CN105905735B - A kind of elevator rope end break monitoring device - Google Patents
A kind of elevator rope end break monitoring device Download PDFInfo
- Publication number
- CN105905735B CN105905735B CN201610427524.8A CN201610427524A CN105905735B CN 105905735 B CN105905735 B CN 105905735B CN 201610427524 A CN201610427524 A CN 201610427524A CN 105905735 B CN105905735 B CN 105905735B
- Authority
- CN
- China
- Prior art keywords
- swing rod
- blocking element
- drag
- line
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B5/00—Applications of checking, fault-correcting, or safety devices in elevators
- B66B5/02—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
- B66B5/12—Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions in case of rope or cable slack
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Maintenance And Inspection Apparatuses For Elevators (AREA)
Abstract
The invention discloses a kind of elevator rope end break monitoring devices, including multiple rope ends and travel switch, travel switch is set on a mounting board, swing rod is hinged on the mounting plate, swing rod is connect by one end with mounting plate, swing rod side is connected on the Self-resetting pressure head of travel switch, and the elastic lockable mechanism locking by being located at the swing rod other side;Drag-line is connected on swing rod, drag-line is fixed by one end and swing rod, and the other end of drag-line sequentially passes through multiple rope ends by the cross-perforating that rope end is equipped with, and stay wire end is fixed with the rope end for being located at distal end, and drag-line is tightened by both ends fixation.It is preferred that elastic lockable mechanism includes blocking element, blocking element is installed in the mounting hole being equipped on a mounting board, and blocking element has the part of extended mounting hole, and mounting hole rear end is screwed with adjustment plug screw, and compressed spring is equipped between adjustment plug screw and blocking element.The invention has the advantages that structure is simple, manufacture is easy for installation, and occupy little space.
Description
Technical field
The present invention relates to a kind of elevator safety monitoring device, in particular to a kind of elevator rope end break monitoring device.
Background technique
For being more concern uplink and downlink hypervelocity in the detection device industry of elevator actual time safety operation, position is gone beyond the limit of
The detection set carries out switch motion to traction machine and limiter of speed etc. in real time, to guarantee elevator after detecting correlation values
Safe operation, at home in the world, this is the device of universal effective detection elevator safety operation, still, disconnected for elevator
The protection of rope, then the mainly protection after rope-broken accident occurs, i.e., after well-known disconnected rope, then to elevator carry out detection and
Reaction, after disconnected rope, speed is unstable, and carriage, which is fallen, leads to limiter of speed safety tongs movement etc., it is clear that this protection is a lack of earlier
Meeting property.And GB7588-2003 is also to this earlier monitoring without specific requirement.Although currently, there are some disconnected rope monitoring dresses
The scheme set, but the deficiency that these monitoring devices all exist that structure is complicated, manufacturing cost is high, occupied space is big.For this reason, it may be necessary into
One step is improved.
Summary of the invention
The purpose of the present invention is to the deficiencies in the prior art, provide a kind of elevator rope end break monitoring device, the dress
It sets when single elevator wire rope is inclined to there are disconnected rope, warning in advance or elevator operation can be stopped, structure is simple, manufacture
It is easy for installation, and occupy little space.
To achieve the above object, the present invention adopts the following technical scheme that.
A kind of elevator rope end break monitoring device, including multiple rope ends and travel switch, travel switch are set on a mounting board,
Swing rod is hinged on the mounting plate, swing rod is connect by one end with mounting plate, and swing rod side is connected to the runback of travel switch
On the pressure head of position, and the elastic lockable mechanism locking by being located at the swing rod other side;Be connected with drag-line on swing rod, drag-line by one end with
Swing rod is fixed, and the other end of drag-line sequentially passes through multiple rope ends by the cross-perforating that rope end is equipped with, stay wire end be located at
The rope end of distal end is fixed, and drag-line is tightened by both ends fixation.
