CN106065634A - One-level water-proof system and construction method thereof for building basement position - Google Patents

One-level water-proof system and construction method thereof for building basement position Download PDF

Info

Publication number
CN106065634A
CN106065634A CN201610637273.6A CN201610637273A CN106065634A CN 106065634 A CN106065634 A CN 106065634A CN 201610637273 A CN201610637273 A CN 201610637273A CN 106065634 A CN106065634 A CN 106065634A
Authority
CN
China
Prior art keywords
thick
cps
waterproof roll
type
reaction bonded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610637273.6A
Other languages
Chinese (zh)
Inventor
黄爱国
李长明
陈昭羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Original Assignee
China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Bureau Third Construction Engineering Co Ltd filed Critical China Construction Fourth Bureau Third Construction Engineering Co Ltd
Priority to CN201610637273.6A priority Critical patent/CN106065634A/en
Publication of CN106065634A publication Critical patent/CN106065634A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

nullThe invention discloses a kind of one-level water-proof system for building basement position and construction method thereof,C15 concrete cushion bottom right and on set gradually cement gel、1.5 thick double-sided adhesive type CPS CL reaction bonded type macromolecule wet-laying waterproof rolls、50 thick C20 pea gravel concreten protective layers and impervious reinforced concrete floor form base plate,Cement gel is set gradually oozing armored concrete side wall、1.5 thick double-sided adhesive type CPS CL reaction bonded type macromolecule wet-laying waterproof rolls、1.5 thick one sides glue type CPS CL reaction bonded type macromolecule wet-laying waterproof roll and 10 thick polyethylene composite insulation boards protective layers form exterior wall,Cement gel is set gradually oozing roof support with reinforced concrete、1.5 thick double-sided adhesive type CPS CL reaction bonded type macromolecule wet-laying waterproof rolls、1.5 thick one sides glue type CPS CL reaction bonded type macromolecule wet-laying waterproof roll、1.5 thick HDPE high-density polyethylene geomembranes、0.4 thick PE film sealing coat and 70 thick C20 concrete covers form top board.

