CN106065768B - A kind of auxiliary for hydraulic rock drilling machine loads and unloads the method and its device of drill steel manually - Google Patents
A kind of auxiliary for hydraulic rock drilling machine loads and unloads the method and its device of drill steel manually Download PDFInfo
- Publication number
- CN106065768B CN106065768B CN201610385396.5A CN201610385396A CN106065768B CN 106065768 B CN106065768 B CN 106065768B CN 201610385396 A CN201610385396 A CN 201610385396A CN 106065768 B CN106065768 B CN 106065768B
- Authority
- CN
- China
- Prior art keywords
- loading
- drill rod
- drill
- rock drilling
- unloading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/18—Connecting or disconnecting drill bit and drilling pipe
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
一种用于液压凿岩钻机的辅助手动装卸钎杆的方法及其装置,凿岩钻有跟随凿岩钻机移动的装卸架,该装卸架能在低位挂住钎杆,然后利用凿岩钻机回退上行的过程用该装卸架携带钎杆挂起,使钎杆可以直于夹钎器中并被夹钎器固定,等待凿岩钻机的钎尾旋入钎杆,完成钎杆的安装,拆卸钎杆时,当被拆卸钎杆已经与凿岩钻机冲击杆和底下钎杆已经分离后,人工平拉被拆钎杆的下方的钎杆头,同时凿岩钻机上装卸架随同凿岩钻机下移,被拆钎杆被慢慢下移平置,完成钎杆的拆卸,装卸架开带缺口的圆孔,钎杆的尾部从这个缺口移入,使得钎杆挂在装卸架上。
A method and device for assisting manual loading and unloading of drill rods for hydraulic rock drilling rigs. The rock drill has a loading and unloading rack that moves with the rock drilling rig. The loading and unloading rack can hang the drill rod at a low position, and then use the rock drilling machine to return In the process of going back up, use the loading and unloading frame to carry the drill rod to hang, so that the drill rod can be straight in the drill clamp and fixed by the drill clamp, and wait for the drill tail of the rock drilling rig to be screwed into the drill rod to complete the installation and disassembly of the drill rod When drilling the drill rod, when the drill rod to be disassembled has been separated from the rock drilling rig impact rod and the bottom drill rod, manually pull the drill rod head below the removed drill rod, and at the same time, the upper loading and unloading frame of the rock drilling rig is lowered with the rock drilling rig. Move, the drill rod to be dismantled is slowly moved down and placed horizontally, and the disassembly of the drill rod is completed. The loading and unloading frame opens a round hole with a gap, and the tail of the drilling rod moves in from this gap, so that the drilling rod is hung on the loading and unloading frame.
Description
技术领域technical field
本发明属于一种钎杆手动装卸技术领域,主要应用于凿岩钻机钻孔过程中手动添加钎杆和拆卸钎杆的应用场合。The invention belongs to the technical field of manual loading and unloading of drill rods, and is mainly used in the application occasions of manually adding drill rods and removing drill rods during the drilling process of rock drilling rigs.
背景技术Background technique
常见的凿岩钻机配套的一根钎杆长度3.7米,直径32毫米,重量23千克左右,当需要手动加钎杆时,通常的做法是依靠一个人用手扶住这根钎杆,竖直安装它,其缺点是人工扶直容易摇晃,不容易对中,导致钎杆安装失败,还有钎杆重量较大,工人容易手酸疲劳,不宜长时间在此岗位工作;采用一个辅助装置安装和拆卸钎杆,可以提高安装准确度,提高工人施工安全性,降低工人劳动强度,同时为此增加的设备成本低,机械结构简单可靠。A common rock drilling rig is equipped with a drill rod with a length of 3.7 meters, a diameter of 32 mm, and a weight of about 23 kg. The disadvantage of installing it is that manual straightening is easy to shake, and it is not easy to center, resulting in the failure of the installation of the drill rod, and the weight of the drill rod is heavy, and the workers are prone to hand fatigue, so it is not suitable to work in this position for a long time; it is installed with an auxiliary device And dismantling the drill rod can improve the installation accuracy, improve the construction safety of workers, and reduce the labor intensity of workers. At the same time, the increased equipment cost is low, and the mechanical structure is simple and reliable.
