CN105952423A - Layered oil production method with suspension pump and production pipe column - Google Patents

Layered oil production method with suspension pump and production pipe column Download PDF

Info

Publication number
CN105952423A
CN105952423A CN201610373367.7A CN201610373367A CN105952423A CN 105952423 A CN105952423 A CN 105952423A CN 201610373367 A CN201610373367 A CN 201610373367A CN 105952423 A CN105952423 A CN 105952423A
Authority
CN
China
Prior art keywords
oil
well
pump
layer
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610373367.7A
Other languages
Chinese (zh)
Inventor
付亚荣
马永忠
张原�
刘春平
李小永
靳利
姜超
姜一超
姚庆童
张云钊
张睿荫
曹飞
李冬青
付丽霞
付茜
曹瑾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201610373367.7A priority Critical patent/CN105952423A/en
Publication of CN105952423A publication Critical patent/CN105952423A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Cleaning In General (AREA)

Abstract

The invention discloses a layered oil production method with a suspension pump and a production string, belonging to the technical field of oil production in oil fields. The layered oil recovery method comprises the following steps: carrying out layered oil extraction preparation work, wherein the layered oil extraction preparation work comprises an oil well cleaning process, a production string cleaning process and a casing cleaning process; providing a layered oil production pipe column, and lowering the layered oil production pipe column into an oil well; providing a layered oil production rod column, and lowering the layered oil production rod column into an oil well, so that a suspension pump plunger of the layered oil production rod column is installed in a matching manner with a suspension pump cylinder of the layered oil production pipe column; and performing layered oil production through the layered oil production pipe column and the layered oil production rod column. The invention utilizes the packer to separate the middle layer of the oil wellThe oil layer separation with large pressure difference and outstanding interlayer interference contradiction avoids the interlayer interference of the oil layer, reduces the creeping of the oil production pipe column in the well by using a suspension pump, is applied to more than 30 wells on site, has the once success rate of the layered oil production of 100 percent, averagely increases the yield of a single well of an oil well by more than 4.5 tons, and averagely reduces the daily precipitation by 6.8m3The above.

Description

A kind of with the oil production by layer method and the flow string that hang pump
Technical field
The invention belongs to oil extraction in oil field technical field, particularly to a kind of with the oil production by layer method hanging pump And flow string.
Background technology
For Heterogeneous Medium Sandstone Oil Field, owing to it has, oil reservoir is many, interlayer physical difference is big, interlayer interference is tight The feature of weight, so generally using the mode of oil production by layer to exploit it.
Common layering oil production technology the most first uses packer to be separated by each interval, and the most every layer is separated Recover the oil, thus reach to eliminate the purpose of interlayer interference.
During realizing the present invention, inventor find prior art at least there is problems in that due to In the work process recovered the oil, being high temperature and high pressure environment in well, flow string is easy to during adding unloading Produce flexible wriggling, thus cause packer to lose efficacy, and then be unable to reach the purpose of oil production by layer.
Summary of the invention
In order to solve the problem that flow string is wriggled in down-hole, embodiments provide a kind of with suspension The oil production by layer method of pump and flow string.Described technical scheme is as follows:
On the one hand, a kind of oil production by layer method with suspension pump, described layering are embodiments provided Oil production method includes:
Step one: preparation of construction
A, well-flushing: pumping into clear water from oil jacket annular space and make flushing fluid, flushing fluid returns out from oil pipe, the row of flushing fluid Amount controls 25~30m3/ h, treats that returning out clear water from oil pipe stops well-flushing;Continue to see after well head pressure is zero Examine 2 hours, treat that well head, without overflow, tears well head open, the SFZ18-21 preventer that pressure testing is qualified is installed;
B, trip out flow string: play producing well and normally recover the oil the flow string produced, flow string include oil pipe, Oil well pump and sucker rod;
C, with boiler car by oil pipe, sucker rod thorn wash clean, right on ground φ 58mm × 0.5m oil pipe rule Oil pipe is carried out by root latus rectum;
D, sand washing: under with the sand-flushing pipe column of nib, sand washing is to artificial bottom of a well;Sand-flushing pipe column with nib Screwed connection is relied on to form by oil pipe and nib from top to bottom from well head;
E, drifting: under in oil well casing, enter the drifting tubing string with φ 118mm × 1.2m jack rabbit, drifting Tubing string includes oil pipe, φ 118mm × 1.2m jack rabbit, and drifting tubing string is oil pipe thread from top to bottom from well head Connect jack rabbit;Drifting, to artificial bottom of a well, leads to 3 times in the section of setting, it is ensured that unblocked continuously, speed control System is 10~20m/min;
F, sleeve pipe scraping: enter under in down-hole casing with GX-140T casing scraper full well section sleeve pipe Inwall carries out one time and bores scraping, removes the dirt of down-hole casing inwall, wax and other internal surface of sleeve pipe obturator;Set Pipe scraping tubing string includes oil pipe, oil pipe variable buckle joint and GX-140T casing scraper, from well head from top to bottom For oil pipe, oil pipe lower end connected pipes variable buckle joint, oil pipe variable buckle joint lower end connects casing scraper;Oil Manage, threaded between oil pipe variable buckle joint and casing scraper;
G, for the second time well-flushing: pumping into clear water from oil jacket annular space and make flushing fluid, flushing fluid returns out from oil pipe, well-flushing The displacement control of liquid is 30~35m3/ h, treats that returning out clear water from oil pipe stops well-flushing;Trip out scraper column of casing;
Step 2, with hang pump separate-layer production string construction
A, with hang pump separate-layer production string;With hanging the separate-layer production string of pump by well head from upper Under be followed successively by: boll-weevil hanger, φ 73mm tubing nipple, φ 73mm heavy wall tubing, hang pump pump barrel, φ 73mm tubing nipple, φ 73mm heavy wall tubing, point adopt valve, oil well pump anti-sticking with downhole modulator Leakproof automatic cleaning machine, φ 73mm heavy wall tubing, Y221-114 packer, φ 73mm heavy wall tubing, band Have adopt valve, oil well pump anti-clip leak-proof automatic cleaning machine, φ 73mm heavy wall tubing, φ dividing of downhole modulator 73mm plug;
Boll-weevil hanger lower end connects φ 73mm tubing nipple, φ 73mm tubing nipple lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end connect suspension pump pump barrel, hang the connection of pump pump barrel lower end φ 73mm tubing nipple, φ 73mm tubing nipple lower end connect oil well pump anti-clip leak-proof automatic cleaning machine, take out Oil pump anti-clip leak-proof automatic cleaning machine lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end even Tape splicing have downhole modulator point adopt valve, valve lower end of point adopting with downhole modulator connects φ 73mm and adds heat-bodied oil Pipe, φ 73mm heavy wall tubing lower end connect Y221-114 packer, Y221-114 packer lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end connect with adopting valve, with well dividing of downhole modulator To connect oil well pump anti-clip leak-proof automatic cleaning machine, oil well pump anti-clip leak-proof automatic in the valve lower end of point adopting of lower actuator Washer lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end connects φ 73mm plug;
Boll-weevil hanger, φ 73mm tubing nipple, φ 73mm heavy wall tubing, suspension pump pump barrel, φ 73mm Tubing nipple, φ 73mm heavy wall tubing, with downhole modulator point to adopt valve, oil well pump anti-clip leak-proof automatic Washer, φ 73mm heavy wall tubing, Y221-114 packer, φ 73mm heavy wall tubing, with down-hole adjust Valve, oil well pump anti-clip leak-proof automatic cleaning machine, φ 73mm heavy wall tubing, φ 73mm plug are adopted in dividing of joint device Between rely on screwed connection;
Carry on B, packer and setting: at well mouth oil pipe hanger upper end screwed connection 1.0m tubing nipple, so Carrying boll-weevil hanger 1.5~2.0m on Hou, reading on weight indicator in observation Operation Van, when reading is 70~80KN Time, transfer boll-weevil hanger, lay down 1m tubing nipple, set;
Step 3, with hang pump oil production by layer roofbolt construction
A, under enter with hang pump oil production by layer roofbolt;With hanging the oil production by layer roofbolt of pump by well head certainly Upper and under be followed successively by: φ 28mm polished rod, φ 25mm sucker rod, φ 22mm sucker rod, φ 19mm take out Beam hanger, suspension pump plunger;Divide and adopt roofbolt running speed less than 30~35/h;
φ 28mm polished rod, φ 25mm sucker rod, φ 22mm sucker rod, φ 19mm sucker rod, suspension Screwed connection is used between pump plunger;
B, adjustment dead space.Put in place under plunger after entrance pump barrel, carry dead space 0.8m by every 1000m roofbolt;
Step 4, completion
Installing well head, completion oil well normally rises and takes out;Construct with the oil production by layer hanging pump.
On the other hand, embodiments provide a kind of with hang pump oil production by layer method, described point Layer oil production method includes:
Carrying out oil production by layer preparation, described oil production by layer preparation includes cleaning oil well flow, cleaning Flow string flow process and cannula cleaning flow process;
Thering is provided separate-layer production string, described separate-layer production string includes boll-weevil hanger, hangs pump pump barrel, silk Stifled, oil well pump anti-clip leak-proof automatic cleaning machine, point adopt pipeline section, multiple tubing nipple and multiple heavy wall tubing, Described boll-weevil hanger is positioned at the top of described separate-layer production string, and described boll-weevil hanger passes sequentially through oil Pipe pipe nipple and heavy wall tubing are connected with described suspension pump pump barrel,
Described oil well pump anti-clip leak-proof automatic cleaning machine is arranged on described point adopts valve with downhole modulator Lower section, adopt pipeline section for described point and be arranged on described oil well pump anti-clip leak-proof automatic cleaning machine by heavy wall tubing Top, adopts at least two that pipeline section includes from top to bottom being sequentially arranged point adopting with downhole modulator for described point Valve, two adjacent described all has packer by heavy wall tubing connection with point adopting of downhole modulator between valve, The described valve of point adopting with downhole modulator being positioned at bottom connects and has oil well pump anti-clip leak-proof automatically to clean Device, oil well pump anti-clip leak-proof automatic cleaning machine are connected with described plug by heavy wall tubing, described layering are adopted Tubing string is transferred to oil well;
Thering is provided oil production by layer roofbolt, described oil production by layer roofbolt includes polished rod, hangs pump plunger and multiple oil pumping Bar, described suspension pump plunger is connected with described polished rod, by under oil production by layer roofbolt by the plurality of sucker rod Put to oil well so that the suspension hanging pump plunger and described separate-layer production string of described oil production by layer roofbolt Pump pump barrel coordinates to be installed;
Oil production by layer work is carried out by described separate-layer production string and described oil production by layer roofbolt.
Further, described cleaning oil well flow includes:
Carrying out well-flushing operation for the first time, the operation of described first time well-flushing includes: by flushing fluid from being positioned at well head Pump at oil jacket annular space between oil pipe and sleeve pipe, the flushing fluid being pumped to the impurity in oil jacket annular space from Described oil pipe returns out, until after the limpid free from admixture of the flushing fluid returned out in described oil pipe, stops well-flushing for the first time Operation.
Further, described cleaning flow string flow process includes:
In well, trip out described flow string, use boiler car thorn to wash described oil pipe and described sucker rod;
Use oil pipe rule that described oil pipe carries out oil pipe latus rectum operation.
Further, described cannula cleaning flow process includes:
Drifting tubing string is transferred to described sleeve pipe, utilizes the jack rabbit in described latus rectum tubing string to described sleeve pipe Carry out run through casing size operation.
Further, described cannula cleaning flow process also includes:
After described run through casing size operates, scraper column of casing is transferred to described sleeve pipe, utilize described Casing scraper in scraper column of casing carries out internal surface of sleeve pipe scraping operations to described sleeve pipe.
Further, described cleaning oil well flow also includes:
After described internal surface of sleeve pipe scraping operations, carrying out second time well-flushing operation, described second time well-flushing is grasped Work includes: by flushing fluid at the oil jacket annular space between the oil pipe in described sleeve pipe and described scraper column of casing Pumping into, the flushing fluid being pumped to returns with the oil pipe in described scraper column of casing of the impurity in oil jacket annular space Go out, after the limpid free from admixture of the flushing fluid returned out, stop second time well-flushing operation, by described sleeve pipe scraping pipe Post trips out in well.
Further, described oil production by layer method also includes:
Described described flow string is transferred to oil well after, by carry described separate-layer production string and make Described packer moves upward, and observes the reading of weight indicator in Operation Van, when described reading be 70kN extremely During 80kN, again transfer described separate-layer production string, thus complete described packer set operation.
Further, described oil production by layer method also includes:
After the oil production by layer roofbolt of described suspension pump is transferred to oil well, by described oil production by layer roofbolt Being lifted up, think that described oil production by layer roofbolt provides dead space, described dead space is described oil production by layer bar 0.0008 times of post.
Another aspect, embodiments provides a kind of flow string with suspension pump, described production pipe Post provide separate-layer production string, described separate-layer production string include boll-weevil hanger, hang pump pump barrel, plug, Oil well pump anti-clip leak-proof automatic cleaning machine, point adopt pipeline section, multiple tubing nipple and multiple heavy wall tubing, described Boll-weevil hanger is positioned at the top of described separate-layer production string, and it is short that described boll-weevil hanger passes sequentially through oil pipe Joint and heavy wall tubing are connected with described suspension pump pump barrel, and described oil well pump anti-clip leak-proof automatic cleaning machine passes through Heavy wall tubing is arranged on the described lower section point adopting valve with downhole modulator, adopts pipeline section by adding for described point Heat-bodied oil pipe is arranged on the lower section of described oil well pump anti-clip leak-proof automatic cleaning machine, adopts pipeline section for described point and includes by upper At least two being sequentially arranged under to adopts valve with dividing of downhole modulator, and two adjacent described with down-hole tune Point adopting of joint device all has packer by heavy wall tubing connection between valve, is positioned at the described with down-hole of bottom The valve of point adopting of actuator connects and has oil well pump anti-clip leak-proof automatic cleaning machine, oil well pump anti-clip leak-proof automatically to clean Device is connected with described plug by heavy wall tubing;
Described oil production by layer roofbolt includes polished rod, hangs pump plunger and multiple sucker rod, described suspension pump plunger It is connected with described polished rod by the plurality of sucker rod.
The technical scheme that the embodiment of the present invention provides has the benefit that
By use that the embodiment of the present invention provided with hanging the oil production by layer method of pump, first carry out point Layer oil recovery preparation, oil production by layer preparation includes the cleaning oil well flow performed respectively, cleans production Tubing string flow process and cannula cleaning flow process, then transfer separate-layer production string to oil well, separate-layer production string Oil well is layered by interior packer, is transferred to oil well by oil production by layer roofbolt the most again so that layering The pump plunger that hangs of rod string coordinates installation, finally by layering with the suspension pump pump barrel of separate-layer production string Flow string and oil production by layer roofbolt carry out oil production by layer work.This oil production by layer method utilizes packer by oil The oil reservoir that in well, interlayer pressure gap is big, interlayer interference is particularly thorny is separately, it is to avoid oil reservoir interlayer interference, Utilizing suspension pump fall to resist the separate-layer production string wriggling in down-hole, on-the-spot more than 30 mouth wells application, layering is adopted Oil one-time success rate 100%, oil well well yield averagely increases by more than 4.5 tons, average daily precipitation 6.8m3With On.
Accompanying drawing explanation
For the technical scheme being illustrated more clearly that in the embodiment of the present invention, institute in embodiment being described below The accompanying drawing used is needed to be briefly described, it should be apparent that, the accompanying drawing in describing below is only the present invention Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the flow chart of the oil production by layer method that the embodiment of the present invention two provides.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing to the present invention Embodiment is described in further detail.
Embodiment one
A kind of oil production by layer method with suspension pump that the embodiment of the present invention provides, the determination side of the present embodiment Method application more than 30 mouth oil well, oil production by layer one-time success rate 100% at the scene.Particularly Shanxi XXX-15 oil After well construction, the per day increase of oil well well yield 4.5 tons, average daily precipitation 6.8m3
