CN105896423A - Three-phase three-wire combined terminal box - Google Patents
Three-phase three-wire combined terminal box Download PDFInfo
- Publication number
- CN105896423A CN105896423A CN201610308081.0A CN201610308081A CN105896423A CN 105896423 A CN105896423 A CN 105896423A CN 201610308081 A CN201610308081 A CN 201610308081A CN 105896423 A CN105896423 A CN 105896423A
- Authority
- CN
- China
- Prior art keywords
- channel
- phase
- terminal
- adjustable current
- yoke plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/08—Distribution boxes; Connection or junction boxes
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Connections Arranged To Contact A Plurality Of Conductors (AREA)
Abstract
本发明提供了三相三线联合接线盒,属于电力领域。包括电压接线板和电流接线板,在三相三线联合接线盒中设置有三个电压接线板,以及两个电流接线板,每个电压接线板设有双通道接线端子,每个电流接线板设有四通道接线端子,在双通道接线端子中的每个通道上均设置有电压联板,在四通道接线端子中设置有三个可调电流联板。通过根据使用需求,对可调电流联板的位置进行调整,从而实现对电能表和终端的分别投切或者同时投切,以便满足不同的使用需求,防止出现更换终端的过程中无法对用电量进行计量的缺陷,提高了用户的使用体验。
The invention provides a three-phase three-wire combined junction box, which belongs to the field of electric power. It includes a voltage terminal board and a current terminal board. There are three voltage terminal boards and two current terminal boards in the three-phase three-wire joint junction box. Each voltage terminal board is provided with dual-channel terminal blocks, and each current terminal board is provided with For the four-channel terminal, each channel of the two-channel terminal is provided with a voltage connecting plate, and the four-channel terminal is provided with three adjustable current connecting plates. By adjusting the position of the adjustable current connection board according to the usage requirements, the switching of the electric energy meter and the terminal can be realized separately or at the same time, so as to meet different usage requirements and prevent the failure of power consumption in the process of replacing the terminal. The defect of volume measurement improves the user experience.
Description
技术领域technical field
本发明属于电力领域,特别涉及三相三线联合接线盒。The invention belongs to the field of electric power, in particular to a three-phase three-wire combined junction box.
背景技术Background technique
在电力系统中,电能表和终端共用一个联合接线盒,在对终端进行更换时,为了防止电压互感器出现二次回路短路和接地,以及电流互感器出现二次回路开路的现象,需要将终端关闭、电压连接片断开、电流连接片短接,使得终端处于不工作的状态。在上述更换终端的过程中,电能表同时也会停止运行,因此导致在终端更换的时间段内,终端用户的用电量是无法被计量的。In the power system, the electric energy meter and the terminal share a joint junction box. When replacing the terminal, in order to prevent the secondary circuit short circuit and grounding of the voltage transformer and the open circuit of the secondary circuit of the current transformer, it is necessary to replace the terminal Closed, the voltage connector is disconnected, and the current connector is shorted, so that the terminal is in a non-working state. During the above terminal replacement process, the energy meter will also stop running at the same time, so the power consumption of the terminal user cannot be measured during the terminal replacement period.
在现有技术中,在终端更换的时间段内,电力工作人员根据公式电量=实际平均负荷×时间)计算出更换终端期间该用户的使用电量,将计算出来的电量走电费退补流程。但是该计算方式不能准确反映出终端用户的真实用电水平,降低用户的使用体验。In the prior art, during the period of terminal replacement, electric power workers calculate the electricity consumption of the user during the terminal replacement period according to the formula (power consumption = actual average load × time), and use the calculated electricity to go through the electricity fee reimbursement process. However, this calculation method cannot accurately reflect the real power consumption level of the end user, which reduces the user experience.
发明内容Contents of the invention
为了解决现有技术中存在的缺点和不足,本发明提供了能够在更换终端期间依然能够对用电量进行计量的三相三线联合接线盒。In order to solve the shortcomings and deficiencies in the prior art, the present invention provides a three-phase three-wire combined junction box capable of measuring electricity consumption during terminal replacement.
为了达到上述技术目的,本发明提供了三相三线联合接线盒,包括电压接线板和电流接线板,用于连接三相三线电能表和终端,在所述三相三线联合接线盒中设置有三个电压接线板,以及两个电流接线板;In order to achieve the above-mentioned technical purpose, the present invention provides a three-phase three-wire joint junction box, including a voltage terminal board and a current terminal board, for connecting a three-phase three-wire electric energy meter and a terminal, and three a voltage terminal block, and two current terminal blocks;
每个所述电压接线板设有双通道接线端子,每个所述电流接线板设有四通道接线端子,在所述双通道接线端子中的每个通道上均设置有电压联板,在所述四通道接线端子中设置有第一可调电流联板、第二可调电流联板、第三可调电流联板;Each of the voltage wiring boards is provided with a dual-channel terminal, each of the current terminal boards is provided with a four-channel terminal, and each channel of the dual-channel terminal is provided with a voltage connection board. The four-channel terminal is provided with a first adjustable current connection board, a second adjustable current connection board, and a third adjustable current connection board;
所述双通道接线端子中的第一通道接线端子与所述三相三线电能表第一计量元件中的第一端相连,所述双通道接线端子中的第二通道接线端子与所述终端第一计量元件中的第一端相连,所述四通道接线端子中的第一通道接线端子与所述三相三线电能表第一计量元件中的第二端相连,所述四通道接线端子中的第二通道接线端子与所述三相三线电能表第一计量元件中的第三端相连,所述四通道接线端子中的第三通道接线端子与所述终端第一计量元件中的第二端相连,所述四通道接线端子中的第四通道接线端子与所述终端第一计量元件中的第三端相连;The first channel connection terminal of the two-channel connection terminals is connected to the first end of the first metering element of the three-phase three-wire electric energy meter, and the second channel connection terminal of the two-channel connection terminals is connected to the first terminal of the terminal. The first terminal of a metering element is connected, the first channel terminal of the four-channel terminal is connected to the second terminal of the first metering element of the three-phase three-wire electric energy meter, and the first terminal of the four-channel terminal is The second channel connection terminal is connected to the third terminal in the first metering element of the three-phase three-wire electric energy meter, and the third channel connection terminal in the four-channel connection terminal is connected to the second terminal in the first metering element of the terminal connected, the fourth channel connection terminal in the four-channel connection terminal is connected to the third terminal in the first metering element of the terminal;
其中,所述第一可调电流联板、所述第二可调电流联板、所述第三可调电流联板均处于初始位置,并且所述第一可调电流联板、所述第二可调电流联板、所述第三可调电流联板呈相互平行的状态,所述初始位置为连通所述第二通道和所述第三通道的位置。Wherein, the first adjustable current connecting plate, the second adjustable current connecting plate, and the third adjustable current connecting plate are all in the initial position, and the first adjustable current connecting plate, the second adjustable current connecting plate The two adjustable current connecting plates and the third adjustable current connecting plate are parallel to each other, and the initial position is a position connecting the second channel and the third channel.
可选的,当所述三相三线联合接线盒处于正常工作状态时,所述第一可调电流联板、所述第二可调电流联板、所述第三可调电流联板均处于初始位置。Optionally, when the three-phase three-wire combined junction box is in a normal working state, the first adjustable current connection board, the second adjustable current connection board, and the third adjustable current connection board are all in the initial position.
可选的,当所述三相三线联合接线盒处于第一短接工作状态时,所述第一可调电流联板、所述第三可调电流联板均处于初始位置,所述第二可调电流联板处于连通所述第三通道和所述第四通道的位置。Optionally, when the three-phase three-wire combined junction box is in the first short-circuit working state, the first adjustable current connecting plate and the third adjustable current connecting plate are in the initial position, and the second adjustable current connecting plate is in the initial position. The adjustable current connecting plate is in the position of communicating with the third channel and the fourth channel.
可选的,当所述三相三线联合接线盒处于第二短接工作状态时,所述第三可调电流联板处于初始位置,所述第一可调电流联板处于连通所述第一通道和所述第二通道的位置,所述第二可调电流联板处于连通所述第三通道和所述第四通道的位置。Optionally, when the three-phase three-wire combined junction box is in the second short-circuit working state, the third adjustable current connecting board is in the initial position, and the first adjustable current connecting board is in the connection with the first The position of the channel and the second channel, the second adjustable current connecting plate is in the position of communicating with the third channel and the fourth channel.
可选的,当所述三相三线联合接线盒处于正常工作状态时,将所述第一可调电流联板、所述第二可调电流联板以及所述第三可调电流联板移动至初始位置;Optionally, when the three-phase three-wire combined junction box is in a normal working state, the first adjustable current connecting board, the second adjustable current connecting board and the third adjustable current connecting board are moved to the initial position;
当所述三相三线联合接线盒处于短接终端的工作状态时,将所述第二可调电流联板右移,处于连通所述第三通道和所述第四通道的位置,所述第一可调电流联板、所述第三可调电流联板的位置保持在所述初始位置处;When the three-phase three-wire combined junction box is in the working state of short-circuiting the terminal, the second adjustable current connecting plate is moved to the right to be in a position connecting the third channel and the fourth channel, and the second An adjustable current connecting plate, the position of the third adjustable current connecting plate is kept at the initial position;
当所述三相三线联合接线盒处于同时短接所述三相三线电能表和所述终端的工作状态时,将所述第一可调电流联板左移,处于连通所述第一通道和所述第二通道的位置,所述第二可调电流联板右移,处于连通所述第三通道和所述第四通道的位置,所述第三可调电流联板保持在所述初始位置处。When the three-phase three-wire combined junction box is in the working state of short-circuiting the three-phase three-wire electric energy meter and the terminal at the same time, move the first adjustable current connecting plate to the left to connect the first channel and the terminal. For the position of the second channel, the second adjustable current connecting plate moves to the right to be in a position connecting the third channel and the fourth channel, and the third adjustable current connecting plate remains at the initial location.
本发明提供的技术方案带来的有益效果是:The beneficial effects brought by the technical scheme provided by the invention are:
通过根据使用需求,对可调电流联板的位置进行调整,从而实现对电能表和终端的分别投切或者同时投切,以便满足不同的使用需求,防止出现更换终端的过程中无法对用电量进行计量的缺陷,提高了用户的使用体验。By adjusting the position of the adjustable current connection plate according to the usage requirements, the switching of the electric energy meter and the terminal can be realized separately or at the same time, so as to meet different usage requirements and prevent the failure of power consumption in the process of replacing the terminal. The defect of volume measurement improves the user experience.
附图说明Description of drawings
为了更清楚地说明本发明的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solution of the present invention more clearly, the accompanying drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. Ordinary technicians can also obtain other drawings based on these drawings on the premise of not paying creative work.
图1是本发明提供的三相三线联合接线盒在正常工作状态下的连接示意图;Fig. 1 is the connection schematic diagram of the three-phase three-wire combined junction box provided by the present invention under normal working condition;
图2是本发明提供的三相三线联合接线盒在第一短接工作状态下的连接示意图;Fig. 2 is a connection schematic diagram of the three-phase three-wire combined junction box provided by the present invention in the first short-circuit working state;
图3是本发明提供的三相三线联合接线盒在第二短接工作状态下的连接示意图;Fig. 3 is a connection schematic diagram of the three-phase three-wire combined junction box provided by the present invention in the second short-circuit working state;
图4是本发明提供的三相三线联合接线盒的使用流程示意图。Fig. 4 is a schematic flow diagram of the use of the three-phase three-wire combined junction box provided by the present invention.
具体实施方式detailed description
为使本发明的结构和优点更加清楚,下面将结合附图对本发明的结构作进一步地描述。In order to make the structure and advantages of the present invention clearer, the structure of the present invention will be further described below in conjunction with the accompanying drawings.
实施例一Embodiment one
本发明提供了三相三线联合接线盒,包括电压接线板和电流接线板,用于连接三相三线电能表和终端,在所述三相三线联合接线盒中设置有三个电压接线板,以及两个电流接线板;The invention provides a three-phase three-wire combined junction box, including a voltage terminal board and a current terminal board, used to connect a three-phase three-wire electric energy meter and a terminal, and three voltage terminal boards and two a current terminal board;
每个所述电压接线板设有双通道接线端子,每个所述电流接线板设有四通道接线端子,在所述双通道接线端子中的每个通道上均设置有电压联板,在所述四通道接线端子中设置有第一可调电流联板、第二可调电流联板、第三可调电流联板;Each of the voltage wiring boards is provided with a dual-channel terminal, each of the current terminal boards is provided with a four-channel terminal, and each channel of the dual-channel terminal is provided with a voltage connection board. The four-channel terminal is provided with a first adjustable current connection board, a second adjustable current connection board, and a third adjustable current connection board;
所述双通道接线端子中的第一通道接线端子与所述三相三线电能表第一计量元件中的第一端相连,所述双通道接线端子中的第二通道接线端子与所述终端第一计量元件中的第一端相连,所述四通道接线端子中的第一通道接线端子与所述三相三线电能表第一计量元件中的第二端相连,所述四通道接线端子中的第二通道接线端子与所述三相三线电能表第一计量元件中的第三端相连,所述四通道接线端子中的第三通道接线端子与所述终端第一计量元件中的第二端相连,所述四通道接线端子中的第四通道接线端子与所述终端第一计量元件中的第三端相连;The first channel connection terminal of the two-channel connection terminals is connected to the first end of the first metering element of the three-phase three-wire electric energy meter, and the second channel connection terminal of the two-channel connection terminals is connected to the first terminal of the terminal. The first terminal of a metering element is connected, the first channel terminal of the four-channel terminal is connected to the second terminal of the first metering element of the three-phase three-wire electric energy meter, and the first terminal of the four-channel terminal is The second channel connection terminal is connected to the third terminal in the first metering element of the three-phase three-wire electric energy meter, and the third channel connection terminal in the four-channel connection terminal is connected to the second terminal in the first metering element of the terminal connected, the fourth channel connection terminal in the four-channel connection terminal is connected to the third terminal in the first metering element of the terminal;
其中,所述第一可调电流联板、所述第二可调电流联板、所述第三可调电流联板均处于初始位置,并且所述第一可调电流联板、所述第二可调电流联板、所述第三可调电流联板呈相互平行的状态,所述初始位置为连通所述第二通道和所述第三通道的位置。Wherein, the first adjustable current connecting plate, the second adjustable current connecting plate, and the third adjustable current connecting plate are all in the initial position, and the first adjustable current connecting plate, the second adjustable current connecting plate The two adjustable current connecting plates and the third adjustable current connecting plate are parallel to each other, and the initial position is a position connecting the second channel and the third channel.
在实施中,为了解决在更换终端的时间段内无法对用户用电量进行计量的缺陷,本发明提供了三相三线联合接线盒,该联合接线盒的具体结构为:In practice, in order to solve the defect that the electricity consumption of the user cannot be measured during the period of terminal replacement, the present invention provides a three-phase three-wire combined junction box. The specific structure of the combined junction box is:
如图1所示,该三相三线联合接线盒中,设置有三个电压接线板1,在相邻的电压接线板1之间,设置有电流接线板2。该三相三线联合接线盒安装在端子排和电能表以及终端之间,该联合接线盒中的电压接线板1为双通道接线端子,从而能够同时连接三相三线电能表3和终端4,该联合接线盒中的电流接线板2为四通道接线端子,其中两个通道与三相三线电能表连接,另两个通道则与终端连接。As shown in FIG. 1 , three voltage terminal boards 1 are provided in the three-phase three-wire joint junction box, and current terminal boards 2 are provided between adjacent voltage terminal boards 1 . The three-phase three-wire combined junction box is installed between the terminal block, the electric energy meter and the terminal, and the voltage terminal block 1 in the combined junction box is a dual-channel terminal, so that the three-phase three-wire electric energy meter 3 and the terminal 4 can be connected at the same time. The current terminal board 2 in the combined junction box is a four-channel terminal block, two of which are connected to the three-phase three-wire electric energy meter, and the other two are connected to the terminal.
