[go: up one dir, main page]

CN105952162B - A kind of round-the-clock truss assembling method - Google Patents

A kind of round-the-clock truss assembling method Download PDF

Info

Publication number
CN105952162B
CN105952162B CN201610295295.9A CN201610295295A CN105952162B CN 105952162 B CN105952162 B CN 105952162B CN 201610295295 A CN201610295295 A CN 201610295295A CN 105952162 B CN105952162 B CN 105952162B
Authority
CN
China
Prior art keywords
moulding bed
truss
tarpaulin
vertical rod
clock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610295295.9A
Other languages
Chinese (zh)
Other versions
CN105952162A (en
Inventor
邱仙荣
张友恩
章露露
方国华
项杰
刘圣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jinggong Steel Structure Group Co Ltd
Original Assignee
Zhejiang Jinggong Steel Structure Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jinggong Steel Structure Group Co Ltd filed Critical Zhejiang Jinggong Steel Structure Group Co Ltd
Priority to CN201610295295.9A priority Critical patent/CN105952162B/en
Publication of CN105952162A publication Critical patent/CN105952162A/en
Application granted granted Critical
Publication of CN105952162B publication Critical patent/CN105952162B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of round-the-clock truss assembling method, it is characterised in that the 1st step, using truck crane assembly moulding bed;2nd step, using truck crane chord member of truss is lifted on moulding bed;3rd step, drawing, which are set up defences, protects tarpaulin;4th step, using truck crane truss web is deposited in the range of the driving lifting of moulding bed side, then using the assembled truss web of driving a vehicle;5th step, complete truss welding;6th step, protection tarpaulin is removed, hung out truss using truck crane, assembled next truss structure.The present invention is easy to operate, and on-site consolidation can be avoided to be influenceed by boisterous, while can reduce the use of assembled machinery.