发明内容Contents of the invention
本发明所要解决的技术问题是:提供一种提高工人施工安全性、降低工人劳动强度的辅助手动装卸钎杆的方法,采用一个安装在凿岩钻机上的装卸架,不需要人工扶钎,避免有倾倒的危险。The technical problem to be solved by the present invention is to provide a method for assisting manual loading and unloading of drill rods that improves the construction safety of workers and reduces labor intensity. There is a danger of tipping.
本发明可通过下列技术方案来实现:The present invention can be realized through the following technical solutions:
一种用于液压凿岩钻机的辅助手动装卸钎杆的方法,其特征在于:它有跟随凿岩钻机移动的装卸架,该装卸架能在低位挂住钎杆,然后利用凿岩钻机回退上行的过程用该装卸架携带钎杆挂起,使钎杆可以直于夹钎器中并被夹钎器固定,等待凿岩钻机的钎尾旋入钎杆,完成钎杆的安装,拆卸钎杆时,当被拆卸钎杆与凿岩钻机钎尾和底下钎杆已经分离后,人工平拉被拆钎杆的下方的钎杆头,同时凿岩钻机上装卸架随同凿岩钻机下移,被拆钎杆被慢慢下移平置,完成钎杆的拆卸,装卸架能绕凿岩钻机前端旋转,装卸架系一根拉绳,当凿岩钻机降落到大梁的底部时,在拉绳的作用下,带动装卸架旋转,使得装卸架避开凿岩钻机钎尾。A method for assisting manual loading and unloading of drill rods for hydraulic rock drilling rigs, characterized in that it has a loading and unloading frame that moves with the rock drilling rig, and the loading and unloading frame can hang the drill rod at a low position, and then use the rock drilling rig to retreat During the upward process, use the loading and unloading frame to carry the drill rod and hang it, so that the drill rod can be straight in the drill holder and fixed by the drill holder, wait for the drill tail of the rock drilling rig to be screwed into the drill rod, complete the installation of the drill rod, and disassemble the drill rod When removing the drill rod, when the removed drill rod has been separated from the drill tail and the bottom drill rod, manually pull the drill rod head below the removed drill rod, and at the same time, the upper loading and unloading frame of the rock drilling rig moves down with the rock drilling rig. The dismantled drill rod is slowly moved down and placed horizontally to complete the disassembly of the drill rod. The loading and unloading frame can rotate around the front end of the rock drilling rig, and the loading and unloading frame is tied with a pull rope. Under the action of the action, the loading and unloading frame is driven to rotate, so that the loading and unloading frame avoids the shank tail of the rock drilling rig.
本发明所要解决的另一个技术问题是,提供一种手动钎杆装卸装置,通过简单和可靠的机械结构,辅助人工安装和拆卸钎杆。Another technical problem to be solved by the present invention is to provide a manual drill rod loading and unloading device, which assists manual installation and removal of drill rods through a simple and reliable mechanical structure.
为了解决上述技术问题,本发明采用以下技术方案:In order to solve the above technical problems, the present invention adopts the following technical solutions:
一种手动钎杆装卸装置,其特征在于:凿岩钻机前端设有一装卸架,装卸架开带缺口的圆孔,钎杆的尾部从这个缺口移入,使得钎杆挂在装卸架上。A manual drill rod loading and unloading device is characterized in that: the front end of the rock drilling rig is provided with a loading and unloading frame, and the loading and unloading frame has a round hole with a notch, and the tail of the drill rod is moved in through the gap, so that the drill rod is hung on the loading and unloading frame.