具体的,双通道接线端子中的第一通道11接线端子与三相三线电能表3第一计量元件中的第一端31相连,双通道接线端子中的第二通道12接线端子与终端4第一计量元件中的第一端41相连,四通道接线端子中的第一通道21接线端子与三相三线电能表3第一计量元件中的第二端32相连,四通道接线端子中的第二通道22接线端子与三相三线电能表3第一计量元件中的第三端33相连,四通道接线端子中的第三通道23接线端子与终端4第一计量元件中的第二端42相连,四通道接线端子中的第四通道24接线端子与终端4第一计量元件中的第三端43相连;Specifically, the first channel 11 terminal of the two-channel terminal is connected to the first end 31 of the first metering element of the three-phase three-wire electric energy meter 3, and the second channel 12 terminal of the two-channel terminal is connected to the terminal 4 and the first The first terminal 41 in a metering element is connected, the first channel 21 terminal in the four-channel terminal is connected with the second terminal 32 in the first metering element of the three-phase three-wire electric energy meter 3, and the second terminal in the four-channel terminal is The channel 22 connection terminal is connected to the third terminal 33 in the first metering element of the three-phase three-wire electric energy meter 3, and the third channel 23 connection terminal in the four-channel connection terminal is connected to the second terminal 42 in the first metering element of the terminal 4, The fourth passage 24 connection terminal in the four-channel connection terminal is connected to the third terminal 43 in the first metering element of the terminal 4;
其中,第一可调电流联板5、第二可调电流联板6、第三可调电流联板7均处于初始位置,并且第一可调电流联板5、第二可调电流联板6、第三可调电流联板7呈相互平行的状态,初始位置为连通第二通道22和第三通道23的位置。Wherein, the first adjustable current connecting plate 5, the second adjustable current connecting plate 6, and the third adjustable current connecting plate 7 are all in the initial position, and the first adjustable current connecting plate 5, the second adjustable current connecting plate 6. The third adjustable current connecting plates 7 are parallel to each other, and the initial position is the position where the second channel 22 and the third channel 23 are connected.
下文将根据该联合接线盒使用状态的不同,分三种情况进行描述。为了使附图连线清晰,附图中的连线仅仅绘出三相电压中的A相。The following description will be divided into three situations according to the different usage states of the combined junction box. In order to make the wiring in the drawing clear, the wiring in the drawing only draws phase A in the three-phase voltage.
(1)当三相三线联合接线盒处于正常工作状态时,第一可调电流联板、第二可调电流联板、第三可调电流联板均处于初始位置。(1) When the three-phase three-wire combined junction box is in a normal working state, the first adjustable current connection board, the second adjustable current connection board, and the third adjustable current connection board are all in the initial position.
如图1所示,当第一可调电流联板5、第二可调电流联板6、第三可调电流联板7均处于初始位置时,基于上述连接关系,三相三线电能表3能够对终端4的用电量进行计量。As shown in Figure 1, when the first adjustable current connecting plate 5, the second adjustable current connecting plate 6, and the third adjustable current connecting plate 7 are all in the initial position, based on the above connection relationship, the three-phase three-wire electric energy meter 3 The power consumption of the terminal 4 can be measured.
(2)当三相三线联合接线盒处于第一短接工作状态时,第一可调电流联板5、第三可调电流联板7均处于初始位置,第二可调电流联板6处于连通第三通道23和第四通道24的位置。从图2的信号流向箭头中可以看出,三相三线电能表3和终端4均被连入电路中不存在二者被短接的情况。(2) When the three-phase three-wire combined junction box is in the first short-circuit working state, the first adjustable current connecting plate 5 and the third adjustable current connecting plate 7 are in the initial position, and the second adjustable current connecting plate 6 is in the initial position. It communicates with the position of the third channel 23 and the fourth channel 24 . It can be seen from the signal flow arrows in Fig. 2 that the three-phase three-wire electric energy meter 3 and the terminal 4 are both connected into the circuit and there is no short circuit between them.
