CN106088646B - 旧建筑物的加固结构 - Google Patents
旧建筑物的加固结构 Download PDFInfo
- Publication number
- CN106088646B CN106088646B CN201610442373.3A CN201610442373A CN106088646B CN 106088646 B CN106088646 B CN 106088646B CN 201610442373 A CN201610442373 A CN 201610442373A CN 106088646 B CN106088646 B CN 106088646B
- Authority
- CN
- China
- Prior art keywords
- deformed bar
- steel
- reinforcing rib
- wall
- angle steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
- E04G23/0211—Arrangements for filling cracks or cavities in building constructions using injection
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0222—Replacing or adding wall ties
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种旧建筑物的加固结构,其特征是墙体加固采取如下:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋,预应力钢筋上面再布置非预应力加强筋。预应力钢筋张拉完毕后将预应力钢筋通过固定筋进行固定。预应力钢筋与非预应力加强筋形成的张拉单元内布置注浆管,混凝土梁加固采取如下:角钢在1/3和2/3处弯折,角钢弯折处切出三角形缺口,三角形缺口背面焊接钢板进行加强,角钢弯折处设置紧固螺杆,混凝土梁下面两个角部均布置角钢,两个角部角钢之间焊接缀板,缀板厚度为10~12mm,缀板宽度为100~120mm。
Description
技术领域
本发明涉及一种加固结构,特别涉及一种旧建筑物的加固结构。
背景技术
旧建筑物经长期使用后因各种原因会出现承载力下降的现象,主要表现在旧建筑物的墙体因沉降等原因出现裂缝,或者墙体承载力不能满足现有荷载的要求;旧建筑物的混凝土梁因混凝土碳化会出现承载力下降,或者因使用标准的提升而出现承载力不能达到要求。因此对于旧建筑物,要加强结构的整体承力效果,改善结构的力学性能。
发明内容
本发明是提供一种旧建筑物的加固结构,解决墙体承载力和混凝土梁承载力不够的问题。
本发明针对墙体强度不够,采取以下加固结构:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋,预应力钢筋直径为12~14mm,预应力钢筋间距为150~300mm,预应力钢筋上面再布置非预应力加强筋,预应力钢筋与加强筋进行焊接连接,加强筋直径为12~14mm,加强筋钢筋间距为150~300mm。预应力钢筋初布置方向与水平夹角为45度,加强筋布置方向与预应力钢筋初布置方向垂直。预应力钢筋张拉完毕后将预应力钢筋通过固定筋进行固定,固定筋与预应力钢筋进行焊接固定,固定筋直径为14~16mm。固定筋间距为150~300mm,每个张拉单元长度为150~300mm,在张拉单元的两个端头设置加强筋。预应力钢筋与非预应力加强筋形成的张拉单元内布置注浆管,注浆管间距为350~450mm,注浆管为直径10mm的不锈钢钢管,注浆管埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定。注浆管与储浆罐之间设置三通阀门。
还可以采用下列加固结构:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋,预应力钢筋直径为12~14mm,预应力钢筋间距为150~300mm,预应力钢筋上面再布置非预应力加强筋,预应力钢筋与加强筋进行焊接连接,加强筋直径为12~14mm,加强筋钢筋间距为150~300mm。预应力钢筋初布置方向为水平,加强筋布置方向为竖向布置。预应力钢筋张拉完毕后将预应力钢筋通过固定筋进行固定,固定筋与预应力钢筋进行焊接固定,固定筋直径为14~16mm。固定筋间距为300~600mm,每个张拉单元长度为300~600mm,在张拉单元的两个端头设置加强筋,在端头竖向加强筋和竖向固定筋之间布置一排加强筋。预应力钢筋与非预应力加强筋形成的张拉单元内布置注浆管,注浆管间距为350~450mm,注浆管为直径10mm的不锈钢钢管,注浆管埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定。注浆管与储浆罐之间设置三通阀门。
墙体表面设置预应力钢筋后,墙体结构性能会有很大的提升,即使是结构的破坏形态也会很大的改善,会从塑性破坏过渡到弹性破坏,对结构安全会有显著的作用。
墙体加固施工步骤采用如下:
(1)剥离粉刷层,预钻注浆管的埋设孔,注浆管的埋设孔直径为12mm;预钻埋设孔使用电动旋转金刚石取芯钻,用水冷却钻头并带出砖屑;采用钢丝清理墙体表面的灰尘及浮渣或者松散部位并保持干燥;
(2)挂设预应力钢筋,通过U形铁扣将预应力钢筋固定在墙体,U形铁扣插入墙体灰缝;
(3)在预应力钢筋上面挂设加强筋,用钢丝将预应力钢筋与加强筋进行初步连接;
(4)对预应力钢筋进行预应力张拉,预应力钢筋张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.05~0.15。张拉工艺采用如下:将预应力钢筋初张拉张拉至10%的控制张拉应力,持荷3min建立初始应力,再张拉至控制张拉应力,持荷5min建立预应力。
(5)预应力张拉完毕后用固定筋将预应力钢筋进行焊接锚定,将预应力钢筋与加强筋进行焊接固定;
(6)埋设注浆管,注浆管与埋设孔的空隙采用结构胶进行封闭;
(7)对墙体进行注浆;用压力注浆机械浆液注入墙体,注浆从最下排位置开始,逐步向上和对称向两侧发展,在每一个注射点达到预期压力或者浆液在邻近注射点自由流出,注射方可终止,把注射孔堵塞。
如果浆液有渗漏,如找不到漏失通道,将浆液掺入速凝剂持续小量的注射使漏失通道逐渐沉淀堵塞。
浆液完全凝固后,拆除注浆管并进行封孔。
如果墙体有裂缝,在步骤(7)前要进行以下处理:
1)在裂缝中部埋设灌浆嘴,灌注点间距根据裂缝宽度和裂缝深度综合确定,间距为200~300mm;
2)封闭裂缝,灌浆嘴埋设后采用环氧胶泥封闭,形成一个密闭空间,预留浆液进出口,再用针筒将浆液压入缝隙,使其注满。
3)密封检查,沿裂缝涂一层肥皂,从灌浆嘴通入压缩空气,漏气部位予以修补密封至不漏为止。
4)灌浆,当裂缝宽度小于0.3mm时,采用环氧胶泥封闭裂缝后,再采用甲基丙烯酸脂类浆液灌注;当裂缝宽度大于或等于0.3mm且小于1mm时,采用环氧树脂类浆液灌注;当裂缝宽度大于或等于1mm时,采用水泥浆液灌注。
根据混凝土梁的受力特点,混凝土梁加固采取如下:在混凝土梁的1/3和2/3处施加向上的预应力会大大缓解混凝土梁的最大弯矩,所以本发明中角钢在1/3和2/3处弯折,角钢弯折处切出三角形缺口,三角形缺口背面焊接钢板进行加强,焊接钢板焊接宽度为150~200mm,钢板厚度为12~14mm。角钢弯折处设置紧固螺杆,紧固螺杆直径为18~22mm,螺帽高度大于螺杆直径的1.5倍。混凝土梁下面两个角部均布置角钢,左角部角钢和右角部角钢之间焊接缀板,缀板厚度为10~12mm,缀板宽度为100~120mm。
混凝土梁施工步骤采用如下:
(1)在混凝土梁下面设置临时支撑;
(2)凿除支承混凝土梁的砖墙250~300mm,为角钢施工留置操作空间;
(3)混凝土梁表面清理后插入角钢;
(4)安装紧固螺杆,对角钢进行预应力张拉;
(5)焊接钢板和缀板。
本发明结构性能好,安全可靠。
附图说明
图1为墙体加固结构示意图一,图2为墙体加固结构示意图二,图3为混凝土加固前结构示意图,图4为混凝土加固结构示意图。
各附图中:1、预应力钢筋,2、加强筋,3、固定筋,4、注浆管,5、角钢,6、紧固螺杆,7、钢板,8、缀板。
具体实施方式
实施例一
本实施例针对墙体强度不够,采取以下加固结构:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋1,预应力钢筋1直径为12mm,预应力钢筋1间距为200mm,预应力钢筋1上面再布置非预应力加强筋2,预应力钢筋1与加强筋2进行焊接连接,加强筋2直径为12mm,加强筋2钢筋间距为200mm。预应力钢筋1初布置方向与水平夹角为45度,加强筋2布置方向与预应力钢筋1初布置方向垂直,预应力钢筋1初布置为图1虚线位置,预应力钢筋1经张拉后变成实线位置。预应力钢筋1张拉完毕后将预应力钢筋1通过固定筋3进行固定,固定筋3与预应力钢筋1进行焊接固定,固定筋3直径为14mm。固定筋3间距为200mm,每个张拉单元长度为200mm,在张拉单元的两个端头设置加强筋2。预应力钢筋1与非预应力加强筋2形成的张拉单元内布置注浆管4,注浆管4间距为400mm,注浆管4为直径10mm的不锈钢钢管,注浆管4埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定。注浆管4与储浆罐之间设置三通阀门。
还可以采用下列加固结构:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋1,预应力钢筋1直径为12mm,预应力钢筋1间距为200mm,预应力钢筋1上面再布置非预应力加强筋2,预应力钢筋1与加强筋2进行焊接连接,加强筋2直径为12mm,加强筋2钢筋间距为200mm。预应力钢筋1初布置方向为水平,加强筋2布置方向为竖向布置,预应力钢筋1初布置为图2虚线位置,预应力钢筋1经张拉后变成实线位置。预应力钢筋1张拉完毕后将预应力钢筋1通过固定筋3进行固定,固定筋3与预应力钢筋1进行焊接固定,固定筋3直径为14~16mm。固定筋3间距为400mm,每个张拉单元长度为400mm,在张拉单元的两个端头设置加强筋2,在端头竖向加强筋2和竖向固定筋3之间布置一排加强筋2。预应力钢筋1与非预应力加强筋2形成的张拉单元内布置注浆管4,注浆管4间距为400mm,注浆管4为直径10mm的不锈钢钢管,注浆管4埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定。注浆管4与储浆罐之间设置三通阀门。
墙体加固施工步骤采用如下:
(1)剥离粉刷层,预钻注浆管4的埋设孔,注浆管4的埋设孔直径为12mm;预钻埋设孔使用电动旋转金刚石取芯钻,用水冷却钻头并带出砖屑;采用钢丝清理墙体表面的灰尘及浮渣或者松散部位并保持干燥;
(2)挂设预应力钢筋1,通过U形铁扣将预应力钢筋1固定在墙体,U形铁扣插入墙体灰缝;
(3)在预应力钢筋1上面挂设加强筋2,用钢丝将预应力钢筋1与加强筋2进行初步连接;
(4)对预应力钢筋1进行预应力张拉,预应力钢筋1张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.05~0.15。张拉工艺采用如下:将预应力钢筋1初张拉张拉至10%的控制张拉应力,持荷3min建立初始应力,再张拉至控制张拉应力,持荷5min建立预应力。
(5)预应力张拉完毕后用固定筋3将预应力钢筋1进行焊接锚定,将预应力钢筋1与加强筋2进行焊接固定;
(6)埋设注浆管4,注浆管4与埋设孔的空隙采用结构胶进行封闭;
(7)对墙体进行注浆;用压力注浆机械浆液注入墙体,注浆从最下排位置开始,逐步向上和对称向两侧发展,在每一个注射点达到预期压力或者浆液在邻近注射点自由流出,注射方可终止,把注射孔堵塞。
如果浆液有渗漏,如找不到漏失通道,将浆液掺入速凝剂持续小量的注射使漏失通道逐渐沉淀堵塞。
浆液完全凝固后,拆除注浆管4并进行封孔。
如果墙体有裂缝,在步骤(7)前要进行以下处理:
1)在裂缝中部埋设灌浆嘴,灌注点间距根据裂缝宽度和裂缝深度综合确定,间距为200~300mm;
2)封闭裂缝,灌浆嘴埋设后采用环氧胶泥封闭,形成一个密闭空间,预留浆液进出口,再用针筒将浆液压入缝隙,使其注满。
3)密封检查,沿裂缝涂一层肥皂,从灌浆嘴通入压缩空气,漏气部位予以修补密封至不漏为止。
4)灌浆,当裂缝宽度小于0.3mm时,采用环氧胶泥封闭裂缝后,再采用甲基丙烯酸脂类浆液灌注;当裂缝宽度大于或等于0.3mm且小于1mm时,采用环氧树脂类浆液灌注;当裂缝宽度大于或等于1mm时,采用水泥浆液灌注。
混凝土梁加固采取如下:在混凝土梁的1/3和2/3处施加向上的预应力会大大缓解混凝土梁的最大弯矩,所以本发明中角钢5在1/3和2/3处弯折,角钢5弯折处切出三角形缺口,三角形缺口背面焊接钢板7进行加强,焊接钢板7焊接宽度为180mm,钢板7厚度为12mm。角钢5弯折处设置紧固螺杆6,紧固螺杆6直径为20mm,螺帽高度为40mm。混凝土梁下面两个角部均布置角钢5,由于混凝土梁中部弯矩较大,两个角部角钢5之间焊接缀板8,缀板8厚度为10mm,缀板8宽度为100mm。
混凝土梁施工步骤采用如下:
(1)在混凝土梁下面设置临时支撑;
(2)凿除支承混凝土梁的砖墙280mm,为角钢5施工留置操作空间;
(3)混凝土梁表面清理后插入角钢5;
(4)安装紧固螺杆6,对角钢5进行预应力张拉;
(5)焊接钢板7和缀板8。
实施例二
本实施例采用下列加固结构:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋1,预应力钢筋1直径为12mm,预应力钢筋1间距为200mm,预应力钢筋1上面再布置非预应力加强筋2,预应力钢筋1与加强筋2进行焊接连接,加强筋2直径为12mm,加强筋2钢筋间距为200mm。预应力钢筋1初布置方向为水平,加强筋2布置方向为竖向布置,预应力钢筋1初布置为图2虚线位置,预应力钢筋1经张拉后变成实线位置。预应力钢筋1张拉完毕后将预应力钢筋1通过固定筋3进行固定,固定筋3与预应力钢筋1进行焊接固定,固定筋3直径为14~16mm。固定筋3间距为400mm,每个张拉单元长度为400mm,在张拉单元的两个端头设置加强筋2,在端头竖向加强筋2和竖向固定筋3之间布置一排加强筋2。预应力钢筋1与非预应力加强筋2形成的张拉单元内布置注浆管4,注浆管4间距为400mm,注浆管4为直径10mm的不锈钢钢管,注浆管4埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定。注浆管4与储浆罐之间设置三通阀门。
墙体加固施工步骤采用如下:
(1)剥离粉刷层,预钻注浆管4的埋设孔,注浆管4的埋设孔直径为12mm;预钻埋设孔使用电动旋转金刚石取芯钻,用水冷却钻头并带出砖屑;采用钢丝清理墙体表面的灰尘及浮渣或者松散部位并保持干燥;
(2)挂设预应力钢筋1,通过U形铁扣将预应力钢筋1固定在墙体,U形铁扣插入墙体灰缝;
(3)在预应力钢筋1上面挂设加强筋2,用钢丝将预应力钢筋1与加强筋2进行初步连接;
(4)对预应力钢筋1进行预应力张拉,预应力钢筋1张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.05~0.15。张拉工艺采用如下:将预应力钢筋1初张拉张拉至10%的控制张拉应力,持荷3min建立初始应力,再张拉至控制张拉应力,持荷5min建立预应力。
(5)预应力张拉完毕后用固定筋3将预应力钢筋1进行焊接锚定,将预应力钢筋1与加强筋2进行焊接固定;
(6)埋设注浆管4,注浆管4与埋设孔的空隙采用结构胶进行封闭;
(7)对墙体进行注浆;用压力注浆机械浆液注入墙体,注浆从最下排位置开始,逐步向上和对称向两侧发展,在每一个注射点达到预期压力或者浆液在邻近注射点自由流出,注射方可终止,把注射孔堵塞。
如果浆液有渗漏,如找不到漏失通道,将浆液掺入速凝剂持续小量的注射使漏失通道逐渐沉淀堵塞。
浆液完全凝固后,拆除注浆管4并进行封孔。
如果墙体有裂缝,在步骤(7)前要进行以下处理:
1)在裂缝中部埋设灌浆嘴,灌注点间距根据裂缝宽度和裂缝深度综合确定,间距为200~300mm;
2)封闭裂缝,灌浆嘴埋设后采用环氧胶泥封闭,形成一个密闭空间,预留浆液进出口,再用针筒将浆液压入缝隙,使其注满。
3)密封检查,沿裂缝涂一层肥皂,从灌浆嘴通入压缩空气,漏气部位予以修补密封至不漏为止。
4)灌浆,当裂缝宽度小于0.3mm时,采用环氧胶泥封闭裂缝后,再采用甲基丙烯酸脂类浆液灌注;当裂缝宽度大于或等于0.3mm且小于1mm时,采用环氧树脂类浆液灌注;当裂缝宽度大于或等于1mm时,采用水泥浆液灌注。
混凝土梁加固采取如下:在混凝土梁的1/3和2/3处施加向上的预应力会大大缓解混凝土梁的最大弯矩,所以本发明中角钢5在1/3和2/3处弯折,角钢5弯折处切出三角形缺口,三角形缺口背面焊接钢板7进行加强,焊接钢板7焊接宽度为180mm,钢板7厚度为12mm。角钢5弯折处设置紧固螺杆6,紧固螺杆6直径为20mm,螺帽高度为40mm。混凝土梁下面两个角部均布置角钢5,左角部角钢5和右角部角钢5之间焊接缀板8,缀板8厚度为10mm,缀板8宽度为100mm。
混凝土梁施工步骤采用如下:
(1)在混凝土梁下面设置临时支撑;
(2)凿除支承混凝土梁的砖墙280mm,为角钢5施工留置操作空间;
(3)混凝土梁表面清理后插入角钢5;
(4)安装紧固螺杆6,对角钢5进行预应力张拉;
(5)焊接钢板7和缀板8。
Claims (1)
1.一种旧建筑物的加固结构,其特征是墙体加固采取如下:墙体剥离粉刷后在墙体表面布置一皮预应力钢筋,预应力钢筋直径为12~14mm,预应力钢筋间距为150~300mm,预应力钢筋上面再布置非预应力加强筋,预应力钢筋与加强筋进行焊接连接,加强筋直径为12~14mm,加强筋钢筋间距为150~300mm;预应力钢筋张拉完毕后将预应力钢筋通过固定筋进行固定,固定筋与预应力钢筋进行焊接固定,固定筋直径为14~16mm;预应力钢筋与非预应力加强筋形成的张拉单元内布置注浆管,注浆管间距为350~450mm,注浆管为直径10mm的不锈钢钢管,注浆管埋入墙体灰缝,埋入深度为60mm,用结构胶进行固定;注浆管与储浆罐之间设置三通阀门;
混凝土梁加固采取如下:角钢在1/3和2/3处弯折,角钢弯折处切出三角形缺口,三角形缺口背面焊接钢板进行加强,焊接钢板焊接宽度为150~200mm,钢板厚度为12~14mm;角钢弯折处设置紧固螺杆,紧固螺杆直径为18~22mm,螺帽高度大于螺杆直径的1.5倍;混凝土梁下面两个角部均布置角钢,左角部角钢和右角部角钢之间焊接缀板,缀板厚度为10~12mm,缀板宽度为100~120mm。
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610442373.3A CN106088646B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固结构 |
CN201711245741.6A CN107905551B (zh) | 2016-05-21 | 2016-05-21 | 墙体的加固结构施工方法 |
CN201810184634.5A CN108360835B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固结构施工方法 |
CN201711245575.XA CN107916796B (zh) | 2016-05-21 | 2016-05-21 | 一种提升旧建筑物承载性能的结构 |
CN201711245752.4A CN107989397B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固构造施工方法 |
CN201711245677.1A CN107916797B (zh) | 2016-05-21 | 2016-05-21 | 一种提升旧建筑物承载性能的构造方法 |
CN201711246564.3A CN107989398B (zh) | 2016-05-21 | 2016-05-21 | 墙体的加固构造施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610442373.3A CN106088646B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固结构 |
Related Child Applications (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810184634.5A Division CN108360835B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固结构施工方法 |
CN201711245677.1A Division CN107916797B (zh) | 2016-05-21 | 2016-05-21 | 一种提升旧建筑物承载性能的构造方法 |
CN201711245752.4A Division CN107989397B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固构造施工方法 |
CN201711245575.XA Division CN107916796B (zh) | 2016-05-21 | 2016-05-21 | 一种提升旧建筑物承载性能的结构 |
CN201711246564.3A Division CN107989398B (zh) | 2016-05-21 | 2016-05-21 | 墙体的加固构造施工方法 |
CN201711245741.6A Division CN107905551B (zh) | 2016-05-21 | 2016-05-21 | 墙体的加固结构施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106088646A CN106088646A (zh) | 2016-11-09 |
CN106088646B true CN106088646B (zh) | 2018-07-24 |
Family
ID=57237314
Family Applications (7)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711245752.4A Active CN107989397B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固构造施工方法 |
CN201810184634.5A Active CN108360835B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固结构施工方法 |
CN201711245677.1A Active CN107916797B (zh) | 2016-05-21 | 2016-05-21 | 一种提升旧建筑物承载性能的构造方法 |
CN201711245741.6A Active CN107905551B (zh) | 2016-05-21 | 2016-05-21 | 墙体的加固结构施工方法 |
CN201711246564.3A Expired - Fee Related CN107989398B (zh) | 2016-05-21 | 2016-05-21 | 墙体的加固构造施工方法 |
CN201610442373.3A Active CN106088646B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固结构 |
CN201711245575.XA Active CN107916796B (zh) | 2016-05-21 | 2016-05-21 | 一种提升旧建筑物承载性能的结构 |
Family Applications Before (5)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711245752.4A Active CN107989397B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固构造施工方法 |
CN201810184634.5A Active CN108360835B (zh) | 2016-05-21 | 2016-05-21 | 旧建筑物的加固结构施工方法 |
CN201711245677.1A Active CN107916797B (zh) | 2016-05-21 | 2016-05-21 | 一种提升旧建筑物承载性能的构造方法 |
CN201711245741.6A Active CN107905551B (zh) | 2016-05-21 | 2016-05-21 | 墙体的加固结构施工方法 |
CN201711246564.3A Expired - Fee Related CN107989398B (zh) | 2016-05-21 | 2016-05-21 | 墙体的加固构造施工方法 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711245575.XA Active CN107916796B (zh) | 2016-05-21 | 2016-05-21 | 一种提升旧建筑物承载性能的结构 |
Country Status (1)
Country | Link |
---|---|
CN (7) | CN107989397B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577500A (zh) * | 2018-12-04 | 2019-04-05 | 富思特新材料科技发展股份有限公司 | 一种外墙外保温工程建筑疏松保温板基层处理工艺 |
CN110185277A (zh) * | 2019-04-19 | 2019-08-30 | 上海市建筑装饰工程集团有限公司 | 既有建筑外墙渗水点的修复方法 |
CN112065000B (zh) * | 2020-08-05 | 2021-08-06 | 业之峰诺华家居装饰集团股份有限公司 | 一种瓷砖薄贴法层结构及其施工工艺 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0089861A1 (fr) * | 1982-03-22 | 1983-09-28 | CAMPENON BERNARD, Société Anonyme dite: | Procédé pour conforter des arches ou des constructions analogues |
JP2003193420A (ja) * | 2001-12-28 | 2003-07-09 | Kajima Corp | 載荷金属管の補強工法 |
CN101033629A (zh) * | 2006-03-10 | 2007-09-12 | 吴方伯 | 钢筋混凝土抗裂墙 |
CN102041849A (zh) * | 2010-12-03 | 2011-05-04 | 同济大学 | 双角钢拼接型屈曲约束支撑 |
CN102704698A (zh) * | 2012-05-04 | 2012-10-03 | 南京盛圆土木工程高科技有限公司 | 一种全预应力复合一体化加固钢筋混凝土结构 |
CN102900242A (zh) * | 2012-11-16 | 2013-01-30 | 南京工业大学 | 一种钢桁架部分约束钢筋混凝土梁加固结构 |
CN103352581A (zh) * | 2013-07-09 | 2013-10-16 | 北京筑福国际工程技术有限责任公司 | 采用内部预应力钢筋锚杆加固烧结粘土砖砌体结构的方法 |
CN105421808A (zh) * | 2015-12-03 | 2016-03-23 | 四川省大卫建筑设计有限公司 | 修补古建筑墙体中的裂缝的方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202509792U (zh) * | 2012-03-31 | 2012-10-31 | 西安工业大学 | 一种用于加固砖混结构墙体的水泥砂浆面层钢筋网 |
-
2016
- 2016-05-21 CN CN201711245752.4A patent/CN107989397B/zh active Active
- 2016-05-21 CN CN201810184634.5A patent/CN108360835B/zh active Active
- 2016-05-21 CN CN201711245677.1A patent/CN107916797B/zh active Active
- 2016-05-21 CN CN201711245741.6A patent/CN107905551B/zh active Active
- 2016-05-21 CN CN201711246564.3A patent/CN107989398B/zh not_active Expired - Fee Related
- 2016-05-21 CN CN201610442373.3A patent/CN106088646B/zh active Active
- 2016-05-21 CN CN201711245575.XA patent/CN107916796B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0089861A1 (fr) * | 1982-03-22 | 1983-09-28 | CAMPENON BERNARD, Société Anonyme dite: | Procédé pour conforter des arches ou des constructions analogues |
JP2003193420A (ja) * | 2001-12-28 | 2003-07-09 | Kajima Corp | 載荷金属管の補強工法 |
CN101033629A (zh) * | 2006-03-10 | 2007-09-12 | 吴方伯 | 钢筋混凝土抗裂墙 |
CN102041849A (zh) * | 2010-12-03 | 2011-05-04 | 同济大学 | 双角钢拼接型屈曲约束支撑 |
CN102704698A (zh) * | 2012-05-04 | 2012-10-03 | 南京盛圆土木工程高科技有限公司 | 一种全预应力复合一体化加固钢筋混凝土结构 |
CN102900242A (zh) * | 2012-11-16 | 2013-01-30 | 南京工业大学 | 一种钢桁架部分约束钢筋混凝土梁加固结构 |
CN103352581A (zh) * | 2013-07-09 | 2013-10-16 | 北京筑福国际工程技术有限责任公司 | 采用内部预应力钢筋锚杆加固烧结粘土砖砌体结构的方法 |
CN105421808A (zh) * | 2015-12-03 | 2016-03-23 | 四川省大卫建筑设计有限公司 | 修补古建筑墙体中的裂缝的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107916796A (zh) | 2018-04-17 |
CN108360835B (zh) | 2020-02-04 |
CN107905551A (zh) | 2018-04-13 |
CN107905551B (zh) | 2020-02-04 |
CN107989397B (zh) | 2019-03-05 |
CN108360835A (zh) | 2018-08-03 |
CN107989397A (zh) | 2018-05-04 |
CN107916797B (zh) | 2020-05-15 |
CN106088646A (zh) | 2016-11-09 |
CN107916796B (zh) | 2019-03-05 |
CN107916797A (zh) | 2018-04-17 |
CN107989398A (zh) | 2018-05-04 |
CN107989398B (zh) | 2020-05-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204326567U (zh) | 一种钢筋混凝土墙体贯穿大裂缝修补结构 | |
CN106088646B (zh) | 旧建筑物的加固结构 | |
CN111519618A (zh) | 一种预应力管桩后注浆装置及其施工方法 | |
CN107013040A (zh) | 一种套筒预埋式后浇楼板的施工方法 | |
CN211547357U (zh) | 预制拼装结构灌浆套筒连接构造 | |
CN104532860A (zh) | 可回收土钉 | |
CN105625742B (zh) | 砖墙加固结构 | |
CN106626032A (zh) | 一种整体式内凸起空心抗拔桩及其制备方法 | |
CN111502328A (zh) | 一种基于ebtp锚杆的包砖城墙遗址锚固结构 | |
CN103103981B (zh) | 一种预应力楔形管桩接头的施工方法 | |
CN211621263U (zh) | 一种新型新旧混凝土界面连接构造 | |
CN109024249B (zh) | 一种接头采用现浇uhpc材料的承插式构造预制拼装桥墩 | |
CN219637664U (zh) | Uhpc填缝浅槽承插式快速连接装配式桥墩与承台连接结构 | |
CN204626398U (zh) | 一种基坑土钉支护结构 | |
CN208152011U (zh) | 预制预应力地下连续墙 | |
CN114718605A (zh) | 用于加固盾构隧道衬砌结构的超高性能混凝土-钢拱架组合结构及方法 | |
CN221761481U (zh) | 一种混凝土墙体裂缝收缩封堵装置 | |
CN204475352U (zh) | 可回收土钉 | |
CN216465429U (zh) | 一种预制夹心保温墙板的对拉螺栓孔高效成孔装置 | |
CN117822746B (zh) | 一种不同型号混凝土连接装置及其连接工艺 | |
CN216811108U (zh) | 一种砌体墙增设钢筋混凝土柱的加固结构 | |
CN211395690U (zh) | 一种方便施工的基坑支护墙结构 | |
CN108590724A (zh) | 一种散射固灌式锚杆 | |
CN214220276U (zh) | 一种用于砌体墙的拉筋接驳装置 | |
CN110130333B (zh) | Bfrp筋材抗浮锚杆设计方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201124 Address after: 242200 no.3-104 Dongting street, Dongting Township, Guangde City, Xuancheng City, Anhui Province Patentee after: Guangde Leisen Landscape Engineering Co., Ltd Address before: 325000 No. 4, Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, China Patentee before: Ye Changqing |
|
TR01 | Transfer of patent right |