Description

One-level water-proof system and construction method thereof for building basement position
Technical field
The present invention relates to technical field of building construction, a kind of one-level waterproof body for building basement position System and construction method thereof.
Background technology
Present stage China's building mostly is the building with basement, and its basement portion structure overwhelming majority is reinforced concrete Soil structure.The xoncrete structure concrete dynamic modulus crack at basement position own, and moisture content is high, construction environment is complicated, conventional waterproof Material often can be because of the impact of the factors such as basement site environment moisture and hot ageing, swelling, the base layer motion of steam, difficult and concrete surface Have effective adhesive, it is impossible to play the waterproof effect of sealing, once broken a little cause altering a piece of, it is likely that final whole waterproof system loses Lose.Position, basement position except large-area waterproof in addition to, there is also a lot of position of joints waterproof, such as various angles, various seam, each Kind wall pipe, various built-in fitting, various receipts are first-class, and these portion structures are complicated, and the material coefficient of expansion is the most different, easy stress collection In, causing interface cracking, come off, and construction environment is moist, moisture, traditional waterproof material is difficult to accomplish herein to seal Waterproof, therefore node waterproof is also acknowledged as the difficult point of waterproofing work, weak spot and key point, slightly neglects, it is possible to stay The hidden danger of engineering leakage.
Summary of the invention
The technical problem to be solved is: provide a kind of one-level water-proof system for building basement position And construction method, with solve conventional waterproof material often can because of basement site environment moisture and hot ageing, steam swelling, base layer motion Etc. the impact of factor, difficult have effective adhesive with concrete surface, it is impossible to plays the problem sealing waterproof action, to overcome prior art Deficiency.
The present invention is achieved in that
A kind of construction method of the one-level water-proof system for building basement position, the method comprises the following steps:
One, basement position sole plate one-level water-proof system construction;
Step 1, at C15 concrete cushion thick for sole plate blade coating 80-150cm in basement position;
Step 2, on C15 concrete cushion scratch cement gel;
Step 3,1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll pavings are at blade coating cement gel On;
Step 4,1.5 thick one sides glue the reaction bonded type macromolecule wet-laying waterproof roll paving of type CPS-CL in 1.5 thick double-sided adhesive types On CPS-CL reaction bonded type macromolecule wet-laying waterproof roll;
Step 5,50 thick C20 pea gravel concreten protective layers are arranged on 1.5 thick one sides, and to glue type CPS-CL reaction bonded type macromolecule wet On paving waterproof roll;
Step 6, the base plate being made up of impervious armored concrete are arranged on 50 thick C20 pea gravel concreten protective layers;
Two, basement position side wall one-level water-proof system construction;
Step 1, arrange at the side wall of basement position impervious armored concrete formed side wall;
Step 2, brushing cement gel brushing are on impervious armored concrete side wall surface layer;
Step 3,1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll pavings are at brushing cement gel On;
Step 4,1.5 thick one sides glue the reaction bonded type macromolecule wet-laying waterproof roll paving of type CPS-CL in 1.5 thick double-sided adhesive types On CPS-CL reaction bonded type macromolecule wet-laying waterproof roll;
Step 5,10 thick polyethylene composite insulation boards protective layers are arranged on 1.5 thick one sides and glue type CPS-CL reaction bonded type macromolecule On wet-laying waterproof roll;
Three, basement position top board one-level water-proof system construction;
Step 1, arrange at the top board of basement position impervious armored concrete formed top board;
Step 2, brushing cement gel brushing are on impervious roof support with reinforced concrete;
Step 3,1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll pavings are at brushing cement gel On;
Step 4,1.5 thick one sides glue the reaction bonded type macromolecule wet-laying waterproof roll paving of type CPS-CL in 1.5 thick double-sided adhesive types On CPS-CL reaction bonded type macromolecule wet-laying waterproof roll;
Step 5,1.5 thick HDPE high-density polyethylene geomembranes are arranged on 1.5 thick one sides and glue type CPS-CL reaction bonded type high score On sub-wet-laying waterproof roll;
Step 6,0.4 thick PE film sealing coat are arranged on 1.5 thick HDPE high-density polyethylene geomembranes;
Step 7,70 thick C20 pea gravel concreten protective layers are arranged on 0.4 thick PE film sealing coat.
It is previously described in one-level water-proof system and the construction method thereof at building basement position, described cement gel bag Including cement and water, the mass parts ratio of this cement and water is: 1.5-3:1.
Being previously described in one-level water-proof system and the construction method thereof at building basement position, construction 1.5 is thick two-sided During viscous type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll, the release paper of coiled material bottom surface all should be torn only, under coiled material The air in face drains, and roll-in makes coiled material be firmly bonded.
It is previously described in one-level water-proof system and the construction method thereof at building basement position, the thick one side of construction 1.5 During viscous type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll, the upper isolation film of the double-sided adhesive type coiled material of bottom should be torn Fall, then the one side on top is glued type and spool toward centre from both sides, tear coiled material isolating membrane along snap the line, dyestripping aerofluxus on one side Compression coiled material is bonding.
It is previously described in one-level water-proof system and the construction method thereof at building basement position, described building underground The base concrete at position, room is all impervious armored concrete, and seepage-resistant grade is more than P8.
A kind of one-level water-proof system for building basement position, including basement position sole plate, basement Basis, position side wall and basement position base roof plate, described basement position sole plate includes C15 concrete cushion, C15 concrete cushion bottom right and on set gradually cement gel, 1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying Waterproof roll, 1.5 thick one sides glue type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll, 50 thick C20 pea gravel concretens are protected Sheath and impervious reinforced concrete floor, basis, described basement position side wall includes oozing armored concrete side wall, is oozing reinforcing bar Concrete side wall by inner and set gradually outward cement gel, 1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying are prevented Water coiled material, 1.5 thick one sides glue type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll and 10 thick polyethylene composite insulation boards Protective layer, described basement position base roof plate includes impervious roof support with reinforced concrete, is oozing roof support with reinforced concrete lower surface From top to bottom set gradually cement gel, 1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof rolls, 1.5 Thick one side glue type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll, 1.5 thick HDPE high-density polyethylene geomembranes, 0.4 Thick PE film sealing coat and 70 thick C20 pea gravel concreten protective layers.
Being previously described in the one-level water-proof system at building basement position, described cement gel includes cement and water, The mass parts ratio of this cement and water is: 1.5-3:1.
Owing to have employed technique scheme, compared with prior art, to meet national energy-saving, environmental protection, implementation green for the present invention The policy guidance of color construction, engineering method technique is simple, technology requirement is low, speed of application fast, and human oriented design, this waterproof roll tears off After isolating membrane, can be directly with cement cementitious wet-laying and direct dry viscous scrap (bridge), detail treatment good airproof performance, convenient reliably, basic unit will Ask low, can construct the most in a humidity environment;It addition, this waterproof roll have excellence anti tear transitivity, in hole, limit, The waterproof position that angle, seam etc. are weak, is highly resistant to tear in incision, is particularly suitable for site operation cutting, owing to this is prevented Water coiled material possesses any of the above advantage, is substantially shorter the duration, saves construction cost, has good social benefit and economic effect Benefit.
Accompanying drawing explanation
Accompanying drawing 1 is sole plate one-level water-proof system structural representation in basement position in the present invention;
Accompanying drawing 2 is side wall one-level water-proof system structural representation in basement position in the present invention;
Accompanying drawing 3 is top board one-level water-proof system structural representation in basement position in the present invention.
Detailed description of the invention
Embodiments of the invention: the construction method of a kind of one-level water-proof system for building basement position, the party Method comprises the following steps:
One, basement position sole plate one-level water-proof system construction;
Step 1, at C15 concrete cushion thick for sole plate blade coating 80-150cm in basement position;
Step 2, on C15 concrete cushion scratch cement gel;
Step 3,1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll pavings are at blade coating cement gel On;
Step 4,1.5 thick one sides glue the reaction bonded type macromolecule wet-laying waterproof roll paving of type CPS-CL in 1.5 thick double-sided adhesive types On CPS-CL reaction bonded type macromolecule wet-laying waterproof roll;
Step 5,50 thick C20 pea gravel concreten protective layers are arranged on 1.5 thick one sides, and to glue type CPS-CL reaction bonded type macromolecule wet On paving waterproof roll;
Step 6, the base plate being made up of impervious armored concrete are arranged on 50 thick C20 pea gravel concreten protective layers;
Two, basement position side wall one-level water-proof system construction;
Step 1, arrange at the side wall of basement position impervious armored concrete formed side wall;
Step 2, brushing cement gel brushing are on impervious armored concrete side wall surface layer;
Step 3,1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll pavings are at brushing cement gel On;
Step 4,1.5 thick one sides glue the reaction bonded type macromolecule wet-laying waterproof roll paving of type CPS-CL in 1.5 thick double-sided adhesive types On CPS-CL reaction bonded type macromolecule wet-laying waterproof roll;
Step 5,10 thick polyethylene composite insulation boards protective layers are arranged on 1.5 thick one sides and glue type CPS-CL reaction bonded type macromolecule On wet-laying waterproof roll;
Three, basement position top board one-level water-proof system construction;
Step 1, arrange at the top board of basement position impervious armored concrete formed top board;
Step 2, brushing cement gel brushing are on impervious roof support with reinforced concrete;
Step 3,1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll pavings are at brushing cement gel On;
Step 4,1.5 thick one sides glue the reaction bonded type macromolecule wet-laying waterproof roll paving of type CPS-CL in 1.5 thick double-sided adhesive types On CPS-CL reaction bonded type macromolecule wet-laying waterproof roll;
Step 5,1.5 thick HDPE high-density polyethylene geomembranes are arranged on 1.5 thick one sides and glue type CPS-CL reaction bonded type high score On sub-wet-laying waterproof roll;
Step 6,0.4 thick PE film sealing coat are arranged on 1.5 thick HDPE high-density polyethylene geomembranes;
Step 7,70 thick C20 pea gravel concreten protective layers are arranged on 0.4 thick PE film sealing coat.
Wherein this cement gel includes cement and water, and the mass parts ratio of this cement and water is: 1.5-3:1;Construction 1.5 is thick double When type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll is glued in face, the release paper of coiled material bottom surface all should be torn only, coiled material Air below drains, and roll-in makes coiled material be firmly bonded;It is wet that the thick one side of construction 1.5 glues type CPS-CL reaction bonded type macromolecule During paving waterproof roll, the upper isolation film of the double-sided adhesive type coiled material of bottom should be torn, then the one side on top be glued type from two While spool toward centre, tearing coiled material isolating membrane along snap the line, it is bonding that dyestripping aerofluxus on one side compresses coiled material, this building basement The base concrete at position is all impervious armored concrete, and seepage-resistant grade is more than P8.
A kind of one-level water-proof system for building basement position formed according to said method, such as accompanying drawing institute Showing, including by basement position sole plate, basement position basis side wall and basement position base roof plate, its feature exists In: described basement position sole plate includes C15 concrete cushion 1, in C15 concrete cushion 1 bottom right on set gradually The thick one side of the thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll 3,1.5 of cement gel 2,1.5 glues type CPS- The thick C20 pea gravel concreten protective layer 5 of CL reaction bonded type macromolecule wet-laying waterproof roll 4,50 and impervious reinforced concrete floor 6, basis, described basement position side wall includes oozing armored concrete side wall 7, ooze armored concrete side wall 7 by inner and outer successively Cement gel 2, the 1.5 thick one side of thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll 3,1.5 is set and glues type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll 4 and 10 thick polyethylene composite insulation boards protective layer 8, described basement portion Position base roof plate includes impervious roof support with reinforced concrete 9, from top to bottom sets gradually water oozing roof support with reinforced concrete 9 lower surface The thick one side of the thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll 3,1.5 of mud gel 2,1.5 glues type CPS-CL The thick PE film sealing coat 11 of the thick HDPE high-density polyethylene geomembrane 10,0.4 of reaction bonded type macromolecule wet-laying waterproof roll 4,1.5 With 70 thick C20 pea gravel concreten protective layers 12, wherein cement gel 2 includes cement and water, and the mass parts ratio of this cement and water is: 1.5-3:1。
When being embodied as
As shown in accompanying drawing 1 (structural representation of basement position sole plate one-level water-proof system), including: scrape cement solidifying Glue, cement: water=2:1, its blade coating is on 100 thick C15 concrete cushions of conventional design;1.5 thick double-sided adhesive types CPS-CL are anti- Answer binding type macromolecule wet-laying waterproof roll, during this coiled material of paving, the release paper of coiled material bottom surface all should be torn only, below coiled material Air drain, and roll-in makes coiled material be firmly bonded with sole plate, and lap-joint piles up cement mortar and cleans out in time;1.5 it is thick One side glues type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll, during this coiled material of paving, should be rolled up by the double-sided adhesive type of bottom The upper isolation film of material tears, and then the one side on top is glued type and spools toward centre from both sides, tears coiled material isolating membrane along snap the line, It is bonding that dyestripping aerofluxus on one side on one side compresses coiled material;50 thick C20 pea gravel concreten protective layers, it is waterproof that this protective layer is positioned at the second layer On coiled material layer, impervious reinforced concrete floor (seepage-resistant grade P8), the pea gravel concreten that this base plate is positioned at conventional design is waterproof On protective layer.
As shown in Fig. 2 (structural representation of basement position side wall one-level water-proof system), including: impervious armored concrete Side wall (seepage-resistant grade P8);Brushing cement gel, cement: water=2:1, its brushing is on impervious armored concrete side wall surface layer; 1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof rolls, during this coiled material of paving, should by coiled material bottom surface every All tear clean from paper, coiled material air below drains, and roll-in makes coiled material be firmly bonded with side wall;1.5 thick one sides glue type CPS- CL reaction bonded type macromolecule wet-laying waterproof roll, during this coiled material of paving, should be by the upper isolation of the double-sided adhesive type coiled material of bottom Film tears, and then the one side on top is glued type and spools toward centre from both sides, tears coiled material isolating membrane along snap the line, and dyestripping is on one side It is bonding that aerofluxus compresses coiled material;10 thick polyethylene composite insulation boards protective layers, this protective layer is pasted onto second layer waterproof roll surface layer On.
As shown in Fig. 3 (structural representation of basement position top board one-level water-proof system), including: impervious armored concrete Slope (seepage-resistant grade P8) looked for by top board 1%;Blade coating cement gel, cement: water=2:1, its blade coating is on impervious roof support with reinforced concrete; 1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof rolls, during this coiled material of paving, should by coiled material bottom surface every All tear clean from paper, coiled material air below drains, and roll-in makes coiled material be firmly bonded with sole plate, and cement is piled up by lap-joint Slurry is cleaned out in time;1.5 thick one sides glue type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll, during this coiled material of paving, The upper isolation film of the double-sided adhesive type coiled material of bottom should be torn, then the one side on top be glued type and spool toward centre from both sides, Tearing coiled material isolating membrane along snap the line, it is bonding that dyestripping aerofluxus on one side compresses coiled material;1.5 thick HDPE high density polyethylene (HDPE) geotechniques Film (root-resistant puncturing), this geomembrane is positioned on second layer waterproof roll layer;0.4 thick PE film sealing coat, this PE film is positioned at geotechnique On film;70 thick C20 pea gravel concreten protective layers, this protective layer is positioned on PE film sealing coat.
The description of such scheme is the invention being understood that for ease of those skilled in the art and using.It is familiar with Embodiment obviously easily can be made various amendment by the personnel of art technology.Therefore, the invention is not restricted to above-mentioned reality Scheme, those skilled in the art's the method according to the invention, the improvement made without departing from scope and amendment all should Within protection scope of the present invention.

Claims (7)

1. the construction method for the one-level water-proof system at building basement position, it is characterised in that: the method includes Following steps:
One, basement position sole plate one-level water-proof system construction;
Step 1, at C15 concrete cushion thick for sole plate blade coating 80-150cm in basement position;
Step 2, on C15 concrete cushion scratch cement gel;
Step 3,1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll pavings are at blade coating cement gel On;
Step 4,1.5 thick one sides glue the reaction bonded type macromolecule wet-laying waterproof roll paving of type CPS-CL in 1.5 thick double-sided adhesive types On CPS-CL reaction bonded type macromolecule wet-laying waterproof roll;
Step 5,50 thick C20 pea gravel concreten protective layers are arranged on 1.5 thick one sides, and to glue type CPS-CL reaction bonded type macromolecule wet On paving waterproof roll;
Step 6, the base plate being made up of impervious armored concrete are arranged on 50 thick C20 pea gravel concreten protective layers;
Two, basement position side wall one-level water-proof system construction;
Step 1, arrange at the side wall of basement position impervious armored concrete formed side wall;
Step 2, brushing cement gel brushing are on impervious armored concrete side wall surface layer;
Step 3,1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll pavings are at brushing cement gel On;
Step 4,1.5 thick one sides glue the reaction bonded type macromolecule wet-laying waterproof roll paving of type CPS-CL in 1.5 thick double-sided adhesive types On CPS-CL reaction bonded type macromolecule wet-laying waterproof roll;
Step 5,10 thick polyethylene composite insulation boards protective layers are arranged on 1.5 thick one sides and glue type CPS-CL reaction bonded type macromolecule On wet-laying waterproof roll;
Three, basement position top board one-level water-proof system construction;
Step 1, arrange at the top board of basement position impervious armored concrete formed top board;
Step 2, brushing cement gel brushing are on impervious roof support with reinforced concrete;
Step 3,1.5 thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll pavings are at brushing cement gel On;
Step 4,1.5 thick one sides glue the reaction bonded type macromolecule wet-laying waterproof roll paving of type CPS-CL in 1.5 thick double-sided adhesive types On CPS-CL reaction bonded type macromolecule wet-laying waterproof roll;
Step 5,1.5 thick HDPE high-density polyethylene geomembranes are arranged on 1.5 thick one sides and glue type CPS-CL reaction bonded type high score On sub-wet-laying waterproof roll;
Step 6,0.4 thick PE film sealing coat are arranged on 1.5 thick HDPE high-density polyethylene geomembranes;
Step 7,70 thick C20 pea gravel concreten protective layers are arranged on 0.4 thick PE film sealing coat.
One-level water-proof system for building basement position the most according to claim 1 and construction method thereof, it is special Levying and be: described cement gel includes cement and water, the mass parts ratio of this cement and water is: 1.5-3:1.
One-level water-proof system for building basement position the most according to claim 1 and construction method thereof, it is special Levy and be: during the thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll of construction 1.5, should by coiled material bottom surface every All tear clean from paper, coiled material air below drains, and roll-in makes coiled material be firmly bonded.
One-level water-proof system for building basement position the most according to claim 1 and construction method thereof, it is special Levy and be: when the thick one side of construction 1.5 glues type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll, should be by the double-sided adhesive of bottom The upper isolation film of type coiled material tears, and then the one side on top is glued type and spools toward centre from both sides, along snap the line tear coiled material every From film, it is bonding that dyestripping aerofluxus on one side compresses coiled material.
One-level water-proof system for building basement position the most according to claim 1 and construction method thereof, it is special Levy and be: the base concrete at described building basement position is all impervious armored concrete, and seepage-resistant grade is more than P8.
6. for the one-level water-proof system at building basement position, including basement position sole plate, basement portion Position basis side wall and basement position base roof plate, it is characterised in that: described basement position sole plate includes C15 concrete Bed course (1), in C15 concrete cushion (1) bottom right on set gradually cement gel (2), 1.5 thick double-sided adhesive types CPS-CL reactions Binding type macromolecule wet-laying waterproof roll (3), 1.5 thick one sides glue type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll (4), 50 thick C20 pea gravel concreten protective layer (5) and impervious reinforced concrete floor (6), basis, described basement position side wall Including oozing armored concrete side wall (7), ooze armored concrete side wall (7) by inner and set gradually outward cement gel (2), 1.5 Thick double-sided adhesive type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll (3), 1.5 thick one sides glue type CPS-CL reaction bonded type Macromolecule wet-laying waterproof roll (4) and 10 thick polyethylenes composite insulation boards protective layer (8), described basement position base roof plate bag Include impervious roof support with reinforced concrete (9), from top to bottom set gradually cement gel oozing roof support with reinforced concrete (9) lower surface (2), 1.5 thick double-sided adhesives type CPS-CL reaction bonded type macromolecule wet-laying waterproof roll (3), that 1.5 thick one sides glue type CPS-CL is anti- Answer binding type macromolecule wet-laying waterproof roll (4), 1.5 thick HDPE high-density polyethylene geomembranes (10), 0.4 thick PE film sealing coat (11) and 70 thick C20 pea gravel concreten protective layer (12).
One-level water-proof system for building basement position the most according to claim 6, it is characterised in that: described water Mud gel (2) includes cement and water, and the mass parts ratio of this cement and water is: 1.5-3:1.
CN201610637273.6A 2016-08-08 2016-08-08 One-level water-proof system and construction method thereof for building basement position Pending CN106065634A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610637273.6A CN106065634A (en) 2016-08-08 2016-08-08 One-level water-proof system and construction method thereof for building basement position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610637273.6A CN106065634A (en) 2016-08-08 2016-08-08 One-level water-proof system and construction method thereof for building basement position

Publications (1)

Publication Number Publication Date
CN106065634A true CN106065634A (en) 2016-11-02

Family

ID=57206887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610637273.6A Pending CN106065634A (en) 2016-08-08 2016-08-08 One-level water-proof system and construction method thereof for building basement position

Country Status (1)

Country Link
CN (1) CN106065634A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114134943A (en) * 2021-11-05 2022-03-04 中铁六局集团有限公司 Construction method of FQY + TU-JS basement waterproof system
CN115928805A (en) * 2022-12-06 2023-04-07 中建六局建设发展有限公司 Construction method of CPS reaction bonding type wet-laid waterproof coiled material in coastal region

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120131863A1 (en) * 2009-02-19 2012-05-31 Scott Nordhoff Water drainage device
CN102535520A (en) * 2010-12-13 2012-07-04 五冶集团上海有限公司 Waterproof construction method of large-area civil air defense basement
CN204626472U (en) * 2015-04-18 2015-09-09 南通卓强建设集团有限公司 Basement main body water proof structure
CN104929155A (en) * 2015-06-29 2015-09-23 广西金雨伞防水装饰有限公司 Hermetically sealing waterproof construction method for basement
CN105401962A (en) * 2015-06-29 2016-03-16 广西金雨伞防水装饰有限公司 Full-seal waterproof construction method for side wall and engineering top face
CN105544617A (en) * 2015-09-24 2016-05-04 中建四局第一建筑工程有限公司 Integration construction method for basement soleplate and waterproof roll as well as waterproof structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120131863A1 (en) * 2009-02-19 2012-05-31 Scott Nordhoff Water drainage device
CN102535520A (en) * 2010-12-13 2012-07-04 五冶集团上海有限公司 Waterproof construction method of large-area civil air defense basement
CN204626472U (en) * 2015-04-18 2015-09-09 南通卓强建设集团有限公司 Basement main body water proof structure
CN104929155A (en) * 2015-06-29 2015-09-23 广西金雨伞防水装饰有限公司 Hermetically sealing waterproof construction method for basement
CN105401962A (en) * 2015-06-29 2016-03-16 广西金雨伞防水装饰有限公司 Full-seal waterproof construction method for side wall and engineering top face
CN105544617A (en) * 2015-09-24 2016-05-04 中建四局第一建筑工程有限公司 Integration construction method for basement soleplate and waterproof roll as well as waterproof structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
肖飞等: "吉林市公安局办公楼防水工程", 《防水堵漏材料及施工技术交流会论文集》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114134943A (en) * 2021-11-05 2022-03-04 中铁六局集团有限公司 Construction method of FQY + TU-JS basement waterproof system
CN115928805A (en) * 2022-12-06 2023-04-07 中建六局建设发展有限公司 Construction method of CPS reaction bonding type wet-laid waterproof coiled material in coastal region

Similar Documents

Publication Publication Date Title
CN101914927B (en) Waterproof system for basement bottom plate and wall surface and construction method thereof
CN106120873B (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN201695411U (en) Waterproof system for basement bottom plate and wall surface
CN102002983B (en) Wet lay-up and edge-jointing construction method of single-sided adhesive wet lay-up waterproof coiled material
JP4790698B2 (en) 3D reverse tanking membrane
SA95150501B1 (en) Membrane to prevent water leakage
CN103195104B (en) A kind of building method adopting anti-row's combination at building structure waterproof position
CN108643230A (en) A kind of outer waterproof construction of underground pipe gallery and construction method
KR20000002469A (en) Spread film of concrete structure and sheet double waterproofing material and method thereof
CN204983421U (en) Polyurethane waterproofing membrane and production facility, composite waterproof layer thereof
CN107313342A (en) The bridging arrangement and construction method of a kind of waterproof roll
CN100587200C (en) Assembled waterproof structure and assembled waterproof construction method
CN106121139A (en) A kind of integrated construction roof structure and construction method thereof
CN105089208A (en) Polyurethane waterproof roll, production equipment and process, composite waterproof layer and practice thereof
CN206124364U (en) Waterproof roll
DE102016107632A1 (en) Panel or sheet-like gasket for concrete structures and methods for producing a composite waterproofing in the wall, floor and ceiling area of buildings made of cement-based materials, in particular concrete
CN105401962B (en) The hermetically sealed waterproof construction method of side wall, engineering top surface
CN104612254A (en) Reaction joining waterproof roll paving waterproof construction method
CN206529905U (en) Basement waterproofing is constructed
KR20200000973A (en) Complex waterproofing layer
KR101431380B1 (en) Triple composite waterproofing method applied loose laying joint type
CN106065634A (en) One-level water-proof system and construction method thereof for building basement position
KR101530600B1 (en) Waterproofing structure for improving construction, durability and crack resistance and construction method thereof
KR200233893Y1 (en) Waterproof sheet for concrete structure
CN104762999A (en) Self-adhesion coiled material underground waterproof construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161102