CN106081797A - A kind of novel elevator mounting process lifting - Google Patents
A kind of novel elevator mounting process lifting Download PDFInfo
- Publication number
- CN106081797A CN106081797A CN201610280649.2A CN201610280649A CN106081797A CN 106081797 A CN106081797 A CN 106081797A CN 201610280649 A CN201610280649 A CN 201610280649A CN 106081797 A CN106081797 A CN 106081797A
- Authority
- CN
- China
- Prior art keywords
- hoistway
- lifting
- hall door
- guide rail
- mounting process
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title abstract description 8
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 9
- 239000010959 steel Substances 0.000 claims abstract description 9
- 238000010276 construction Methods 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
Landscapes
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Structural Engineering (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
A kind of novel elevator mounting process lifts, and guide rail, steel wire rope, hall door use the mode of lifting to install, and all operations completes outside hoistway.The present invention relates to elevator mounting process.High in order to fundamentally solve existing mounting process work high above the ground danger, long in time limit, complexity, the problem that cost is high, the outer operation of hoistway are installed, it is time saving and energy saving that hoistway construction volume reduces, reduce installation cost, reduce the hoistway activity duration, it is ensured that safety of workers is effectively guaranteed precision simultaneously, allow user enjoy the most comfortable life, therefore there is good exploitation prospect.
Description
Technical field
This patent relates to elevator mounting process.
Background technology
The situation of existing elevator mounting process is:
1. hall door, guide rail, the installation one by one in hoistway of all parts of steel wire rope.
2. an elevator is installed and needs the long period.
Its defect:
1. installing all operations in hoistway, difficulty of construction is big, and accident risk is high, long in time limit.
2. cost is high, efficiency is low.
Summary of the invention
This patent solves the technical problem that: high in order to fundamentally solve existing product work high above the ground danger, the duration
Long, complexity, the problem that cost is high, it is proposed that a kind of brand-new elevator mounting process are installed.
The technical solution adopted for the present invention to solve the technical problems is: hall door, guide rail, steel wire rope use the mode of lifting
Installing, all operations completes outside hoistway.
The invention has the beneficial effects as follows: hall door, guide rail, steel wire rope use the mode of lifting to install, the outer operation of hoistway, hoistway
It is time saving and energy saving that construction volume reduces, and strong ensure that precision, reduces installation cost, reduces the hoistway activity duration, it is ensured that workman
Safety.
Accompanying drawing illustrates:
The present invention is further described below in conjunction with the accompanying drawings:
Accompanying drawing Fig. 1,2 it is the lifting schematic diagram of guide rail.
Accompanying drawing Fig. 3,4 it is the lifting schematic diagram of hoist ropes.
Accompanying drawing Fig. 5,6 it is the lifting schematic diagram of hall door.
Detailed description of the invention
1, hall door assembles in factory, and entirety is transported to scene.
2, the special transport integrated lorry-mounted crane of lifting vehicle and hoist engine device for hoisting, arrival, unload, lift
Accomplish without any letup.
3, prepare before the lifting of machine room: 1. machine room preformed hole template, just use machine room pre-machine room civil engineering when
Staying template to reserve, civil engineering directly can be installed once completing.2. hole for hoist template, finishes hall door, guide rail on Polypropylence Sheet
Hoisting Position, on-the-spot directly by relevant position punching lifting.Or determine that car guide rail position, hall door fixed position are direct with shaped steel
Welding shelf is fixed on machine room spandrel girder at top layer;Determine that counter weight guide track position is fixed on machine room spandrel girder at top layer with shaped steel
On.So guide rail, hall door is the most directly had good positioning.
4, prepare before the lifting of equipment: lift special vehicle and hoist engine is in place, can be used to elevator components with overhead cable
Mode is transported in building.
5, equipment opening is reserved on machine room ground, and traction machine, spandrel girder, switch board are lifted into machine room successively.
6, guide rail lifting.First a guide rail is sling at one layer of hall door mouth, then with guide rail splice by two guide rails even
Pick up and lift again, put in place by root lifting successively according to this mode.
7, hoist ropes lifting.Hoist ropes all hung top layer and is arranged on shelf, then with row's card, fag end being fixed.
It is fixed on spandrel girder after traction machine is by another traction hole from traction hole.One is added in hoist ropes bottom after walking around traction machine
Pulley, adds a weight below.Another towline head is fixed on spandrel girder, adds a pulley in hoist ropes bottom, add below
One weight.Last directly by counterweight diversion sheave and sedan-chair top diversion sheave two weights of replacement.
8, hall door lifting.Hall door successively lifts outside one layer of hoistway, arranges steel wire rope self-locking device on hoistway door,
Make hall door upwards can art skating, auto lock when moving down, determine hall door position.
Claims (9)
1. it is characterized in that:
The special transport integrated lorry-mounted crane of lifting vehicle and hoist engine, show up unloading while, by traction machine, spandrel girder,
Switch board, hall door, guide rail, hoist ropes disposably lift in place.
2. guide rail lifting, slings guide rail at hoistway by root and connects with screw, then hanging in relevant position.
3. hall door lifting, hoistway door arranges steel wire rope self-locking device, make hall door upwards can art skating, move down
Time auto lock, all hall door entirety are lifted up into hoistway and are hung on the same steel wire rope on hoistway top, and are promoted to corresponding positions
Put.
4. hoist ropes lifting, all hangs hoist ropes top layer and is arranged on shelf, then is fixed by fag end with row's card.
5. it is fixed on spandrel girder after traction machine is by another traction hole from traction hole.
6. add a pulley after walking around traction machine in hoist ropes bottom, add a weight below.
7. another towline head is fixed on spandrel girder, adds a pulley in hoist ropes bottom, add a weight below.
8. last directly by counterweight diversion sheave and sedan-chair top diversion sheave two weights of replacement.
9. lift special calculator room equipment preformed hole for equipment from hoistway.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610280649.2A CN106081797A (en) | 2016-05-03 | 2016-05-03 | A kind of novel elevator mounting process lifting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610280649.2A CN106081797A (en) | 2016-05-03 | 2016-05-03 | A kind of novel elevator mounting process lifting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106081797A true CN106081797A (en) | 2016-11-09 |
Family
ID=58702502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610280649.2A Pending CN106081797A (en) | 2016-05-03 | 2016-05-03 | A kind of novel elevator mounting process lifting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106081797A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110191855A (en) * | 2017-01-26 | 2019-08-30 | 三菱电机株式会社 | The installation method of elevator |
CN112623981A (en) * | 2020-12-09 | 2021-04-09 | 日立电梯(中国)有限公司 | Mounting method of hoisting equipment |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0549775U (en) * | 1991-12-17 | 1993-06-29 | 株式会社日立ビルシステムサービス | Dumbwaiter basket lifting device |
JP2000038270A (en) * | 1998-07-23 | 2000-02-08 | Mitsubishi Electric Corp | Elevator device |
CN2654578Y (en) * | 2003-10-28 | 2004-11-10 | 江苏康力电梯集团有限公司 | Machine room-free elevator |
CN201395455Y (en) * | 2009-04-23 | 2010-02-03 | 新疆天山电梯制造有限公司 | Non-machinery room elevator |
CN101830388A (en) * | 2010-05-21 | 2010-09-15 | 日立电梯(中国)有限公司 | Installation method of counter-weight frame of elevator |