如图2所示,需要对终端4进行短接时,在前一种情况的基础上,将第二可调电流联板6向右侧移动,即从初始位置中连通第二通道22和第三通道23的位置,改为连通第三通道和第四通道的位置,这样从图3中的信号流向箭头可以看出,通过第二可调电流联板6的移动,使得终端4中没有电流的流动,实现了将终端短接的效果。As shown in Figure 2, when the terminal 4 needs to be short-circuited, on the basis of the previous situation, the second adjustable current connecting plate 6 is moved to the right, that is, the second channel 22 and the second channel 22 are connected from the initial position. The position of the three channels 23 is changed to the position connecting the third channel and the fourth channel, so that it can be seen from the signal flow arrows in Fig. 3 that the movement of the second adjustable current connecting plate 6 causes no current in the terminal 4 The flow realizes the effect of short-circuiting the terminals.
(3)当三相三线联合接线盒处于第二短接工作状态时,第三可调电流联板7处于初始位置,第一可调电流联板5处于连通第一通道21和第二通道22的位置,第二可调电流联板6处于连通第三通道23和第四通道24的位置。(3) When the three-phase three-wire combined junction box is in the second short-circuit working state, the third adjustable current connecting plate 7 is in the initial position, and the first adjustable current connecting plate 5 is in the connection between the first channel 21 and the second channel 22 position, the second adjustable current connecting plate 6 is in a position communicating with the third channel 23 and the fourth channel 24 .
如图3所示,需要对三相三线电能表3和终端4同时进行短接时,在前一种情况的基础上,再将第一可调电流联板5向左移动,即从初始位置连通第二通道23和第三通道23的位置,改为连通第一通道和第二通道的位置,此时,第二可调电流联板6依然处于连通第三通道23和第四通道24的位置,这样从图4中的信号流向箭头可以看出,通过第一可调电流联板5、第二可调电流联板6的移动,使得三相三线电能表3和终端4中没有电流的流动,实现了将终端短接的效果。As shown in Figure 3, when it is necessary to short-circuit the three-phase three-wire electric energy meter 3 and the terminal 4 at the same time, on the basis of the previous situation, the first adjustable current connecting plate 5 is moved to the left, that is, from the initial position Connect the position of the second passage 23 and the third passage 23 to the position of connecting the first passage and the second passage. At this time, the second adjustable current connecting plate 6 is still in the position of connecting the third passage 23 and the fourth passage 24. In this way, it can be seen from the signal flow arrows in Figure 4 that through the movement of the first adjustable current connecting plate 5 and the second adjustable current connecting plate 6, there is no current in the three-phase three-wire electric energy meter 3 and the terminal 4 The flow realizes the effect of short-circuiting the terminals.
基于前文提出的能够根据工作状态将可调电流联板进行位置移动的三相三线联合接线盒,如图4所示,该接线盒的使用方法为:Based on the three-phase three-wire combined junction box proposed above that can move the adjustable current connection board according to the working state, as shown in Figure 4, the usage method of the junction box is as follows:
41、当三相三线联合接线盒处于正常工作状态时,将第一可调电流联板、第二可调电流联板以及第三可调电流联板移动至初始位置。41. When the three-phase three-wire combined junction box is in a normal working state, move the first adjustable current connecting board, the second adjustable current connecting board and the third adjustable current connecting board to the initial position.
42、当三相三线联合接线盒处于短接终端的工作状态时,将第二可调电流联板右移,处于连通第三通道和第四通道的位置,第一可调电流联板、第三可调电流联板的位置保持在初始位置处。42. When the three-phase three-wire combined junction box is in the working state of short-circuiting the terminal, move the second adjustable current connecting plate to the right, and it is in the position connecting the third channel and the fourth channel. The first adjustable current connecting plate, the second The position of the three adjustable current coupling plates remains at the initial position.