Description

A kind of round-the-clock truss assembling method
Technical field:
The present invention relates to construction steel structure technical field, specifically a kind of round-the-clock truss assembling method.
Background technology:
Because its processing and fabricating is completed in workshop, quality is easily controlled steel construction, but due to truss often size It is larger, can not be in the assembled integral rear delivery of factory, scene is there is still a need for carry out largely assembly work.In general is assembled at present Method is:Assembled moulding bed is set up, on-site consolidation is carried out using truck crane, and is outdoor progress mostly, even if there is provided go along with sb. to guard him to arrange Apply, otherwise it is very simple and crude, it is difficult to bad weather is dealt with, otherwise cost is high, it is difficult to popularization and application.
The content of the invention:
The first aspect of the present invention purpose is to provide a kind of easy to operate, can avoid on-site consolidation by boisterous Influence, while the truss assembling method that assembled machinery uses can be reduced.
To achieve these goals, the present invention is achieved through the following technical solutions:
A kind of round-the-clock truss assembling method, it is characterised in that comprise the following steps:
1st step, using truck crane assembly moulding bed;
2nd step, using truck crane chord member of truss is lifted on moulding bed;
3rd step, drawing, which are set up defences, protects tarpaulin;
4th step, using truck crane by truss web be deposited in moulding bed side driving lifting in the range of, then using driving Assembled truss web;
5th step, complete truss welding;
6th step, protection tarpaulin is removed, hung out truss using truck crane, assembled next truss structure.
Further it is provided in:
The assembled moulding bed of step 1, jig structure are as follows:Including moulding bed cross bar, two moulding bed vertical rods are arranged at tire in opposition On frame cross bar, the side of moulding bed vertical rod is provided with moulding bed support bar, moulding bed bracket is provided with the inside of moulding bed vertical rod, drives a vehicle Beam is arranged at the upper end of moulding bed vertical rod, and driving is installed on crane beam, and can be moved back and forth along crane beam, in the upper of moulding bed vertical rod Side is provided with tarpaulin hanger, and tarpaulin is loaded on tarpaulin hanger.
The moulding bed support bar is arranged at the outside of moulding bed vertical rod.
The moulding bed cross bar, moulding bed vertical rod, moulding bed bracket are made using H steel, and moulding bed support bar is made using angle steel, OK Bicycle beam is made using H steel, and tarpaulin hanger is made using scaffold tubes.
The driving is driven a vehicle for planer-type small-sized movable.
The drawing of step 3, which is set up defences, protects tarpaulin, and tarpaulin is opened or closed according to live weather condition.
Compared with prior art, following advantages be present in the present invention:
1st, substantial amounts of truss web is assembled is carried out using driving, without using other loop wheel machines, saves machinery cost;
2nd, assembled using driving, trussmember from upper air installing without being put into moulding bed so that assembled moulding bed top can be sealed Close, realize round-the-clock consolidation service, progress can be accelerated, avoid personnel's work holdup;
3rd, by protecting the setting of tarpaulin, rain-proof, sun-proof, improvement operating environment, assembled, welding, painting can effectively be carried out Packing quality can greatly improve.
Below in conjunction with Figure of description and specific embodiment, the present invention will be described in detail.
Brief description of the drawings:
Fig. 1 is the structural representation of assembled moulding bed of the present invention;
Fig. 2 is the assembled operating diagram of truss of the present invention.
Embodiment:
As Figure 1-Figure 2, a kind of round-the-clock truss assembly moulding bed, including:Moulding bed cross bar 1, moulding bed vertical rod 2, moulding bed branch Strut 3, moulding bed bracket 4, crane beam 5, driving 6, tarpaulin hanger 7, tarpaulin 8 form, wherein:Two moulding bed vertical rods 2 are set in opposition It is placed on moulding bed cross bar 1, the side of moulding bed vertical rod 2 is provided with moulding bed support bar 3, fixation is supported to moulding bed vertical rod 2, it is excellent Choosing, the moulding bed support bar 3 is arranged at the outside of moulding bed vertical rod 2, the inner side of moulding bed vertical rod 2 is provided with moulding bed bracket 4, OK Bicycle beam 5 is arranged at the upper end of moulding bed vertical rod 2, and driving 6 is installed on crane beam 5, and can be moved back and forth along crane beam 5.
Tarpaulin hanger 7 is also equipped with the top of moulding bed vertical rod 2, tarpaulin 8 is set on tarpaulin hanger 7, can be effective Sun-proof, rain-proof etc. is carried out, the influence for avoiding bad weather from bringing, is effectively improved operating environment.
The moulding bed cross bar 1, moulding bed vertical rod 2, moulding bed bracket 4 are made using H steel, and moulding bed support bar 3 uses angle steel system Make, crane beam 5 is made using H steel, and tarpaulin hanger 7 is made using scaffold tubes, and crane beam 5 is used as moulding bed simultaneously with tarpaulin hanger 7 The plane outer support of vertical rod, effectively improve the stability of structure.
Fig. 1 shows a kind of embodiment of the assembled English truss of the present invention.
It is a kind of using above-mentioned assembled moulding bed come the method for assembled truss, comprise the following steps:
1st step, using truck crane assembly moulding bed;
2nd step, using truck crane chord member of truss is lifted on moulding bed;
3rd step, drawing, which are set up defences, protects tarpaulin;
4th step, truss web is deposited in the range of the driving lifting of moulding bed side, then using assembled truss abdomen of driving a vehicle Bar;
5th step, complete truss welding, paint;
6th step, protection tarpaulin is removed, hung out truss using truck crane, assembled next truss structure.
The present invention can adjust consolidation service mode and progress according to weather condition:, can not if weather condition is good Draw and tarpaulin is set, consolidation service is carried out together with driving using truck crane, accelerates assembled speed;
During work, bundled truss web is transported within the range of operation of driving using truck crane, then using driving Assembled truss web;
Fig. 1 shows a kind of embodiment of the assembled English truss of the present invention, but the invention is not limited in assembled triangle purlin Frame, it is only necessary to be adjusted to the position of moulding bed bracket, be equally applicable to the spelling of the various truss such as plane girder, space truss Dress.

Claims (5)

1. a kind of round-the-clock truss assembling method, it is characterised in that comprise the following steps:
1st step, using truck crane assembly moulding bed;The jig structure is as follows:Including moulding bed cross bar, two moulding bed vertical rods are in opposition It is arranged on moulding bed cross bar, the side of moulding bed vertical rod is provided with moulding bed support bar, moulding bed is provided with the inside of moulding bed vertical rod Bracket, crane beam are arranged at the upper end of moulding bed vertical rod, and driving is installed on crane beam, and is moved back and forth along crane beam, in moulding bed Tarpaulin hanger is installed, tarpaulin is loaded on tarpaulin hanger above vertical rod;
2nd step, using truck crane chord member of truss is lifted on moulding bed;
3rd step, drawing, which are set up defences, protects tarpaulin;
4th step, using truck crane truss web is deposited in the range of the driving lifting of moulding bed side, it is then assembled using driving Truss web;
5th step, complete truss welding;
6th step, protection tarpaulin is removed, hung out truss using truck crane, assembled next truss structure.
A kind of 2. round-the-clock truss assembling method according to claim 1, it is characterised in that:The drawing of step 3 sets protective awning Cloth, tarpaulin is opened or closed according to live weather condition.
A kind of 3. round-the-clock truss assembling method according to claim 1, it is characterised in that:The moulding bed support bar is set In the outside of moulding bed vertical rod.
A kind of 4. round-the-clock truss assembling method according to claim 1, it is characterised in that:The moulding bed cross bar, moulding bed Vertical rod, moulding bed bracket are made using H steel, and moulding bed support bar is made using angle steel, and crane beam is made using H steel, tarpaulin hanger Made using scaffold tubes.
A kind of 5. round-the-clock truss assembling method according to claim 1, it is characterised in that:The driving is small for planer-type Type movement driving.
CN201610295295.9A 2016-05-06 2016-05-06 A kind of round-the-clock truss assembling method Active CN105952162B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610295295.9A CN105952162B (en) 2016-05-06 2016-05-06 A kind of round-the-clock truss assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610295295.9A CN105952162B (en) 2016-05-06 2016-05-06 A kind of round-the-clock truss assembling method