CN102887415A (en) * | 2012-09-14 | 2013-01-23 | 马海英 | Elevator |
CN202785172U (en) * | 2012-09-29 | 2013-03-13 | 唐海山 | Special escape elevator system for high-rise buildings |
CN103723591A (en) * | 2013-11-13 | 2014-04-16 | 西子奥的斯电梯有限公司 | Lift car position detection system |
CN103803383A (en) * | 2013-12-23 | 2014-05-21 | 西子奥的斯电梯有限公司 | Elevator traction system |
CN105502131A (en) * | 2016-01-20 | 2016-04-20 | 江南嘉捷电梯股份有限公司 | Elevator traction machine installing device |
-
2016
- 2016-05-03 CN CN201610280649.2A patent/CN106081797A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0549775U (en) * | 1991-12-17 | 1993-06-29 | 株式会社日立ビルシステムサービス | Dumbwaiter basket lifting device |
JP2000038270A (en) * | 1998-07-23 | 2000-02-08 | Mitsubishi Electric Corp | Elevator device |
CN2654578Y (en) * | 2003-10-28 | 2004-11-10 | 江苏康力电梯集团有限公司 | Machine room-free elevator |
CN201395455Y (en) * | 2009-04-23 | 2010-02-03 | 新疆天山电梯制造有限公司 | Non-machinery room elevator |
CN101830388A (en) * | 2010-05-21 | 2010-09-15 | 日立电梯(中国)有限公司 | Installation method of counter-weight frame of elevator |
CN102887415A (en) * | 2012-09-14 | 2013-01-23 | 马海英 | Elevator |
CN202785172U (en) * | 2012-09-29 | 2013-03-13 | 唐海山 | Special escape elevator system for high-rise buildings |
CN103723591A (en) * | 2013-11-13 | 2014-04-16 | 西子奥的斯电梯有限公司 | Lift car position detection system |
CN103803383A (en) * | 2013-12-23 | 2014-05-21 | 西子奥的斯电梯有限公司 | Elevator traction system |
CN105502131A (en) * | 2016-01-20 | 2016-04-20 | 江南嘉捷电梯股份有限公司 | Elevator traction machine installing device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110191855A (en) * | 2017-01-26 | 2019-08-30 | 三菱电机株式会社 | The installation method of elevator |
CN110191855B (en) * | 2017-01-26 | 2020-11-13 | 三菱电机株式会社 | Method for installing elevator |
CN112623981A (en) * | 2020-12-09 | 2021-04-09 | 日立电梯(中国)有限公司 | Mounting method of hoisting equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9617121B2 (en) | Installation method for an elevator | |
CN103979383B (en) | Building operation multiple layer up-down plateform system | |
WO2010061265A1 (en) | Method of installing an elevator | |
CN209052240U (en) | A kind of tool for super high-rise building duplex elevator vertical transport | |
CN103266192A (en) | Hoisting method for replacing cooling wall in overhauling of blast furnace | |
CN106976769A (en) | A kind of building hoist automatic leveling method | |
CN201395455Y (en) | Non-machinery room elevator | |
CN106081797A (en) | A kind of novel elevator mounting process lifting | |
CN103086221B (en) | Extension protecting structure for hoisting rope of elevator | |
CN102807178A (en) | Chamfered hanging basket device with slide rail | |
CN103086276A (en) | Construction method for hoisting bridge type crane in high-rise well tower type building | |
US9580279B2 (en) | Maintenance method for an elevator | |
CN211447834U (en) | Curtain wall transportation and installation system | |
CN205555796U (en) | Car elevating gear of elevator | |
CN101195455A (en) | Automatic maintenance and operation equipment for elevators | |
CN107651589B (en) | The guidance method of double leading block and double multistrand rope | |
CN209770224U (en) | Suspension rail lifting device | |
CN103879860A (en) | Device special for elevator installation | |
RU145274U1 (en) | ELECTROTAL WITH SYNCHRONOUS DOUBLE LIFT | |
CN203269287U (en) | Underneath type elevator without machine room | |
CN108190688A (en) | A kind of automatic external climbing construction platform | |
CN102887415B (en) | Elevator | |
CN109512315B (en) | Suspension rail lifting device | |
CN104973515A (en) | Multi-section safe operation chamber of crane and operation method thereof | |
CN205325056U (en) | Integrated frock of ladder way rail fixation plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |