CN105910243A - Control method and device of air conditioner - Google Patents
Control method and device of air conditioner Download PDFInfo
- Publication number
- CN105910243A CN105910243A CN201610363452.5A CN201610363452A CN105910243A CN 105910243 A CN105910243 A CN 105910243A CN 201610363452 A CN201610363452 A CN 201610363452A CN 105910243 A CN105910243 A CN 105910243A
- Authority
- CN
- China
- Prior art keywords
- data
- weather
- air
- conditioner
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 37
- 238000011217 control strategy Methods 0.000 claims abstract description 21
- 230000001960 triggered effect Effects 0.000 claims abstract description 7
- 230000008569 process Effects 0.000 claims description 8
- 230000032683 aging Effects 0.000 claims description 7
- 230000004044 response Effects 0.000 claims description 7
- 230000002123 temporal effect Effects 0.000 claims description 6
- 230000001143 conditioned effect Effects 0.000 claims description 5
- 230000002159 abnormal effect Effects 0.000 claims description 4
- 238000012790 confirmation Methods 0.000 claims 1
- 230000008859 change Effects 0.000 abstract description 8
- 238000004378 air conditioning Methods 0.000 description 8
- 238000004891 communication Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 230000003993 interaction Effects 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004393 prognosis Methods 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2110/00—Control inputs relating to air properties
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F11/63—Electronic processing
- F24F11/64—Electronic processing using pre-stored data
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F11/63—Electronic processing
- F24F11/65—Electronic processing for selecting an operating mode
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2130/00—Control inputs relating to environmental factors not covered by group F24F2110/00
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2130/00—Control inputs relating to environmental factors not covered by group F24F2110/00
- F24F2130/10—Weather information or forecasts
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Fuzzy Systems (AREA)
- Mathematical Physics (AREA)
- Signal Processing (AREA)
- Life Sciences & Earth Sciences (AREA)
- Atmospheric Sciences (AREA)
- Air Conditioning Control Device (AREA)
Abstract
The invention discloses a control method and a control device of an air conditioner, wherein the method comprises the following steps: responding to a triggered instruction for starting an intelligent control mode, and sending a first request through an air conditioner built-in network module to obtain weather data representing the area where the air conditioner is located in corresponding time; and generating a control strategy according to the acquired weather data so as to control the operation of the air conditioner. The invention solves the problem that the user needs to pay attention to weather information in real time and manually adjust the operation mode of the air conditioner to cope with the change of weather in the prior art, improves the intelligent control of the air conditioner, and further improves the user experience.
Description
Technical field
The present invention relates to air-conditioning technical field, in particular to the controlling party of a kind of air-conditioner
Method and device.
Background technology
In prior art, the use process of air-conditioner is usually after user selects operational mode, presses
The operation logic of sighting target formula formula runs, but, in actual use, different installations
Area, space temperature variation change and weather conditions, heat air-conditioner, freeze to adjust and all can
Produce impact.Prior art needs user oneself pay close attention to Weather information in real time, and carry out manually
Adjust operating modes of air conditioner to tackle the change of weather.
For correlation technique needing user oneself pay close attention to Weather information in real time, and manually adjust
Whole operating modes of air conditioner, with the problem of the change of reply weather, the most not yet proposes effectively to solve
Certainly scheme.
Summary of the invention
The invention provides control method and the device of a kind of air-conditioner, at least to solve existing skill
Art needs user oneself pay close attention to Weather information in real time, and carry out manually adjusting air-conditioner operation mould
Formula is with the problem of the change of reply weather.
For solving above-mentioned technical problem, according to an aspect of disclosure embodiment, the present invention carries
Having supplied the control method of a kind of air-conditioner, the method includes: in response to the startup intelligence control triggered
The instruction of molding formula, by air conditioner built-in mixed-media network modules mixed-media send the first request with obtain to correspondence time
The interior weather data characterizing air-conditioner region;Generate according to the weather data obtained and control
Strategy is to control the operation of air-conditioner.
Further, by air conditioner built-in mixed-media network modules mixed-media send the first request with obtain to correspondence time
The interior weather data characterizing air-conditioner region, including: judge whether for characterizing
The positional information of air-conditioner region;If existing, access the data base of data server the most really
Recognize in data base the city that the positional information of whether domain of the existence is corresponding, wherein, data server
Comprising for the interface mutual with weather platform data, data server is every first scheduled time
Obtain multiple cities and weather data thereof in weather platform by interface, and store to data base;
If the city that in data base, the positional information of domain of the existence is corresponding, obtain the sky destiny that city is corresponding
According to.
Further, control strategy is generated to control the fortune of air-conditioner according to the weather data obtained
OK, including: judge whether weather data ageing obtained meets pre-conditioned;If meeting,
Judge the weather data obtained as effective status, data based on the weather data obtained
Generate control strategy to control the operation of air-conditioner.
Further, access the data base of data server and confirm whether data base exists district
The city that the positional information in territory is corresponding, including: if the positional information of not domain of the existence in data base
Corresponding city, sends second by air conditioner built-in interface and asks to weather platform, with request
Access weather platform and obtain the weather data that city is corresponding.
Further, send second by air conditioner built-in interface to ask to weather platform, to ask
Seek access weather platform and obtain the weather data that city is corresponding, including: judge to be connect by built-in
Mouth accesses whether weather platform is successfully obtained weather data;If so, the sky destiny being successfully obtained
According to being updated to the data base of data server, and data genaration control based on this weather data
System strategy is to control the operation of air-conditioner.
Further, it is judged that whether be successfully obtained by air conditioner built-in interface accessing weather platform
Weather data, including: if judging to access weather platform unsuccessful acquisition weather by built-in interface
Data, send abnormal log information and process for subsequent analysis to mixed-media network modules mixed-media.
Further, following solicited message is at least carried in the first request and the second request: the time please
Ask, for limiting the corresponding temporal information of required weather data, and position requests, it is used for limiting
The correspondence position information of fixed required weather data.
Further, weather data at least includes one below: temperature information, humidity information,
Wind speed information, weather conditions information.
Another aspect according to disclosure embodiment, it is provided that the control device of a kind of air-conditioner,
This device includes: the first request unit, in response to the startup intelligent control mode triggered
Instruction, sends the first request to characterize in obtaining the corresponding time by air conditioner built-in mixed-media network modules mixed-media
The weather data of air-conditioner region;Control unit, for raw according to the weather data obtained
Become control strategy to control the operation of air-conditioner.
Further, the first request unit includes: the first judge module, is used for judging whether to deposit
At the positional information for characterizing air-conditioner region;Confirm module, at judge module
In the presence of judged result is, accesses the data base of data server and confirm whether data base deposits
In the city that the positional information in region is corresponding, wherein, data server comprises for putting down with weather
The interface of platform data interaction, data server obtains weather every first scheduled time by interface
Multiple cities and weather data thereof in platform, and store to data base;Acquisition module, is used for
When confirming that module confirms the city that in data base, the positional information of domain of the existence is corresponding, obtain city
The weather data that city is corresponding.
Further, control unit includes: the second judge module, for judging the weather obtained
It is pre-conditioned whether data ageing meets;First control module, for judging mould second
When block judged result is for meeting, it is determined that the weather data of acquisition for effective status, with obtain
Based on weather data, data genaration control strategy is to control the operation of air-conditioner.
Further, access the data base of data server and confirm whether data base exists district
City that the positional information in territory is corresponding, including the second request unit, in data base not
The city that the positional information of domain of the existence is corresponding, sends the second request by air conditioner built-in interface
To weather platform, access weather platform with request and obtain the weather data that city is corresponding.
Further, logical second request unit includes: the 3rd judge module, passes through for judgement
Built-in interface accesses whether weather platform is successfully obtained weather data;More new module, for the 3rd
When judge module judged result is for being, the weather data being successfully obtained is updated to data server
Data base;Second control module, data genaration based on the weather data to update
Control strategy is to control the operation of air-conditioner.
Further, the second request unit also includes: exception reporting module, for sentencing the 3rd
Disconnected module judges to access weather platform unsuccessful acquisition weather data by built-in interface, sends different
Often log information processes to mixed-media network modules mixed-media for subsequent analysis.
Further, following solicited message is at least carried in the first request and the second request: the time please
Ask, for limiting the corresponding temporal information of required weather data, and position requests, it is used for limiting
The correspondence position information of fixed required weather data.
Further, weather data at least includes one below: temperature information, humidity information,
Wind speed information, weather conditions information.
In the present invention, air conditioner built-in mixed-media network modules mixed-media, this mixed-media network modules mixed-media can with comprise a day destiny
According to data server connect communication, include multiple city in the data base of data server
Weather data, additionally, data server also can update by the interior weather platform that accesses at predetermined time intervals
Weather data in its data base.After opening air-conditioner intelligent control mode, mixed-media network modules mixed-media can
With send solicited message to this data server, solicited message carries time request information and
Characterize the position request information of air-conditioning region, be connected setting up with data server and receive
After the required weather data returned, this weather data is controlled as air-conditioner the data of logic
Foundation, formulates control strategy and realizes automatically controlling air-conditioner according to weather data, this control
Mode processed efficiently solves needs user oneself to pay close attention to Weather information in real time in prior art, and
Carry out the problem manually adjusting operating modes of air conditioner with the change of reply weather, improve air-conditioning
The intelligentized control method of device, further, also improves user experience.
Accompanying drawing explanation
Fig. 1 is a kind of optional flow process of the control method of air-conditioner according to embodiments of the present invention
Figure;
Fig. 2 is the another kind of optional stream of the control method of air-conditioner according to embodiments of the present invention
Cheng Tu;
Fig. 3 is a kind of optional structure controlling device of air-conditioner according to embodiments of the present invention
Block diagram;
Fig. 4 is the another kind of optional knot controlling device of air-conditioner according to embodiments of the present invention
Structure block diagram;And
Fig. 5 is the another kind of optional knot controlling device of air-conditioner according to embodiments of the present invention
Structure block diagram.
Detailed description of the invention
Here will illustrate exemplary embodiment in detail, its example represents in the accompanying drawings.
When explained below relates to accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represents
Same or analogous key element.Embodiment described in following exemplary embodiment does not represent
The all embodiments consistent with the present invention.On the contrary, they be only with such as claims
The example of the apparatus and method that some aspects that described in detail in book, the present invention are consistent.
Embodiment 1
Below in conjunction with the accompanying drawings the control method of the air-conditioner that the present invention provides is illustrated.
The control method of the air-conditioner that the present invention provides can be applied on domestic air conditioner, permissible
The commercial use air conditioners such as market or marine air conditioner equipment realize.Fig. 1 illustrates the one of this method
Plant optional flow chart, as it is shown in figure 1, the control method of this air-conditioner can include following step
Rapid:
S102, in response to the instruction of the startup intelligent control mode triggered, passes through air conditioner built-in
Mixed-media network modules mixed-media sends the first request to characterize the weather of air-conditioner region in obtaining the corresponding time
Data;
When implementing, air conditioner built-in mixed-media network modules mixed-media, this mixed-media network modules mixed-media can with comprise a day destiny
According to data server connect communication, as preferably, this mixed-media network modules mixed-media can include GPRS module
And/or 3G, 4G module and/or Wi-Fi module, the present invention is not limited to this, for closely
Data server, it is also possible to select near field communication (NFC).The data base of data server
Inside include the weather data in multiple city, additionally, data server also can be at predetermined time intervals
Interior access weather platform updates the weather data in its data base.Preferably, air-conditioner can set
Putting various modes, under a kind of normal operation mode, air-conditioning carries out work as in the state of the art
Making, after opening air-conditioner intelligent control mode, mixed-media network modules mixed-media can send solicited message to being somebody's turn to do
Data server, carries time request information and characterizes air-conditioning region in solicited message
Position request information is right with the position request information in this time request information and region institute to obtain
The weather data answered.
S104, generates control strategy to control the operation of air-conditioner according to the weather data obtained.
After set up the required weather data being connected and receiving return with data server, should
Weather data controls the data foundation of logic as air-conditioner, formulates control strategy and realizes according to sky
Destiny is according to automatically controlling air-conditioner.Preferably, control is being generated according to the weather data obtained
When system strategy is to control the operation of air-conditioner, it is judged that the weather data of acquisition ageing whether full
Foot is pre-conditioned;If meeting, it is determined that the weather data of acquisition for effective status, with obtain
Based on weather data, data genaration control strategy is to control the operation of air-conditioner.This control
Mode increases intelligent, no longer depends on artificial according to environmental change as traditional control method
Manual adjustment.
Preferably, above-mentioned weather data at least includes one below: temperature information, humidity are believed
Breath, wind speed information, weather conditions information.Additionally, the first request of above-mentioned record is carried following
Solicited message: the time asks, for limiting the corresponding temporal information of required weather data, and
Position requests, for limiting the correspondence position information of required weather data.Specifically, following table one
In schematically list the composition of solicited message and response message:
Table one
In an optional embodiment, it is provided that one is above-mentioned crosses air conditioner built-in network mould
Block sends the first request to characterize the weather data of air-conditioner region in obtaining the corresponding time
Scheme, may include steps of: judge whether for characterizing air-conditioner region
Positional information;If existing, accessing the data base of data server and confirming whether data base deposits
In the city that the positional information in region is corresponding, wherein, data server comprises for putting down with weather
The interface of platform data interaction, data server obtains weather every first scheduled time by interface
Multiple cities and weather data thereof in platform, and store to data base;If data base exists
The city that the positional information in region is corresponding, obtains the weather data that city is corresponding.
As one preferred embodiment, judging whether for characterizing air-conditioner place
During the positional information in region, if the city that in data base, the positional information of domain of the existence is not corresponding,
Send second by air conditioner built-in interface to ask to weather platform, access weather platform with request
And obtain the weather data that city is corresponding.When implementing, it is judged that access sky by built-in interface
Whether gas platform is successfully obtained weather data;If so, the weather data being successfully obtained is updated to
The data base of data server, and based on this weather data data genaration control strategy with
Control the operation of air-conditioner.If judging to access weather platform unsuccessful acquisition sky by built-in interface
Destiny evidence, sends abnormal log information and processes for subsequent analysis to mixed-media network modules mixed-media.Preferably, on
Following solicited message is carried in the second request stating record: the time asks, and is used for limiting required weather
The corresponding temporal information of data, and position requests, for limiting the correspondence of required weather data
Positional information.
Specifically, sky can be may have access in air-conditioner side built-in interface by this built-in interface
Gas platform is to obtain weather data.When implementing, in order to economize on resources, directly from
Weather platform obtains data, but first above-mentioned record be data server data base in obtain,
Owing to data base will update internal data at set intervals, so these data have the highest
Referential.Only when in data base data age inadequate, or, data base does not has the
During the city that in one request, the positional information that carries is corresponding, just can access weather by built-in interface
Platform.
Additionally, building about server, can be according to the function needing to perform of above-mentioned record
Build the most voluntarily, be the most only briefly described: the general frame of server is included
1. data receiver, 2. data forward, 3. data query, 4. data upload, 5. data parsing, 6. machine
The functional modules such as group monitoring.Can realize air conditioning unit real time data inspecting, also can grasp machine
The running status of group.
Wherein, TCP and multithreading, multistage storage can be used, solve data receiver concurrently big,
Data process promptness and require high practical situation;Owing to not every data are required in real time
Resolve, therefore use distributed storage, alleviate the pressure that downstream data resolves, ensure number simultaneously
According to accuracy.
Position information by real time parsing air-conditioning, and dock meteorological platform, obtain on meteorological platform
Weather information, it is achieved real-time weather conditions obtain.Simultaneously, history meteorological data is protected
Stay, by the weather prognosis to following a period of time, send the sky destiny that actual set needs most
According to, such as variations in temperature, humidity index, wind speed rank, weather conditions etc., accomplish intelligence management and control.
As can be seen here, the acquisition of meteorological data and the logic screening of valid data, be the weight of the present invention
Will foundation.
The control method of the air-conditioner of 2 couples of present invention is further detailed below in conjunction with the accompanying drawings,
To be better understood from the present invention.
As in figure 2 it is shown, after triggering the instruction starting intelligent control mode, the network mould such as GPRS
Block request weather data;Before acquisition request weather data, first detection knows whether to exist and characterizes
The location information of this side position, if not existing, being marked and returning failure information, after being used as
Continuous analysis, change, the feature operation such as interpolation.If judging there is the location letter characterizing this side position
Breath, then need to check whether to be present in this location information from the data base of data server corresponding
City.Wherein, above-mentioned data server is the server put up in advance, in this server
Comprising data base, data server is periodically inquired about multiple urban weather and updates to internal data
In storehouse.If data base exists required city, directly inquire about and obtain in data base with this city
The weather data that city is corresponding.After obtaining weather data, need weather data effectiveness is entered
Row judge, when judging, mainly judge with ageing, if weather data corresponding time
Between the most remote with required time phase difference, then it is assumed that data invalid.When data base does not exist institute
The city needed, or during the situation of the data invalid of above-mentioned introduction, directly can be adjusted by air-conditioner
Use weather network interface, say, that be built-in with in air-conditioner side for directly accessing weather platform
Built-in interface.When accessing weather platform by weather network interface, it is judged that weather is the most successful,
If success, new data (in data base without during this city together with urban information) are updated to number
According to storehouse, and using new data as controlling according to formulating ensuing airconditioning control logic.If
Unsuccessful, can send and characterize abnormal area information to mixed-media network modules mixed-medias such as GPRS, as follow-up
Analyzing and processing.
Embodiment 2
Control method based on the air-conditioner provided in above-described embodiment 1, the present invention is optionally real
Executing example 2 and additionally provide the control device of a kind of air-conditioner, specifically, Fig. 3 illustrates this device
A kind of optional structured flowchart, as it is shown on figure 3, this device includes: the first request unit 32,
For the instruction in response to the startup intelligent control mode triggered, by air conditioner built-in network mould
Block sends the first request to characterize the weather data of air-conditioner region in obtaining the corresponding time;
Control unit 34, for generating control strategy to control air-conditioner according to the weather data obtained
Run.
As shown in Figure 4, the first request unit 32 includes: the first judge module 322, is used for sentencing
Break and whether there is the positional information for characterizing air-conditioner region;Confirm module 324, be used for
In the presence of judge module judged result is, accesses the data base of data server and confirm data
The city that in storehouse, the positional information of domain of the existence is corresponding, wherein, data server comprises use
In the interface mutual with weather platform data, data server passed through to connect every first scheduled time
Mouth obtains multiple cities and weather data thereof in weather platform, and stores to data base;Obtain
Module 326, for confirming that module confirms the city that in data base, the positional information of domain of the existence is corresponding
During city, obtain the weather data that city is corresponding.
Further, control unit includes: the second judge module, for judging the weather obtained
It is pre-conditioned whether data ageing meets;First control module, for judging mould second
When block judged result is for meeting, it is determined that the weather data of acquisition for effective status, with obtain
Based on weather data, data genaration control strategy is to control the operation of air-conditioner.
Further, as it is shown in figure 5, this device also includes: the second request unit 36, it is used for
The city that positional information of domain of the existence is not corresponding in data base, by air conditioner built-in interface
Second request that sends, to weather platform, accesses weather platform with request and obtains the sky that city is corresponding
Destiny evidence.
Further, logical second request unit includes: the 3rd judge module, passes through for judgement
Built-in interface accesses whether weather platform is successfully obtained weather data;More new module, for the 3rd
When judge module judged result is for being, the weather data being successfully obtained is updated to data server
Data base;Second control module, data genaration based on the weather data to update
Control strategy is to control the operation of air-conditioner.
Further, the second request unit also includes: exception reporting module, for sentencing the 3rd
Disconnected module judges to access weather platform unsuccessful acquisition weather data by built-in interface, sends different
Often log information processes to mixed-media network modules mixed-media for subsequent analysis.
Further, following solicited message is at least carried in the first request and the second request: the time please
Ask, for limiting the corresponding temporal information of required weather data, and position requests, it is used for limiting
The correspondence position information of fixed required weather data.
Further, weather data at least includes one below: temperature information, humidity information,
Wind speed information, weather conditions information.
About the device in above-described embodiment, wherein unit, module perform the concrete of operation
Mode has been described in detail in about the embodiment of the method, will not do in detail herein
Illustrate explanation.
Those skilled in the art, will easily after considering description and putting into practice invention disclosed herein
Expect other embodiments of the present invention.The application is intended to any modification of the present invention, use
Way or adaptations, these modification, purposes or adaptations follow the one of the present invention
As property principle include common knowledge in the art or the conventional techniques that the present invention do not invents
Means.Description and embodiments is considered only as exemplary, true scope and spirit of the invention
Pointed out by claim below.
It should be appreciated that the invention is not limited in described above and shown in the drawings
Precision architecture, and various modifications and changes can carried out without departing from the scope.The present invention
Scope only limited by appended claim.
Claims (13)
1. the control method of an air-conditioner, it is characterised in that including:
In response to the instruction of the startup intelligent control mode triggered, by air conditioner built-in network mould
Block sends the first request to characterize the weather data of air-conditioner region in obtaining the corresponding time;
Control strategy is generated to control the fortune of described air-conditioner according to the described weather data obtained
OK.
The control method of air-conditioner the most according to claim 1, it is characterised in that described logical
Cross air conditioner built-in mixed-media network modules mixed-media and send the first request to characterize air-conditioner institute in obtaining the corresponding time
At the weather data in region, including:
Judge whether the positional information for characterizing air-conditioner region;
If existing, accessing the data base of data server and confirming whether described data base exists
The city that the positional information in described region is corresponding, wherein, described data server comprise for
The interface that weather platform data is mutual, described data server passes through institute every first scheduled time
State interface and obtain multiple cities and weather data thereof in described weather platform, and store to described number
According in storehouse;
If the city that the positional information that there is described region in described data base is corresponding, obtain described
The weather data that city is corresponding.
The control method of air-conditioner the most according to claim 2, it is characterised in that described
The control strategy operation with the described air-conditioner of control is generated according to the described weather data obtained, including:
Judge whether described weather data ageing obtained meets pre-conditioned;
If meeting, it is determined that the described weather data of acquisition for effective status, with described acquisition
Based on described weather data, data genaration control strategy is to control the operation of described air-conditioner.
The control method of air-conditioner the most according to claim 2, it is characterised in that described visit
Ask the data base of data server and confirm whether described data base exists the position in described region
The city that information is corresponding, including:
If the city that the positional information that there is not described region in described data base is corresponding, by sky
Adjust device built-in interface to send the second request extremely described weather platform, access described weather with request and put down
Platform also obtains the weather data that described city is corresponding.
The control method of air-conditioner the most according to claim 4, it is characterised in that described logical
Cross air conditioner built-in interface and send the second request extremely described weather platform, access described sky with request
Gas platform also obtains the weather data that described city is corresponding, including:
Judge to access whether described weather platform is successfully obtained a day destiny by described built-in interface
According to;
If so, the weather data being successfully obtained is updated to the data base of described data server,
And based on this weather data data genaration control strategy with control described air-conditioner fortune
OK.
The control method of air-conditioner the most according to claim 5, it is characterised in that described in sentence
Whether weather platform described in open close air conditioner built-in interface accessing excessively is successfully obtained weather data, bag
Include:
If judging to access described weather platform unsuccessful acquisition sky destiny by described built-in interface
According to, send abnormal log information and process for subsequent analysis to described mixed-media network modules mixed-media.
The control method of air-conditioner the most according to claim 4, it is characterised in that described
Following solicited message is at least carried in one request and described second request:
Time asks, for limiting the corresponding temporal information of required weather data, and
Position requests, for limiting the correspondence position information of required weather data.
8., according to the control method of the air-conditioner described in any one of claim 1 to 7, its feature exists
One below is at least included in, described weather data:
Temperature information, humidity information, wind speed information, weather conditions information.
9. the control device of an air-conditioner, it is characterised in that including:
First request unit is for the instruction in response to the startup intelligent control mode triggered, logical
Cross air conditioner built-in mixed-media network modules mixed-media and send the first request to characterize air-conditioner institute in obtaining the corresponding time
Weather data in region;
Control unit, for generating control strategy to control institute according to the described weather data obtained
State the operation of air-conditioner.
The control device of air-conditioner the most according to claim 9, it is characterised in that described
First request unit includes:
First judge module, for judging whether the position for characterizing air-conditioner region
Confidence ceases;
Confirm module, in the presence of described judge module judged result is, access data clothes
Whether the data base confirming of business device exists described region positional information in described data base is corresponding
City, wherein, described data server comprises for the interface mutual with weather platform data,
Described data server was obtained in described weather platform by described interface every first scheduled time
Multiple cities and weather data thereof, and store to described data base;
, in confirming described data base in described confirmation module, there is described region in acquisition module
City corresponding to positional information time, obtain the weather data that described city is corresponding.
The control device of 11. air-conditioners according to claim 10, it is characterised in that institute
State control unit to include:
Second judge module, for judging whether the ageing of described weather data obtained meets
Pre-conditioned;
First control module, for when described second judge module judged result is for meeting, sentences
The fixed described weather data obtained for effective status, make with the described weather data of described acquisition
Based on data genaration control strategy with control described air-conditioner operation.
The control device of 12. air-conditioners according to claim 10, it is characterised in that also
Including:
, for the most there is not the positional information in described region in the second request unit
Corresponding city, sends the second request extremely described weather platform by air conditioner built-in interface, with
Request accesses described weather platform and obtains the weather data that described city is corresponding.
The control device of 13. air-conditioners according to claim 12, it is characterised in that institute
State logical second request unit to include:
3rd judge module, for judging that accessing described weather platform by described built-in interface is
No it is successfully obtained weather data;
More new module, for described 3rd judge module judged result for being time, will be successfully obtained
Weather data be updated to the data base of described data server;
Second control module, based on the weather data to update, data genaration controls plan
Slightly to control the operation of described air-conditioner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610363452.5A CN105910243B (en) | 2016-05-25 | 2016-05-25 | control method and device of air conditioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610363452.5A CN105910243B (en) | 2016-05-25 | 2016-05-25 | control method and device of air conditioner |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105910243A true CN105910243A (en) | 2016-08-31 |
CN105910243B CN105910243B (en) | 2018-10-23 |
Family
ID=56741636
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610363452.5A Active CN105910243B (en) | 2016-05-25 | 2016-05-25 | control method and device of air conditioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105910243B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108944339A (en) * | 2018-07-24 | 2018-12-07 | 奇瑞汽车股份有限公司 | Air conditioning for automobiles tele-control system, method and server |
CN110431357A (en) * | 2017-04-07 | 2019-11-08 | 大金工业株式会社 | Air conditioner management system |
CN110858065A (en) * | 2018-08-24 | 2020-03-03 | 珠海格力电器股份有限公司 | Data processing method and data processing equipment |
CN111077814A (en) * | 2019-11-06 | 2020-04-28 | 珠海格力电器股份有限公司 | Control method of intelligent socket in abnormal weather, computer readable storage medium and socket |
CN111457559A (en) * | 2019-01-21 | 2020-07-28 | 珠海格力电器股份有限公司 | Humidity control method and device, storage medium and air conditioner |
CN112556117A (en) * | 2020-12-07 | 2021-03-26 | 珠海格力电器股份有限公司 | Air conditioner control method and system and electronic equipment |
CN114353181A (en) * | 2021-12-31 | 2022-04-15 | 北京金茂人居环境科技有限公司 | Air conditioning unit with heat recovery function and mode control method and equipment thereof |
WO2024016853A1 (en) * | 2022-07-20 | 2024-01-25 | 青岛海尔空调器有限总公司 | Control method and apparatus for air conditioner, and smart air conditioner |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101178235A (en) * | 2006-11-08 | 2008-05-14 | 乐金电子(天津)电器有限公司 | Air conditioning system and method of operating same |
WO2014171314A1 (en) * | 2013-04-15 | 2014-10-23 | 三菱電機株式会社 | Air conditioning system control device |
CN104267626A (en) * | 2014-09-19 | 2015-01-07 | 珠海格力电器股份有限公司 | Household appliance control method and system |
CN104501371A (en) * | 2014-12-08 | 2015-04-08 | 广东美的制冷设备有限公司 | Air conditioning system, air conditioner, control method of air conditioner, mobile terminal and integrated controller |
CN104950707A (en) * | 2015-05-29 | 2015-09-30 | 小米科技有限责任公司 | Control method and device for wind discharge equipment |
-
2016
- 2016-05-25 CN CN201610363452.5A patent/CN105910243B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101178235A (en) * | 2006-11-08 | 2008-05-14 | 乐金电子(天津)电器有限公司 | Air conditioning system and method of operating same |
WO2014171314A1 (en) * | 2013-04-15 | 2014-10-23 | 三菱電機株式会社 | Air conditioning system control device |
CN104267626A (en) * | 2014-09-19 | 2015-01-07 | 珠海格力电器股份有限公司 | Household appliance control method and system |
CN104501371A (en) * | 2014-12-08 | 2015-04-08 | 广东美的制冷设备有限公司 | Air conditioning system, air conditioner, control method of air conditioner, mobile terminal and integrated controller |
CN104950707A (en) * | 2015-05-29 | 2015-09-30 | 小米科技有限责任公司 | Control method and device for wind discharge equipment |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110431357A (en) * | 2017-04-07 | 2019-11-08 | 大金工业株式会社 | Air conditioner management system |
CN108944339A (en) * | 2018-07-24 | 2018-12-07 | 奇瑞汽车股份有限公司 | Air conditioning for automobiles tele-control system, method and server |
CN110858065A (en) * | 2018-08-24 | 2020-03-03 | 珠海格力电器股份有限公司 | Data processing method and data processing equipment |
CN111457559A (en) * | 2019-01-21 | 2020-07-28 | 珠海格力电器股份有限公司 | Humidity control method and device, storage medium and air conditioner |
CN111077814A (en) * | 2019-11-06 | 2020-04-28 | 珠海格力电器股份有限公司 | Control method of intelligent socket in abnormal weather, computer readable storage medium and socket |
CN112556117A (en) * | 2020-12-07 | 2021-03-26 | 珠海格力电器股份有限公司 | Air conditioner control method and system and electronic equipment |
CN114353181A (en) * | 2021-12-31 | 2022-04-15 | 北京金茂人居环境科技有限公司 | Air conditioning unit with heat recovery function and mode control method and equipment thereof |
WO2024016853A1 (en) * | 2022-07-20 | 2024-01-25 | 青岛海尔空调器有限总公司 | Control method and apparatus for air conditioner, and smart air conditioner |
Also Published As
Publication number | Publication date |
---|---|
CN105910243B (en) | 2018-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105910243A (en) | Control method and device of air conditioner | |
EP2790082B1 (en) | A system and method with geo location triggering automatic action | |
CN108844181B (en) | Household appliance repair reporting method and air conditioner repair system | |
US10845081B2 (en) | Building management HVAC control using user voice feedback | |
EP1987459B1 (en) | A system and a method for assessing and reducing air pollution by regulating airflow ventiilation | |
US10607478B1 (en) | Building security system with false alarm reduction using hierarchical relationships | |
CN106642534B (en) | Air conditioner control method and device | |
US20190353378A1 (en) | Building management autonomous hvac control using reinforcement learning with occupant feedback | |
CN109445848B (en) | Equipment linkage method and device | |
CN108981092A (en) | Central air conditioner temp controller, the control method of fan coil, medium and system | |
CN110715401B (en) | Defrosting control method and device for air conditioning equipment, medium and air conditioning equipment | |
CN107809378A (en) | For providing intelligent gateway device, the system and method for communication between HVAC system network | |
CN108829074A (en) | A kind of artificial intelligence domestic environment system control method based on big data | |
EP3184918A1 (en) | Hvac control using geofencing | |
KR20150020171A (en) | Information control system | |
CN110345602B (en) | Air conditioner maintenance method and device, computer equipment and storage medium | |
JP2010288231A (en) | Home appliance remote control system and home appliance remote control method | |
CN113932282B (en) | Urban heating supervision method and system | |
CN114026505A (en) | IoT context-aware digital twin with enhanced discovery | |
CN111862536A (en) | Automatic monitoring and early warning system for geological disasters | |
CN114326648B (en) | Remote cooperative electrolysis control method and system | |
CN106568121A (en) | Method, device and system for monitoring heat supply states of building | |
CN107461881B (en) | Refrigeration host energy efficiency diagnosis method and system for hospital air conditioner room | |
JP2020165642A (en) | How to control air conditioning systems, server systems, networks, air conditioning systems, and how to control networks | |
CN107832192A (en) | A kind of server start and stop intelligence control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |