CN106051352B CN201610509351.4A CN201610509351A CN106051352B CN 106051352 B CN106051352 B CN 106051352B CN 201610509351 A CN201610509351 A CN 201610509351A CN 106051352 B CN106051352 B CN 106051352B
Authority
CN
China
Prior art keywords
reducing tee
pipeline
mouth
blank
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610509351.4A
Other languages
Chinese (zh)
Other versions
CN106051352A (en
Inventor
宗军伟
范国
王洪选
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN EVERBRIGHT TUBE INDUSTRY CO LTD
Original Assignee
HENAN EVERBRIGHT TUBE INDUSTRY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN EVERBRIGHT TUBE INDUSTRY CO LTD filed Critical HENAN EVERBRIGHT TUBE INDUSTRY CO LTD
Priority to CN201610509351.4A priority Critical patent/CN106051352B/en
Publication of CN106051352A publication Critical patent/CN106051352A/en
Application granted granted Critical
Publication of CN106051352B publication Critical patent/CN106051352B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/02Branch units, e.g. made in one piece, welded, riveted
    • F16L41/021T- or cross-pieces

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Extrusion Of Metal (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

A kind of processing technology of large-scale pressure pipeline reducing tee pipe fitting, described large-scale pressure pipeline reducing tee pipe fitting, using SA3P35P91 superhigh temperature resistants pipeline as reducing tee embryo material, the external diameter of embryo material is more than maximum outside diameter in the middle part of reducing tee straight pipeline, length of stock adds required surplus according to the length of reducing tee straight pipeline, then blanking;Embryo material is put into preheating furnace, blank is taken out when preheating temperature is between 1000 °C 1050 °C, embryo material is put into compacting tool set material embryo flatten up and down, mould to be pressed is intraoral to be full of and is taken out after the shaping that reducing tee is completed during the bubbling of end, then cuts away the blank for the bubbling completion reducing tee for being in charge of road junction;In the intraoral increase slope cushion block of mould, to inwardly mending with cramps outside the mouth of straight pipeline and subtube, pressure carries out necking and the necking repeated is suppressed;The present invention alleviates the high pressure of big flow when pipeline is in controlled valve, avoids high pressure and corrodes the damage connect to pipe, increases the service life.

Description

A kind of processing technology of large-scale pressure pipeline reducing tee pipe fitting
Technical field
The present invention relates to the processing of the T joint of the pressure pipeline of large power generating equipment, especially a kind of large-scale pressure pipe The processing technology of road reducing tee pipe fitting.
Background technology
At present, the T joint of the pressure pipeline of common large power generating equipment is cast member and pipeline welding part, and is cast The tube wall crushing resistance of forging piece is relatively low, in addition tube wall frequent phase use, by high temperature, high pressure oxidation and erosion after, it is common to have gas Phenomenon of osmosis is steeped, the quality of the T joint of pipeline welding part is unstable, and most of is weld seam phenomenon of osmosis, high-rating generator one But it was found that the three-way pipe of pressure pipeline is connected to phenomenon of osmosis, in order to ensure safety in production, it is necessary to maintenance down;In addition, common three The majority that siphunculus connects is straight tube, and three bores are identical, and resistance to pressure is low, and the flow of three bores is uneven;In view of the foregoing, it is existing It is proposed a kind of processing technology of large-scale pressure pipeline reducing tee pipe fitting.
The content of the invention
The invention aims to the T joint for the pressure pipeline for the overcoming existing large power generating equipment frequent phase to make With, by high temperature, high pressure oxidation and erosion after, it is common to have bubble phenomenon of osmosis, the quality of the T joint of pipeline welding part Unstable, most of is weld seam phenomenon of osmosis;The majority of common T joint is straight tube, and three bores are identical, and resistance to pressure is low, three The flow of individual bore is uneven, by reasonably designing, there is provided a kind of processing technology of large-scale pressure pipeline reducing tee pipe fitting, Inventive pipeline can play the high pressure for alleviating big flow in controlled valve, so as to avoid high pressure and corrode to connect pipe to cause Damage, increases the service life.
The present invention to achieve these goals, adopts the following technical scheme that:A kind of large-scale pressure pipeline reducing tee pipe fitting Processing technology, described large-scale pressure pipeline reducing tee pipe fitting, be by compressing small interface, the big interface of compression, big mouth thickeies Tube wall, osculum thicken tube wall, osculum outer tube diameter, mouth of pipe slope soldering opening, big mouth outer tube diameter, reducing tee composition;Reducing tee The mouth of pipe at straight pipeline both ends set and compress small interface, be vertically arranged bigbore isocon in the middle part of the straight pipeline of reducing tee Road, isocon road junction, which is set, compresses big interface, sets outer camber osculum to thicken tube wall in the middle part of straight pipeline, osculum thickeies the thickness of tube wall Degree is arranged to the thin gradual change shape of the thick oral area in middle part, and the outer diameter tube for compressing small interface is arranged to osculum outer tube diameter, osculum outer tube diameter External diameter corresponds to small gas pipeline outer wall and set, and straight pipeline oral area sets mouth of pipe slope soldering opening;Compress the outer diameter tube of big interface Big mouth outer tube diameter is arranged to, root and the straight pipeline of shunt conduit set the big mouth of oblique wave type to thicken tube wall, and pipeline oral area is set Mouth of pipe slope soldering opening;
Sorting, reducing tee is more than as reducing tee embryo material, the external diameter of embryo material using SA335P91 superhigh temperature resistants pipeline Maximum outside diameter in the middle part of straight pipeline, length of stock add required surplus according to the length of reducing tee straight pipeline, then blanking;
During processing, the embryo material of reducing tee is put into preheating furnace, is taken out when preheating temperature is between 1000 DEG C -1050 DEG C Blank, embryo material is put into compacting tool set material embryo flatten up and down, both ends extruding, both ends are carried out to embryo material after the completion of flattening Extruding is full of to protrusion compacting tool set isocon road junction in the middle part of blank, mould to be pressed are intraoral and completes reducing three during the bubbling of end Taken out after logical shaping, then cut away the blank for the bubbling completion reducing tee for being in charge of road junction;
When necking is processed, in the intraoral increase slope cushion block of mould, slope cushion block is after the intraoral positioning of mould;Change after flattening The blank of footpath threeway is put into preheating furnace be preheated to 1000 DEG C -1050 DEG C again between when take out;Blank is put into compacting tool set In, mould presses the compacting for carrying out necking by slope cushion block to inwardly mending with cramps outside the mouth of straight pipeline and subtube, in blank temperature During less than 1000 DEG C stop compacting, take out blank be put into preheating furnace be preheated to 1000 DEG C -1050 DEG C again between when take out;Such as This repetition after mould closes reality, completes the necking compacting of reducing tee oral area to the multiple compacting of blank;
Reducing tee necking completion carries out polishing to inner-walls of duct and repaiies embryo, and inwall puts threeway blank after carrying out polishing equating Enter lathe positioning, the internal diameter and external diameter of Vehicle Processing necking after positioning, the internal diameter and external diameter of reducing tee necking correspond to gas pipeline Internal diameter and external diameter Vehicle Processing;Equating is processed to the opening's edge portion of reducing tee after the completion of Vehicle Processing, opening's edge portion entered after equating The soldering opening Vehicle Processing of row mouth of pipe slope, after mouth of pipe slope soldering opening completes Vehicle Processing, reducing tee is moved lower lathe, carried out next Procedure.
The beneficial effects of the invention are as follows:The present invention, as reducing tee, passes through mould using SA335P91 superhigh temperature resistants pipeline Tool is suppressed repeatedly, carries out both ends extruding after the completion of flattening to material embryo, and both ends, which are extruded to blank middle part mould to be pressed is intraoral, to be full of With the shaping that reducing tee is completed during the bubbling of end, pipeline can play the high pressure for alleviating big flow in controlled valve, so as to Avoid high pressure and corrode to connect pipe to cause to damage, moulding process is simple, efficiency high;Manufactured reducing tee is formed in one, sternly Close property is good, non-leakage, energy-saving and emission-reduction, increases the service life and maintenance cycle.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is general assembly structural representation;
In Fig. 1:Small interface 1, the big interface 2 of compression are compressed, big mouth thickeies tube wall 3, osculum thickeies tube wall 4, osculum outer tube diameter 5th, mouth of pipe slope soldering opening 6, big mouth outer tube diameter 7, reducing tee 8.
Embodiment
The present invention is described in further detail with embodiment with reference to embodiment:
Embodiment 1
The mouth of pipe at the straight pipeline both ends of reducing tee 8, which is set, compresses small interface 1, vertical in the middle part of the straight pipeline of reducing tee 8 Bigbore shunt conduit is set, and isocon road junction, which is set, compresses big interface 2, and outer camber osculum extra strong pipe is set in the middle part of straight pipeline Wall 4, the thickness that osculum thickeies tube wall 4 are arranged to the thin gradual change shape of the thick oral area in middle part, and the outer diameter tube for compressing small interface 1 is arranged to Osculum outer tube diameter 5, the external diameter of osculum outer tube diameter 5 correspond to small gas pipeline outer wall and set, and straight pipeline oral area sets the welding of mouth of pipe slope Mouth 6;The outer diameter tube for compressing big interface 2 is arranged to big mouth outer tube diameter 7, and root and the straight pipeline of shunt conduit set oblique wave type Big mouth thickeies tube wall 3, and pipeline oral area sets mouth of pipe slope soldering opening 6;
Sorting, reducing tee is more than as the embryo material of reducing tee 8, the external diameter of embryo material using SA335P91 superhigh temperature resistants pipeline Maximum outside diameter in the middle part of 8 straight pipelines, length of stock add required surplus according to the length of the straight pipeline of reducing tee 8, then blanking;
During processing, the embryo material of reducing tee 8 is put into preheating furnace, is taken when preheating temperature is between 1000 DEG C -1050 DEG C Go out blank, embryo material be put into compacting tool set to material embryo carry out up and down flatten, after the completion of flattening to embryo material carry out both ends extruding, two End extruding is full of to protrusion compacting tool set isocon road junction in the middle part of blank, mould to be pressed are intraoral and completes reducing during the bubbling of end Taken out after the shaping of threeway 8, then cut away the blank for the bubbling completion reducing tee 8 for being in charge of road junction;
Embodiment 2
When necking is processed, in the intraoral increase slope cushion block of mould, slope cushion block is after the intraoral positioning of mould;Change after flattening The blank of footpath threeway 8 is put into preheating furnace be preheated to 1000 DEG C -1050 DEG C again between when take out;Blank is put into compacting tool set In, mould presses the compacting for carrying out necking by slope cushion block to inwardly mending with cramps outside the mouth of straight pipeline and subtube, in blank temperature During less than 1000 DEG C stop compacting, take out blank be put into preheating furnace be preheated to 1000 DEG C -1050 DEG C again between when take out;Such as This repetition after mould closes reality, completes the necking compacting of the oral area of reducing tee 8 to the multiple compacting of blank;
Embodiment 3
The necking of reducing tee 8 is completed to carry out inner-walls of duct polishing to repair embryo, and inwall is carried out after polishing equating threeway blank Lathe positioning is put into, the internal diameter and external diameter of Vehicle Processing necking after positioning, the internal diameter and external diameter of the necking of reducing tee 8 correspond to appendix Road internal diameter and external diameter Vehicle Processing;Equating is processed to the opening's edge portion of reducing tee 8 after the completion of Vehicle Processing, to opening's edge portion after equating The Vehicle Processing of mouth of pipe slope soldering opening 6 is carried out, after mouth of pipe slope soldering opening 6 completes Vehicle Processing, reducing tee 8 is moved lower lathe, entered Row next process.

Claims (3)

1. a kind of processing technology of large-scale pressure pipeline reducing tee pipe fitting, described large-scale pressure pipeline reducing tee pipe fitting, It is that big mouth thickeies tube wall (3), osculum thickeies tube wall (4), osculum outer tube diameter by compressing small interface (1), the big interface (2) of compression (5), mouth of pipe slope soldering opening (6), big mouth outer tube diameter (7), reducing tee (8) are formed;It is characterized in that:Reducing tee (8) The mouth of pipe at straight pipeline both ends, which is set, compresses small interface (1), and bigbore shunting is vertically arranged in the middle part of the straight pipeline of reducing tee (8) Pipeline, isocon road junction, which is set, compresses big interface (2), sets outer camber osculum to thicken tube wall (4) in the middle part of straight pipeline, osculum thickeies The thickness of tube wall (4) is arranged to the thin gradual change shape of the thick oral area in middle part, and the outer diameter tube for compressing small interface (1) is arranged to osculum outer tube Footpath (5), osculum outer tube diameter (5) external diameter correspond to small gas pipeline outer wall and set, and straight pipeline oral area sets mouth of pipe slope soldering opening (6);The outer diameter tube for compressing big interface (2) is arranged to big mouth outer tube diameter (7), and root and the straight pipeline of shunt conduit set oblique wave The big mouth of type thickeies tube wall (3), and pipeline oral area sets mouth of pipe slope soldering opening (6);
Sorting, reducing tee is more than as reducing tee (8) embryo material, the external diameter of embryo material using SA335P91 superhigh temperature resistants pipeline (8) maximum outside diameter in the middle part of straight pipeline, length of stock add required surplus according to the length of reducing tee (8) straight pipeline, then blanking;
During processing, the embryo material of reducing tee (8) is put into preheating furnace, is taken out when preheating temperature is between 1000 DEG C -1050 DEG C Blank, embryo material is put into compacting tool set material embryo flatten up and down, both ends extruding, both ends are carried out to embryo material after the completion of flattening Extruding is full of to protrusion compacting tool set isocon road junction in the middle part of blank, mould to be pressed are intraoral and completes reducing three during the bubbling of end Taken out after the shaping of logical (8), then cut away the blank for the bubbling completion reducing tee (8) for being in charge of road junction.
A kind of 2. processing technology of large-scale pressure pipeline reducing tee pipe fitting according to claim 1, it is characterised in that:Contracting During mouth processing, in the intraoral increase slope cushion block of mould, slope cushion block is after the intraoral positioning of mould;Reducing tee (8) after flattening Blank be put into preheating furnace be preheated to 1000 DEG C -1050 DEG C again between when take out;Blank is put into compacting tool set, mould By slope cushion block to inwardly curium pressure carries out the compacting of necking outside the mouth of straight pipeline and subtube, it is less than 1000 in blank temperature DEG C when stop compacting, take out blank be put into preheating furnace be preheated to 1000 DEG C -1050 DEG C again between when take out;So repeat To the multiple compacting of blank, after mould closes reality, the necking compacting of reducing tee (8) oral area is completed.
A kind of 3. processing technology of large-scale pressure pipeline reducing tee pipe fitting according to claim 1, it is characterised in that:Become Footpath threeway (8) necking is completed to carry out inner-walls of duct polishing to repair embryo, and inwall carries out that threeway blank is put into lathe after polishing equating Positioning, the internal diameter and external diameter of Vehicle Processing necking after positioning, the internal diameter and external diameter of reducing tee (8) necking correspond to gas pipeline internal diameter With external diameter Vehicle Processing;Equating is processed to the opening's edge portion of reducing tee (8) after the completion of Vehicle Processing, opening's edge portion carried out after equating The mouth of pipe slope soldering opening (6) Vehicle Processing, after mouth of pipe slope soldering opening (6) completes Vehicle Processing, reducing tee (8) is moved lower lathe, Carry out next process.
CN201610509351.4A 2016-06-30 2016-06-30 A kind of processing technology of large-scale pressure pipeline reducing tee pipe fitting Active CN106051352B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610509351.4A CN106051352B (en) 2016-06-30 2016-06-30 A kind of processing technology of large-scale pressure pipeline reducing tee pipe fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610509351.4A CN106051352B (en) 2016-06-30 2016-06-30 A kind of processing technology of large-scale pressure pipeline reducing tee pipe fitting

Publications (2)

Publication Number Publication Date
CN106051352A CN106051352A (en) 2016-10-26
CN106051352B true CN106051352B (en) 2017-12-26

Family

ID=57201511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610509351.4A Active CN106051352B (en) 2016-06-30 2016-06-30 A kind of processing technology of large-scale pressure pipeline reducing tee pipe fitting

Country Status (1)

Country Link
CN (1) CN106051352B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108302273A (en) * 2018-03-23 2018-07-20 嘉兴市乍浦杭湾重型机械有限公司 A kind of corrosion-resistant high rigidity threeway forging
CN108758142B (en) * 2018-06-28 2024-03-19 江阴市天柠管道有限公司 Main pipe reducing tee joint and production process thereof
CN108843866A (en) * 2018-08-01 2018-11-20 江苏新恒基特种装备股份有限公司 A kind of connection method of high-temperature service adapter tube
CN112082029A (en) * 2020-09-18 2020-12-15 中国航发四川燃气涡轮研究院 Joint
CN113339612A (en) * 2021-06-07 2021-09-03 中山中舟海洋科技有限公司 Reducing three-way hose joint and processing technology thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ATE225010T1 (en) * 1998-03-13 2002-10-15 Gates Corp MOLDED HOSE COUPLING ARRANGEMENT
ATE348976T1 (en) * 2004-08-12 2007-01-15 Advanced Fluid Connections Plc METHOD FOR PRODUCING A PRESS CONNECTION ASSEMBLY, TOOL FOR DEFORMING INTERMATCHING THREADS OF A PRESS CONNECTION ARRANGEMENT, AND PRESS CONNECTION ARRANGEMENT
CN104373721B (en) * 2014-09-03 2017-04-12 江苏天毅冷镦股份有限公司 Integrated spherical hydraulic hose metal joint structure and production process thereof
CN105033142B (en) * 2015-07-10 2017-06-27 河南光大管业有限公司 The compacting tool set and pressing process of a kind of hubbed flange
CN105114740B (en) * 2015-09-28 2017-08-25 成都贝根管道科技有限公司 Preparation method for lining plastic Steel triplet pipe fitting
CN205118545U (en) * 2015-11-17 2016-03-30 天津市包尔科密封件有限责任公司 Technology tee bend is pressed in oil gas pipeline area

Also Published As

Publication number Publication date
CN106051352A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN106051352B (en) A kind of processing technology of large-scale pressure pipeline reducing tee pipe fitting
CN101745789A (en) Forming method of large-caliber tee pipe fitting with high steel grade
CN103286527A (en) Production process for extra-large aperture super wall thickness square steel pipe
CN106944495B (en) A kind of oversize two phase stainless steel threeway integral forming method
CN103394881A (en) Novel hot extrusion tee joint forming process
CN204164569U (en) A kind of composite steel-plastic pipe fitting not needing secondary sealing
CN105537344A (en) Multi-connected-elbow compression molding device
CN202402867U (en) Electric smelting sleeve and plastic composite pipe with steel framework
CN210306361U (en) Coiled tubing butt welding cooling hoop
CN105195625B (en) A kind of necking threeway processing mold and the method using mould processing threeway
CN102641917A (en) Round setting technique for pipe end of large-size pipe fitting
CN205859447U (en) A kind of large-scale pressure pipeline reducing tee pipe fitting
CN101829706B (en) Production technology for quick coupling tube
CN202015747U (en) A combined drawing die for automatic cold drawing machine for non-ferrous metal pipes
CN207064887U (en) A kind of two halves compacting butt-welding pipe fitting of large-scale pipeline with straight length concentric reducer reducing
CN204312920U (en) A kind of combined type heavy caliber electric melting reducing tee pipe fitting
CN104373721A (en) Integrated spherical hydraulic hose metal joint structure and production process thereof
CN203908127U (en) Branch pipe of air conditioner
CN203221136U (en) Pipe joint expansion forming die
CN203726251U (en) Flared chip discharge pipe
CN205110402U (en) Circular tubular product lead alloy hot extrusion die
CN207117995U (en) Titanium pipe electrothermal tube and steel flange Hermetical connecting structure
CN202402414U (en) Gland assembly line
CN206689239U (en) U-shaped heat exchanger tube corrector
CN202708432U (en) Right-angled tee joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Zong Junwei

Inventor after: Zhang Hui

Inventor after: Fan Guo

Inventor before: Zong Junwei

Inventor before: Fan Guo

Inventor before: Wang Hongxuan