[go: up one dir, main page]

CN105887620A - Pervious area system and laying method - Google Patents

Pervious area system and laying method Download PDF

Info

Publication number
CN105887620A
CN105887620A CN201610205940.3A CN201610205940A CN105887620A CN 105887620 A CN105887620 A CN 105887620A CN 201610205940 A CN201610205940 A CN 201610205940A CN 105887620 A CN105887620 A CN 105887620A
Authority
CN
China
Prior art keywords
permeable
pervious
water
bar
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610205940.3A
Other languages
Chinese (zh)
Inventor
胡俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renchuang ecological environmental protection Polytron Technologies Inc
Original Assignee
Suzhou Lejuyitang Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Lejuyitang Electronic Technology Co Ltd filed Critical Suzhou Lejuyitang Electronic Technology Co Ltd
Priority to CN201610205940.3A priority Critical patent/CN105887620A/en
Publication of CN105887620A publication Critical patent/CN105887620A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/04Pavings made of prefabricated single units made of bricks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention provides a pervious area system which comprises a pervious base layer. A plurality of pervious bricks which are spliced are arranged on the upper face of the pervious base layer. Gaps are formed between every two adjacent pervious bricks. A clamping base is arranged at the lower portion of each gap. A pervious strip is clamped on each clamping base and is made from micropore elastic pervious material. The upper surfaces of the pervious strips are lower than the upper surfaces of the pervious bricks. By means of the pervious area system, downward water seepage is achieved through the pervious bricks and the pervious strips at the same time, and the pervious strips are made from micropore elastic pervious material and are pervious and not prone to blockage. It is well known that the upper surfaces of the pervious bricks will be blocked sooner or later, however the pervious strips can be conveniently replaced after ageing or blocking, so the service life of the whole pervious area system is prolonged.

Description

A kind of pervious surface system and method for paving
Technical field
The present invention relates to road pavement technical field, especially relate to a kind of pervious surface system and method for paving.
Background technology
Along with the development of urban construction, non-pervious surface decoration area is increasing, and environment is severely impacted, Urban Thermal The phenomenons such as island effect, flood, depletion of groundwater are on the rise.Therefore, urban water-through ground is increased extremely urgent, permeable pottery The products such as ceramic tile, pervious concrete brick, sand base water-permeable brick arise at the historic moment.
But, owing to current city environmental pollution is more serious, dust and other particulate matters are more, and that newly lays is various Though water brick has comparatively ideal permeable effect, after a period of time, the particulate matter such as foreign material and dust is easy to permeable hole dirty Dye blocking, permeable hole is difficult to clear up, and water permeable ability drastically declines.After a lot of pervious surface one-year ages, water permeable ability is only About 10%, almost lose pervious function.
Summary of the invention
It is an object of the invention to provide a kind of pervious surface system and method for paving, to solve present in prior art The technical problem that pervious surface is of serious failure after using a period of time.
For achieving the above object, the present invention provides a kind of pervious surface system, including porous base course, described porous base course Being arranged above with multiple water-permeable brick, have gap, bottom, gap to be provided with deck between water-permeable brick, described deck includes pedestal and snap fit, Described pedestal is pressed in below adjacent described water-permeable brick, and described snap fit is clipped between two pieces of described water-permeable bricks, described snap fit top Card sets permeable bar;The upper surface of described permeable bar is less than the upper surface of described water-permeable brick.
Described water-permeable brick is made up of the seepy material possessing pore structure;Described permeable bar is made up of elastic materials with voids.
During use, the hole on water-permeable brick surface is the least, is less susceptible to blocking.But the surface impurity of water-permeable brick is the most at last Block all of hole.In normal maintenance, typically can regularly replace permeable bar, permeable bar itself possesses micropore, permissible Filtering surface impurity is the most permeable.
Further, the one during described water-permeable brick is pervious concrete brick, permeable Ceramic Tiles, sand base water-permeable brick.
Further, the material of described permeable bar includes Nano titanium dioxide, or surface scribbles nanoscale dioxy Change titanium.
Further, the material of described permeable bar includes nanometer level silver oxide, or surface scribbles nanometer level silver oxide.
Further, the one during the material of described porous base course is at least sandstone compound, pervious concrete.For thoroughly Water-base has certain load-bearing requirements, and non-driving ground need not pour, and load-bearing requirements is relatively low, and sandstone can be used to mix Closing material etc. to constitute, on driving ground, then porous base course can pour with the pervious concrete of respective strengths grade, or first lays sandstone Compound pours pervious concrete again, then, lays water-permeable brick, deck and permeable bar on pervious concrete.
Further, the permeable bar that the pervious surface system that the present invention provides is used adds or surface the most in the material Scribble Nano titanium dioxide (TiO2), titanium dioxide is under the irradiation of light or produces similar photosynthetic light-catalyzed reaction, Produce the extremely strong free hydroxy of oxidability and active oxygen, there is the strongest photoredox function, classification can be aoxidized Various organic compound and part inorganic matter, thus can the dirt of gap resolve into free of contamination by covering on permeable bar surface Water and titanium dioxide, possess self-cleaning ability.
Further, the permeable bar that the pervious surface system that the present invention provides is used adds or surface the most in the material Scribbling nanometer level silver oxide, nanometer level silver oxide has the strongest long-acting bactericidal effect, makes the antibacterial cannot be on the surface of permeable bar Existence, it is to avoid some diseases produces.
Further, the cross sectional shape of described permeable bar matches with the cross sectional shape of described snap fit.
The present invention also provides for the method for paving of a kind of pervious surface system, it is characterised in that comprise the following steps:
Porous base course is laid on concrete on the ground of compacting or with surge tank;
Described porous base course arranges water-permeable brick, at bottom, the gap installed cassette of adjacent described water-permeable brick, will card The pedestal of seat is pressed under adjacent water-permeable brick, is clipped between adjacent water-permeable brick by the snap fit of deck;
Installing permeable bar in gap, permeable bar spacing card is located on the snap fit of described deck.
In use, impurity can filter stays surface to a kind of pervious surface system that the present invention provides, and water can flow through Water-permeable brick and permeable bar, and porous base course has permeable ability, water continues to flow through porous base course, flow ultimately in soil or Flowed in gutter by surge tank.
All of pervious surface system, all cannot avoid the phenomenon that water-permeable brick is blocked by dust, but the use present invention's is saturating Water ground system can keep the water penetration in gap by regularly cleaning or replacing permeable bar.Because permeable bar surface is less than thoroughly Water brick surface, so will not being trampled and strongly being filled in mud, after the most permeable bar is aging, additionally it is possible to pull out replacing easily, Summing up above two, it is low that this pervious surface system has maintenance cost, the feature that service life is longer.
Relative to prior art, the method for paving of the pervious surface system that the present invention provides, make in advance because employing Deck, it is possible to accurately ensure the width in gap, additionally it is possible to save and mat formation the time.
Accompanying drawing explanation
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art, below will be to specifically In embodiment or description of the prior art, the required accompanying drawing used is briefly described, it should be apparent that, in describing below Accompanying drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not paying creative work Put, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
The schematic cross-section of a kind of pervious surface system that Fig. 1 provides for first embodiment of the invention;
The schematic diagram do not installed before permeable bar of a kind of pervious surface system that Fig. 2 provides for first embodiment of the invention;
The deck schematic diagram of a kind of pervious surface system that Fig. 3 provides for first embodiment of the invention;
The permeable bar schematic diagram of a kind of pervious surface system that Fig. 4 provides for first embodiment of the invention;
The top view of a kind of pervious surface system that Fig. 5 provides for second embodiment of the invention;
Fig. 6 does not installs the schematic diagram before permeable bar for a kind of pervious surface system that second embodiment of the invention provides;
The deck schematic diagram of a kind of pervious surface system that Fig. 7 provides for second embodiment of the invention;
The permeable bar schematic diagram of a kind of pervious surface system that Fig. 8 provides for second embodiment of the invention;
The top view of a kind of pervious surface system that Fig. 9 provides for third embodiment of the invention;
Figure 10 does not installs the schematic diagram before permeable bar for a kind of pervious surface system that third embodiment of the invention provides;
The deck schematic diagram of a kind of pervious surface system that Figure 11 provides for third embodiment of the invention;
The permeable bar schematic diagram of a kind of pervious surface system that Figure 12 provides for third embodiment of the invention;
The FB(flow block) of the method for paving of a kind of pervious surface that Figure 13 provides for fourth embodiment of the invention.
Reference
1-porous base course;2-water-permeable brick;3-deck;31-pedestal;32-snap fit;The permeable bar of 4-.
Detailed description of the invention
Below in conjunction with accompanying drawing, technical scheme is clearly and completely described, it is clear that described enforcement Example is a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill The every other embodiment that personnel are obtained under not making creative work premise, broadly falls into the scope of protection of the invention.
In describing the invention, it should be noted that term " " center ", " on ", D score, "left", "right", " vertically ", Orientation or the position relationship of the instruction such as " level ", " interior ", " outward " they are based on orientation shown in the drawings or position relationship, merely to Be easy to describe the present invention and simplifying describe rather than instruction or the hint device of indication or element must have specific orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.Additionally, term " first ", " second ", " the 3rd " is only used for describing purpose, and it is not intended that indicate or hint relative importance.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " is installed ", " phase Even ", " connection " should be interpreted broadly, for example, it may be fixing connection, it is also possible to be to removably connect, or be integrally connected;Can To be mechanical connection, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi The connection of two element internals.For the ordinary skill in the art, can understand that above-mentioned term is at this with concrete condition Concrete meaning in invention.
First embodiment
The schematic cross-section of a kind of pervious surface system 100 that Fig. 1 provides for the embodiment of the present invention.As it is shown in figure 1, this reality Execute a kind of pervious surface system that example provides, including porous base course 1, two pieces of water-permeable bricks 2, a deck 3, and a permeable bar 4.The upper surface of permeable bar 4 is less than the upper surface of water-permeable brick 2, say, that can be formed in the surface of permeable bar 4 one shallow Groove.
Viewed from above, it is impossible to see deck 3 and porous base course 1, can only see the permeable bar 4 of water-permeable brick 2 and its gap location, The bottom of permeable bar 4 is fastened on deck 3.
As shown in Figures 2 and 3, deck 3 has two pedestals 31 being positioned at both sides, also two snap fits 32, and pedestal 31 is the thinnest, Being pressed between water-permeable brick and porous base course, two snap fits 32 inwardly have card to set structure.It is understood that in other embodiments In, deck 3 can also only one of which snap fit 32, as long as permeable bar 4 above can be played card by it sets fixation.
As shown in Figure 4, the spatial form coupling between cross sectional shape and two snap fits 32 of permeable bar 4 is permissible during installation Permeable bar 4 is fastened on wherein, aging at permeable bar 4, it is also possible to pull-out is replaced.
It is understood that deck 3 is spaced, its interval is arranged between adjacent water-permeable brick, and permeable bar 4 is Strip is arranged, and is laid in the gap of all water-permeable bricks, and below permeable bar 4, big many places are empty, there is no deck 3, deck 3 Simply permeable bar 4 is played card and sets fixation by interval.
A kind of pervious surface system that the present invention provides, in use, impurity rests on water-permeable brick 2 to this pervious surface system With permeable bar 4 surface, water flows in porous base course 1 by water-permeable brick 2 and permeable bar 4, flows ultimately in soil or by falling Tank flows in gutter.
The permeable bar 4 that the pervious surface system that the present invention provides is used adds the most in the material or surface scribbles nanometer Grade titanium dioxide (TiO2), titanium dioxide is under the irradiation of light or produces similar photosynthetic light-catalyzed reaction, produces oxygen Change very competent free hydroxy and active oxygen, there is the strongest photoredox function, classification can be aoxidized various organic Compound and part inorganic matter, thus the dirt of gap can resolve into free of contamination water and dioxy by covering on permeable bar surface Change titanium, possess self-cleaning ability.
The permeable bar 4 that the pervious surface system that the present invention provides is used adds the most in the material or surface scribbles nanometer Level silver oxide, nanometer level silver oxide has the strongest long-acting bactericidal effect, makes antibacterial cannot survive on the surface of permeable bar 3, keeps away Exempt from some diseases to produce.
All of pervious surface system, all cannot avoid the phenomenon that water-permeable brick 2 is blocked by dust, but the use present invention's is saturating Water ground system can keep the water penetration in gap by regularly cleaning or replacing permeable bar 4.Because the surface of permeable bar 4 is low In the surface of water-permeable brick 2, so will not being trampled and strongly filling in mud, the most permeable bar 4 can also pull out replacing easily, Summing up above two, it is low that this pervious surface system has maintenance cost, the feature that service life is longer.
Second embodiment
The top view of a kind of pervious surface system 200 that Fig. 5 provides for the embodiment of the present invention.The present embodiment and first is implemented Example is similar to, and except for the difference that, it designates the splicing situation of three pieces of water-permeable bricks.
As it is shown in figure 5, a kind of pervious surface system that the present embodiment provides, including porous base course 1, three pieces of water-permeable bricks 2, one Individual deck 3, and a permeable bar 4.The upper surface of permeable bar 4 is less than the upper surface of water-permeable brick 2, say, that at permeable bar 4 Surface can form a shallow slot.
As it is shown in figure 5, viewed from above, it is impossible to see deck 3 and porous base course 1, can only see water-permeable brick 2 and its gap location Permeable bar 4, the bottom of permeable bar 4 is fastened on deck 3.
As shown in Figure 6 and Figure 7, deck 3 has two pedestals 31 being positioned at both sides, also two snap fits 32, and pedestal 31 is the thinnest, Being pressed between water-permeable brick and porous base course, two snap fits 32 inwardly have card to set structure.Deck 3 in the present embodiment is also equipped with T-shaped Trifid structure.
As shown in Figure 8, the gap shape coupling between cross sectional shape and two snap fits 32 of permeable bar 4 is permissible during installation Permeable bar 4 is fastened on wherein, replacement can be pulled out after permeable bar 4 is aging.In the present embodiment, permeable bar 4 is that one becomes The T-shaped bifurcation structure of type.
A kind of pervious surface system that the present invention provides, in use, impurity rests on water-permeable brick 2 to this pervious surface system With permeable bar 4 surface, water flows in porous base course 1 by water-permeable brick 2 and permeable bar 4, flows ultimately in soil or by falling Tank flows in gutter.
All of pervious surface system, all cannot avoid the phenomenon that water-permeable brick 2 is blocked by dust, but the use present invention's is saturating Water ground system can keep the water penetration in gap by regularly cleaning or replacing permeable bar 4.Because the surface of permeable bar 4 is low In the surface of water-permeable brick 2, so will not being trampled and strongly filling in mud, the most permeable bar 4 can also pull out replacing easily, Summing up above two, it is low that this pervious surface system has maintenance cost, the feature that service life is longer.
3rd embodiment
The top view of a kind of pervious surface system 300 that Fig. 9 provides for the embodiment of the present invention.The present embodiment and first is implemented Example is similar to, and except for the difference that, it designates the splicing situation of four pieces of water-permeable bricks.
As it is shown in figure 9, a kind of pervious surface system that the present embodiment provides, including porous base course 1, four pieces of water-permeable bricks 2, one Individual deck 3, and a permeable bar 4.The upper surface of permeable bar 4 is less than the upper surface of water-permeable brick 2, say, that at permeable bar 4 Surface can form a shallow slot.
As it is shown in figure 9, viewed from above, it is impossible to see deck 3 and porous base course 1, can only see water-permeable brick 2 and its gap location Permeable bar 4, the bottom of permeable bar 4 is fastened on deck 3.
As shown in Figure 10 and Figure 11, deck 3 has two pedestals 31 being positioned at both sides, and also two snap fits 32, pedestal 31 is very Thin, it is pressed between water-permeable brick and porous base course, two snap fits 32 inwardly have card to set structure.Deck 3 in the present embodiment is also equipped with Criss-cross construction.
As shown in figure 12, the gap shape coupling between cross sectional shape and two snap fits 32 of permeable bar 4 is permissible during installation Permeable bar 4 is fastened on wherein, it is also possible to after permeable bar 4 is aging, pull out replacement.In the present embodiment, permeable bar 4 is one The criss-cross construction of molding.
A kind of pervious surface system that the present invention provides, in use, impurity rests on water-permeable brick 2 to this pervious surface system With permeable bar 4 surface, water flows in porous base course 1 by water-permeable brick 2 and permeable bar 4, flows ultimately in soil or by falling Tank flows in gutter.
All of pervious surface system, all cannot avoid the phenomenon that water-permeable brick 2 is blocked by dust, but the use present invention's is saturating Water ground system can keep the water penetration in gap by regularly cleaning or replacing permeable bar 4.Because the surface of permeable bar 4 is low In the surface of water-permeable brick 2, so will not being trampled and strongly filling in mud, the most permeable bar 4 can also pull out replacing easily, Summing up above two, it is low that this pervious surface system has maintenance cost, the feature that service life is longer.
4th embodiment
Such as Figure 13, fourth embodiment of the invention also provides for the method for paving of a kind of pervious surface, comprises the following steps:
Porous base course is laid on concrete on the ground of compacting or with surge tank;Porous base course is according to weighted design Requirement decides whether to use pervious concrete to pour;
Arranging water-permeable brick on described porous base course, the thickness of water-permeable brick is 60-100mm, adjacent described water-permeable brick it Between preset clearance;At reserved bottom, described gap installed cassette, the pedestal of deck is pressed in below adjacent water-permeable brick, the card of deck Hook is clipped between adjacent water-permeable brick;
Installing permeable bar in described gap, permeable interspace is fastened on the snap fit of described deck.
A kind of method for paving of the pervious surface of the present invention, because needing installed cassette in the gap of adjacent water-permeable brick, so Gap between specification water-permeable brick, has been also convenient for the laying of water-permeable brick.Use the method for paving of the pervious surface of the present invention, its Pervious surface gap is fixed, and direction is consistent, and height is unified.
Mat formation actual, the upper surface 2-10mm lower than the upper surface of water-permeable brick of permeable bar;Width between water-permeable brick For 5-15mm, gap is unsuitable wide, and as at pavement, narrower gap, it can be avoided that pedestrian directly tramples on permeable bar, drops The low probability trampled, increases the comfort of walking.
Permeable bar is fastened on deck, is not easy deformation and tilts under general case, but in the maintenance in later stage, permeable Bar can individually be strongly pulled out replacing.
Last it is noted that various embodiments above is only in order to illustrate technical scheme, it is not intended to limit;To the greatest extent The present invention has been described in detail by pipe with reference to foregoing embodiments, it will be understood by those within the art that: it depends on So the technical scheme described in foregoing embodiments can be modified, or the most some or all of technical characteristic is entered Row equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology The scope of scheme.

Claims (8)

1. a pervious surface system, it is characterised in that include porous base course, being arranged above with of described porous base course is multiple permeable Brick;Being provided with gap between adjacent water-permeable brick, bottom, gap is provided with deck, and described deck includes pedestal and snap fit, described pedestal Being pressed in below adjacent water-permeable brick, described snap fit is clipped between adjacent water-permeable brick, and described snap fit top card sets permeable bar;Described Permeable bar is made up of microcellular elastomeric seepy material, and the upper surface of described permeable bar is less than the upper surface of described water-permeable brick.
Pervious surface system the most according to claim 1, it is characterised in that described water-permeable brick is pervious concrete brick, thoroughly One of ceramic water brick, sand base water-permeable brick.
Pervious surface system the most according to claim 1, it is characterised in that the material of described permeable bar is permeable rubber, And including hydrophilic high mol composition.
Pervious surface system the most according to claim 1, it is characterised in that the material of described permeable bar includes nanoscale Titanium dioxide;Or the surface of described permeable bar scribbles Nano titanium dioxide.
Pervious surface system the most according to claim 1, it is characterised in that the material of described permeable bar includes nanoscale Silver oxide;Or the surface of described permeable bar scribbles nanometer level silver oxide.
Pervious surface system the most according to claim 1, it is characterised in that the cross sectional shape of described permeable bar and described card The cross sectional shape hooked matches.
Pervious surface system the most according to claim 1, it is characterised in that the material of described porous base course is at least sandstone One in compound, pervious concrete.
8. the method for paving of a pervious surface system, it is characterised in that comprise the following steps:
Porous base course is laid on concrete on the ground of compacting or with surge tank;
Arranging water-permeable brick on described porous base course, bottom, the gap installed cassette of adjacent described water-permeable brick, by described deck Pedestal be pressed between adjacent water-permeable brick, the snap fit of described deck is clipped between adjacent water-permeable brick;
Installing permeable bar in described gap, permeable bar spacing card is located on the snap fit of described deck.
CN201610205940.3A 2016-04-05 2016-04-05 Pervious area system and laying method Pending CN105887620A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610205940.3A CN105887620A (en) 2016-04-05 2016-04-05 Pervious area system and laying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610205940.3A CN105887620A (en) 2016-04-05 2016-04-05 Pervious area system and laying method

Publications (1)

Publication Number Publication Date
CN105887620A true CN105887620A (en) 2016-08-24

Family

ID=57012132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610205940.3A Pending CN105887620A (en) 2016-04-05 2016-04-05 Pervious area system and laying method

Country Status (1)

Country Link
CN (1) CN105887620A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259009A (en) * 2019-06-27 2019-09-20 苏州美瑞德建筑装饰有限公司 A kind of quick attachment pedestal of ceramic thin plate
CN110510996A (en) * 2019-09-24 2019-11-29 中电建路桥集团有限公司 A kind of high water-permeable brick of ceramic base and high porous pavement system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1217039A (en) * 1996-04-24 1999-05-19 格哈德·弗莱施哈克 Floor Paving System
CN101445340A (en) * 2008-12-30 2009-06-03 程卫国 Self-cleaning water permeable brick and preparation method thereof
CN104727201A (en) * 2015-03-20 2015-06-24 吕国兵 Water-permeable ground system and pavement method
CN105155389A (en) * 2015-08-27 2015-12-16 泉州师范学院 Sewage interception water-permeable brick

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1217039A (en) * 1996-04-24 1999-05-19 格哈德·弗莱施哈克 Floor Paving System
CN101445340A (en) * 2008-12-30 2009-06-03 程卫国 Self-cleaning water permeable brick and preparation method thereof
CN104727201A (en) * 2015-03-20 2015-06-24 吕国兵 Water-permeable ground system and pavement method
CN105155389A (en) * 2015-08-27 2015-12-16 泉州师范学院 Sewage interception water-permeable brick

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110259009A (en) * 2019-06-27 2019-09-20 苏州美瑞德建筑装饰有限公司 A kind of quick attachment pedestal of ceramic thin plate
CN110259009B (en) * 2019-06-27 2024-05-28 苏州美瑞德建筑装饰有限公司 Quick mounting base of ceramic sheet
CN110510996A (en) * 2019-09-24 2019-11-29 中电建路桥集团有限公司 A kind of high water-permeable brick of ceramic base and high porous pavement system and method

Similar Documents

Publication Publication Date Title
CN104727201B (en) A kind of pervious surface system and method for paving
CN105821737A (en) Water permeable ground system and paving method
JPS59213803A (en) Pavement support standard and pavement block leveling tool
CN105821736A (en) Water permeable ground system and paving method
CN208072199U (en) Municipal pedestrian way of bridge infiltration drainage system
CN105887620A (en) Pervious area system and laying method
CN107299592B (en) Grouting bridge for filter underdrain block
CN105862547A (en) Water-permeable floor system and paving method
CN106758636B (en) Permeable pavement belt convenient for maintenance of permeable pavement and permeable pavement
CN210797161U (en) Municipal administration pavement ceramic tile
KR100945254B1 (en) Unclogging surface filtering elastic paving for non-point source pollution management with constant thickness
KR20170143279A (en) Water permeable block assembly, water permeable system having this and construction method thereof
CN105862546A (en) Pavement brick
KR20170001078U (en) Manhole cover
CN204551177U (en) A kind of pervious surface system
CN207062668U (en) A kind of permeable pavement structure
CN216765472U (en) Urban road bituminous paving structure that permeates water
CN208088051U (en) A kind of fast spreading road surface
CN109322226A (en) Sponge city permeable trail with replaceable filter device
CN205604016U (en) Trade brick and pavement
CN210177308U (en) Permeable pavement structure
KR101096195B1 (en) Prefabricated Sidewalk Block System
CN215104379U (en) Construction access road
CN107354840B (en) Drainage structure of spliced pavement system
CN218540263U (en) Asphalt pavement drainage structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Qin Shengyi

Inventor before: Hu Junfeng

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20171219

Address after: 246600, No. 1, general road, Yuexi Economic Development Zone, Anqing, Anhui

Applicant after: Renchuang ecological environmental protection Polytron Technologies Inc

Address before: Science and Technology City kolding road high tech Zone of Suzhou City, Jiangsu Province, No. 78 215163

Applicant before: Suzhou Le Juyitang Electronic Science and Technology Co., Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20160824

RJ01 Rejection of invention patent application after publication