Publications (2)

Publication Number Publication Date
CN105952162A CN105952162A (en) 2016-09-21
CN105952162B true CN105952162B (en) 2018-02-06

Family

ID=56914185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610295295.9A Active CN105952162B (en) 2016-05-06 2016-05-06 A kind of round-the-clock truss assembling method

Country Status (1)

Country Link
CN (1) CN105952162B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202280A (en) * 2021-04-21 2021-08-03 中交第四公路工程局有限公司 Conversion bracket type steel structure for steel structure high-altitude construction and construction method thereof
CN114412196B (en) * 2022-02-25 2023-05-09 中建八局新型建造工程有限公司 High-altitude safety assembling jig frame device of pipe truss and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06330635A (en) * 1993-05-25 1994-11-29 Marufuji Shiitopairu Kk Unloading device for temporarily pitch tent
CN101725255A (en) * 2009-11-13 2010-06-09 高申甫 Segmental slipping and assembling process of overhead large-span steel structure
CN202925957U (en) * 2012-12-17 2013-05-08 南通市达欣工程股份有限公司 Instrumentalized extension-type safety protection shed
CN103821372A (en) * 2014-02-26 2014-05-28 中天建设集团有限公司 Method for installing trusses with different heights
CN103899093A (en) * 2014-04-28 2014-07-02 江苏南通六建建设集团有限公司 Step-by-step hoisting construction method of mega-frame steel truss beam
CN205152802U (en) * 2015-11-22 2016-04-13 中铁十八局集团有限公司 Improve structure of arched bridge strength nature skeleton building -site preparation precision

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06330635A (en) * 1993-05-25 1994-11-29 Marufuji Shiitopairu Kk Unloading device for temporarily pitch tent
CN101725255A (en) * 2009-11-13 2010-06-09 高申甫 Segmental slipping and assembling process of overhead large-span steel structure
CN202925957U (en) * 2012-12-17 2013-05-08 南通市达欣工程股份有限公司 Instrumentalized extension-type safety protection shed
CN103821372A (en) * 2014-02-26 2014-05-28 中天建设集团有限公司 Method for installing trusses with different heights
CN103899093A (en) * 2014-04-28 2014-07-02 江苏南通六建建设集团有限公司 Step-by-step hoisting construction method of mega-frame steel truss beam
CN205152802U (en) * 2015-11-22 2016-04-13 中铁十八局集团有限公司 Improve structure of arched bridge strength nature skeleton building -site preparation precision

Also Published As

Publication number Publication date
CN105952162A (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN104773671A (en) Foldable radar antenna lifting mechanism based on space link multi-oil-cylinder coordinated drive
CN202358849U (en) Small-size suspension crane
CN105952162B (en) A kind of round-the-clock truss assembling method
CN105926959A (en) All-weather truss splicing bed-jig
CN204571478U (en) Stockyard, building site dust guard
CN105298139A (en) Modular mounting method of large space division cooling box steel structure
CN105986664A (en) Hanging basket and roof reverse hanging plate operation platform with same
CN105986684A (en) Mobile type multifunctional component machining workshop
CN207343138U (en) A kind of telescopic paint spray booth
CN206752318U (en) A kind of bridge coping template fast dismounting device
CN202719016U (en) Haff hinge capable of adjusting trolley level angle and lateral displacement
CN214885399U (en) Adjustable operation construction equipment of steel column
CN206029069U (en) Suspension type welding jobs canopy
CN206279555U (en) Purlin vehicle type closure construction system
CN205779497U (en) Wind power blade tip lightening operation bracket
CN209259164U (en) A kind of inverted arch trestle convenient for whole Transporting
CN102701064A (en) Hanging basket for aluminum profiles
CN211888358U (en) Movable rack
CN107829061A (en) Full-automatic smallclothes galvanization production line turning manipulator
CN208584091U (en) A kind of Welding steel truss abat-vent
CN206705328U (en) Time saving and energy saving safety dress film machine
CN203319589U (en) Hoisting machine for installing air hose
CN206927501U (en) The gantry crane of standby suspender is installed
CN206987042U (en) A kind of green building steel structure frame
CN206395222U (en) A kind of tank case armrest system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant