CN105971667B - A kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its application method - Google Patents

A kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its application method Download PDF

Info

Publication number
CN105971667B
CN105971667B CN201610574020.9A CN201610574020A CN105971667B CN 105971667 B CN105971667 B CN 105971667B CN 201610574020 A CN201610574020 A CN 201610574020A CN 105971667 B CN105971667 B CN 105971667B
Authority
CN
China
Prior art keywords
sump
tunnel
cover plate
filter layer
railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610574020.9A
Other languages
Chinese (zh)
Other versions
CN105971667A (en
Inventor
丁文云
郭永发
李光慧
殷洪波
徐涛
罗云飞
罗胜利
肖勇刚
刘正初
李贵民
伍容兵
杨进京
郑刚强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CREEC Kunming Survey Design and Research Co Ltd
Original Assignee
CREEC Kunming Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREEC Kunming Survey Design and Research Co Ltd filed Critical CREEC Kunming Survey Design and Research Co Ltd
Priority to CN201610574020.9A priority Critical patent/CN105971667B/en
Publication of CN105971667A publication Critical patent/CN105971667A/en
Application granted granted Critical
Publication of CN105971667B publication Critical patent/CN105971667B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention discloses a kind of rich water railway tunnel railway roadbed and risen soil disease control structure and its application method, including components such as central trench, cobble filter layer, coarse sand filter layer, sump, sump cover plate, spilled water hole and extension springs, described sump is orderly arranged outside each coarse sand filter layer and cobble filter layer, bottom of catchmenting sets spilled water hole, it is built in the sump of tunnel central trench insertion under tunnel inverted arch, and sump cover plate is set in central trench basal surface position, sump cover plate is locked by being arranged at the extension spring for bottom of catchmenting;Using structure of the present invention, in rich water railway tunnel construction process, pre-processed for disease excessive risk location:During the rich water of underground, the water for penetrating into sump reaches after certain pressure that just top opener well cover plate enters central trench side by side automatically, so as to realize the purpose for actively drain underground rich water and release groundwater pressure, reaches and prevents and treats tunnel railway roadbed and rise soil the effect of disease.

Description

A kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its application method
Technical field
The invention belongs to Tunnel Engineering technical field, is related to a kind of tunnel defect control structure, more particularly to a kind of rich water Railway tunnel railway roadbed is risen soil disease control structure and its application method.
Background technology
With the progressively popularization of railway construction in China, the various risks and disease that Concerning Railway Tunnel Construction faces are also further multiple It is miscellaneous.Because all kinds of factors such as geological conditions, construction technology influence under the railway tunnel railway roadbed of rich groundwater, it is easier to burst and become muddy when a thaw sets in Mud disease, particularly length are emitted in 6 more than km and lays the tunnel of solid concrete roabed, if occurring this disease during operation, by can not Cut off traffic, the harsh conditions limitation such as treatment construction window time is short, solid concrete roabed is not easy-maintaining, administer eradicate it is extremely difficult. Therefore, after fully the origin cause of formation of this disease is grasped, effective design is taken during tunnel construction and is reliably applied Work measure is prevented, and is the optimal selection for eliminating this disease.Based on above mentioned problem, it is proposed that structure of the present invention, by disease Evil excessive risk location applies decompression discharge structure in advance, so as to realize the mesh actively drained underground rich water and discharge groundwater pressure , reach preventing and treating tunnel railway roadbed and rise soil the effect of disease.
The content of the invention
It is an object of the invention to for above-mentioned the deficiencies in the prior art, propose the rich water railway tunnel of set of system Road railway roadbed is risen soil disease control structure and its application method, is solved underground rich water railway tunnel railway roadbed disease of rising soil and is asked Topic, realize and actively drain underground water more than needed and release groundwater pressure.
The technical scheme is that:
A kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its application method, including central trench, cobble Filter layer, coarse sand filter layer, sump, sump cover plate, spilled water hole and extension spring, described sump are orderly arranged outside each Coarse sand filter layer and cobble filter layer, bottom of catchmenting set spilled water hole, and tunnel is built in the sump of tunnel central trench insertion Under road inverted arch, and sump cover plate is set in central trench basal surface position, sump cover plate is by being arranged at bottom of catchmenting Extension spring locks, and construction method is as follows:
(1), excavate out space needed for total in tunnel inverted arch bottom after, cast in situs and the insertion of tunnel central trench Sump, and in the pre-buried spilled water hole of surrounding side wall;
(2), in sump be orderly arranged outside each coarse sand filter layer and cobble filter layer;
(3), central trench basal surface position install sump cover plate;
(4), in bottom installation extension spring of catchmenting, extension spring bottom be locked in bottom of catchmenting, tip locks in Sump cover plate, during the rich water of underground, penetrate into sump water reach certain pressure after can push up opener well cover plate automatically simultaneously Central trench is discharged into, so as to realize the purpose actively drained underground rich water and discharge groundwater pressure, reaches preventing and treating tunnel railway roadbed and turns over Slurry emits the effect of mud disease.
As the preferred technical solution of the present invention:
The cobble filter layer is disposed circumferentially sump outermost, and the surrounding width that bankets is 0.5m, and cobble particle diameter is 80~120mm。
For the coarse sand filter layer around being adjacently arranged on the outside of sump, the surrounding width that bankets is 0.5m;Coarse sand particle diameter For 0.5 ~ 2mm.
The sump and top tunnel central trench one-piece casting, using reinforced concrete structure;Interior headroom size is The cm of the cm of length × width × height=50 × 60 × 50 cm, wall thickness 25cm.
The sump cover plate is stainless steel trench cover, and physical dimension is cm × 15 of the cm of length × width x thickness=60 × 30 Cm, sump cover plate is fixed in central trench water (flow) direction rear end using bolt, front end and side wall overlap joint and surrounding cohesive position are adopted Waterproof is wrapped up with sealing rod.
The spilled water hole uses Φ 60mm stainless steel tubes, is embedded in sump surrounding and bottom in advance, and in coarse sand filter layer one Side head parcel thin wire gauze and non-woven fabrics filter water source, arrangement spacing are 20cm.
The extension spring bottom is locked in bottom of catchmenting, and tip locks are under normal circumstances in sump cover plate Extended state is tight to ensure cover plate covering, during rich water when water pressure is more than cover plate deadweight and spring tension sum, just Cover plate can be automatically opened up and realize draining.
Railway roadbed disease control structure of rising soil is equally applicable to similar rich water railway tunnel.
The present invention is as follows using step:
(1)According to the specific hydrogeologic condition of Tunnel Engineering, disease excessive risk location is average at a certain distance in tunnel Arrangement railway roadbed is risen soil disease control structure;
(2)Railway roadbed disease control structure of rising soil applies step everywhere:1. excavate out whole knot in tunnel inverted arch bottom Behind space needed for structure, cast in situs sump reinforced concrete structure, poured together with this section of central trench, and it is pre- in surrounding side wall Bury spilled water hole;2. apply cobble filter layer and coarse sand filter layer successively from outside to inside;3. sump cover plate is installed;4. installation stretching Spring.
Beneficial effects of the present invention are:
The present invention rises soil disease control structure and its application method for a kind of rich water railway tunnel railway roadbed, by disease Evil excessive risk location applies drop and drainage structure in advance, so as to realize the mesh actively drained underground rich water and discharge groundwater pressure , reach preventing and treating tunnel railway roadbed and rise soil the effect of disease.
Brief description of the drawings
Fig. 1:Common double track tunnel central trench structural map of the invention;
Fig. 2:Rich water railway tunnel railway roadbed of the present invention is risen soil disease control structural facades figure;
Fig. 3:Rich water railway tunnel railway roadbed of the present invention is risen soil disease control structural facades drawing;
Fig. 4:Rich water railway tunnel railway roadbed of the present invention is risen soil disease control structural plan figure;
Fig. 5:Rich water railway tunnel railway roadbed of the present invention is risen soil disease control texture edge figure-dry season;
Fig. 6:Rich water railway tunnel railway roadbed of the present invention is risen soil disease control texture edge figure-rainy season;
Fig. 7:Rich water railway tunnel railway roadbed of the present invention is risen soil disease control texture edge drawing-rainy season.
In figure respectively marked as:1-central trench;2-cobble filter layer;3-coarse sand filter layer;4-sump;5-catchment Manhole cover plate;6-spilled water hole;7-extension spring.Arrow is water (flow) direction in figure.
Embodiment
The present invention is described in further detail below by drawings and examples, but protection scope of the present invention is not limited to In content described in embodiment.
Embodiment:As shown in figs. 1-7, a kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its user Method, by central trench 1, cobble filter layer 2, coarse sand filter layer 3, sump 4, sump cover plate 5, spilled water hole 6,7 groups of extension spring Into.Construction cobble filter layer 2 and coarse sand filter layer 3 carry out underground water deslagging filtering first;Then built under tunnel inverted arch The sump 4 penetrated with tunnel central trench 1, the bottom of sump 4 sets the draining of spilled water hole 6, and is set in the basal surface position of central trench 1 Sump cover plate 5, sump cover plate 5 are locked by being arranged at the extension spring 7 of the bottom of sump 4;During the rich water of underground, collection is penetrated into The water of well 4 can push up opener well cover plate 5 automatically after reaching certain pressure and be discharged into central trench 1.Specific setting is as follows:Ovum Stone filter layer 2 is disposed circumferentially the outermost of sump 4, and the surrounding width that bankets is 0.5m, and cobble particle diameter is 80 ~ 120mm.Coarse sand For filter layer 3 around being adjacently arranged in the outside of sump 4, the surrounding width that bankets is 0.5m;Coarse sand particle diameter is 0.5 ~ 2mm.Catchment Well 4 and the one-piece casting of top tunnel central trench 1, using reinforced concrete structure;Interior headroom size is length × width × height=50 The cm of cm × 60 × 50 cm, wall thickness 25cm.Sump cover plate 5 is stainless steel trench cover, and physical dimension is length × width x thickness=60 cm×30 cm×15 cm.Wherein, cover plate 5 is fixed in the water (flow) direction rear end of central trench 1 using bolt, and front end overlaps with side wall 10cm;The surrounding cohesive position of cover plate 5 is using sealing rod parcel waterproof.Spilled water hole 6 uses Φ 60mm stainless steel tubes, is embedded in catchments in advance The surrounding of well 4 and bottom, and thin wire gauze and non-woven fabrics filter water source are wrapped up in the side termination of coarse sand filter layer 3, arrangement spacing is 20cm.The bottom of extension spring 7 is locked in the bottom of sump 4, and tip locks are in sump cover plate 5, under normal circumstances in stretching State is to ensure that cover plate 5 covers tightly, when water pressure is conducted oneself with dignity more than cover plate 5 and during 7 pulling force sum of spring during rich water, Automatically open up cover plate and realize draining.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God any modification, equivalent substitution and improvements made etc., should be included in the scope of the protection with principle.

Claims (8)

  1. Disease control structure, including central trench 1. a kind of rich water railway tunnel railway roadbed is risen soil(1), cobble filter layer(2), it is thick Sand filter layer(3), sump(4), sump cover plate(5), spilled water hole(6)And extension spring(7), it is characterised in that:Described Sump(4)It is orderly arranged outside each coarse sand filter layer(3)And cobble filter layer(2), sump(4)Bottom sets spilled water hole(6), With tunnel central trench(1)The sump of insertion(4)It is built under tunnel inverted arch, and in central trench(1)Basal surface position sets collection Well cover plate(5), sump cover plate(5)By being arranged at sump(4)The extension spring of bottom(7)Locking, as follows Construction:
    (1), excavate out space needed for total in tunnel inverted arch bottom after, cast in situs and tunnel central trench(1)Insertion Sump(4), and in the pre-buried spilled water hole of surrounding side wall(6);
    (2), in sump(4)It is orderly arranged outside each coarse sand filter layer(3)And cobble filter layer(2);
    (3), in central trench(1)Basal surface position installs sump cover plate(5);
    (4), in sump(4)Bottom is installed by extension spring(7), extension spring(7)Bottom is locked in sump(4)Bottom, top End is locked in sump cover plate(5), when water pressure is more than sump cover plate during rich water(5)Deadweight and extension spring(7)Draw During power sum, sump cover plate is automatically opened up(5)Water is discharged into central trench(1).
  2. The disease control structure 2. rich water railway tunnel railway roadbed according to claim 1 is risen soil, it is characterised in that:It is described Cobble filter layer(2)It is disposed circumferentially sump(4)Outermost, the surrounding width that bankets is 0.5m, and cobble particle diameter is 80 ~ 120mm。
  3. The disease control structure 3. rich water railway tunnel railway roadbed according to claim 1 is risen soil, it is characterised in that:It is described Coarse sand filter layer(3)It surround and is adjacently arranged in sump(4)Outside, the surrounding width that bankets is 0.5m;Coarse sand particle diameter be 0.5 ~ 2mm。
  4. The disease control structure 4. rich water railway tunnel railway roadbed according to claim 1 is risen soil, it is characterised in that:It is described Sump(4)With top tunnel central trench(1)Formed using reinforced concrete whole-casting;Interior headroom size is length × width × height The cm of=50 cm × 60 × 50 cm, wall thickness 25cm.
  5. The disease control structure 5. rich water railway tunnel railway roadbed according to claim 1 is risen soil, it is characterised in that:It is described Sump cover plate(5)For stainless steel trench cover, physical dimension is the cm of the cm of the cm of length × width x thickness=60 × 30 × 15;Water collecting well cover Plate(5)In tunnel central trench(1)Water (flow) direction rear end is fixed using bolt, front end and side wall overlap joint and surrounding cohesive position use Sealing rod wraps up waterproof.
  6. The disease control structure 6. rich water railway tunnel railway roadbed according to claim 1 is risen soil, it is characterised in that:It is described Spilled water hole(6)Using Φ 60mm stainless steel tubes, sump is embedded in advance(4)Surrounding and bottom, and in coarse sand filter layer(3)One side Head parcel thin wire gauze and non-woven fabrics filter water source, arrangement spacing are 20cm.
  7. The disease control structure 7. rich water railway tunnel railway roadbed according to claim 1 is risen soil, it is characterised in that:It is described Extension spring(7)Bottom is locked in sump(4)Bottom, tip locks are in sump cover plate(5), under normal circumstances in stretching State is to ensure sump cover plate(5)Covering is tight, when water pressure is more than sump cover plate during rich water(5)Deadweight and spring (7)During pulling force sum, just automatically open up sump cover plate and realize draining.
  8. The application method of disease control structure 8. rich water railway tunnel railway roadbed according to claim 1 is risen soil, it is special Sign is that step is as follows:
    (1)According to the specific hydrogeologic condition of Tunnel Engineering, disease excessive risk location is averagely arranged at a certain distance in tunnel Railway roadbed is risen soil disease control structure;
    (2)Railway roadbed disease control structure of rising soil applies step everywhere:1. excavate out total institute in tunnel inverted arch bottom After needing space, cast in situs sump reinforced concrete structure, poured together with this section of central trench, and let out in surrounding side wall is pre-buried Water hole;2. apply cobble filter layer and coarse sand filter layer successively from outside to inside;3. sump cover plate is installed;4. installation stretching bullet Spring.
CN201610574020.9A 2016-07-20 2016-07-20 A kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its application method Active CN105971667B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610574020.9A CN105971667B (en) 2016-07-20 2016-07-20 A kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610574020.9A CN105971667B (en) 2016-07-20 2016-07-20 A kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its application method

Publications (2)

Publication Number Publication Date
CN105971667A CN105971667A (en) 2016-09-28
CN105971667B true CN105971667B (en) 2018-02-02

Family

ID=56952653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610574020.9A Active CN105971667B (en) 2016-07-20 2016-07-20 A kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its application method

Country Status (1)

Country Link
CN (1) CN105971667B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106968712B (en) * 2017-05-12 2023-06-09 西南交通大学 Drainage Structure and Construction Method of Tunnel Bottom in Water-rich Stratum
CN107503364A (en) * 2017-09-26 2017-12-22 中国科学院武汉岩土力学研究所 Underground water depressurizes drainage arrangement and underground water decompression drainage system
CN108131162B (en) * 2018-02-11 2023-06-13 中铁二院工程集团有限责任公司 Tunnel drainage device and tunnel integral ballast bed
CN108755722A (en) * 2018-08-18 2018-11-06 中铁二院昆明勘察设计研究院有限责任公司 The drainage arrangement and water discharge method in tunnel and underground structure
CN109441489B (en) * 2018-12-29 2024-04-05 中国铁路设计集团有限公司 Tunnel deep-buried central ditch supporting structure and supporting construction method
CN109973147B (en) * 2019-03-08 2020-05-22 中铁十九局集团第三工程有限公司 Construction method of highway tunnel drainage ditch
CN111271118B (en) * 2020-03-30 2024-06-04 中铁二院工程集团有限责任公司 Drainage structure suitable for reconstruction of karst tunnel bottom structure and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7503725B1 (en) * 2007-08-20 2009-03-17 Pratt James M Subsurface drainage system
CN103510528A (en) * 2012-06-29 2014-01-15 深圳市工勘岩土工程有限公司 Blind trench water discharging structure used for underground structure up-floating prevention
CN204212052U (en) * 2014-10-16 2015-03-18 杭州中艺园林工程有限公司 A kind of bridge deck rainwater collecting eco-filtration device
CN104594946A (en) * 2015-01-19 2015-05-06 中铁十八局集团有限公司 Water-rich narrow tunnel water drainage structure under soft surrounding rock condition
CN204370373U (en) * 2014-11-13 2015-06-03 昆明理工大学 Seepage proof curtain structure closed by a kind of reservoir
CN204626625U (en) * 2015-04-17 2015-09-09 龙滩水电开发有限公司 Underground power house Self-resetting draining disc type valve
CN105545355A (en) * 2016-01-19 2016-05-04 西南交通大学 Drainage structure suitable for tunnel bottom in water-rich rock stratum
CN105569674A (en) * 2016-01-28 2016-05-11 西南交通大学 Tunnel structure for weak and broken high-temperature water-bearing stratum

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7503725B1 (en) * 2007-08-20 2009-03-17 Pratt James M Subsurface drainage system
CN103510528A (en) * 2012-06-29 2014-01-15 深圳市工勘岩土工程有限公司 Blind trench water discharging structure used for underground structure up-floating prevention
CN204212052U (en) * 2014-10-16 2015-03-18 杭州中艺园林工程有限公司 A kind of bridge deck rainwater collecting eco-filtration device
CN204370373U (en) * 2014-11-13 2015-06-03 昆明理工大学 Seepage proof curtain structure closed by a kind of reservoir
CN104594946A (en) * 2015-01-19 2015-05-06 中铁十八局集团有限公司 Water-rich narrow tunnel water drainage structure under soft surrounding rock condition
CN204626625U (en) * 2015-04-17 2015-09-09 龙滩水电开发有限公司 Underground power house Self-resetting draining disc type valve
CN105545355A (en) * 2016-01-19 2016-05-04 西南交通大学 Drainage structure suitable for tunnel bottom in water-rich rock stratum
CN105569674A (en) * 2016-01-28 2016-05-11 西南交通大学 Tunnel structure for weak and broken high-temperature water-bearing stratum

Also Published As

Publication number Publication date
CN105971667A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN105971667B (en) A kind of rich water railway tunnel railway roadbed is risen soil disease control structure and its application method
CN103031837B (en) Well-points dewatering combined stack-load ground preloading deep soft soil foundation method
CN102979535B (en) Draining type section of jurisdiction is used in a kind of tunnel lining
CN105735055B (en) Imbibition drainage
CN106988295A (en) The processing method and its processing equipment of sludge dewatering and solidification are carried out using ground treatments
CN204139159U (en) Side slope deep layer gutter
CN106869946B (en) Make bottom frozen construction method in a kind of sand-pebble layer tunneling subway station
CN100572688C (en) The method of consolidating soft soil ground foundation by dynamic pre drainage consolidation
CN103215945B (en) The three-dimensional assembly power drain consolidation system of heterogeneous body place soft soil foundation and method
US20100200516A1 (en) Concurrent disposal and consolidation of dredged sediment using horizontal drains and vacuum loading
CN205955773U (en) Rich water railway tunnel railway roadbed mud pumping disease prevention and control structure
CN206829163U (en) A kind of high artesian section construction Yield rainfall relation device
CN205444395U (en) Be equipped with drain pipe in hole of permeating water on pipe wall
CN105696543B (en) A kind of method that dam front row is seeped when red mud dump constructs sub- dam
CN102787606B (en) Guard method to surrounding environment in a kind of excavation of foundation pit Precipitation Process
CN208996764U (en) A kind of bored tunnel step automation water plug
CN102383408A (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN104088637A (en) Method for second mining of upper-group shallow residual coal under coal seam group conditions
CN202031103U (en) Efficient non-pressure artesian water drainage pipe for side slopes
CN205714282U (en) Waterproof/drainage structure at the bottom of a kind of soft stratum tunnel
CN205000346U (en) Slope frame for slope reinforcement and water drainage
CN108625402A (en) Foundation pit fertilizer slot ponding processing method
CN206052752U (en) A kind of miniature sand drain sand pocket joint drainage device
CN205475600U (en) Ore dressing plant wet -type preliminary election drainage device for refuse bin
CN105544555B (en) A kind of foundation pit supporting method with gas sealing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Ding Wenyun

Inventor after: Li Guimin

Inventor after: Wu Rongbing

Inventor after: Yang Jinjing

Inventor after: Zheng Gangqiang

Inventor after: Guo Yongfa

Inventor after: Li Guanghui

Inventor after: Yin Hongbo

Inventor after: Xu Tao

Inventor after: Luo Yunfei

Inventor after: Luo Shengli

Inventor after: Xiao Yonggang

Inventor after: Liu Zhengchu

Inventor before: Ding Wenyun

Inventor before: Wu Rongbing

Inventor before: Yang Jinjing

Inventor before: Zheng Gangqiang

Inventor before: Guo Yongfa

Inventor before: Yang Xiang

Inventor before: Luo Yunfei

Inventor before: Yin Hongbo

Inventor before: Luo Shengli

Inventor before: Xiao Yonggang

Inventor before: Liu Zhengchu

Inventor before: Li Guimin

CB03 Change of inventor or designer information
GR01 Patent grant