所述装卸架设有挂钩,凿岩钻机前端设有耳轴,挂钩挂在耳轴上,装卸架可绕耳轴旋转运动,装卸架系一根拉绳,当凿岩钻机降落到大梁的底部时,在拉绳的作用下,装卸架会绕耳轴旋转,使得装卸架避开凿岩钻机钎尾。The loading and unloading frame is provided with a hook, the front end of the rock drilling rig is provided with a trunnion, the hook is hung on the trunnion, the loading and unloading frame can rotate around the trunnion, and the loading and unloading frame is tied with a pull rope. , under the action of the pull rope, the loading and unloading frame will rotate around the trunnion, so that the loading and unloading frame avoids the shank of the rock drilling rig.
所述装卸架会绕耳轴顺时针旋转60°The dock will rotate 60° clockwise about the trunnion
采用上述结构后:采用一个安装在凿岩钻机上的装卸架,工人只要将钎杆尾部平放入装卸架上,不需要人工扶钎;在拆卸钎杆时,当被拆卸钎杆已经与凿岩钻机冲击杆和底下钎杆已经分离后,工人平拉被拆钎杆的下方的钎杆头,同时凿岩钻机上装卸架随同凿岩钻机下移,被拆钎杆被慢慢下移平置,避免有倾倒的危险。本发明通过简单和可靠的机械结构,辅助人工安装和拆卸钎杆,提高安装钎杆的准确度,提高工人施工安全性,降低工人劳动强度。After the above-mentioned structure is adopted: a loading and unloading frame installed on the rock drilling rig is adopted, and the worker only needs to put the end of the chisel on the loading and unloading frame flatly, and does not need to manually support the chisel; After the impact rod of the rock drilling rig and the lower drill rod have been separated, the worker pulls the drill rod head below the removed drill rod, and at the same time, the upper loading and unloading frame of the rock drilling rig moves down with the rock drilling rig, and the removed drill rod is slowly moved down. place to avoid the risk of tipping. The invention assists manual installation and disassembly of drill rods through a simple and reliable mechanical structure, improves the accuracy of installing the drill rods, improves the construction safety of workers, and reduces the labor intensity of workers.
附图说明Description of drawings
图1为钎杆手动装卸装置工位一Figure 1 is the first position of the drill rod manual loading and unloading device
图2为图1的局部放大图Figure 2 is a partial enlarged view of Figure 1
图3为钎杆手动装卸装置工位二Figure 3 is the second position of the drill rod manual loading and unloading device
图4为 装卸架结构图Figure 4 is a structural diagram of the loading and unloading rack
图中:1-销、2-装卸架、3-拉绳、4-凿岩钻机、5-耳轴、6-卡箍、7-钎杆、8-顶板、9-大梁、10-圆孔。In the figure: 1-pin, 2-handling frame, 3-drawing rope, 4-rock drilling rig, 5-trunnion, 6-clamp, 7-drilling rod, 8-top plate, 9-beam, 10-round hole .
具体实施方式Detailed ways
下面结合附图进一步说明本发明的具体实施方式和内容。The specific implementation and content of the present invention will be further described below in conjunction with the accompanying drawings.
参见图1、图2、图3,一种用于液压凿岩钻机的辅助手动装卸钎杆的方法,它有跟随凿岩钻机移动的装卸架2,该装卸架能在低位挂住钎杆7,然后利用凿岩钻机回退上行的过程用该装卸架2携带钎杆7挂起,使钎杆可以直于夹钎器中并被夹钎器固定,等待凿岩钻机的钎尾旋入钎杆,完成钎杆的安装,拆卸钎杆时,当被拆卸钎杆与凿岩钻机钎尾和底下钎杆已经分离后,人工平拉被拆钎杆的下方的钎杆头,同时凿岩钻机上装卸架2随同凿岩钻机下移,被拆钎杆被慢慢下移平置,完成钎杆的拆卸。Referring to Fig. 1, Fig. 2 and Fig. 3, a method for auxiliary manual loading and unloading of drilling rods for hydraulic rock drilling rigs, it has a loading and unloading frame 2 that moves with the rock drilling rig, and the loading and unloading frame can hang the drilling rod 7 at a low position , and then use the rock drilling rig to go back up and use the loading frame 2 to carry the drill rod 7 to hang, so that the drill rod can be straight in the drill clamp and fixed by the drill clamp, waiting for the drill tail of the rock drill to be screwed into the drill Rod, complete the installation of the drill rod, when removing the drill rod, when the removed drill rod has been separated from the drill tail and the bottom drill rod, manually pull the drill rod head below the removed drill rod, and at the same time the rock drill The upper loading and unloading frame 2 moves down along with the rock drilling rig, and the drill rod to be dismantled is slowly moved down and leveled to complete the dismounting of the drill rod.
参见图1,图4,凿岩钻机前端安装装卸架2,装卸架2下端开带缺口的圆孔10,钎杆7的尾部从这个缺口移入,使得钎杆7挂在装卸架2上,装卸架2能绕凿岩钻机前端旋转,两个耳轴5焊接在凿岩钻机4前端外壳,装卸架2设有挂钩,挂钩挂在耳轴5上,可以绕耳轴5旋转运动,装卸架2插入两个销1,可以防止装卸架2与耳轴5分离,在销1前端有孔,安装有卡箍6,防止销1与装卸架2分离。Referring to Fig. 1 and Fig. 4, the front end of the rock drilling rig is equipped with a loading and unloading frame 2, and the lower end of the loading and unloading frame 2 has a round hole 10 with a notch, and the tail of the drilling rod 7 is moved in from this gap, so that the drilling rod 7 is hung on the loading and unloading frame 2, and the loading and unloading The frame 2 can rotate around the front end of the rock drilling rig. Two trunnions 5 are welded to the shell of the front end of the rock drilling rig 4. The loading and unloading frame 2 is provided with a hook, which is hung on the trunnions 5 and can rotate around the trunnions 5. Inserting two pins 1 can prevent the loading and unloading bracket 2 from being separated from the trunnion 5. There is a hole at the front end of the pin 1, and a hoop 6 is installed to prevent the pin 1 from being separated from the loading and unloading bracket 2.
装卸架2下端有一小孔,系一根拉绳3到顶板8上,当凿岩钻机降落到大梁9的底部时,在拉绳3的作用下,装卸架2会绕耳轴5顺时针旋转60°,使得装卸架2避开凿岩钻机钎尾。There is a small hole at the lower end of the loading and unloading frame 2, and a stay rope 3 is tied to the top plate 8. When the rock drilling rig lands on the bottom of the girder 9, under the action of the stay rope 3, the loading and unloading frame 2 will rotate clockwise around the trunnion 5 60°, so that the loading and unloading frame 2 avoids the shank tail of the rock drilling rig.
当打孔深度超过4米时,需要接杆打孔,当打完一根钎杆后,需要安装第二根钎杆时,采用一个安装在凿岩钻机上的装卸架2,工人只要将钎杆尾部平放入装卸架2上(参见图1),由凿岩钻机上的装卸架2将钎杆向上提升,当凿岩钻机到达大梁顶部后(参见图2),被安装的钎杆被提升到适合加杆的位置,自动与凿岩钻机钎尾和已经被打入地面的钎杆对中,方便凿岩钻机将被安装钎杆旋紧,同时工人只需要在旁边监控,不需要人工扶钎;在拆卸钎杆时,当被拆卸钎杆与凿岩钻机钎尾和底下钎杆已经分离后,工人平拉被拆钎杆的下方的钎杆头,同时凿岩钻机上装卸架随同凿岩钻机下移,被拆钎杆被慢慢下移平置,避免有倾倒的危险。When the depth of drilling exceeds 4 meters, it is necessary to drill the hole with the extension rod. When a second drill rod needs to be installed after a drill rod is finished, a loading and unloading frame 2 installed on the rock drilling rig is adopted. The end of the rod is placed flat on the loading and unloading frame 2 (see Figure 1), and the drilling rod is lifted up by the loading and unloading frame 2 on the rock drilling rig. When the rock drilling rig reaches the top of the beam (see Figure 2), the installed drilling rod is lifted Lift to the position suitable for adding rods, and automatically align with the drill tail of the rock drilling rig and the drill rod that has been driven into the ground, so that the rock drilling rig will be installed and tightened by the drill rod. At the same time, the workers only need to monitor at the side without manual labor When disassembling the drill rod, when the disassembled drill rod has been separated from the drill tail and the bottom drill rod, the worker pulls the drill rod head below the dismantled drill rod flatly, and at the same time, the upper loading and unloading frame of the rock drilling rig is accompanied by The rock drilling rig moves down, and the dismantled chisel is slowly moved down and leveled to avoid the danger of toppling.
以上的具体实施方式仅为本发明的较佳施例,并不用以限制本发明,凡在本发明的精神及原则之内所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The specific implementation above is only a preferred embodiment of the present invention, and is not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the present invention within the scope of protection.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610385396.5A CN106065768B (en) | 2016-06-03 | 2016-06-03 | A kind of auxiliary for hydraulic rock drilling machine loads and unloads the method and its device of drill steel manually |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610385396.5A CN106065768B (en) | 2016-06-03 | 2016-06-03 | A kind of auxiliary for hydraulic rock drilling machine loads and unloads the method and its device of drill steel manually |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106065768A CN106065768A (en) | 2016-11-02 |
| CN106065768B true CN106065768B (en) | 2018-05-01 |
Family
ID=57421050
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610385396.5A Active CN106065768B (en) | 2016-06-03 | 2016-06-03 | A kind of auxiliary for hydraulic rock drilling machine loads and unloads the method and its device of drill steel manually |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106065768B (en) |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3915244A (en) * | 1974-06-06 | 1975-10-28 | Cicero C Brown | Break out elevators for rotary drive assemblies |
| CN1060694A (en) * | 1990-09-30 | 1992-04-29 | 任经略 | Quarrying machine drill rod-removed device |
| CN101427001A (en) * | 2006-04-28 | 2009-05-06 | 国民油井华高有限合伙公司 | The method and apparatus of running tubulars |
| CN201963221U (en) * | 2010-12-31 | 2011-09-07 | 中国石油天然气集团公司 | Automatic hanging and clamping device |
| CN102704869A (en) * | 2012-06-05 | 2012-10-03 | 重庆迪马工业有限责任公司 | Rod connecting and disconnecting device applicable to drill rod |
| CN203808871U (en) * | 2014-01-10 | 2014-09-03 | 张志军 | Single hanging ring prevention device for petroleum drilling machine |
| CN204283255U (en) * | 2014-10-31 | 2015-04-22 | 山河智能装备股份有限公司 | The two rod drilling rod library of a kind of top hammer churn |
| CN105178843A (en) * | 2015-10-15 | 2015-12-23 | 东营嘉岩石油工艺研究院 | Chain type top drive drilling machine |
| CN105625955A (en) * | 2016-03-09 | 2016-06-01 | 杭州海聚动力科技有限公司 | Method and device capable of achieving automatic descent and ascent of drill rod lifter |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7140443B2 (en) * | 2003-11-10 | 2006-11-28 | Tesco Corporation | Pipe handling device, method and system |
