CN105933321A - Subway construction information system - Google Patents
Subway construction information system Download PDFInfo
- Publication number
- CN105933321A CN105933321A CN201610371611.6A CN201610371611A CN105933321A CN 105933321 A CN105933321 A CN 105933321A CN 201610371611 A CN201610371611 A CN 201610371611A CN 105933321 A CN105933321 A CN 105933321A
- Authority
- CN
- China
- Prior art keywords
- construction
- information
- controller
- mobile terminal
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 199
- 230000005540 biological transmission Effects 0.000 claims abstract description 4
- 238000005516 engineering process Methods 0.000 claims description 7
- 230000008054 signal transmission Effects 0.000 claims description 5
- 238000004891 communication Methods 0.000 claims description 4
- 239000002994 raw material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000029058 respiratory gaseous exchange Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L65/00—Network arrangements, protocols or services for supporting real-time applications in data packet communication
- H04L65/40—Support for services or applications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Signal Processing (AREA)
- Multimedia (AREA)
- Computer Networks & Wireless Communication (AREA)
- Telephonic Communication Services (AREA)
Abstract
The invention provides a subway construction information system. The system comprises a plurality of wireless signal emitting terminals, a plurality of mobile terminals, and a controller, wherein the plurality of mobile terminals are carried to the responsible construction sites by construction units responsible for each sub-line; when the mobile terminal is carried to the construction site, a positioning module is used for positioning the construction site and transmitting the position information of the construction site to the controller through a wireless transmission module; a construction drawing for the subway construction is pre-stored in the controller; the controller receives the position information and then obtains the construction document of the construction region and the construction information corresponding to the construction document from the construction drawing; the controller is used for feeding back the construction document and the construction information to the corresponding mobile terminal. Through the adoption of the subway construction information system provided by the invention, each construction unit can understand the engineering construction condition in real time, and the units can conveniently form fast, accurate and efficient contact.
Description
Technical field
The invention belongs to subway field, particularly to a kind of subway work information system.
Background technology
Subway is a kind of form of railway transportation, and subway operates to main City Rail Transit System in underground,
Subway is the biggest fortune of a kind of electric propulsion progressively developing formation along the form of ground rail system
Amount urban track traffic pattern, its circuit is generally laid in subterranean tunnel, have beyond down town,
System of laying ground or overpass is forwarded to from underground.
Subway has become as the transportation mode spreading all over city, builds due to subway more and is located in the ground, its ring
Border relative closure, point more than long lines of constructing, is the key character of current subway work.Therefore, subway work
During, various information are difficult to transmit timely and effectively, bring a lot of inconvenience for subway construction.
Summary of the invention
It is an object of the invention to solve at least the above or defect, and offer at least will be described later
Advantage.
A further object of the invention is many for unit in charge of construction during subway work, and construction information is complicated
Situation, utilize wireless communication technology, by the construction drawing of each unit in charge of construction and with construction drawing corresponding to
Construction information sends to the mobile terminal of unit in charge of construction, and unit in charge of construction can be by executing on mobile terminal
Work information carries out constructing and recording construction progress, is so easy to unit in charge of construction and quickly grasps construction information, with
Time, collect the construction progress of each unit in charge of construction, it is simple to grasp the construction situation of whole subway.
In order to realize according to object of the present invention and further advantage, it is provided that a kind of subway work information
System, including:
Multiple wireless signal transmission ends, it is arranged on each sub-line road of subway work spaced a predetermined distance;
Multiple mobile terminals, it is by executing that the unit in charge of construction being responsible for each described sub-line road takes that it is responsible for
Building site point;Including locating module and wireless transport module on described mobile terminal, described mobile terminal is in institute
After stating at job location, described locating module positions described job location, and by the position of described job location
Confidence breath is transferred in controller by described wireless transport module;
Controller, it prestores the construction drawing of subway work;Described controller accepts each described movement
The described positional information that terminal is uploaded, and transfer each from described construction drawing according to described positional information
Construction information corresponding to the construction drawing of the construction area corresponding to described mobile terminal and this construction drawing,
Described construction drawing and described construction information are fed back on the described mobile terminal of correspondence by described controller;
Wherein, each described mobile terminal receives described construction drawing and described construction information, and, construction
Constructed in described construction site by some position according to the construction information of display on described mobile terminal, meanwhile,
Described construction drawing marks its construction progress situation.Unit in charge of construction can obtain it from mobile terminal and need
The construction drawing wanted and construction information, construct according to construction information, and meanwhile, unit in charge of construction can move
Record its construction progress situation on construction drawing in dynamic terminal, and construction progress situation is uploaded to controller
In, in order to controller collects the construction progress situation of all units in charge of construction and obtains the construction situation of whole subway.
Preferably, in described subway work information system, multiple described wireless signal transmission ends, its
It is embedded in the underground on each described sub-line road.Wireless signal transmission end is embedded in each subway sub-line road
, the most both will not there is damaging the generation of the phenomenon of wireless transmitting terminals because of construction in underground, and, when
After subway construction completes, it is not necessary to other sender units are being set, are utilizing wireless transmitting terminals the most permissible
As subway signal delivery means.
Preferably, in described subway work information system, each described mobile terminal also includes information
Feedback module;
When the Specific construction information of described job location does not corresponds with construction information on described construction drawing, institute
State information feedback module and described Specific construction information is fed back to described controller;
Described controller receives described Specific construction information and by described Specific construction information reporting to technology people
Member.There will be a lot of emergency situations during the construction of subway, utilize specific environment and the construction of construction
On drawing inconsistent, raw material of constructing in work progress can not meet the needs etc. of built environment, work order
Position utilizes feedback module that the emergency situations in work progress is fed back to controller, in order to technical staff is timely
Process the emergency situations in construction.
Preferably, in described subway work information system, when described technical staff according to described specifically
Construction information on construction information and described construction drawing is analyzed, and repaiies according to described Specific construction information
When changing described construction drawing, described controller utilizes amended construction drawing to replace original construction drawing, and will
Described amended construction drawing sends on corresponding described mobile terminal.
Preferably, in described subway work information system, described mobile terminal also includes image acquisition
Module;
Described image capture module is for gathering the Specific construction in construction progress situation and record work progress
Information, shown construction progress situation and described Specific construction information are uploaded to institute by described image capture module
State in controller.
Preferably, in described subway work information system, described mobile terminal also includes voice module;
Described voice module is for the transmission of voice messaging;
Described voice messaging is uploaded to described controller by described voice module.Voice module is convenient, fast
Record condition of construction, as construction in some problem such as instrument or insufficient raw material.
Preferably, in described subway work information system, described voice messaging includes construction progress feelings
Produced problem and speech communication in condition, work progress.
Preferably, in described subway work information system, when job location shown in has multiple simultaneously
During described unit in charge of construction, execute described in described mobile terminal records corresponding to each described construction site is each
The construction information of work station point, and described construction information is uploaded to described controller;
Described controller receives the described construction information not isolabeling of each described unit in charge of construction and is labeled in institute
Stating on construction drawing, construction drawing good for standard is sent to each described mobile terminal by described controller.
Beneficial effects of the present invention is as follows:
1, in described subway work information system, the positional information according to each unit in charge of construction will be with its position
The construction drawing that confidence manner of breathing is corresponding sends to this unit in charge of construction, in order to unit in charge of construction obtains what it needed in time
Construction information.
2, in described subway work information system, unit in charge of construction records its construction progress on mobile terminals
Situation, the controller in subway work information system collects the construction progress situation of each unit in charge of construction, and
Time, obtain the construction situation of whole subway exactly.
3, in described subway work information system, technology in its work progress is asked by each unit in charge of construction
The construction practical problem that topic, Specific construction situation and construction drawing do not correspond etc., feeds back to controller, in order to
Technical staff obtains the firsthand information of construction phenomenon in time, analyzes and provide these practical problems of solution
Technical scheme.
Detailed description of the invention
The present invention is described in further detail below, to make those skilled in the art with reference to description literary composition
Word can be implemented according to this.
The invention discloses in a kind of subway work information system, at least include:
Multiple wireless signal transmission ends, it is arranged on each sub-line road of subway work spaced a predetermined distance;
Multiple mobile terminals, it is by executing that the unit in charge of construction being responsible for each described sub-line road takes that it is responsible for
Building site point;Including locating module and wireless transport module on described mobile terminal, described mobile terminal is in institute
After stating at job location, described locating module positions described job location, and by the position of described job location
Confidence breath is transferred in controller by described wireless transport module;
Controller, it prestores the construction drawing of subway work;Described controller accepts each described movement
The described positional information that terminal is uploaded, and transfer each from described construction drawing according to described positional information
Construction information corresponding to the construction drawing of the construction area corresponding to described mobile terminal and this construction drawing,
Described construction drawing and described construction information are fed back on the described mobile terminal of correspondence by described controller;
Wherein, each described mobile terminal receives described construction drawing and described construction information, and, construction
Constructed in described construction site by some position according to the construction information of display on described mobile terminal, meanwhile,
Described construction drawing marks its construction progress situation.
In such scheme, it is embedded in the underground on each described sub-line road.
In such scheme, each described mobile terminal also includes information feedback module;
When the Specific construction information of described job location does not corresponds with construction information on described construction drawing, institute
State information feedback module and described Specific construction information is fed back to described controller;
Described controller receives described Specific construction information and by described Specific construction information reporting to technology people
Member.
In such scheme, in described subway work information system, when described technical staff is according to described tool
Construction information in body construction information and described construction drawing is analyzed, and according to described Specific construction information
When revising described construction drawing, described controller utilizes amended construction drawing to replace original construction drawing, and
Described amended construction drawing is sent on corresponding described mobile terminal.
In such scheme, described mobile terminal also includes image capture module;
Described image capture module is for gathering the Specific construction in construction progress situation and record work progress
Information, shown construction progress situation and described Specific construction information are uploaded to institute by described image capture module
State in controller.
In such scheme, described mobile terminal also includes voice module;
Described voice module is for the transmission of voice messaging;
Described voice messaging is uploaded to described controller by described voice module.
In such scheme, described voice messaging includes produced problem in construction progress situation, work progress
And speech communication.
In such scheme, in described subway work information system, when job location shown in has many simultaneously
During individual described unit in charge of construction, the described mobile terminal records corresponding to each described construction site is each described
The construction information in construction site, and described construction information is uploaded to described controller;
Described controller receives the described construction information not isolabeling of each described unit in charge of construction and is labeled in institute
Stating on construction drawing, construction drawing good for standard is sent to each described mobile terminal by described controller.
Although embodiments of the invention are disclosed as above, but it is not restricted to description and embodiment
Using listed by, it can be applied to various applicable the field of the invention completely, for being familiar with this area
Personnel for, be easily achieved other amendment, therefore without departing substantially from claim and equivalency range
Under the general concept limited, the present invention is not limited to specific details.
Claims (8)
1. a subway work information system, it is characterised in that including:
Multiple wireless signal transmission ends, it is arranged on each sub-line road of subway work spaced a predetermined distance;
Multiple mobile terminals, it is by executing that the unit in charge of construction being responsible for each described sub-line road takes that it is responsible for
Building site point;Including locating module and wireless transport module on described mobile terminal, described mobile terminal is in institute
After stating at job location, described locating module positions described job location, and by the position of described job location
Confidence breath is transferred in controller by described wireless transport module;
Controller, it prestores the construction drawing of subway work;Described controller accepts each described movement
The described positional information that terminal is uploaded, and transfer each from described construction drawing according to described positional information
Construction information corresponding to the construction drawing of the construction area corresponding to described mobile terminal and this construction drawing,
Described construction drawing and described construction information are fed back on the described mobile terminal of correspondence by described controller;
Wherein, each described mobile terminal receives described construction drawing and described construction information, and, construction
Constructed in described construction site by some position according to the construction information of display on described mobile terminal, meanwhile,
Described construction drawing marks its construction progress situation.
2. subway work information system as claimed in claim 1, it is characterised in that multiple described wireless
Signal transmitting terminal, it is embedded in the underground on each described sub-line road.
3. subway work information system as claimed in claim 2, it is characterised in that each described movement
Terminal also includes information feedback module;
When the Specific construction information of described job location does not corresponds with construction information on described construction drawing, institute
State information feedback module and described Specific construction information is fed back to described controller;
Described controller receives described Specific construction information and by described Specific construction information reporting to technology people
Member.
4. subway work information system as claimed in claim 3, it is characterised in that as described technology people
Member is analyzed according to the construction information on described Specific construction information and described construction drawing, and according to described
When Specific construction information revises described construction drawing, it is original that described controller utilizes amended construction drawing to replace
Construction drawing, and described amended construction drawing is sent on corresponding described mobile terminal.
5. subway work information system as claimed in claim 4, it is characterised in that described mobile terminal
Also include image capture module;
Described image capture module is for gathering the Specific construction in construction progress situation and record work progress
Information, shown construction progress situation and described Specific construction information are uploaded to institute by described image capture module
State in controller.
6. subway work information system as claimed in claim 5, it is characterised in that described mobile terminal
Also include voice module;
Described voice module is for the transmission of voice messaging;
Described voice messaging is uploaded to described controller by described voice module.
7. subway work information system as claimed in claim 6, it is characterised in that described voice messaging
Including produced problem and speech communication in construction progress situation, work progress.
8. subway work information system as claimed in claim 7, it is characterised in that when constructing Suo Shi
Described mobile terminal when there is multiple described unit in charge of construction in place simultaneously, corresponding to each described construction site
Record the construction information in each described construction site, and described construction information is uploaded to described controller;
Described controller receives the described construction information not isolabeling of each described unit in charge of construction and is labeled in institute
Stating on construction drawing, construction drawing good for standard is sent to each described mobile terminal by described controller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610371611.6A CN105933321A (en) | 2016-05-30 | 2016-05-30 | Subway construction information system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610371611.6A CN105933321A (en) | 2016-05-30 | 2016-05-30 | Subway construction information system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105933321A true CN105933321A (en) | 2016-09-07 |
Family
ID=56841335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610371611.6A Pending CN105933321A (en) | 2016-05-30 | 2016-05-30 | Subway construction information system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105933321A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107784487A (en) * | 2017-11-14 | 2018-03-09 | 浙江交工高等级公路养护有限公司 | Data processing method and system |
CN110598903A (en) * | 2019-08-05 | 2019-12-20 | 中交机电工程局有限公司 | Subway construction information system |
CN111050283A (en) * | 2019-11-22 | 2020-04-21 | 南京金海设计工程有限公司 | BIM model-based real-time positioning method for construction site |
CN118097698A (en) * | 2024-04-26 | 2024-05-28 | 一智科技(成都)有限公司 | Information reminding method, system and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1505873A (en) * | 2001-04-05 | 2004-06-16 | �Ҵ���˾ | Virtual cooperative network formed by local clients in zones without cellular services |
US20110227745A1 (en) * | 2010-03-19 | 2011-09-22 | Hitachi Solutions, Ltd. | Operational management system of agricultural work vehicle |
CN103388344A (en) * | 2013-07-23 | 2013-11-13 | 吴江市同心电子科技有限公司 | GSM-based (Global System of Mobile Communication-based) pile foundation construction survey and setting-out system |
CN104780223A (en) * | 2015-04-30 | 2015-07-15 | 广东志高空调有限公司 | Whole construction process monitoring system and monitoring method based on cloud computing technology |
CN105303304A (en) * | 2015-10-15 | 2016-02-03 | 贵州省邮电规划设计院有限公司 | Method for engineering field management based on handheld terminal |
-
2016
- 2016-05-30 CN CN201610371611.6A patent/CN105933321A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1505873A (en) * | 2001-04-05 | 2004-06-16 | �Ҵ���˾ | Virtual cooperative network formed by local clients in zones without cellular services |
US20110227745A1 (en) * | 2010-03-19 | 2011-09-22 | Hitachi Solutions, Ltd. | Operational management system of agricultural work vehicle |
CN103388344A (en) * | 2013-07-23 | 2013-11-13 | 吴江市同心电子科技有限公司 | GSM-based (Global System of Mobile Communication-based) pile foundation construction survey and setting-out system |
CN104780223A (en) * | 2015-04-30 | 2015-07-15 | 广东志高空调有限公司 | Whole construction process monitoring system and monitoring method based on cloud computing technology |
CN105303304A (en) * | 2015-10-15 | 2016-02-03 | 贵州省邮电规划设计院有限公司 | Method for engineering field management based on handheld terminal |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107784487A (en) * | 2017-11-14 | 2018-03-09 | 浙江交工高等级公路养护有限公司 | Data processing method and system |
CN110598903A (en) * | 2019-08-05 | 2019-12-20 | 中交机电工程局有限公司 | Subway construction information system |
CN110598903B (en) * | 2019-08-05 | 2022-04-22 | 中交机电工程局有限公司 | Subway construction information system |
CN111050283A (en) * | 2019-11-22 | 2020-04-21 | 南京金海设计工程有限公司 | BIM model-based real-time positioning method for construction site |
CN118097698A (en) * | 2024-04-26 | 2024-05-28 | 一智科技(成都)有限公司 | Information reminding method, system and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105933321A (en) | Subway construction information system | |
DE102013205057B3 (en) | Method for operating a stationary device and stationary device within a system for communication | |
CN102644235B (en) | Intelligent vehicle for signing and marking lines | |
CN104260762A (en) | Precise positioning method and set of mine locomotives | |
CN106886219A (en) | Robot automated navigation system | |
CN107161179A (en) | Suitable for the running control system of general fast railway | |
WO2019228394A1 (en) | Centralized train dispatch control system and control method | |
CN106323319A (en) | Navigation method system | |
CN103971538B (en) | Based on the intelligent parking management system of vehicle-carrying communication | |
CN1212415A (en) | Image data transfer system and method | |
CN104422442B (en) | A kind of indoor navigation method and system | |
CN106530802A (en) | Guiding system and method for vehicle parking | |
CN103685534A (en) | Wireless communication based vehicle-mounted data intelligent and safe updating method | |
CN108189868A (en) | A kind of wheel movement special equipment shunting monitoring method and system certainly | |
CN106515789A (en) | Multi-function intelligent traffic indicator for railway station platform | |
CN202559220U (en) | Intelligent mark and marking line car | |
CN103605864B (en) | Urban rail transit network train working diagram displaying method | |
CN108550086A (en) | A kind of recognition methods of Station construction speed and system | |
CN206358166U (en) | The device of shunting route control is implemented in combination with using STP and CTC | |
CN106779328A (en) | A kind of information-based environmental sanitation management system | |
CN105416347A (en) | In-car crowding condition foreknowing device | |
CN108966135A (en) | A kind of underground intercommunication secondary navigation system based on iBeacon technology | |
CN103971559A (en) | Modular traffic information and control experimental platform | |
CN107977913A (en) | A kind of wisdom for architectural environment identifies system and its control method | |
CN108891449A (en) | Metro operation real time location tracking based on wireless base station controls analogue system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160907 |
|
RJ01 | Rejection of invention patent application after publication |