CN106064374A - A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management - Google Patents
A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management Download PDFInfo
- Publication number
- CN106064374A CN106064374A CN201610623422.3A CN201610623422A CN106064374A CN 106064374 A CN106064374 A CN 106064374A CN 201610623422 A CN201610623422 A CN 201610623422A CN 106064374 A CN106064374 A CN 106064374A
- Authority
- CN
- China
- Prior art keywords
- cabinet
- switch cabinet
- drawer
- measurement instrument
- intelligent management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 32
- 238000005259 measurement Methods 0.000 title claims abstract description 31
- 238000003860 storage Methods 0.000 claims abstract description 31
- 230000006870 function Effects 0.000 claims abstract description 8
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 239000000203 mixture Substances 0.000 claims description 5
- 235000004443 Ricinus communis Nutrition 0.000 claims description 3
- 238000007689 inspection Methods 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 abstract description 4
- 230000004927 fusion Effects 0.000 abstract description 3
- 238000012800 visualization Methods 0.000 abstract 1
- 238000007726 management method Methods 0.000 description 37
- 238000005516 engineering process Methods 0.000 description 7
- 230000014759 maintenance of location Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000013473 artificial intelligence Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 229940079593 drug Drugs 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H3/00—Storage means or arrangements for workshops facilitating access to, or handling of, work tools or instruments
- B25H3/02—Boxes
- B25H3/021—Boxes comprising a number of connected storage elements
- B25H3/023—Boxes comprising a number of connected storage elements movable relative to one another for access to their interiors
- B25H3/028—Boxes comprising a number of connected storage elements movable relative to one another for access to their interiors by sliding extraction from within a common frame
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Drawers Of Furniture (AREA)
Abstract
The invention discloses a kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management, the method structure of this invention possesses disposable at least storage single-phase electric meter 100 pieces, three-phase kilowatt-hour meter 10 pieces, amount to the capacity of 110 pieces of electric energy meters, and pass through electrical equipment control, any one in 110 drawers can be automatically opened up, when receiving assets, be only capable of opening the dispatching patcher of the table meter storage space meeting operation plan.Technical scheme is supported stock management, is gone out library management, stock-taking, week switch cabinet monitoring and four functions of alarm, there is standardization, intellectuality, visualization, modular technical characterstic, the requirement of metering device asset management information overall process can be met, solve an electric power metering device least significant end warehousing management difficult problem, the whole-life cycle fee and the repairing business that support electric-power metering assets seek the demand joining fusion, and rely on marketing system and measuring asset management system, finally can realize the Life cycle of electric energy measuring assets control.
Description
Technical field
The present invention relates to a kind of all switch cabinet methods of intelligent management, specially one and realize measurement instrument drawer type intelligence pipe
All switch cabinet methods of reason, belong to week switch cabinet management method applied technical field.
Background technology
Currently, power supply station of basic unit of power supply enterprise storehouse quantity is many, distribution disperses, quantity in stock is little, and because condition is limited,
Measurement meter utensil storage facility is poor, and asset management personnel, can only be by measurement instrument heaps such as scattered standby tables for preventing utensil from losing
Being placed in storehouse, power distribution rush-repair personnel get the utensils such as electric energy meter need to have impact on night by marketing measuring asset management personnel
And festivals or holidays rush to repair operation.The problem existed is as follows: 1. storehouse construction, management imperfection: be not provided with independent storehouse, and do not configure
The information system management equipment such as computer, scanner, monitoring, do not carry out measuring asset and make an inventory or make an inventory excessive cycle;2. receive, cancelling stocks
And delivery management is not in place: receive electric energy meter without work order or super work order number is received and receive out of order, cause stock to exceed standard, examine
Fixed expired, and measure anti-lost, shockproof, rainproof of providing and delivering is not enough;3. store management workload is big: table meter warehousing management work flow
Loaded down with trivial details, personnel put into greatly, and management cost is high, and magnitude of the operation is big, the confusion of responsibilities, easily makes mistakes, and bad call to account;4. system shelves
There is deviation in case: table meter inventory information is inaccurate, and electric energy meter assets information is inconsistent, the flow process filing various problems such as not in time;
Though 5. the storage of part measurement instrument uses " goods-shelf type cabinet " mode, but shelf cabinet type cabinet memory capacity is little, and separate unit is
56 pieces of electric energy meters of many storages, after opening cabinet Qianmen by control, whole measurement instruments cover all at one glance, it is impossible to operator to electricity
The operation of table singularity can accurately control, and existence is not inconsistent with actual table meter because maloperation causes electric energy assets to receive Archives
Non-controllable risk, therefore, for the problems referred to above propose a kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management.
Summary of the invention
The purpose of the present invention is that magnitude of the operation present in electric power measure device management process is big, pipe in order to solve
Reason human resources is not enough, storage facilities are weak, receive formality managing device imperfect, existing can not meet management needs and provide
A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management.
The present invention is achieved through the following technical solutions above-mentioned purpose, a kind of measurement instrument drawer type intelligent management that realizes
All switch cabinet methods, including switch board and cabinet, described switch board is by switch board cabinet, side plate, back door and electric component group
Becoming, described electric component is taken out by sound equipment, photographic head, touch control screen, fixing barcode scanner, hand-held bar code scan device storage
Drawer forms;Described cabinet is by cabinet cabinet, side plate, back door, individual event table drawer, three-phase meter drawer, LED display, drawer
Lock, touching switch and control circuit and panel composition;Described cabinet and switch board bottom are respectively provided with castor and support ground
Foot;Described single-phase meter drawer is arranged on the lower portion that before using, perpendicular brachymedial column is spliced with front beam;Described three-phase meter
Drawer is arranged on the lower portion that before using, perpendicular long central post is spliced with front beam;Perpendicular long central post bottom welding before described
Crossbeam front and back, and front and back crossbeam side arranges middle cross member;Said midsole crossbeam side splicing C/B length vertical beam, and C/B length is perpendicular
Perpendicular short beam in after beam connection;Perpendicular little vertical beam after crossbeam before and after the setting of said midsole crossbeam side, and the connection of described crossbeam front and back.
Preferably, described storage individual event table storage space drawer quantity is 100, and numbering is 001 from the upper left corner, cabinet front
Number, walking crosswise layout quantity is 10, and No. 011 queues on the left of the second row, and No. 021 queues on the left of the third line, and No. 031 from the 4th
Queuing on the left of row, No. 041 queues on the left of fifth line, and No. 051 queues on the left of the 6th row, and No. 061 queues on the left of the 7th row,
No. 071 queues on the left of the 8th row, and No. 081 queues on the left of the 9th row, and No. 091 queues on the left of the tenth row.
Preferably, described storage three-phase meter storage space drawer quantity is 10, is divided into two row often row 5, position and numbering to connect
Individual event table drawer arranges, and numbering queues to No. 110 from 101.
Preferably, the described cabinet back side arranges and is provided with 4 pieces of control circuit boards, wherein transverse direction 2 pieces, vertical 2 pieces, wherein
1-3 wiring board controls 28 drawers, and No. 4 wiring boards control 6 drawers.
Preferably, length and width and the height of described cabinet is respectively 1682mm, 400mm, 1700mm.
Preferably, length and width and the height of described switch board is respectively 420mm, 400mm, 1700mm.
Preferably, week switch cabinet to control mainboard be the main actuator of switch cabinet of ammeter week, PC control carry out specifically
Open and close lock, link, the concrete operations such as display, mainboard by power supply, master chip, signal feedback, the part that controls, linkage part, show
Show that part forms.
Preferably, its intelligent management is: after system electrification, and master chip first carries out self-inspection to various functions, determines not
Problematic rear system enters duty, and after mainboard receives the open and close lock signal that upper computer software is sent, mainboard is according to upper
Machine software signal is opened a unique ammeter and is locked;After ammeter is removed, mainboard can take the feedback information of ammeter away, sends
To upper computer software to manage, necessary information can be shown at LED by upper computer software by the display function of mainboard simultaneously
On screen;One piece of mainboard can control 28 independent ammeter locks, if need the operation of many cabinets, many locks, and can be by being
The toggle switch of system, 485 PORT COM carry out cascade operation, realize more controlling.
Preferably, this week switch cabinet by with sales service application system, provincial measurement centre production scheduling platform seamless
Integrated.
The invention has the beneficial effects as follows: this kind realizes all switch cabinet methods of measurement instrument drawer type intelligent management and disposably may be used
At least storage single-phase electric energy meter 100 pieces, three-phase electric energy meter 10 pieces, altogether 110 pieces of electric energy meters.By electrical equipment control, 110 can be opened
Any one in individual drawer, when receiving assets, is only capable of opening the table meter storage space meeting operation plan;Overall process bar code is used to know
Not and with the Seamless integration-of sales service application system, use sensing location, bar code identification and multi-media voice airmanship, adopt
By technology such as identification, three-dimensional artificial and video monitors, use modularized design;Source from electric energy measuring assets life cycle
Head is started with, and sets up complete assets archives for each piece of electric energy metering device, by Information Technology Methods, follows the trail of each block of electric energy
The circulation of measurement instrument, install, use and scrap process;Take the mode of electric drawer, industrial control host send instruction control
Drawer panel, drawer panel the machinery of each drawer that links, support stock management, go out library management, stock's dish
Point, week switch cabinet monitoring and alarm function, by with sales service application system, provincial measurement centre production scheduling platform seamless
Integrated, it is achieved that teams and groups of the basic unit electric energy meter storages such as power supply station and the online management and control received, solve the storage of electric energy meter least significant end
Management problems, supports the whole-life cycle fee of electric energy meter assets and the demand of fusion is joined by " three collection five big " repairing business battalion,
All switch cabinets of measurement instrument drawer type intelligent management are to require design, exploitation, portion based on two or three grades of library managements of electric energy metering device
Administration is applied to national grid basic unit power supply unit, mainly for grass-roots unit's small lot single-phase electric energy meter, three-phase electric energy meter, collection
The getting of terminal or current transformer, store, the life-cycle processes of the electric energy metering device such as use carries out information system management, take
For the conventional management mode in the existing three grades of flat storehouses of basic unit's power supply unit, improve existing electric energy asset management level, it is achieved that
The overall process informationization of electric energy measuring assets life cycle is controlled by metrological service, and all switch cabinets make state's network metering utensil asset management
Business extends to power supply station of basic unit, promotes and is changed to the way to manage dispatched in advance by amended record afterwards, improves asset management
Level, it is achieved that measurement instrument asset management information overall process.
Accompanying drawing explanation
Fig. 1 is overall structure front view of the present invention;
Fig. 2 is whole interior circuit diagram of the present invention;
Fig. 3 is overall structure schematic diagram of the present invention;
Fig. 4 is present invention week switch cabinet main structure chart;
Fig. 5 is present invention week switch cabinet cut-away view;
Fig. 6 is that drawer of the present invention assembles interior sequences structure chart;
Fig. 7 is that drawer of the present invention assembles sequence external structure;
Fig. 8 is present invention week switch cabinet assembly structure chart;
Fig. 9 is present invention week switch cabinet panel layout.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise
Embodiment, broadly falls into the scope of protection of the invention.
Embodiment:
As shown in Figures 1 to 9: a kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management, including switch board
And cabinet, described switch board is made up of switch board cabinet, side plate, back door and electric component, and described electric component is by sound
Sound, photographic head, touch control screen, fixing barcode scanner, hand-held bar code scan device storage drawer composition;Described cabinet is by depositing
Container cabinet, side plate, back door, individual event table drawer, three-phase meter drawer, LED display, drawer-lock, touching switch and control line
Road and panel composition;Described cabinet and switch board bottom are respectively provided with castor and support lower margin;Described single-phase meter drawer is installed
The lower portion that perpendicular brachymedial column is spliced with front beam before employing;Described three-phase meter drawer erects in length before being arranged on employing
The lower portion that column and front beam are spliced;Crossbeam before and after the welding of perpendicular long central post bottom before described, and crossbeam one front and back
Side arranges middle cross member;Said midsole crossbeam side splicing C/B length vertical beam, and C/B length vertical beam connect after in perpendicular short beam;Described
Perpendicular little vertical beam after crossbeam before and after the setting of middle cross member side, and the connection of described crossbeam front and back.
Storage individual event table storage space drawer quantity is 100, and numbering is No. 001 from the upper left corner, cabinet front, walks crosswise layout
Quantity is 10, and No. 011 queues on the left of the second row, and No. 021 queues on the left of the third line, and No. 031 queues on the left of fourth line,
No. 041 queues on the left of fifth line, and No. 051 queues on the left of the 6th row, and No. 061 queues on the left of the 7th row, and No. 071 from the 8th
Queuing on the left of row, No. 081 queues on the left of the 9th row, and No. 091 queues on the left of the tenth row.
Storage three-phase meter storage space drawer quantity is 10, is divided into two row often row 5, position and numbering order item table drawer row
Row, numbering queues to No. 110 from 101.
The cabinet back side arranges and is provided with 4 pieces of control circuit boards, wherein transverse direction 2 pieces, vertical 2 pieces, wherein 1-3 wiring board
Controlling 28 drawers, No. 4 wiring boards control 6 drawers.
The length and width of cabinet and high respectively 1682mm, 400mm, 1700mm;The length and width of switch board and high difference
For 420mm, 400mm, 1700mm.
Week switch cabinet to control mainboard be the main actuator of switch cabinet of ammeter week, PC control carry out concrete open and close
Lock, link, the concrete operations such as display, mainboard by power supply, master chip, signal feedback, control part, linkage part, display part
Composition.
Its intelligent management is: after system electrification, and master chip first carries out self-inspection to various functions, determine no problem after
System enters duty, and after mainboard receives the open and close lock signal that upper computer software is sent, mainboard is believed according to upper computer software
Number open a unique ammeter lock;After ammeter is removed, mainboard can take the feedback information of ammeter away, is sent to host computer
Software is to manage, and necessary information can be shown in LED screen by upper computer software by the display function of mainboard simultaneously;
One piece of mainboard can control 28 independent ammeter locks, if need the operation of many cabinets, many locks, and can be by the dial-up of system
Switch, 485 PORT COM carry out cascade operation, realize more controlling.
This week switch cabinet by with sales service application system, the Seamless integration-of provincial measurement centre production scheduling platform;Week
Switch cabinet is made up of control system, storage cabinet, telescopic memory element, scanning element, display unit, NE etc., it is achieved
To the storage of batch electric energy meter, acquisition terminal or low-voltage current mutual inductor, the equipment that production process is managed such as get;Use
The technology of Internet of things such as bar code scan, video monitoring, multimedia guiding, produce with SG186 sales service application system and metering and adjust
Degree platform carries out seamless connection, can be in the case of unmanned, by automatically identifying on sales service system work order and electric energy meter
Bar code, it is achieved power supply station is scattered and the storage of repairing table, the overall process management and control received, in-depth measurement instrument full longevity further
Life cycle management, it is achieved power supply station's whole process is information-based, intelligent management.
This invention be a set of be one based on intelligent sensing technology, the integration technology that communicates, artificial intelligence technology, collection software and hardware more
The Intelligent Storage Management system of body.By with sales service application system, the seamless collection of provincial measurement centre production scheduling platform
Become, it is achieved that teams and groups of the basic unit electric energy meter storages such as power supply station and the online management and control received, solve electric energy meter least significant end storage pipe
A reason difficult problem, the demand of fusion is joined by whole-life cycle fee and " three collection five are big " repairing business battalion of supporting electric energy meter assets.This
The method of invention has been applied to electric-power metering department, and is applied checking at drug in some provinces power supply industry, and obtains good
Application effect.
Such as emergency (power-off as long-time in outside), when needing manual unlocking drawer, after external power source is cut off in PLSCONFM,
Open back door, touch the metallic rod pressed on the left of drawer-lock in breach, can manual unlocking drawer!Making sure to keep in mind can not be fully open by drawer,
In order to avoid causing cabinet to lean forward, injure other people by a crashing object.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of the spirit or essential attributes of the present invention, it is possible to realize the present invention in other specific forms.Therefore, no matter
From the point of view of which point, all should regard embodiment as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit requires rather than described above limits, it is intended that all by fall in the implication of equivalency and scope of claim
Change is included in the present invention.Should not be considered as limiting involved claim by any reference in claim.
Although moreover, it will be appreciated that this specification is been described by according to embodiment, but the most each embodiment only wraps
Containing an independent technical scheme, this narrating mode of description is only that for clarity sake those skilled in the art should
Description can also be formed those skilled in the art through appropriately combined as an entirety, the technical scheme in each embodiment
May be appreciated other embodiments.
Claims (9)
1. realizing all switch cabinet methods of measurement instrument drawer type intelligent management, including switch board and cabinet, its feature exists
In: described switch board is made up of switch board cabinet, side plate, back door and electric component, and described electric component is by sound equipment, shooting
Head, touch control screen, fixing barcode scanner, hand-held bar code scan device storage drawer composition;Described cabinet is by cabinet cabinet
Body, side plate, back door, individual event table drawer, three-phase meter drawer, LED display, drawer-lock, touching switch and control circuit and control
Making sheet forms;Described cabinet and switch board bottom are respectively provided with castor and support lower margin;Described single-phase meter drawer is arranged on employing
The lower portion that front perpendicular brachymedial column is spliced with front beam;Described three-phase meter drawer before being arranged on employing perpendicular long central post with
The lower portion that front beam is spliced;Crossbeam before and after the welding of perpendicular long central post bottom before described, and front and back crossbeam side is arranged
Middle cross member;Said midsole crossbeam side splicing C/B length vertical beam, and C/B length vertical beam connect after in perpendicular short beam;Said midsole is horizontal
Perpendicular little vertical beam after crossbeam before and after the setting of beam side, and the connection of described crossbeam front and back.
A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management the most according to claim 1, its feature exists
In: described storage individual event table storage space drawer quantity is 100, and numbering is No. 001 from the upper left corner, cabinet front, walks crosswise layout number
Amount is 10, and No. 011 queues on the left of the second row, and No. 021 queues on the left of the third line, and No. 031 queues on the left of fourth line,
No. 041 queues on the left of fifth line, and No. 051 queues on the left of the 6th row, and No. 061 queues on the left of the 7th row, and No. 071 from the 8th
Queuing on the left of row, No. 081 queues on the left of the 9th row, and No. 091 queues on the left of the tenth row.
A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management the most according to claim 1, its feature exists
In: described storage three-phase meter storage space drawer quantity is 10, is divided into two row often row 5, position and numbering order item table drawer row
Row, numbering queues to No. 110 from 101.
A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management the most according to claim 1, its feature exists
In: the described cabinet back side arranges and is provided with 4 pieces of control circuit boards, wherein transverse direction 2 pieces, vertical 2 pieces, wherein 1-3 wiring board
Controlling 28 drawers, No. 4 wiring boards control 6 drawers.
A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management the most according to claim 1, its feature exists
In: the length and width of described cabinet and high respectively 1682mm, 400mm, 1700mm.
A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management the most according to claim 1, its feature exists
In: the length and width of described switch board and high respectively 420mm, 400mm, 1700mm.
A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management the most according to claim 1, its feature exists
In: week switch cabinet to control mainboard be the main actuator of switch cabinet of ammeter week, PC control carry out concrete open and close lock, connection
The concrete operations such as dynamic, display, mainboard is grouped into by power supply, master chip, signal feedback, control part, linkage part, display part.
A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management the most according to claim 1, its feature exists
In: its intelligent management is: after system electrification, and master chip first carries out self-inspection to various functions, determines no problem rear system
Entering duty, after mainboard receives the open and close lock signal that upper computer software is sent, mainboard is opened according to upper computer software signal
Open a unique ammeter to lock;After ammeter is removed, mainboard can take the feedback information of ammeter away, is sent to upper computer software
To manage, necessary information can be shown in LED screen by upper computer software by the display function of mainboard simultaneously;One piece
Mainboard can control 28 independent ammeter locks, if need the operation of many cabinets, many locks, can be opened by the dial-up of system
Close, 485 PORT COM carry out cascade operation, realize more controlling.
A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management the most according to claim 1, its feature exists
In: this week switch cabinet by with sales service application system, the Seamless integration-of provincial measurement centre production scheduling platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610623422.3A CN106064374A (en) | 2016-08-02 | 2016-08-02 | A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610623422.3A CN106064374A (en) | 2016-08-02 | 2016-08-02 | A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106064374A true CN106064374A (en) | 2016-11-02 |
Family
ID=57207257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610623422.3A Pending CN106064374A (en) | 2016-08-02 | 2016-08-02 | A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106064374A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107093051A (en) * | 2017-06-20 | 2017-08-25 | 江苏方天电力技术有限公司 | A kind of electric energy meter self-identifying storage device |
CN107861085A (en) * | 2017-04-28 | 2018-03-30 | 国网安徽省电力公司宿州供电公司 | Batch meter intelligent management system |
CN109605306A (en) * | 2018-12-12 | 2019-04-12 | 西北工业大学 | A modular assembled intelligent combination cabinet |
CN111807004A (en) * | 2020-06-28 | 2020-10-23 | 东风商用车有限公司 | Weight induction-based bolt mistaken-fetching-preventing storage system |
CN114604543A (en) * | 2021-12-29 | 2022-06-10 | 重庆品胜科技有限公司 | Metering identification system, metering identification method and turnover box |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080265722A1 (en) * | 2007-04-26 | 2008-10-30 | Liebert Corporation | Intelligent track system for mounting electronic equipment |
CN203317399U (en) * | 2013-06-13 | 2013-12-04 | 贵州航天工业学校 | Tool cabinet |
CN103662560A (en) * | 2013-12-24 | 2014-03-26 | 国家电网公司 | Electric energy meter intelligent transfer cabinet based on bar code scanning and control method thereof |
CN103859832A (en) * | 2014-03-28 | 2014-06-18 | 福建通力达实业有限公司 | A new type of electric energy meter turnover cabinet |
CN204576210U (en) * | 2014-12-19 | 2015-08-19 | 郑州万特电气股份有限公司 | Electric energy meter intelligence storage and managenent system |
-
2016
- 2016-08-02 CN CN201610623422.3A patent/CN106064374A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080265722A1 (en) * | 2007-04-26 | 2008-10-30 | Liebert Corporation | Intelligent track system for mounting electronic equipment |
CN203317399U (en) * | 2013-06-13 | 2013-12-04 | 贵州航天工业学校 | Tool cabinet |
CN103662560A (en) * | 2013-12-24 | 2014-03-26 | 国家电网公司 | Electric energy meter intelligent transfer cabinet based on bar code scanning and control method thereof |
CN103859832A (en) * | 2014-03-28 | 2014-06-18 | 福建通力达实业有限公司 | A new type of electric energy meter turnover cabinet |
CN204576210U (en) * | 2014-12-19 | 2015-08-19 | 郑州万特电气股份有限公司 | Electric energy meter intelligence storage and managenent system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107861085A (en) * | 2017-04-28 | 2018-03-30 | 国网安徽省电力公司宿州供电公司 | Batch meter intelligent management system |
CN107093051A (en) * | 2017-06-20 | 2017-08-25 | 江苏方天电力技术有限公司 | A kind of electric energy meter self-identifying storage device |
CN109605306A (en) * | 2018-12-12 | 2019-04-12 | 西北工业大学 | A modular assembled intelligent combination cabinet |
CN111807004A (en) * | 2020-06-28 | 2020-10-23 | 东风商用车有限公司 | Weight induction-based bolt mistaken-fetching-preventing storage system |
CN114604543A (en) * | 2021-12-29 | 2022-06-10 | 重庆品胜科技有限公司 | Metering identification system, metering identification method and turnover box |
CN114604543B (en) * | 2021-12-29 | 2024-06-04 | 重庆品胜科技有限公司 | Metering identification system, metering identification method and turnover box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106064374A (en) | A kind of all switch cabinet methods realizing measurement instrument drawer type intelligent management | |
Cross et al. | The afterlives of solar power: Waste and repair off the grid in Kenya | |
CN102124623B (en) | Methods and systems for managing facility power and cooling | |
US20120078680A1 (en) | Electrical Engineering And Capacity Management System And Method | |
CN105284027B (en) | Power balance in multiphase system | |
KR101907202B1 (en) | Data center management system | |
CN106056335A (en) | Intelligent asset management method | |
CN108734383A (en) | A kind of power grid enterprises' tool management system and method based on cloud platform | |
CN109522982A (en) | A kind of Intelletual Asset management method and system based on MDC data center | |
CN103632312A (en) | Power grid resource module building method based on GIS (geographic information system) | |
CN107742161A (en) | A kind of data monitoring system | |
CN109840737A (en) | A kind of mine materials management system | |
CN204399921U (en) | Based on Whole-dismountable, the configurable Intelligent temporary storage cabinet for electric energy meter of storage space | |
CN112975881A (en) | Intelligent tool maintenance vehicle, management system and method | |
CN109709918A (en) | A kind of satellite intelligence production visualization managing and control system | |
CN108340335A (en) | A kind of electric power first-aid intelligent storage cabinet | |
CN207718543U (en) | A kind of all switch cabinets of electric energy meter intelligent positioning storage | |
Fauzan et al. | Information system for asset management | |
CN103279847B (en) | Department provides storehouse Spare Parts Management System for oneself | |
WO2012040515A1 (en) | Electrical engineering and capacity management system and method | |
CN207107239U (en) | A kind of intelligent box table cabinet | |
CN217097714U (en) | Intelligent tool maintenance vehicle | |
CN109298698A (en) | A kind of Energy Consumption of Public Buildings full-automation monitoring system | |
CN116757606A (en) | Inventory metering asset lean management system based on intelligent Internet of things | |
CN103559828A (en) | Advanced manufacturing simulation factory |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161102 |