[go: up one dir, main page]

CN105954629B - 一种六相整流发电机整流桥工作过程的分析方法 - Google Patents

一种六相整流发电机整流桥工作过程的分析方法 Download PDF

Info

Publication number
CN105954629B
CN105954629B CN201610473939.9A CN201610473939A CN105954629B CN 105954629 B CN105954629 B CN 105954629B CN 201610473939 A CN201610473939 A CN 201610473939A CN 105954629 B CN105954629 B CN 105954629B
Authority
CN
China
Prior art keywords
rectifier
bridge
matrix
phase
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610473939.9A
Other languages
English (en)
Other versions
CN105954629A (zh
Inventor
郑晓钦
吴新振
由蕤
张伟玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University
Original Assignee
Qingdao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University filed Critical Qingdao University
Priority to CN201610473939.9A priority Critical patent/CN105954629B/zh
Publication of CN105954629A publication Critical patent/CN105954629A/zh
Application granted granted Critical
Publication of CN105954629B publication Critical patent/CN105954629B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Rectifiers (AREA)
  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)

Abstract

本发明属于六相整流发电机的分析技术领域,涉及一种六相整流发电机整流桥工作过程的分析方法,适用于正常和故障两种工况,应用于两桥及多桥整流系统,针对每个时刻点,通过分别比较同一整流桥上、下桥臂整流元件的电压大小判断上、下桥臂整流元件的导通情况,再根据流经整流元件的电流的正负判断各整流元件的关断情况,最后运用变拓扑结构下的电路网络进行运行性能的分析计算,得到一段时间内整流桥工作状态的变化过程,其设计原理科学可靠,方法简单,通用性强,运用灵便,分析效率高,应用效果好。