-
2016
- 2016-06-03 CN CN201610385396.5A patent/CN106065768B/en active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3915244A (en) * | 1974-06-06 | 1975-10-28 | Cicero C Brown | Break out elevators for rotary drive assemblies |
| CN1060694A (en) * | 1990-09-30 | 1992-04-29 | 任经略 | Quarrying machine drill rod-removed device |
| CN101427001A (en) * | 2006-04-28 | 2009-05-06 | 国民油井华高有限合伙公司 | The method and apparatus of running tubulars |
| CN201963221U (en) * | 2010-12-31 | 2011-09-07 | 中国石油天然气集团公司 | Automatic hanging and clamping device |
| CN102704869A (en) * | 2012-06-05 | 2012-10-03 | 重庆迪马工业有限责任公司 | Rod connecting and disconnecting device applicable to drill rod |
| CN203808871U (en) * | 2014-01-10 | 2014-09-03 | 张志军 | Single hanging ring prevention device for petroleum drilling machine |
| CN204283255U (en) * | 2014-10-31 | 2015-04-22 | 山河智能装备股份有限公司 | The two rod drilling rod library of a kind of top hammer churn |
| CN105178843A (en) * | 2015-10-15 | 2015-12-23 | 东营嘉岩石油工艺研究院 | Chain type top drive drilling machine |
| CN105625955A (en) * | 2016-03-09 | 2016-06-01 | 杭州海聚动力科技有限公司 | Method and device capable of achieving automatic descent and ascent of drill rod lifter |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106065768A (en) | 2016-11-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101357739B (en) | Column crane special for movable arm type group tower | |
| CN203159047U (en) | Hydraulic span and height adjustable gantry crane | |
| CN101692554A (en) | Cable guider | |
| CN103510541A (en) | Device and method for installing steel pipe column to interior of lifting frame hole | |
| CN103863938A (en) | Safe lifting device for conveying wind tunnel test car | |
| CN107311022A (en) | A kind of sump vessel molding carries deployment device | |
| CN101402436A (en) | Method and apparatus for disassembling cargo boom of climbing tower crane | |
| CN106065768B (en) | A kind of auxiliary for hydraulic rock drilling machine loads and unloads the method and its device of drill steel manually | |
| CN107142954A (en) | The steel lifted trunk Lift-on/Lift-off System and its hanging method of a kind of integral hoisting | |
| CN102602801A (en) | Vertical lifting clamp for heavy barrel | |
| CN103521527A (en) | Device and method for replacing balance cylinder of backup roll of heavy plate mill | |
| CN114370241A (en) | A vehicle-mounted full hydraulic workover rig | |
| CN204567983U (en) | One can fall mizzen mast | |
| CN201495028U (en) | Large-tonnage tunnel concrete segment horizontal hoisting tool | |
| CN104528519A (en) | Clamping tool for assisting in hoisting cement electric poles | |
| CN207347040U (en) | A kind of drilling mud pump Air Rubber Capsule replacement auxiliary boom | |
| CN209988990U (en) | A hanger that is easy to install and disassemble | |
| CN208071167U (en) | A kind of column combination formula cantilever crane | |
| CN210118122U (en) | Logging instrument retracting and pulling device convenient to operate | |
| CN205799376U (en) | A kind of beam pumping unit crank pin handling aid | |
| CN204549813U (en) | A kind of precast reinforced skeleton lifting suspension bracket | |
| CN221253694U (en) | Novel tool for inspecting 180-degree bent pipe of alumina dissolution device | |
| CN103938551B (en) | A kind of apparatus for assembling of continuous beam pier support for construction | |
| CN212003022U (en) | A kind of self-loading and unloading structure of rotary drilling rig counterweight | |
| CN220847570U (en) | Reinforcing cage positioner for spiral bored pile construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: Room 701-1, Building 7, 1818-2 Wenyi West Road, Yuhang Street, Yuhang District, Hangzhou City, Zhejiang Province 311100 Patentee after: Zhejiang Haiju Intelligent Equipment Technology Co.,Ltd. Country or region after: China Address before: 310053 51 Huan Hing Road, Binjiang District, Hangzhou, Zhejiang. Patentee before: MHP (HANGZHOU) CO.,LTD. Country or region before: China |