd external pipeline to mud-settling pit Slurry conveyed, thus completes clear hole to the second stake holes;E, concrete perfusion complete pile foundation construction.
CN201610750995.2A 2016-08-30 2016-08-30 Combined type pile foundation construction treatment of the earth and combined type pile foundation construction process Pending CN106149681A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610750995.2A CN106149681A (en) 2016-08-30 2016-08-30 Combined type pile foundation construction treatment of the earth and combined type pile foundation construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610750995.2A CN106149681A (en) 2016-08-30 2016-08-30 Combined type pile foundation construction treatment of the earth and combined type pile foundation construction process

Publications (1)

Publication Number Publication Date
CN106149681A true CN106149681A (en) 2016-11-23

Family

ID=57343772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610750995.2A Pending CN106149681A (en) 2016-08-30 2016-08-30 Combined type pile foundation construction treatment of the earth and combined type pile foundation construction process

Country Status (1)

Country Link
CN (1) CN106149681A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114809910A (en) * 2022-05-31 2022-07-29 中国十九冶集团有限公司 Composite hole forming method for friction pile foundation hole forming
CN115012807A (en) * 2022-05-11 2022-09-06 山东电力工程咨询院有限公司 Construction process of slurry retaining wall cast-in-place pile of rotary drilling rig

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5125464A (en) * 1988-07-28 1992-06-30 Cogema Drilling device for the study and exploitation of the subsoil
CN1149662A (en) * 1996-09-19 1997-05-14 薛仁定 Positive and negative circulation impact holing method
CN203655190U (en) * 2013-09-29 2014-06-18 深圳市工勘岩土工程有限公司 Hole cleaning equipment for cast-in-place bored pile
CN105804059A (en) * 2014-12-31 2016-07-27 上海市机械施工集团有限公司 Cast-in-situ bored pile hole-forming device and method
CN206052694U (en) * 2016-08-30 2017-03-29 泰昌建设有限公司 Combined type pile foundation construction treatment of the earth

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5125464A (en) * 1988-07-28 1992-06-30 Cogema Drilling device for the study and exploitation of the subsoil
CN1149662A (en) * 1996-09-19 1997-05-14 薛仁定 Positive and negative circulation impact holing method
CN203655190U (en) * 2013-09-29 2014-06-18 深圳市工勘岩土工程有限公司 Hole cleaning equipment for cast-in-place bored pile
CN105804059A (en) * 2014-12-31 2016-07-27 上海市机械施工集团有限公司 Cast-in-situ bored pile hole-forming device and method
CN206052694U (en) * 2016-08-30 2017-03-29 泰昌建设有限公司 Combined type pile foundation construction treatment of the earth

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115012807A (en) * 2022-05-11 2022-09-06 山东电力工程咨询院有限公司 Construction process of slurry retaining wall cast-in-place pile of rotary drilling rig
CN115012807B (en) * 2022-05-11 2025-07-25 山东电力工程咨询院有限公司 Construction process of slurry wall-protecting cast-in-place pile of rotary drilling rig
CN114809910A (en) * 2022-05-31 2022-07-29 中国十九冶集团有限公司 Composite hole forming method for friction pile foundation hole forming

Similar Documents

Publication Publication Date Title
CN102704873B (en) Construction equipment of hole drilling/punching cast-in-place pile with self-provided mud pit and mud separating device
CN104947652B (en) Long auger drilling cement mortar retaining wall type implanted pile tube construction device and construction method
KR100657418B1 (en) Method for attaching horizontal filtration wells and its capping device
JP2012112163A (en) Pile construction method in contaminated soil
JP2009179945A (en) Well conduit for road and its construction method
CN104695879B (en) A kind of stake holes is rinsed and takes out sand hole method
CN108643169A (en) One kind can slip casting prefabricated pile and its piling construction and grouting method
DE102008056262B4 (en) Apparatus and method for extracting cuttings and drilling mud
CN106149681A (en) Combined type pile foundation construction treatment of the earth and combined type pile foundation construction process
CN209129542U (en) The boring jackrod structure of bad ground
CN206052694U (en) Combined type pile foundation construction treatment of the earth
CN104074184B (en) Pile base post-grouted expanded-base bored pile
JP2014084611A (en) Pull-out device for buried pile
CN210797603U (en) Pumping well shaft
CN104631479B (en) Construction method of soil-changing and stirring waterproof curtain
CN207331791U (en) A kind of mine sump device for treating sludge
CN214741177U (en) Self-filtering mud pit of cast-in-situ bored pile
CN201802363U (en) In-situ leaching fluid-injecting system
RU2087617C1 (en) Method for construction of cast-in-place pile
KR100690396B1 (en) Peripheral filter installation method of perforated pipe of groundwater collecting well using flexible pressure pipe
CN204456094U (en) Bored pile environmental protection casing
CN113585992A (en) Pump suction reverse circulation drilling structure of super-thick covering layer large-diameter rock-socketed cast-in-place pile
CN101353894A (en) Filling pile construction pore-creating method of pervious ultra-deep loose backfill two-piece stone zone
KR100919729B1 (en) A method for horizontally drilling filtrate intake well and apparatus for clogging front tip of well
CN205077490U (en) Prevent suck -back and prevent slip casting device that deposits in deep full water sand bed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161123

RJ01 Rejection of invention patent application after publication