This well requires epimere 16 in 2015 06 month geological scheme#、18#、19#、20#Layer, stress level 0.95; With hypomere 23#、25#、28#Layer, stress level 1.0MPa;Carry out oil production by layer.Oil production by layer requires: on Section 16#、18#、19#、20#Layer, 15m3/d;Hypomere 23#、25#、28#Layer, 10m3/d;Lower pump requires: Day production fluid 25m3, liquid level 1800m.
Table 1: JinXXX-15Jing each layer basic data
Level number Well section Thickness (m)
16# 2858.4~2860.0 1.6m
18# 2864.2~2872.2 8.0m
19# 2881.0~2885.0 4.0m
20# 2888.2~2893.4 5.2m
23# 2925.0~2927.2 2.2m
25# 2940.4~2943.0 2.6m
28# 2925.0~2955.6 3.6m
Petroleum production engineering, according to geological scheme, uses with the oil production by layer method construction hanging pump.
Specifically, this oil production by layer method includes:
Step one: preparation of construction
A, well-flushing: pumping into clear water from oil jacket annular space and make flushing fluid, flushing fluid returns out from oil pipe, the row of flushing fluid Amount controls 25~30m3/ h, treats that returning out clear water from oil pipe stops well-flushing;Continue to see after well head pressure is zero Examine 2 hours, treat that well head, without overflow, tears well head open, the SFZ18-21 preventer that pressure testing is qualified is installed;
B, trip out flow string: play producing well and normally recover the oil the flow string produced, flow string include oil pipe, Oil well pump and sucker rod;
C, with boiler car by oil pipe, sucker rod thorn wash clean, right on ground φ 58mm × 0.5m oil pipe rule Oil pipe is carried out by root latus rectum;Carry out oil pipe by root latus rectum to be this on ground φ 58mm × 0.5m oil pipe rule Technology and the method known to operator in field, do not describing in detail;
D, sand washing: under with the sand-flushing pipe column of nib, sand washing is to artificial bottom of a well;The sand clean out pipe with nib Post is relied on screwed connection to form by oil pipe and nib from well head from top to bottom;Oil pipe and nib are that device is commonly used in oil field Material, commercially available;It rushes a kind of farm tools method is technology and the method known to operator in this area, is not describing in detail;
E, drifting: under in oil well casing, enter the drifting tubing string with φ 118mm × 1.2m jack rabbit, drifting Tubing string includes oil pipe, φ 118mm × 1.2m jack rabbit, and drifting tubing string is oil pipe thread from top to bottom from well head Connect jack rabbit;Drifting, to artificial bottom of a well, leads to 3 times in the section of setting, it is ensured that unblocked continuously, speed control System is 10~20m/min;
F, sleeve pipe scraping: enter under in down-hole casing with GX-140T casing scraper full well section sleeve pipe Inwall carries out one time and bores scraping, removes the dirt of down-hole casing inwall, wax and other internal surface of sleeve pipe obturator;Set Pipe scraping tubing string includes oil pipe, oil pipe variable buckle joint and GX-140T casing scraper, from well head from top to bottom For oil pipe, oil pipe lower end connected pipes variable buckle joint, oil pipe variable buckle joint lower end connects casing scraper;Oil Pipe, screwed connection between oil pipe variable buckle joint and casing scraper;
G, for the second time well-flushing: pumping into clear water from oil jacket annular space and make flushing fluid, flushing fluid returns out from oil pipe, well-flushing The displacement control of liquid is 30~35m3/ h, treats that returning out clear water from oil pipe stops well-flushing;Trip out scraper column of casing;
Step 2, with hang pump separate-layer production string construction
A, with hang pump separate-layer production string;With hanging the separate-layer production string of pump by well head from upper Under be followed successively by: boll-weevil hanger, φ 73mm tubing nipple, φ 73mm heavy wall tubing, hang pump pump barrel, φ 73mm tubing nipple, φ 73mm heavy wall tubing, point adopt valve, oil well pump anti-sticking with downhole modulator Leakproof automatic cleaning machine, φ 73mm heavy wall tubing, Y221-114 packer, φ 73mm heavy wall tubing, band Have adopt valve, oil well pump anti-clip leak-proof automatic cleaning machine, φ 73mm heavy wall tubing, φ dividing of downhole modulator 73mm plug;
Boll-weevil hanger lower end connects φ 73mm tubing nipple, φ 73mm tubing nipple lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end connect suspension pump pump barrel, hang the connection of pump pump barrel lower end φ 73mm tubing nipple, φ 73mm tubing nipple lower end connect oil well pump anti-clip leak-proof automatic cleaning machine, take out Oil pump anti-clip leak-proof automatic cleaning machine lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end even Tape splicing have downhole modulator point adopt valve, valve lower end of point adopting with downhole modulator connects φ 73mm and adds heat-bodied oil Pipe, φ 73mm heavy wall tubing lower end connect Y221-114 packer, Y221-114 packer lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end connect with adopting valve, with well dividing of downhole modulator To connect oil well pump anti-clip leak-proof automatic cleaning machine, oil well pump anti-clip leak-proof automatic in the valve lower end of point adopting of lower actuator Washer lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end connects φ 73mm plug;
Boll-weevil hanger, φ 73mm tubing nipple, φ 73mm heavy wall tubing, suspension pump pump barrel, φ 73mm Tubing nipple, φ 73mm heavy wall tubing, with downhole modulator point to adopt valve, oil well pump anti-clip leak-proof automatic Washer, φ 73mm heavy wall tubing, Y221-114 packer, φ 73mm heavy wall tubing, with down-hole adjust Valve, oil well pump anti-clip leak-proof automatic cleaning machine, φ 73mm heavy wall tubing, φ 73mm plug are adopted in dividing of joint device Between rely on screwed connection;
Carry on B, packer and setting: connect 1.0m tubing nipple at well mouth oil pipe hanger threaded upper ends, so Carrying boll-weevil hanger 1.5~2.0m on Hou, reading on weight indicator in observation Operation Van, when reading is 70~80KN Time, transfer boll-weevil hanger, lay down 1m tubing nipple, set;
Step 3, with hang pump oil production by layer roofbolt construction
A, under enter with hang pump oil production by layer roofbolt;With hanging the oil production by layer roofbolt of pump by well head certainly Upper and under be followed successively by: φ 28mm polished rod, φ 25mm sucker rod, φ 22mm sucker rod, φ 19mm take out Beam hanger, suspension pump plunger;Divide and adopt roofbolt running speed less than 30~35/h;
φ 28mm polished rod, φ 25mm sucker rod, φ 22mm sucker rod, φ 19mm sucker rod, suspension Screwed connection is used between pump plunger;
B, adjustment dead space.Put in place under plunger after entrance pump barrel, carry dead space 0.8m by every 1000m roofbolt;
Step 4, completion
Installing well head, completion oil well normally rises and takes out;Construct with the oil production by layer hanging pump.
By use that the embodiment of the present invention provided with hanging the oil production by layer method of pump, first carry out point Layer oil recovery preparation, oil production by layer preparation includes the cleaning oil well flow performed respectively, cleans production Tubing string flow process and cannula cleaning flow process, then transfer separate-layer production string to oil well, separate-layer production string Oil well is layered by interior packer, is transferred to oil well by oil production by layer roofbolt the most again so that layering The pump plunger that hangs of rod string coordinates installation, finally by layering with the suspension pump pump barrel of separate-layer production string Flow string and oil production by layer roofbolt carry out oil production by layer work.This oil production by layer method utilizes packer by oil The oil reservoir that in well, interlayer pressure gap is big, interlayer interference is particularly thorny is separately, it is to avoid oil reservoir interlayer interference, Suspension pump fall is utilized to resist the separate-layer production string wriggling in down-hole, on-the-spot more than 30 mouth oil wells, oil production by layer One-time success rate 100%.Particularly after Shanxi XXX-15 well construction, the per day increase of oil well well yield 4.8 Ton, average daily precipitation 7.3m3Above.
Embodiment two
A kind of oil production by layer method with suspension pump that the embodiment of the present invention provides, as it is shown in figure 1, this point Layer oil production method includes:
Step 110: carry out oil production by layer preparation, oil production by layer preparation include clean oil well flow, Clean flow string flow process and cannula cleaning flow process.
As such, it is possible to the oil jacket annular space between oil pipe and sleeve pipe is cleaned up by cleaning oil well flow, logical Original flow string is cleaned up by over cleaning flow string flow process, by cannula cleaning flow process by sleeve pipe Inner wall washing is clean such that it is able to improved a chance of success of oil production by layer by oil production by layer preparation.
When implementing, oil production by layer preparation comprises the following steps:
Step 111: carry out well-flushing operation for the first time, well-flushing operation for the first time includes: by flushing fluid from being positioned at well Mouthful oil pipe and sleeve pipe between oil jacket annular space at pump into, miscellaneous with in oil jacket annular space of the flushing fluid being pumped to Matter is returned out from oil pipe, until after the limpid free from admixture of the flushing fluid returned out in oil pipe, stops well-flushing operation for the first time.
So, reached to clean the purpose of oil jacket annular space.
In above-mentioned implementation, the displacement control of flushing fluid is 25~30m3/ h, is stopping well-flushing for the first time After operation, well head pressure should be zero, hereafter continues to observe well head pressure at least 2 hours, if well head without Overflow, then install preventer at well head, thus play and prevent oil well from producing blowout.
Preferably, the preventer that model can be selected to be SFZ18-21, it should be noted that the type of preventer Number it is not limited in above-mentioned preferred version, in other embodiments, it is also possible to select not according to different demands The preventer of same model, such as SFZ18-35 etc., the present invention is without limitation.
Step 112: trip out flow string in well, flow string includes oil pipe and sucker rod, uses boiler car Thorn washing oil pipe and sucker rod.
So, original flow string is tripped out in well so that staff can be on the ground to oil pipe Carry out thorn with sucker rod and wash operation, thus reach the purpose of cleaning tubing and sucker rod.
Step 113: use oil pipe rule that oil pipe carries out oil pipe latus rectum operation.
When implementing, the oil pipe rule using specification to be φ 58mm × 0.5m in bottom surface carry out latus rectum behaviour to oil pipe Making, if having many with oil pipe, then carrying out latus rectum one by one to each with oil pipe.
It should be noted that the specification of oil pipe rule can be changed according to practical situation, such as when oil pipe When specification is bigger, the specification of oil pipe rule can also increase accordingly, and the specification that oil pipe is advised by the present invention does not limits System.
Step 114: sand-flushing pipe column is transferred to artificial bottom of a well;After sand-flushing pipe column is transferred, utilize sand clean out pipe Post carries out sand washing operation to producing well, and the specific embodiment of sand washing operation is basically identical with prior art, Do not repeat at this.Wherein, artificial bottom of a well is the upper plane of the nethermost cement plug of finger sleeve.
In above-mentioned implementation, sand-flushing pipe column can include that oil pipe and nib, nib lead to the bottom of oil pipe Crossing screwed connection, wherein, oil pipe is for carrying sand cleaning fluid in well, and nib is used for improving the flow velocity of sand cleaning fluid, To reach to improve the purpose of sand washing effect.
Step 115: transferred to sleeve pipe by drifting tubing string, utilizes the jack rabbit in latus rectum tubing string to carry out sleeve pipe Run through casing size operates.
As such, it is possible to during latus rectum operates, remove the foreign material in sleeve pipe.
In above-mentioned implementation, drifting tubing string can include the end of oil pipe and jack rabbit, jack rabbit and oil pipe Portion is threaded, such that it is able to utilize oil pipe to be transferred to well by jack rabbit.
When implementing, jack rabbit is transferred to artificial bottom of a well by sleeve pipe from well head always, logical to complete sleeve pipe Footpath operates.
Preferably due to the cleannes of the section of setting (for laying the well section of packer) are required higher, when When jack rabbit is transferred to the section of setting, need to lead to three times the most continuously in the section of setting such that it is able to ensure the section of setting Cleannes meet construction requirement.It should be noted that for the number of times of the logical section of setting, can be according to difference Construction requirement and change accordingly, such as when the cleannes of the section of setting are required higher, it is also possible to suitably increase Adding the number of times of the logical section of setting, the present invention is without limitation.
In the present embodiment, the specification of jack rabbit elects φ 118mm × 1.2m as, and the translational speed of jack rabbit controls 10~20m/min, it is readily appreciated that, the specification of jack rabbit and translational speed all can be according to actual demands And making corresponding change, the present invention is without limitation.
After run through casing size has operated, drifting tubing string is tripped out in well.
Step 116: transferred to sleeve pipe by scraper column of casing, utilizes the sleeve pipe scraping in scraper column of casing Device carries out internal surface of sleeve pipe scraping operations to sleeve pipe.
As such, it is possible to the dirt on internal surface of sleeve pipe, wax and other internal surface of sleeve pipe are blocked by scraper column of casing Thing is removed clean.
In above-mentioned implementation, scraper column of casing can include that oil pipe, oil pipe variable buckle joint and sleeve pipe are scraped Cutting device, casing scraper is connected with the bottom of oil pipe by oil pipe variable buckle joint, so that casing scraper Can be transferred to well by oil pipe.
Preferably, casing scraper selects model to be the casing scraper of GX-140T, it should be noted that The model of casing scraper is not limited in above-mentioned preferred version, and in other embodiments, casing scraper is also Can be other models, such as GX-146T etc., the present invention be without limitation.
Step 117: carry out second time well-flushing operation, well-flushing operation for the second time includes: by flushing fluid from sleeve pipe and Pumping at oil jacket annular space between oil pipe in scraper column of casing, the flushing fluid being pumped to is with oil jacket annular space Interior impurity oil pipe in scraper column of casing returns out, after the limpid free from admixture of the flushing fluid returned out, stops Well-flushing operation, trips out scraper column of casing in well for the second time.
As such, it is possible to the foreign material scraped in internal surface of sleeve pipe scraping operations are rinsed by second time well-flushing operation Totally.
When implementing, can be by the displacement control of flushing fluid 30~35m3/ h, it should be noted that wash The discharge capacity of well liquid can make corresponding change according to actual demand, and the present invention is without limitation.
Step 121: provide separate-layer production string, separate-layer production string includes hanging pump and packer, will layering Flow string is transferred to oil well.
As such, it is possible to utilize packer by oil well, interlayer pressure gap is big, interlayer interference is particularly thorny oil Layer is separately, it is to avoid oil reservoir interlayer interference, reduces the separate-layer production string wriggling in down-hole.
Preferably, the packer that packer can select model to be Y221-114.
Step 122: carry separate-layer production string on by and packer is moved upward, observes the finger in Operation Van The reading of weight table, when reading is 70kN to 80kN, again transfers separate-layer production string, thus completes envelope Operation is set every device.
As such, it is possible to by setting operation by packer setting in oil jacket annular space, so that packer energy Enough different oil reservoirs is separated.
It should be noted that the method that sets of packer is corresponding with the model of packer, selected by the present embodiment Packer model be Y221-114, what this packer was corresponding sets mode is that machinery sets, it is possible to Set by the method in above-mentioned steps 121, it is readily appreciated that, in other embodiments, if choosing With the packer of other models, it sets mode accordingly and is likely to difference, such as hydraulic setting, from swollen Swollen set.
Step 131: oil production by layer roofbolt is transferred to oil well so that the suspension pump plunger of oil production by layer roofbolt Installation is coordinated with the suspension pump pump barrel of separate-layer production string.
As such, it is possible to be transferred to hang pump by the power that oil pumper exports by oil production by layer roofbolt, thus it is Hang pump and driving force is provided.
Preferably, the lowering velocity of oil production by layer roofbolt is less than 30~35/h.
In the present embodiment, oil production by layer roofbolt may include that polished rod, the first sucker rod, the second sucker rod, 3rd sucker rod and hang pump plunger, polished rod, the first sucker rod, the second sucker rod, the 3rd sucker rod and outstanding Hang pump plunger the most threaded, wherein, the polished rod selecting external diameter to be φ 28mm, select external diameter For first sucker rod of φ 25mm, the second sucker rod selecting external diameter to be φ 22mm, selection external diameter is φ The sucker rod of 19mm.
Step 132: be lifted up by oil production by layer roofbolt, thinks that oil production by layer roofbolt provides dead space, erosion control Away from for 0.0008 times of oil production by layer roofbolt.
As such, it is possible to prevent oil production by layer roofbolt during work, produce with the standing valve hanging pump Collide, thus improve the reliability of oil production by layer.
Step 141: carry out oil production by layer work by separate-layer production string and oil production by layer roofbolt.
When implementing, the well head at oil well installs wellhead assembly, and wellhead assembly can include casing head, oil Tube head and production tree etc., wellhead assembly is mainly used in regulation and controls oil well production;Install at wellhead assembly Cheng Hou, can be pumped operation normally by separate-layer production string and oil production by layer roofbolt, now with The oil production by layer hanging pump has been constructed.
What deserves to be explained is, in the present embodiment, Y221-114 packer preferably employs CNPC's North China oil The product that Tian company petroleum production engineering academy produces, those skilled in the art can also select commercially available has phase Like product with performance.
In the present embodiment, divide and adopt valve to preferably employ North China Oilfield company of CNPC petroleum production engineering academy raw The product produced, those skilled in the art can also select the commercially available like product with same performance.
In the present embodiment, hang pump and preferably employ the product that Shandong Weima Pumps Manufacturing Co., Ltd. produces, Can to select model be φ 32, the suspension pump of φ 38, φ 44, φ 56, and those skilled in the art can also select With the commercially available like product with same performance.
In the present embodiment, oil well pump anti-clip leak-proof automatic cleaning machine preferably employs double of Henan petroleum equipment system Making the product that limited company provides, those skilled in the art can also select commercially available has same performance Like product.
Commonly using it addition, other materials of the present invention or equipment are oil field, petroleum industry technical staff is ripe Know, commercially available.
By use that the embodiment of the present invention provided with hanging the oil production by layer method of pump, first carry out point Layer oil recovery preparation, oil production by layer preparation includes the cleaning oil well flow performed respectively, cleans production Tubing string flow process and cannula cleaning flow process, then transfer separate-layer production string to oil well, separate-layer production string Oil well is layered by interior packer, is transferred to oil well by oil production by layer roofbolt the most again so that layering The pump plunger that hangs of rod string coordinates installation, finally by layering with the suspension pump pump barrel of separate-layer production string Flow string and oil production by layer roofbolt carry out oil production by layer work.This oil production by layer method utilizes packer by oil The oil reservoir that in well, interlayer pressure gap is big, interlayer interference is particularly thorny is separately, it is to avoid oil reservoir interlayer interference, Suspension pump fall is utilized to resist the separate-layer production string wriggling in down-hole, on-the-spot more than 30 mouth oil wells, oil production by layer One-time success rate 100%.Particularly after Shanxi XXX-15 well construction, the per day increase of oil well well yield 4.8 Ton, average daily precipitation 7.3m3Above.
Embodiment three
A kind of flow string with suspension pump that the embodiment of the present invention provides, this flow string is applicable to above-mentioned Oil production by layer method in embodiment one and embodiment two, this flow string includes: separate-layer production string and setting Oil production by layer roofbolt in separate-layer production string, separate-layer production string includes:
Boll-weevil hanger, hang pump pump barrel, plug, oil well pump anti-clip leak-proof automatic cleaning machine, point adopt pipeline section, Multiple tubing nipples and multiple heavy wall tubing, described boll-weevil hanger is positioned at going up most of described separate-layer production string Side, described boll-weevil hanger passes sequentially through tubing nipple and heavy wall tubing and is connected with described suspension pump pump barrel, institute The oil well pump anti-clip leak-proof automatic cleaning machine stated is arranged on described with downhole modulator by heavy wall tubing Point adopt the lower section of valve, adopt pipeline section to be arranged on described oil well pump anti-clip leak-proof by heavy wall tubing the most clear for described point Wash the lower section of device, adopt at least two that pipeline section includes from top to bottom being sequentially arranged with downhole modulator for described point Point adopt valve, two adjacent described is all had by heavy wall tubing connection between valve with point adopting of downhole modulator Packer, be positioned at bottom described with downhole modulator point adopt valve connect have oil well pump anti-clip leak-proof from Dynamic washer, oil well pump anti-clip leak-proof automatic cleaning machine are connected with described plug by heavy wall tubing;
Oil production by layer roofbolt includes polished rod, hangs pump plunger and multiple sucker rod, hangs pump plunger by multiple Sucker rod is connected with polished rod.
In the present embodiment, boll-weevil hanger, to hang pump pump barrel, plug, oil well pump anti-clip leak-proof the most clear Wash device, tubing nipple, heavy wall tubing, packer and the junction adopting valve of dividing with downhole modulator to be Silk mouth, the external diameter of tubing nipple and heavy wall tubing isThe model of packer elects Y221-114 as.
The present embodiment utilizes packer by oil well, interlayer pressure gap is big, interlayer interference is particularly thorny oil reservoir Separately, it is to avoid oil reservoir interlayer interference, utilize and hang pump and resisted the separate-layer production string wriggling in down-hole, On-the-spot more than 30 mouth oil wells, oil production by layer one-time success rate 100%.Particularly after Shanxi XXX-15 well construction, The per day increase of oil well well yield 4.8 tons, average daily precipitation 7.3m3
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all the present invention's Within spirit and principle, any modification, equivalent substitution and improvement etc. made, should be included in the present invention's Within protection domain.

Claims (10)

1. the oil production by layer method with suspension pump, it is characterised in that oil production by layer method includes:
Step one: preparation of construction
A, well-flushing: pumping into clear water from oil jacket annular space and make flushing fluid, flushing fluid returns out from oil pipe, the row of flushing fluid Amount controls 25~30m3/ h, treats that returning out clear water from oil pipe stops well-flushing;Continue to see after well head pressure is zero Examine 2 hours, treat that well head, without overflow, tears well head open, the SFZ18-21 preventer that pressure testing is qualified is installed;
B, trip out flow string: play producing well and normally recover the oil the flow string produced, flow string include oil pipe, Oil well pump and sucker rod;
C, with boiler car by oil pipe, sucker rod thorn wash clean, right on ground φ 58mm × 0.5m oil pipe rule Oil pipe is carried out by root latus rectum;
D, sand washing: under with the sand-flushing pipe column of nib, sand washing is to artificial bottom of a well;Sand-flushing pipe column with nib Screwed connection is relied on to form by oil pipe and nib from top to bottom from well head;
E, drifting: under in oil well casing, enter the drifting tubing string with φ 118mm × 1.2m jack rabbit, drifting Tubing string includes oil pipe, φ 118mm × 1.2m jack rabbit, and drifting tubing string is oil pipe thread from top to bottom from well head Connect jack rabbit;Drifting, to artificial bottom of a well, leads to 3 times in the section of setting, it is ensured that unblocked continuously, speed control System is 10~20m/min;
F, sleeve pipe scraping: enter under in down-hole casing with GX-140T casing scraper full well section sleeve pipe Inwall carries out one time and bores scraping, removes the dirt of down-hole casing inwall, wax and other internal surface of sleeve pipe obturator;Set Pipe scraping tubing string includes oil pipe, oil pipe variable buckle joint and GX-140T casing scraper, from well head from top to bottom For oil pipe, oil pipe lower end connected pipes variable buckle joint, oil pipe variable buckle joint lower end connects casing scraper;Oil Pipe, screwed connection between oil pipe variable buckle joint and casing scraper;
G, for the second time well-flushing: pumping into clear water from oil jacket annular space and make flushing fluid, flushing fluid returns out from oil pipe, well-flushing The displacement control of liquid is 30~35m3/ h, treats that returning out clear water from oil pipe stops well-flushing;Trip out scraper column of casing;
Step 2, with hang pump separate-layer production string construction
A, with hang pump separate-layer production string;With hanging the separate-layer production string of pump by well head from upper Under be followed successively by: boll-weevil hanger, φ 73mm tubing nipple, φ 73mm heavy wall tubing, hang pump pump barrel, φ 73mm tubing nipple, φ 73mm heavy wall tubing, point adopt valve, oil well pump anti-sticking with downhole modulator Leakproof automatic cleaning machine, φ 73mm heavy wall tubing, Y221-114 packer, φ 73mm heavy wall tubing, band Have adopt valve, oil well pump anti-clip leak-proof automatic cleaning machine, φ 73mm heavy wall tubing, φ dividing of downhole modulator 73mm plug;
Boll-weevil hanger lower end connects φ 73mm tubing nipple, φ 73mm tubing nipple lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end connect suspension pump pump barrel, hang the connection of pump pump barrel lower end φ 73mm tubing nipple, φ 73mm tubing nipple lower end connect oil well pump anti-clip leak-proof automatic cleaning machine, take out Oil pump anti-clip leak-proof automatic cleaning machine lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end even Tape splicing have downhole modulator point adopt valve, valve lower end of point adopting with downhole modulator connects φ 73mm and adds heat-bodied oil Pipe, φ 73mm heavy wall tubing lower end connect Y221-114 packer, Y221-114 packer lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end connect with adopting valve, with well dividing of downhole modulator To connect oil well pump anti-clip leak-proof automatic cleaning machine, oil well pump anti-clip leak-proof automatic in the valve lower end of point adopting of lower actuator Washer lower end connects φ 73mm heavy wall tubing, φ 73mm heavy wall tubing lower end connects φ 73mm plug;
Boll-weevil hanger, φ 73mm tubing nipple, φ 73mm heavy wall tubing, suspension pump pump barrel, φ 73mm Tubing nipple, φ 73mm heavy wall tubing, with downhole modulator point to adopt valve, oil well pump anti-clip leak-proof automatic Washer, φ 73mm heavy wall tubing, Y221-114 packer, φ 73mm heavy wall tubing, with down-hole adjust Valve, oil well pump anti-clip leak-proof automatic cleaning machine, φ 73mm heavy wall tubing, φ 73mm plug are adopted in dividing of joint device Between rely on screwed connection;
Carry on B, packer and setting: at well mouth oil pipe hanger upper end screwed connection 1.0m tubing nipple, so Carrying boll-weevil hanger 1.5~2.0m on Hou, reading on weight indicator in observation Operation Van, when reading is 70~80KN Time, transfer boll-weevil hanger, lay down 1m tubing nipple, set;
Step 3, with hang pump oil production by layer roofbolt construction
A, under enter with hang pump oil production by layer roofbolt;With hanging the oil production by layer roofbolt of pump by well head certainly Upper and under be followed successively by: φ 28mm polished rod, φ 25mm sucker rod, φ 22mm sucker rod, φ 19mm take out Beam hanger, suspension pump plunger;Divide and adopt roofbolt running speed less than 30~35/h;
φ 28mm polished rod, φ 25mm sucker rod, φ 22mm sucker rod, φ 19mm sucker rod, suspension Screwed connection is used between pump plunger;
B, adjustment dead space.Put in place under plunger after entrance pump barrel, carry dead space 0.8m by every 1000m roofbolt;
Step 4, completion
Installing well head, completion oil well normally rises and takes out;Construct with the oil production by layer hanging pump.
2. the oil production by layer method with suspension pump, it is characterised in that described oil production by layer method includes:
Carrying out oil production by layer preparation, described oil production by layer preparation includes cleaning oil well flow, cleaning Flow string flow process and cannula cleaning flow process;
Thering is provided separate-layer production string, described separate-layer production string includes boll-weevil hanger, hangs pump pump barrel, silk Stifled, oil well pump anti-clip leak-proof automatic cleaning machine, point adopt pipeline section, multiple tubing nipple and multiple heavy wall tubing, Described boll-weevil hanger is positioned at the top of described separate-layer production string, and described boll-weevil hanger passes sequentially through oil Pipe pipe nipple and heavy wall tubing are connected with described suspension pump pump barrel,
Described oil well pump anti-clip leak-proof automatic cleaning machine is arranged on described point adopts valve with downhole modulator Lower section, adopt pipeline section for described point and be arranged on described oil well pump anti-clip leak-proof automatic cleaning machine by heavy wall tubing Top, adopts at least two that pipeline section includes from top to bottom being sequentially arranged point adopting with downhole modulator for described point Valve, two adjacent described all has packer by heavy wall tubing connection with point adopting of downhole modulator between valve, The described valve of point adopting with downhole modulator being positioned at bottom connects and has oil well pump anti-clip leak-proof automatically to clean Device, oil well pump anti-clip leak-proof automatic cleaning machine are connected with described plug by heavy wall tubing, described layering are adopted Tubing string is transferred to oil well;
Thering is provided oil production by layer roofbolt, described oil production by layer roofbolt includes polished rod, hangs pump plunger and multiple oil pumping Bar, described suspension pump plunger is connected with described polished rod, by under oil production by layer roofbolt by the plurality of sucker rod Put to oil well so that the suspension hanging pump plunger and described separate-layer production string of described oil production by layer roofbolt Pump pump barrel coordinates to be installed;
Oil production by layer work is carried out by described separate-layer production string and described oil production by layer roofbolt.
Oil production by layer method the most according to claim 2, it is characterised in that described cleaning oil well flow Including:
Carrying out well-flushing operation for the first time, the operation of described first time well-flushing includes: by flushing fluid from being positioned at well head Pump at oil jacket annular space between oil pipe and sleeve pipe, the flushing fluid being pumped to the impurity in oil jacket annular space from Described oil pipe returns out, until after the limpid free from admixture of the flushing fluid returned out in described oil pipe, stops well-flushing for the first time Operation.
Oil production by layer method the most according to claim 2, it is characterised in that described cleaning flow string Flow process includes:
In well, trip out described flow string, use boiler car thorn to wash described oil pipe and described sucker rod;
Use oil pipe rule that described oil pipe carries out oil pipe latus rectum operation.
Oil production by layer method the most according to claim 2, it is characterised in that described cannula cleaning flow process Including:
Drifting tubing string is transferred to described sleeve pipe, utilizes the jack rabbit in described latus rectum tubing string to described sleeve pipe Carry out run through casing size operation.
Oil production by layer method the most according to claim 5, it is characterised in that described cannula cleaning flow process Also include:
After described run through casing size operates, scraper column of casing is transferred to described sleeve pipe, utilize described Casing scraper in scraper column of casing carries out internal surface of sleeve pipe scraping operations to described sleeve pipe.
Oil production by layer method the most according to claim 6, it is characterised in that described cleaning oil well flow Also include:
After described internal surface of sleeve pipe scraping operations, carrying out second time well-flushing operation, described second time well-flushing is grasped Work includes: by flushing fluid at the oil jacket annular space between the oil pipe in described sleeve pipe and described scraper column of casing Pumping into, the flushing fluid being pumped to returns with the oil pipe in described scraper column of casing of the impurity in oil jacket annular space Go out, after the limpid free from admixture of the flushing fluid returned out, stop second time well-flushing operation, by described sleeve pipe scraping pipe Post trips out in well.
Oil production by layer method the most according to claim 2, it is characterised in that described oil production by layer method Also include:
After described separate-layer production string is transferred to oil well, by carry described separate-layer production string and make Described packer moves upward, and observes the reading of weight indicator in Operation Van, when described reading be 70kN extremely During 80kN, again transfer described separate-layer production string, thus complete described packer set operation.
Oil production by layer method the most according to claim 2, it is characterised in that described oil production by layer method Also include:
After described oil production by layer roofbolt is transferred to oil well, described oil production by layer roofbolt is lifted up, Thinking that described oil production by layer roofbolt provides dead space, described dead space is the 0.0008 of described oil production by layer roofbolt Times.
10. the flow string with suspension pump, it is characterised in that described flow string includes that layering is adopted Tubing string and the oil production by layer roofbolt being located in described separate-layer production string, described separate-layer production string includes: Boll-weevil hanger, hang pump pump barrel, plug, oil well pump anti-clip leak-proof automatic cleaning machine, point adopt pipeline section, many Individual tubing nipple and multiple heavy wall tubing, described boll-weevil hanger is positioned at the top of described separate-layer production string, Described boll-weevil hanger passes sequentially through tubing nipple and heavy wall tubing and is connected with described suspension pump pump barrel, described Oil well pump anti-clip leak-proof automatic cleaning machine is arranged on described point adopting with downhole modulator by heavy wall tubing The lower section of valve, adopts pipeline section for described point and is arranged on described oil well pump anti-clip leak-proof automatic cleaning machine by heavy wall tubing Lower section, described point adopt at least two that pipeline section includes from top to bottom being sequentially arranged with downhole modulator point Adopting valve, two adjacent described all has packing by heavy wall tubing connection with point adopting of downhole modulator between valve Device, the described valve of point adopting with downhole modulator being positioned at bottom connects and has oil well pump anti-clip leak-proof the most clear Wash device, oil well pump anti-clip leak-proof automatic cleaning machine is connected with described plug by heavy wall tubing;
Described oil production by layer roofbolt includes polished rod, hangs pump plunger and multiple sucker rod, described suspension pump plunger It is connected with described polished rod by the plurality of sucker rod.
CN201610373367.7A 2016-05-31 2016-05-31 Layered oil production method with suspension pump and production pipe column Pending CN105952423A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610373367.7A CN105952423A (en) 2016-05-31 2016-05-31 Layered oil production method with suspension pump and production pipe column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610373367.7A CN105952423A (en) 2016-05-31 2016-05-31 Layered oil production method with suspension pump and production pipe column

Publications (1)

Publication Number Publication Date
CN105952423A true CN105952423A (en) 2016-09-21

Family

ID=56911163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610373367.7A Pending CN105952423A (en) 2016-05-31 2016-05-31 Layered oil production method with suspension pump and production pipe column

Country Status (1)

Country Link
CN (1) CN105952423A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725013A (en) * 2017-09-19 2018-02-23 中国石油天然气股份有限公司 Layered test and layered oil production combined operation method
CN109025872A (en) * 2018-09-20 2018-12-18 明士皓 A kind of safe tripping in of oil production by layer packer and anti-pollution Refloatation method
CN109267954A (en) * 2018-09-20 2019-01-25 明士皓 The safe tripping in of oil production by layer packer and anti-pollution salvaging dual-purpose apparatus
CN109469450A (en) * 2017-09-07 2019-03-15 中国石油化工股份有限公司 Sucker rod control selective oil extraction device and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110048122A1 (en) * 2007-11-30 2011-03-03 Pierre Le Foll Downhole, single trip, multi-zone testing system and downhole testing method using such
CN102953715A (en) * 2012-12-12 2013-03-06 陕西中明能源投资有限公司 Layered oil production device
CN104533356A (en) * 2014-12-31 2015-04-22 中国石油天然气股份有限公司 Two-layer self-control layered oil production method and layered oil production method
CN105089583A (en) * 2015-07-30 2015-11-25 中国石油天然气股份有限公司 Layered controllable oil production pipe column
CN105257263A (en) * 2015-10-28 2016-01-20 中国石油天然气股份有限公司 Method for combining layered oil production and sand prevention
CN105484712A (en) * 2014-09-18 2016-04-13 中国石油天然气股份有限公司 Toothbrush-shaped oil reservoir layered mining method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110048122A1 (en) * 2007-11-30 2011-03-03 Pierre Le Foll Downhole, single trip, multi-zone testing system and downhole testing method using such
CN102953715A (en) * 2012-12-12 2013-03-06 陕西中明能源投资有限公司 Layered oil production device
CN105484712A (en) * 2014-09-18 2016-04-13 中国石油天然气股份有限公司 Toothbrush-shaped oil reservoir layered mining method
CN104533356A (en) * 2014-12-31 2015-04-22 中国石油天然气股份有限公司 Two-layer self-control layered oil production method and layered oil production method
CN105089583A (en) * 2015-07-30 2015-11-25 中国石油天然气股份有限公司 Layered controllable oil production pipe column
CN105257263A (en) * 2015-10-28 2016-01-20 中国石油天然气股份有限公司 Method for combining layered oil production and sand prevention

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109469450A (en) * 2017-09-07 2019-03-15 中国石油化工股份有限公司 Sucker rod control selective oil extraction device and method
CN109469450B (en) * 2017-09-07 2022-05-13 中国石油化工股份有限公司 Sucker rod control selective oil extraction device and method
CN107725013A (en) * 2017-09-19 2018-02-23 中国石油天然气股份有限公司 Layered test and layered oil production combined operation method
CN107725013B (en) * 2017-09-19 2020-05-08 中国石油天然气股份有限公司 Layered test and layered oil production combined operation method
CN109025872A (en) * 2018-09-20 2018-12-18 明士皓 A kind of safe tripping in of oil production by layer packer and anti-pollution Refloatation method
CN109267954A (en) * 2018-09-20 2019-01-25 明士皓 The safe tripping in of oil production by layer packer and anti-pollution salvaging dual-purpose apparatus
CN109025872B (en) * 2018-09-20 2020-11-03 徐州天骋智能科技有限公司 Packer safe running and anti-pollution salvaging method for layered oil extraction
CN109267954B (en) * 2018-09-20 2020-11-06 徐州企润食品有限公司 Packer safety running and anti-pollution salvaging dual-purpose device for layered oil extraction

Similar Documents

Publication Publication Date Title
CN105952423A (en) Layered oil production method with suspension pump and production pipe column
CN104832143B (en) Water injection well umbilical pipe full-horizon injection regulation device
CN107725013B (en) Layered test and layered oil production combined operation method
CN103061684A (en) Open-hole horizontal well sectional multi-cluster uniform acidizing tubular column and acidizing method thereof
CN204941492U (en) Regulation device is injected in water injection well umbilical duct holostrome position
CN104533356A (en) Two-layer self-control layered oil production method and layered oil production method
CN204511401U (en) A kind of Intelligent testing adjusts selective sand control separate layer water injection string
CN105544573A (en) Water pressure jetting type well completion construction method of dewatering tube well
CN102817594B (en) Horizontal well water pumping gas production method and device
CN110374167A (en) A kind of groundwater heat pump inverted well and method for realizing that silting is removed
CN204225804U (en) A kind of novel oil production well lost circulation prevention Flushing tubular column
CN205532523U (en) Layered oil production pipe column with pressure control switch
CN104989325A (en) Method for producing gas by using production pipe column of parallel double-pipe gas well
CN102536144A (en) Coal bed gas double-channel well washing valve
CN204754881U (en) Double -barrelled gas well flow string parallels
CN206376757U (en) Tubing head reducing joint for pump detection operation of oil pumping well
CN104879097A (en) Gas well production string provided with double parallel pipes
CN105257263B (en) Method for combining layered oil production and sand prevention
CN204457576U (en) Mechanical water plugging pipe column
CN205117297U (en) Concentric double -barrelled gas well flow string
CN103790529A (en) Coalbed methane drainage extraction and backwashing device and method
RU2547860C1 (en) Method of development of oil deposits
CN105484712B (en) Toothbrush-shaped oil reservoir layered mining method
CN104747139B (en) Hydraulic drive type oil extraction system
CN209539280U (en) A kind of high pressure sealing exntension tubs on coiled tubing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160921