43、当三相三线联合接线盒处于同时短接三相三线电能表和终端的工作状态时,将第一可调电流联板左移,处于连通第一通道和第二通道的位置,第二可调电流联板右移,处于连通第三通道和第四通道的位置,第三可调电流联板保持在初始位置处。43. When the three-phase three-wire combined junction box is in the working state of short-circuiting the three-phase three-wire electric energy meter and the terminal at the same time, move the first adjustable current connecting plate to the left to be in the position connecting the first channel and the second channel, and the second The adjustable current connecting plate moves to the right to be in the position connecting the third channel and the fourth channel, and the third adjustable current connecting plate remains at the initial position.
本发明提供了三相三线联合接线盒,包括电压接线板和电流接线板,在三相三线联合接线盒中设置有三个电压接线板,以及两个电流接线板,每个电压接线板设有双通道接线端子,每个电流接线板设有四通道接线端子,在双通道接线端子中的每个通道上均设置有电压联板,在四通道接线端子中设置有三个可调电流联板。通过根据使用需求,对可调电流联板的位置进行调整,从而实现对电能表和终端的分别投切或者同时投切,以便满足不同的使用需求,防止出现更换终端的过程中无法对用电量进行计量的缺陷,提高了用户的使用体验。The invention provides a three-phase three-wire joint junction box, including a voltage junction board and a current junction board, three voltage junction boards and two current junction boards are arranged in the three-phase three-wire joint junction box, each voltage junction board is provided with two Channel connection terminals, each current connection board is provided with four-channel connection terminals, each channel in the dual-channel connection terminals is provided with a voltage connection board, and three adjustable current connection boards are provided in the four-channel connection terminals. By adjusting the position of the adjustable current connection plate according to the usage requirements, the switching of the electric energy meter and the terminal can be realized separately or at the same time, so as to meet different usage requirements and prevent the failure of power consumption in the process of replacing the terminal. The defect of volume measurement improves the user experience.
上述实施例中的各个序号仅仅为了描述,不代表各部件的组装或使用过程中的先后顺序。The serial numbers in the above embodiments are for description only, and do not represent the sequence of the components during assembly or use.
以上所述仅为本发明的实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above description is only an embodiment of the present invention, and is not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention Inside.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610308081.0A CN105896423A (en) | 2016-05-10 | 2016-05-10 | Three-phase three-wire combined terminal box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610308081.0A CN105896423A (en) | 2016-05-10 | 2016-05-10 | Three-phase three-wire combined terminal box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105896423A true CN105896423A (en) | 2016-08-24 |
Family
ID=56702554
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610308081.0A Pending CN105896423A (en) | 2016-05-10 | 2016-05-10 | Three-phase three-wire combined terminal box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105896423A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106786265A (en) * | 2017-02-14 | 2017-05-31 | 邹文峰 | Multifunctional combined terminal box |
CN107345976A (en) * | 2017-09-07 | 2017-11-14 | 贵州电网有限责任公司 | A kind of metering secondary terminal box |
CN111509639A (en) * | 2020-04-24 | 2020-08-07 | 贵州电网有限责任公司 | Safe and reliable's three-phase four-wire terminal box |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2700894Y (en) * | 2004-04-26 | 2005-05-18 | 刘益勇 | Electrical energy metering junction box |
CN102798743A (en) * | 2012-08-29 | 2012-11-28 | 重庆市电力公司电力科学研究院 | Wiring terminal box for electric energy meter |
CN203732582U (en) * | 2014-01-26 | 2014-07-23 | 浙江盛锋成套电气有限公司 | Three-phase electric energy meter junction box |
CN203894291U (en) * | 2014-04-10 | 2014-10-22 | 国家电网公司 | Electric energy metering combined conjunction box |
CN204556692U (en) * | 2015-05-06 | 2015-08-12 | 广东电网有限责任公司江门供电局 | Multiple way electric metering junction box |
CN105487039A (en) * | 2015-11-19 | 2016-04-13 | 国家电网公司 | Conjunction box without power loss during replacement |
CN205583587U (en) * | 2016-05-10 | 2016-09-14 | 国网浙江省电力公司湖州供电公司 | Three-phase three-wire combined junction box |
-
2016
- 2016-05-10 CN CN201610308081.0A patent/CN105896423A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2700894Y (en) * | 2004-04-26 | 2005-05-18 | 刘益勇 | Electrical energy metering junction box |
CN102798743A (en) * | 2012-08-29 | 2012-11-28 | 重庆市电力公司电力科学研究院 | Wiring terminal box for electric energy meter |
CN203732582U (en) * | 2014-01-26 | 2014-07-23 | 浙江盛锋成套电气有限公司 | Three-phase electric energy meter junction box |
CN203894291U (en) * | 2014-04-10 | 2014-10-22 | 国家电网公司 | Electric energy metering combined conjunction box |
CN204556692U (en) * | 2015-05-06 | 2015-08-12 | 广东电网有限责任公司江门供电局 | Multiple way electric metering junction box |
CN105487039A (en) * | 2015-11-19 | 2016-04-13 | 国家电网公司 | Conjunction box without power loss during replacement |
CN205583587U (en) * | 2016-05-10 | 2016-09-14 | 国网浙江省电力公司湖州供电公司 | Three-phase three-wire combined junction box |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106786265A (en) * | 2017-02-14 | 2017-05-31 | 邹文峰 | Multifunctional combined terminal box |
CN107345976A (en) * | 2017-09-07 | 2017-11-14 | 贵州电网有限责任公司 | A kind of metering secondary terminal box |
CN111509639A (en) * | 2020-04-24 | 2020-08-07 | 贵州电网有限责任公司 | Safe and reliable's three-phase four-wire terminal box |
CN111509639B (en) * | 2020-04-24 | 2021-04-06 | 贵州电网有限责任公司 | Safe and reliable's three-phase four-wire terminal box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204556692U (en) | Multiple way electric metering junction box | |
CN211296072U (en) | A junction box that realizes seamless measurement of electric energy meter replacement | |
CN103640597B (en) | A kind of two get two continuous exchange of track circuit and method of inspection thereof | |
CN203479934U (en) | Vehicle-mounted integrated testing system for transformer | |
CA2784338A1 (en) | Wiring tester of multifunctional electric energy metering device | |
CN105896423A (en) | Three-phase three-wire combined terminal box | |
CN102931661B (en) | Alternating-current distribution method and power supply wiring device compatible to various power grid patterns | |
CN203025343U (en) | Compound type intelligent terminal junction device | |
CN203811656U (en) | A combined junction box for electric energy metering | |
CN105891566A (en) | Three-phase four-wire combined terminal box | |
CN205594047U (en) | Terminal box is united to three -phase four -wire | |
CN205583587U (en) | Three-phase three-wire combined junction box | |
CN204028161U (en) | A kind of current sample composite structure resisting strong magnetic for electric energy meter | |
CN204649874U (en) | A kind of platform district line loss is abnormal checks instrument | |
CN105510714A (en) | Intelligent substation pressure transmitter secondary automatic phase tester | |
CN210294366U (en) | Two-in and two-out combined junction box | |
CN202997335U (en) | Ring network cabinet | |
CN203337814U (en) | Energy meter wiring device | |
CN207516534U (en) | A kind of transformer station direct current system punching current transformer, which does not have a power failure, replaces capacity checking device | |
CN205911811U (en) | A multi-channel intelligent maintenance auxiliary power supply system for EMUs | |
CN205301429U (en) | Intelligent substation presses and becomes automatic nuclear phase ware of secondary | |
CN209707554U (en) | It exchanges prepared auto restart and switches debugging apparatus | |
CN203705633U (en) | An electric energy meter test junction box | |
CN209401205U (en) | High-supply high-count fault simulation device | |
CN201828639U (en) | Signal cable insulation testing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160824 |