CN105937280A - Novel prefabricated building connecting joint - Google Patents

Novel prefabricated building connecting joint Download PDF

Info

Publication number
CN105937280A
CN105937280A CN201610385644.6A CN201610385644A CN105937280A CN 105937280 A CN105937280 A CN 105937280A CN 201610385644 A CN201610385644 A CN 201610385644A CN 105937280 A CN105937280 A CN 105937280A
Authority
CN
China
Prior art keywords
prefabricated
sandwich
reinforcement cage
walls
superposed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610385644.6A
Other languages
Chinese (zh)
Inventor
张剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Broad Homes Industrial Group Co Ltd
Original Assignee
Changsha Broad Homes Industrial Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Broad Homes Industrial Group Co Ltd filed Critical Changsha Broad Homes Industrial Group Co Ltd
Priority to CN201610385644.6A priority Critical patent/CN105937280A/en
Publication of CN105937280A publication Critical patent/CN105937280A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2/8611Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf
    • E04B2/8617Walls made by casting, pouring, or tamping in situ made in permanent forms with spacers being embedded in at least one form leaf with spacers being embedded in both form leaves

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

A novel prefabricated building connecting joint comprises two adjacent prefabricated sandwich superposed walls, each prefabricated sandwich superposed wall comprises prefabricated walls at the two sides and a sandwich layer in the middle, and a reinforcement cage is installed at the connecting position of the two adjacent prefabricated sandwich superposed walls and is installed in the middle sandwich layers of the two adjacent prefabricated sandwich superposed walls in a bridging mode. The reinforcement cage is installed from top to bottom, the upper end of the reinforcement cage stretches out of the upper ends of the prefabricated sandwich superposed walls and then is anchored into a cast-in-situ layer of a prefabricated superposed top plate, and the lower end of the reinforcement cage stretches out of the lower ends of the prefabricated sandwich superposed walls and then is anchored into a cast-in-situ layer of a prefabricated superposed bottom plate. The connecting position of the prefabricated sandwich superposed walls and a prefabricated superposed wall is high in strength and anti-shear ability.

Description

Novel fabricated building connects node
Technical field
The invention belongs to construction engineering technical field, be specifically related to the connection node of a kind of assembled architecture.
Background technology
Existing assembled architecture needs to install two row's vertical reinforcements in the sandwich of layers of prefabricated sandwich overlapping wall, in the lower end insertion base plate of two row's vertical reinforcements, the upper end of two row's vertical reinforcements is inserted in top board, to realize prefabricated sandwich overlapping wall and base plate, the connection of top board, thus the junction of prefabricated sandwich overlapping wall and prefabricated sandwich overlapping wall is extruded by the space of two row's vertical reinforcements, hinders, at most the most only overlap transverse steel, therefore after cast concrete, structural strength is low, and anti-shear performance is poor.
Summary of the invention
The technical problem to be solved is: solving the problem that above-mentioned background technology exists, and provide a kind of novel fabricated building to connect node, make prefabricated sandwich overlapping wall high with the junction structural strength of prefabricated sandwich overlapping wall, anti-shear ability is strong.
The technical solution used in the present invention is: the novel fabricated building of the present invention connects node, including two adjacent prefabricated sandwich overlapping walls, described prefabricated sandwich overlapping wall includes again the preformed layer of both sides and middle sandwich of layers, the junction of two adjacent prefabricated sandwich overlapping walls, installing steel reinforcement cage, steel reinforcement cage bridging is arranged in the middle sandwich of layers of two contiguous prefabricated sandwich overlapping walls.
In technique scheme, described steel reinforcement cage is installed from top to bottom, and steel reinforcement cage upper end anchors into the in-situ layer of prefabricated overlapping top board after stretching out prefabricated sandwich overlapping wall upper end, and steel reinforcement cage lower end anchors into after stretching out prefabricated sandwich overlapping wall lower end in the in-situ layer of prefabricated overlapping base plate.
In technique scheme, after the sandwich of layers cast concrete in the middle of described prefabricated sandwich overlapping wall, become in-situ layer.
Prominent substantive distinguishing features and remarkable result:
The present invention revolutionizes the attachment structure of existing prefabricated sandwich overlapping wall and prefabricated sandwich overlapping wall, in the middle of two adjacent prefabricated sandwich overlapping walls, in sandwich of layers, steel reinforcement cage is installed in bridging, after cast concrete, significantly enhance the structural strength that prefabricated sandwich overlapping wall is connected with prefabricated sandwich overlapping wall, anti-shear performance is good, the upper and lower two ends of steel reinforcement cage anchor into in-situ layer and the in-situ layer of prefabricated overlapping base plate of prefabricated overlapping top board the most respectively, strengthen prefabricated sandwich overlapping wall and prefabricated overlapping top board, the bonding strength of prefabricated overlapping base plate especially.
Accompanying drawing illustrates:
Fig. 1 is present configuration top view.
Reference:
1 prefabricated sandwich overlapping wall, 2 preformed layers, 3 sandwich of layers, 4 steel reinforcement cages, 5 truss, 6 cast-in-place concretes.
Detailed description of the invention:
See Fig. 1, the novel fabricated building of the present invention connects node, including two adjacent prefabricated sandwich overlapping walls, described prefabricated sandwich overlapping wall includes again the preformed layer of both sides and middle sandwich of layers, the junction of two adjacent prefabricated sandwich overlapping walls, mounting finished product steel reinforcement cage, the bridging of finished product steel reinforcement cage is arranged in the middle sandwich of layers of two contiguous prefabricated sandwich overlapping walls, described finished product steel reinforcement cage is installed from top to bottom, finished product steel reinforcement cage upper end anchors into the in-situ layer of prefabricated overlapping top board after stretching out prefabricated sandwich overlapping wall upper end, finished product steel reinforcement cage lower end anchors in the in-situ layer of prefabricated overlapping base plate after stretching out prefabricated sandwich overlapping wall lower end, in-situ layer is become after sandwich of layers cast concrete in the middle of described prefabricated sandwich overlapping wall.

Claims (2)

1. a novel fabricated building connects node, it is characterized in that: include two adjacent prefabricated sandwich overlapping walls, described prefabricated sandwich overlapping wall includes again the preformed layer of both sides and middle sandwich of layers, the junction of two adjacent prefabricated sandwich overlapping walls, installing steel reinforcement cage, steel reinforcement cage bridging is arranged in the middle sandwich of layers of two contiguous prefabricated sandwich overlapping walls.
Novel fabricated the most according to claim 1 building connects node, it is characterized in that: described steel reinforcement cage is installed from top to bottom, steel reinforcement cage upper end anchors into the in-situ layer of prefabricated overlapping top board after stretching out prefabricated sandwich overlapping wall upper end, steel reinforcement cage lower end anchors into after stretching out prefabricated sandwich overlapping wall lower end in the in-situ layer of prefabricated overlapping base plate.
CN201610385644.6A 2016-06-03 2016-06-03 Novel prefabricated building connecting joint Pending CN105937280A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610385644.6A CN105937280A (en) 2016-06-03 2016-06-03 Novel prefabricated building connecting joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610385644.6A CN105937280A (en) 2016-06-03 2016-06-03 Novel prefabricated building connecting joint

Publications (1)

Publication Number Publication Date
CN105937280A true CN105937280A (en) 2016-09-14

Family

ID=57152438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610385644.6A Pending CN105937280A (en) 2016-06-03 2016-06-03 Novel prefabricated building connecting joint

Country Status (1)

Country Link
CN (1) CN105937280A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836280A (en) * 2017-02-08 2017-06-13 大连三川建筑科技有限公司 A kind of assembled integral pipe gallery, escape canal or Great Gulch canal
CN107327047A (en) * 2017-07-24 2017-11-07 远大住宅工业(上海)有限公司 Overlap the vertical openings connecting node of wall and overlapping wall
CN110805061A (en) * 2019-08-20 2020-02-18 湖南远大工程设计有限公司 Pipe gallery wall unit, pipe gallery wall and construction method of pipe gallery wall
CN113404190A (en) * 2021-05-20 2021-09-17 上海建工二建集团有限公司 Self-supporting double-sided superposed shear wall and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3817236A1 (en) * 1988-05-20 1989-11-23 Brusnowitz Georg Junction connection for frameworks consisting of bamboo
CN103938731A (en) * 2014-04-14 2014-07-23 北京工业大学 Combination joint of prefabricated concrete beam and round concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN204126048U (en) * 2014-10-19 2015-01-28 昆明营造工程设计有限公司 Bracket steel bar concrete shear force wall connecting pin contact assembled architecture
CN104328846A (en) * 2014-10-30 2015-02-04 刘家文 Laminated board type shearing wall with exposure of fastened steel bars and connecting method
CN204435564U (en) * 2015-01-16 2015-07-01 青岛建安建设集团有限公司 Prefabricated assembled frame construction New Types of Beam column Connections
CN205742643U (en) * 2016-06-03 2016-11-30 长沙远大住宅工业集团股份有限公司 Novel fabricated building connects node

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3817236A1 (en) * 1988-05-20 1989-11-23 Brusnowitz Georg Junction connection for frameworks consisting of bamboo
CN103938731A (en) * 2014-04-14 2014-07-23 北京工业大学 Combination joint of prefabricated concrete beam and round concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN204126048U (en) * 2014-10-19 2015-01-28 昆明营造工程设计有限公司 Bracket steel bar concrete shear force wall connecting pin contact assembled architecture
CN104328846A (en) * 2014-10-30 2015-02-04 刘家文 Laminated board type shearing wall with exposure of fastened steel bars and connecting method
CN204435564U (en) * 2015-01-16 2015-07-01 青岛建安建设集团有限公司 Prefabricated assembled frame construction New Types of Beam column Connections
CN205742643U (en) * 2016-06-03 2016-11-30 长沙远大住宅工业集团股份有限公司 Novel fabricated building connects node

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836280A (en) * 2017-02-08 2017-06-13 大连三川建筑科技有限公司 A kind of assembled integral pipe gallery, escape canal or Great Gulch canal
CN107327047A (en) * 2017-07-24 2017-11-07 远大住宅工业(上海)有限公司 Overlap the vertical openings connecting node of wall and overlapping wall
CN110805061A (en) * 2019-08-20 2020-02-18 湖南远大工程设计有限公司 Pipe gallery wall unit, pipe gallery wall and construction method of pipe gallery wall
CN110805061B (en) * 2019-08-20 2024-05-28 湖南远大工程设计有限公司 Pipe gallery wall unit, pipe gallery wall and construction method of pipe gallery wall
CN113404190A (en) * 2021-05-20 2021-09-17 上海建工二建集团有限公司 Self-supporting double-sided superposed shear wall and construction method

Similar Documents

Publication Publication Date Title
CN103572840B (en) Notch-key type prefabricated member connection node and connection method
CN103572873B (en) Assembled integral floor and construction method thereof
KR101152270B1 (en) Precast concrete slab system for building which have long span and require high design load and construction method using this system
CN102720272B (en) Embedded column type prefabricated part connection node and manufacturing method thereof
CN102787681B (en) Connecting structure of prefabricated concrete wall body
CN110469001B (en) Superimposed shear wall and construction method thereof
CN102808465A (en) Assembly connecting structure and assembly connecting method of assembled concrete frame and shear wall combination
CN203684399U (en) Embedded-column prefabricated part connection node
CN105937280A (en) Novel prefabricated building connecting joint
CN108951955A (en) An Assembled Integral Reinforced Concrete Combined Shear Wall Structure with Keyway
CN110847447B (en) Double-skin wall connecting structure
CN203452228U (en) Frame-shear wall architectural structure
CN105220792A (en) A kind of prefabricated concealed bracings energy-consuming shear wall and assemble method thereof
CN202672351U (en) Sunk key type prefabricated component connected node
CN103741809A (en) Embedded column type prefabricated part connecting method
KR101599811B1 (en) Joint structure for corrugated steel plate and construction method thereof
CN106760038A (en) A kind of T-shaped precast concrete shear wall and its dry construction connection method
CN107642104B (en) Connecting structure of prefabricated sandwich wall and middle laminated slab and construction method thereof
KR101179442B1 (en) pc slab for one way joist slab and producing method of it
CN205742550U (en) Novel fabricated building connects node
CN205742262U (en) Concrete prefabricated board pin-connected panel underground structure
CN207194228U (en) Wall is overlapped with overlapping the vertical openings connecting node of wall
KR102267643B1 (en) Inverse Tee PSC Girder Prefabricated With Top Saddle PC blocks And Slab Construction Method Using Thereof
CN105937270A (en) Novel prefabricated building connecting joint
CN205742643U (en) Novel fabricated building connects node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160914

RJ01 Rejection of invention patent application after publication