Description

一种六相整流发电机整流桥工作过程的分析方法
技术领域:
本发明属于六相整流发电机的分析技术领域,涉及一种六相整流发电机整流桥工作过程的分析方法,适用于正常和故障两种工况,应用于两桥及多桥整流系统。
背景技术:
六相整流发电机的运行过程包括正常和故障两种工况,在其运行过程中,整流元件通断状态的变化能够引起系统电路网络拓扑结构的改变,随着多相整流发电机、尤其是六相整流发电机在航天、航海等军工领域的推广应用,判断整流元件通断状态的变化过程对于研究六相整流发电机系统具有重要意义,在现有技术中,传统的分析方法通过比较整流桥线电压大小成对判断上、下桥臂整流元件导通情况,并根据流经整流元件的电流判断整流元件关断情况,此方法可用于六相整流发电机正常工况运行过程,而故障工况运行过程中六相整流发电机的整流桥拓扑结构复杂多变,该方法并不适用。
发明内容:
本发明的目的在于克服现有技术存在的缺点,提出一种六相整流发电机整流桥工作过程的分析方法,针对每个时刻点,通过分别比较同一整流桥上、下桥臂整流元件的电压大小判断上、下桥臂整流元件的导通情况,再根据流经整流元件的电流正负判断各整流元件的关断情况,最后运用变拓扑结构下的电路网络进行运行性能的分析计算,得到一段时间内整流桥工作状态的变化过程。
为实现上述目的,本发明所采用的分析方法包括以下工艺步骤:
(1)先确定六相整流发电机中整流系统的所有正常回路和故障回路;
(2)再列出六相整流发电机正常工作时的开路矩阵、短路矩阵和整流元件导通状态矩阵,若三相整流桥中整流元件出现开路故障,则改写开路矩阵中相应的元素;若三相整流桥中整流元件出现短路故障,则改写短路矩阵中相应的元素;
(3)依次判断两个整流桥中整流元件的导通情况,选择上一时刻为起始时刻,若上一时刻同一整流桥中无整流元件导通,则比较同一整流桥中各线电压的大小,结合开路矩阵判断整流元件的导通情况;若上一时刻同一整流桥中有整流元件导通,则分别比较上、下半桥整流元件端电压的大小,结合开路矩阵判断整流元件的导通情况,并改写整流元件导通状态矩阵中的相应元素;
(4)根据上一时刻流经各整流元件的电流的正负,结合短路矩阵判断各整流元件的关断情况,改写整流元件导通状态矩阵中的相应元素;
(5)根据短路矩阵和当前时刻的整流元件导通状态矩阵,得出整流桥的导通回路;
(6)根据当前时刻整流元件导通状态矩阵判断整流桥上、下桥臂的直通状况,直通时直流侧负载阻抗为零,非直通时直流侧负载阻抗为实际值;
(7)根据步骤(5)得到的导通回路和步骤(6)得到的负载阻抗,结合整流系统中其他已知量得出整流桥的支路电压和支路电流;
(8)选择当前时刻为非结束时刻,回到步骤(3)继续进行下一时刻的分析,选择当前时刻为结束时刻,分析过程结束,实现对六相整流发电机整流桥工作过程的分析。
本发明针对每个时刻点,当整流系统的拓扑结构与开路矩阵、短路矩阵、整流桥状态矩阵以及相关参数均已知时,通过电路分析方法得出整流桥的交流侧电压、电流与直流侧电压、电流等电气量;通过选择分析过程的起始时刻、结束时刻以及合适的求解步长,得到六相发电机整流系统在这段时间内运行情况。
本发明与现有技术相比,适用于正常和故障两种运行工况,包含整流元件发生故障时,整流元件开路时原有正常回路不能全部正常导通,整流元件短路时只有上、下半桥的整流元件导通,上、下桥臂直通时直流侧负载被短路等多种情况,并适用于两桥及多桥整流系统;其设计原理科学可靠,方法简单,通用性强,运用灵便,分析效率高,应用效果好。
附图说明:
图1为本发明涉及的六相整流发电机的整流桥的连接结构原理示意图。
图2为图1中左侧整流桥的拓扑结构图,其中,二极管所在1-6支路用虚线表示,相应二极管的编号分别与支路编号一致,①和②分别表示1条正常回路和1条故障回路。
具体实施方式:
下面结合附图和实施例对本发明作进一步的详细描述。
实施例:
本实施例涉及的六相整流发电机包含两个三相不可控整流桥,如图1所示,左侧整流桥为第1个整流桥,右侧整流桥为第2个整流桥,整流元件均为二极管,发电机的六相绕组为两个中性点相互独立的三相绕组,两个三相绕组分别为a1、b1、c1和a2、b2、c2,中性点分别为O1、O2,两个整流桥的交流侧分别与两个三相绕组相连接,直流侧并联向负载供电;设第k(k=1,2)个整流桥的交流侧相电压uak、ubk、uck分别为u3(k-1)+1、u3(k-1)+2、u3(k-1)+3,第k(k=1,2)个整流桥的第j(j=1,2,3,4,5,6)个二极管D6(k-1)+j的电压分别为uD6(k-1)+j,第k(k=1,2)个整流桥的第j(j=1,2,3,4,5,6)个二极管D6(k-1)+j的电流分别为iD6(k-1)+j
本实施例涉及的分析方法的具体工艺步骤为:
(1)先列出图2中整流桥的全部回路,其中,6个正常回路和6个故障回路,故障回路在二极管短路时存在,与6个正常回路相关联的二极管所在支路编号分别为1与5、1与6、2与4、2与6、3与4、3与5,与6个故障回路相关联的二极管所在支路编号分别为1与2、1与3、2与3、4与5、4与6、5与6;
(2)再列出二极管的开路矩阵为C、短路矩阵为S,C和S均为1×12的矩阵,各矩阵中元素编号与图1中二极管的编号一致,C中的开路故障二极管为0,否则为1,S中的短路故障二极管为1,否则为0,C中的第j个元素为cj(j=1,2…12),S中的第j个元素为sj(j=1,2…12),当D1发生开路故障且D8同时发生短路故障时,表示为:C=[0,1,1,1,1,1,1,1,1,1,1,1],S=[0,0,0,0,0,0,0,1,0,0,0,0];
整流桥状态矩阵为D,D为1×12的矩阵,矩阵中元素编号与图1中二极管的编号一致,导通或短路的二极管在D中为1,关断或开路的二极管在D中为0,D中的第j个元素为dj(j=1,2…12),D在0时刻初始状态为S,依据二极管状态的变化对应改写D中的相应元素;
(3)依次判断第k(k=1,2)个整流桥二极管的导通情况,当上一时刻第k个整流桥的6个二极管均未导通,依据a进行判断,否则依据b进行判断:
a.根据上一时刻整流桥的交流侧相电压U和直流侧电压Udc,并结合二极管开路故障矩阵C得到第k(k=1,2)个整流桥的二极管电压矩阵UDk(k=1,2),UDk为3×3矩阵,UDk中的第m行第n个元素为uDkmn(m,n=1,2,3),uDkmn为相电压u3(k-1)+m、u3(k-1)+n共同作用下二极管D6(k-1)+m、D6(k-1)+n+3的电压,两个二极管的电压相同都等于uDkmn,表示为:
当k=2,m=2,n=1时,根据上一时刻整流桥的交流侧b2、a2的相电压u5、u4和直流侧电压Udc,并结合二极管开路故障状态c8、c10,得出u5、u4共同作用下二极管D8、D10的电压uD221,令uDMk=max(UDk),即uDMk取矩阵UDk所有元素的最大值,当uDMk=uDkmn>0.7V,对应的两个二极管D6(k-1)+m、D6(k-1)+n+3导通,同桥其余二极管的导通状态不变,D中元素d6(k-1)+m、d6(k-1)+n+3为1,其余元素不变,即当uDM2=uD221>0.7V,与uD221对应的二极管D8、D10导通,d8=1、d10=1;
b.通过第k(k=1,2)个整流桥中任意一个导通二极管支路,得出上一时刻Rdc两端相对于中性点Ok(k=1,2)的电压uUk和uLk,当上桥臂有二极管导通,如D1导通,则uU1=u1-0.7V,uL1=uU1-Udc,当上桥臂无二极管导通,则依据下桥臂导通二极管进行计算,如D6导通,则uL1=u3+0.7V,uU1=uL1+Udc,根据上一时刻整流桥交流侧相电压U和二极管开路矩阵C分别得到上、下桥臂的二极管电压矩阵UDUk和UDLk,UDUk和UDLk均为1×3矩阵,UDUk中第m(m=1,2,3)个元素为uDUkm,UDLk中第n(n=1,2,3)个元素为uDLkn,uDUkm和uDLkn分别为相电压二极管D6(k-1)+m、D6(k-1)+n+3电压,表示为:
当k=2,m=2,n=1时,根据上一时刻整流桥的交流侧b2和a2的相电压为u5和u4,直流侧电压为uU2和uL2,并结合二极管开路状态c8和c10,分别得二极管D8和D10的电压为uDU22和uDL21,令uDUMk=max(UDUk),uDLMk=max(UDLk),对uDUMk和uDLMk分别进行判断,当uDUMk=uDUkm>0.7V时,第k个整流桥上桥臂二极管D6(k-1)+m导通,上半桥的其余二极管的导通状态不变,当uDLMk=uDLkn>0.7V时,第k个整流桥下桥臂二极管D6(k-1)+n+3导通,下半桥的其余二极管的导通状态不变,D中元素d6(k-1)+m、d6(k-1)+n+3为1,其余元素不变,如uDUM2=uDU22>0.7V,uDLM2=uDL21≤0.7V时,D8导通,D10的状态同上一时刻,令d8=1、d10的值不变;
(4)接着判断两个整流桥所有二极管的关断情况,上一时刻第k(k=1,2)个整流桥的二极管D6(k-1)+j(j=1,2,3,4,5,6)的支路电流iD6(k-1)+j<0,二极管D6(k-1)+j关断,但短路二极管仍导通,如上一时刻iD6<0,则d6=s6
(5)根据二极管短路矩阵S和当前时刻状态矩阵D确定整流系统的实际导通回路,D=[1,0,0,0,0,1,0,1,1,1,0,0],S=[0,0,0,0,0,0,0,1,0,0,0,0],存在的回路有4条,与之相关联的二极管编号分别为1与6、8与10、9与10、8与9,其中,前3条为正常回路,第4条为故障回路;
(6)根据二极管当前时刻的状态矩阵D,判断各整流桥中有无上、下桥臂直通的现象,任一整流桥中出现上、下桥臂直通时整流桥直流侧负载阻抗均为0,否则负载阻抗为实际值,如D=[0,1,0,1,0,0,1,0,0,1,0,0],第二个整流桥出现上、下桥臂直通,Rdc=0;
(7)根据步骤(5)得到的导通回路和步骤(6)得到的负载阻抗Rdc,并结合整流桥的交流侧其他支路列写整个系统的网络方程,得出当前时刻整流系统中各支路的电压和电流;
(8)选择当前时刻为非结束时刻,回到步骤(3)继续进行下一时刻的分析,直到选择当前时刻为结束时刻,分析过程结束,实现了对六相整流发电机整流桥工作过程的分析。

Claims (2)

1.一种六相整流发电机整流桥工作过程的分析方法,其特征在于:针对每个时刻点,通过分别比较同一整流桥上、下桥臂整流元件的电压大小判断上、下桥臂整流元件的导通情况,再根据流经整流元件的电流正负判断各整流元件的关断情况,最后运用变拓扑结构下的电路网络进行运行性能的分析计算,得到一段时间内整流桥工作状态的变化过程,其分析过程包括以下步骤:
(1)先列出六相整流发电机的两个三相整流桥的所有正常回路和故障回路;
(2)再列出六相整流发电机正常工作时的开路矩阵、短路矩阵和整流元件导通状态矩阵,整流元件出现开路故障,改写开路矩阵中相应的元素,整流元件出现短路故障,改写短路矩阵中相应的元素;
(3)依次判断两个整流桥中整流元件的导通情况,当上一时刻同一整流桥中无整流元件导通时,比较同一整流桥中各线电压的大小,结合开路矩阵判断整流元件的导通情况;当上一时刻同一整流桥中有整流元件导通时,分别比较上、下半桥整流元件端电压的大小,结合开路矩阵判断整流元件的导通情况,并改写状态矩阵中的相应元素;
(4)接着根据上一时刻流经各整流元件的电流的正负,结合短路矩阵判断各整流元件的关断情况,改写状态矩阵中的相应元素;
(5)根据短路矩阵和当前时刻的状态矩阵,得出整流桥的导通回路;
(6)根据当前时刻状态矩阵判断整流桥上、下桥臂的直通状况,直通时直流侧负载阻抗为零,非直通时直流侧负载阻抗为实际值;
(7)根据步骤(5)得到的导通回路和步骤(6)得到的负载阻抗,并结合整流桥的交流侧其他支路列写整个系统的网络方程,得出当前时刻整流系统中各支路的电压和电流;
(8)选择当前时刻为非结束时刻,回到步骤(3)继续进行下一时刻的分析,选择当前时刻为结束时刻,则分析过程结束,实现对六相整流发电机整流桥工作过程的分析。
2.依据权利要求1所述的六相整流发电机整流桥工作过程的分析方法,其特征在于:该分析方法用于两桥及多桥整流系统,适用于正常和故障两种运行工况。
CN201610473939.9A 2016-06-24 2016-06-24 一种六相整流发电机整流桥工作过程的分析方法 Expired - Fee Related CN105954629B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610473939.9A CN105954629B (zh) 2016-06-24 2016-06-24 一种六相整流发电机整流桥工作过程的分析方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610473939.9A CN105954629B (zh) 2016-06-24 2016-06-24 一种六相整流发电机整流桥工作过程的分析方法

Publications (2)

Publication Number Publication Date
CN105954629A CN105954629A (zh) 2016-09-21
CN105954629B true CN105954629B (zh) 2018-08-03

Family

ID=56904784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610473939.9A Expired - Fee Related CN105954629B (zh) 2016-06-24 2016-06-24 一种六相整流发电机整流桥工作过程的分析方法

Country Status (1)

Country Link
CN (1) CN105954629B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108563842B (zh) * 2018-03-23 2022-09-09 渤海大学 以电压源作为输入的六相不控整流系统的建模方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102073014A (zh) * 2011-01-07 2011-05-25 华北电网有限公司 一种同步发电机参数的辨识方法
CN103762579A (zh) * 2013-12-22 2014-04-30 南京南瑞集团公司 一种提高电网暂态功角稳定性的直流功率紧急控制性能指标计算方法
CN104732033A (zh) * 2015-03-31 2015-06-24 河南行知专利服务有限公司 一种电力系统机电暂态过程的仿真分析方法
CN105093054A (zh) * 2015-06-30 2015-11-25 许昌许继软件技术有限公司 一种大功率整流器开关管直通故障快速在线诊断方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT409318B (de) * 2000-07-11 2002-07-25 Siemens Ag Oesterreich Schutzschaltung für eine netzgeführte thyristorbrücke

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102073014A (zh) * 2011-01-07 2011-05-25 华北电网有限公司 一种同步发电机参数的辨识方法
CN103762579A (zh) * 2013-12-22 2014-04-30 南京南瑞集团公司 一种提高电网暂态功角稳定性的直流功率紧急控制性能指标计算方法
CN104732033A (zh) * 2015-03-31 2015-06-24 河南行知专利服务有限公司 一种电力系统机电暂态过程的仿真分析方法
CN105093054A (zh) * 2015-06-30 2015-11-25 许昌许继软件技术有限公司 一种大功率整流器开关管直通故障快速在线诊断方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
十二相整流发电机缺桥故障运行分析;张伟玲 等;《中国电机工程学报》;20160320;第36卷(第6期);第1724-1730页 *

Also Published As

Publication number Publication date
CN105954629A (zh) 2016-09-21

Similar Documents

Publication Publication Date Title
CN107039993B (zh) 对称双极柔性直流输电换流器功率转带控制方法
CN104764943B (zh) 一种模块化多电平变换器单相逆变试验电路及其试验方法
CN105356764B (zh) 具有容错拓扑结构的z源双级式矩阵变换器及其控制方法
CN106154103B (zh) 三电平逆变器的开关管开路故障诊断方法
CN105958892B (zh) 四相电励磁双凸极电机变换器容错拓扑结构及容错方法
EP3116096A1 (en) Ups circuit
CN111313713B (zh) 一种大规模直流变压器的分布式控制方法
CN106374767A (zh) 一种考虑二次回路的模块化多电平换流器子模块仿真模型
CN112821842B (zh) 一种开关磁阻电机断路故障容错控制方法
CN107064707A (zh) 双级矩阵变换器在反向发电状态时的开路故障检测方法
CN101833055A (zh) 换流阀设备低压加压试验方法及系统
CN104682351A (zh) 基于数学构造调制的矩阵变换器开路故障容错控制方法
CN105305801B (zh) 一种模块式冷冗余航空电力转换器拓扑结构
CN209592999U (zh) 具备故障穿越能力的柔性直流输电装置及直流输电系统
CN108963980B (zh) 一种基于故障隔离库的多模态故障隔离方法
CN105954629B (zh) 一种六相整流发电机整流桥工作过程的分析方法
CN107015081A (zh) 一种阻尼模块试验装置及其试验方法
CN107733217B (zh) 一种三相-单相矩阵变换器的容错控制方法
CN110943640B (zh) 一种t型逆变器fc桥臂冗余结构电力转换器拓扑结构
Huang et al. A calculation method for maximum steady-state loss of VSC-HVDC grounding resistor in Luxi back-back HVDC interconnector
CN108376992B (zh) 一种混合子模块mmc等效仿真方法
CN113063985A (zh) 一种换流阀过流和均压测试电路、系统及方法
CN110994974B (zh) 一种低损耗模块化多电平直流直流变换器及其子模块
CN110427635B (zh) Lcc-hvdc优化电磁暂态仿真方法
CN109217753B (zh) 一种交直流发电系统的拓扑结构及控制方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zheng Xiaoqin

Inventor after: Wu Xinzhen

Inventor after: You Rui

Inventor after: Zhang Weiling

Inventor before: Wu Xinzhen

Inventor before: Zheng Xiaoqin

Inventor before: You Rui

Inventor before: Zhang Weiling

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180803

Termination date: 20210624