Using the present invention of preceding solution, the control signal that the switching signal of travel switch is run as elevator,
When the Self-resetting pressure head of travel switch is oppressed by swing rod, elevator is operated normally;When the Self-resetting pressure head of travel switch resets,
Elevator is out of service.Swing rod passes through elastic lockable mechanism locking, and is connected with drag-line, and drag-line passes through multiple rope ends, stay wire end
It is fixed with the rope end for being located at distal end, drag-line is tightened by both ends fixation.To occur stretching in traction steel-cable in any rope end or
When fracture defect, rope end moves under counterbalance spring effect, and pulling swing rod by drag-line makes it overcome the bullet of the elastic locking of compressing
Property power after, in release travel switch Self-resetting pressure head direction swing.When rope end displacement reaches setting value, displacement is swung
Meet Self-resetting pressure head and reset shift value, Self-resetting pressure head resets, and corresponding elevator is out of service.Therefore, monitoring of the invention dress
Set be not required to until rope end fracture after can just generate effect, as long as but wirerope occur set length stretcher strain amount when, or
When any wirerope is inclined to there are disconnected rope, elevator is set to stop transport by force at once.And structure is simple, manufacture is easy for installation, and occupies
Space is small.In the alarm signal for running the switching signal of travel switch as elevator, in any wirerope, there are disconnected ropes to incline
Xiang Shi, can and alarm.
Preferably, the elastic lockable mechanism includes blocking element, and blocking element installs the installation being equipped on a mounting board
In hole, blocking element has the part of extended mounting hole, and mounting hole rear end is screwed with adjustment plug screw, adjustment plug screw and locking structure
Compressed spring is equipped between part.To simplify lockable mechanism structure, further ensure that structure is simple, latch functions are reliable.
It is further preferred that the blocking element is steel ball, the mounting hole front end is in outer small interior big taper hole structure.Into
One step ensures that structure is simple, and under rope end displacement effect, unlock is quick.And steel ball directly commercially can improve system
Make the convenience of efficiency and maintenance replacement.
It is further preferred that the blocking element and mounting hole are in step structure, after blocking element leading portion diameter is less than
Section, blocking element front end are in frustum structure;The swing rod respective side is formed with guiding surface.Further ensure that structure is simple, locks
Only function is reliable, and unlocks quick.
Compared with the prior art, the invention has the advantages that when single elevator wire rope is inclined to there are disconnected rope, energy
Enough warning in advance stop elevator operation, and structure is simple, manufacture is easy for installation, and occupies little space.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is A-A cross-sectional view of Fig. 1 of the present invention, for disclosing the elastic lockable mechanism in embodiment 1.
Fig. 3 is the partial structure diagram of the embodiment of the present invention 2.
Specific embodiment
The present invention will be further described below with reference to the drawings, but does not therefore limit the present invention to the implementation
Among example range.
Embodiment 1, referring to Fig. 1, Fig. 2, a kind of elevator rope end break monitoring device, including multiple rope ends 1 and travel switch
2, rope end 1 movably passes through end plate 9, and the upper end that rope end 1 is located at end plate 9 is equipped with traction steel-cable by pressing plate 10, nut 11
It stretches and uses counterbalance spring 12;Travel switch 2 is located on mounting plate 3, and swing rod 4 is hinged on the mounting plate 3, and swing rod 4 passes through one
End is connect with mounting plate 3, and 4 side of swing rod is connected on the Self-resetting pressure head 2a of travel switch 2, and another by being located at swing rod 4
The elastic lockable mechanism locking of side;4 distal end of swing rod is connected with drag-line 6, and drag-line 6 is fixed by one end and swing rod 4, drag-line 6 it is another
End sequentially passes through multiple rope ends 1 by the cross-perforating that rope end 1 is equipped with, and 6 end of drag-line and the rope end 1 for being located at distal end are fixed,
Drag-line 6 is tightened by both ends fixation.
Wherein, the L shape of the swing rod 4 in obtuse angle, swing rod 4 on the inside of L shape corner with the idler wheel of Self-resetting pressure head 2a by connecting
It connects;Cross-perforating on the rope end 1 is located at the lower end of rope end 1, and elastic lockable mechanism includes the blocking element being made of steel ball
5, blocking element 5 is installed in the mounting hole that mounting plate 3 is equipped with, and mounting hole front end is in outer small interior big taper hole structure, locking
Component 5 has the part of extended mounting hole, and mounting hole rear end is screwed with adjustment plug screw 7, adjustment plug screw 7 and blocking element 5 it
Between be equipped with compressed spring 8.
Embodiment 2, referring to Fig. 3, blocking element 5 and mounting hole are in step structure, after 5 leading portion diameter of blocking element is less than
Section, 5 front end of blocking element are in frustum structure;4 respective side of swing rod is formed with guiding surface 4a.
Remaining structure of the present embodiment is same as Example 1, and details are not described herein.
In previous embodiment, cross-perforating on the rope end 1 may be alternatively provided at the upper end of rope end 1.Wherein, drag-line 6 can be adopted
With individual wire, wirerope made of steel wire strand can also be used.Drag-line 6 and 4 link position of swing rod may be alternatively provided at L shape corner with
In the rod segment of swing rod 4 between hinge joint, Self-resetting pressure head 2a reset can be triggered to be displaced smaller situation in rope end 1, is mentioned
The sensitivity of height monitoring.
Above although the embodiments of the invention are described in conjunction with the attached drawings, but those skilled in the art can also anticipate
Know to various changes can be made in scope of the appended claims or modification, such as does the wedge-shaped working face of the push rod in the present invention
The mode being gradually increased at ecto-entad, by pulling push rod to realize, clutch disengaging surmounts the purpose of state, corresponding push rod
Extension spring etc. can be set in inner face bottom.These modifications and variations are understood as within the scope of the present invention and intention
's.
Claims (4)
1. a kind of elevator rope end break monitoring device, including multiple rope ends (1) and travel switch (2), travel switch (2) are located at peace
In loading board (3), which is characterized in that be hinged with swing rod (4) on the mounting plate (3), swing rod (4) passes through one end and mounting plate (3)
Connection, swing rod (4) side are connected on the Self-resetting pressure head (2a) of travel switch (2), and by being located at swing rod (4) other side
Elastic lockable mechanism locking;It is connected on swing rod (4) drag-line (6), drag-line (6) is fixed by one end and swing rod (4), drag-line (6)
The cross-perforating that the other end is equipped with by rope end (1) sequentially passes through multiple rope ends (1), drag-line (6) end be located at distal end
Rope end (1) is fixed, and drag-line (6) is in tensioned state.
2. elevator rope end break monitoring device according to claim 1, which is characterized in that it is described elasticity lockable mechanism include
Blocking element (5), blocking element (5) are installed in the mounting hole that mounting plate (3) is equipped with, and blocking element (5) has extended
The part of mounting hole, mounting hole rear end are screwed with adjustment plug screw (7), and compression is equipped between adjustment plug screw (7) and blocking element (5)
Spring (8).
3. elevator rope end break monitoring device according to claim 2, which is characterized in that the blocking element (5) is steel
Ball, the mounting hole front end are in outer small interior big taper hole structure.
4. elevator rope end break monitoring device according to claim 2, which is characterized in that the blocking element (5) and peace
Kong Juncheng step structure is filled, blocking element (5) leading portion diameter is less than back segment, and blocking element (5) front end is in frustum structure;The pendulum
Bar (4) respective side is formed with guiding surface (4a).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610427524.8A CN105905735B (en) | 2016-06-14 | 2016-06-14 | A kind of elevator rope end break monitoring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610427524.8A CN105905735B (en) | 2016-06-14 | 2016-06-14 | A kind of elevator rope end break monitoring device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105905735A CN105905735A (en) | 2016-08-31 |
CN105905735B true CN105905735B (en) | 2018-12-11 |
Family
ID=56751061
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610427524.8A Active CN105905735B (en) | 2016-06-14 | 2016-06-14 | A kind of elevator rope end break monitoring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105905735B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306152A (en) * | 2020-04-02 | 2020-06-19 | 中冶赛迪工程技术股份有限公司 | Bolt with abrasion prompt function |
CN112096933B (en) * | 2020-09-16 | 2022-04-26 | 株洲时代新材料科技股份有限公司 | Self-sealing method of oil valve and self-sealing oil valve |
CN113090219B (en) * | 2021-06-09 | 2021-08-17 | 西南石油大学 | A downhole blowout preventer |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB623228A (en) * | 1947-02-21 | 1949-05-13 | Oliver Baird | Improvements relating to taking up slack in rope haulage systems |
CN2677348Y (en) * | 2004-03-04 | 2005-02-09 | 黄善康 | Protective device for elevator overspeed |
CN202148110U (en) * | 2011-05-25 | 2012-02-22 | 余利仁 | Tightness sensor for steel wire rope of elevator |
CN202785437U (en) * | 2012-08-31 | 2013-03-13 | 无锡佳能工程机械有限公司 | Detection and alarm mechanism for fracture of steel wire ropes |
CN203631338U (en) * | 2013-12-27 | 2014-06-04 | 郑微丹 | An insertion-piece control type elevator space limiting stroke switch |
CN105197835A (en) * | 2015-11-03 | 2015-12-30 | 赛埃孚汽车保修设备(太仓)有限公司 | Steel wire rope anti-breaking device for hoisting machine |
CN205820604U (en) * | 2016-06-14 | 2016-12-21 | 重庆伊士顿电梯有限责任公司 | Elevator rope end break monitoring device |
-
2016
- 2016-06-14 CN CN201610427524.8A patent/CN105905735B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB623228A (en) * | 1947-02-21 | 1949-05-13 | Oliver Baird | Improvements relating to taking up slack in rope haulage systems |
CN2677348Y (en) * | 2004-03-04 | 2005-02-09 | 黄善康 | Protective device for elevator overspeed |
CN202148110U (en) * | 2011-05-25 | 2012-02-22 | 余利仁 | Tightness sensor for steel wire rope of elevator |
CN202785437U (en) * | 2012-08-31 | 2013-03-13 | 无锡佳能工程机械有限公司 | Detection and alarm mechanism for fracture of steel wire ropes |
CN203631338U (en) * | 2013-12-27 | 2014-06-04 | 郑微丹 | An insertion-piece control type elevator space limiting stroke switch |
CN105197835A (en) * | 2015-11-03 | 2015-12-30 | 赛埃孚汽车保修设备(太仓)有限公司 | Steel wire rope anti-breaking device for hoisting machine |
CN205820604U (en) * | 2016-06-14 | 2016-12-21 | 重庆伊士顿电梯有限责任公司 | Elevator rope end break monitoring device |
Also Published As
Publication number | Publication date |
---|---|
CN105905735A (en) | 2016-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110173104B (en) | Anti-falling structure attached with lifting scaffold | |
KR102352343B1 (en) | Drag chain and monitoring system for protecting against line breaks | |
CN105905735B (en) | A kind of elevator rope end break monitoring device | |
CN202988636U (en) | Electromagnetic type elevator braking device | |
CN105060081B (en) | Protecting device for preventing accidental stop of elevator | |
CN106623677A (en) | Press ram fall-arrest locking mechanism and application method thereof | |
CN210598319U (en) | Mechanical parking equipment wire rope locking device and parking equipment | |
CN202770576U (en) | Steel-wire-rope tensioning detection device and engineering machinery | |
CN205820604U (en) | Elevator rope end break monitoring device | |
CN201801265U (en) | Energy consumption type buffer for elevator | |
CN204823562U (en) | Gradual two -way rope ware that presss from both sides | |
CN202148110U (en) | Tightness sensor for steel wire rope of elevator | |
CN202704850U (en) | Control device for super-lift system, super-lift system and engineering machinery | |
CN201647760U (en) | Wire breaking real-time detector of elevator hauling rope | |
CN211110497U (en) | Elevator car safety buffer structure | |
CN105905733B (en) | A kind of construction hoist falling-proof insurance system | |
CN201190062Y (en) | Elevator safety gear linkage device | |
CN211496651U (en) | Buffer type damping protection device | |
CN210447905U (en) | Anti-falling damping device for high-altitude lifeline system | |
CN208200056U (en) | It is a kind of for overhauling the protective device of elevator | |
CN216512568U (en) | Tower crane hoisting mechanism stop device | |
CN220376046U (en) | Safety tongs triggering system of elevator and elevator | |
CN207406081U (en) | A kind of intelligent machine garage lifter rack-and-pinion limiting safe protective device | |
CN206035028U (en) | Three -dimensional garage falling protector | |
CN210944386U (en) | Disconnected monitoring devices of pine of elevator rope and elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A monitoring device for elevator rope breakage Granted publication date: 20181211 Pledgee: Agricultural Bank of China Limited Chongqing Nan'an Branch Pledgor: EASTERN ELEVATORS Pty Ltd. Registration number: Y2024500000109 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |