[go: up one dir, main page]

CN105811402B - A kind of Electric Load Prediction System and its Forecasting Methodology - Google Patents

A kind of Electric Load Prediction System and its Forecasting Methodology Download PDF

Info

Publication number
CN105811402B
CN105811402B CN201610163622.5A CN201610163622A CN105811402B CN 105811402 B CN105811402 B CN 105811402B CN 201610163622 A CN201610163622 A CN 201610163622A CN 105811402 B CN105811402 B CN 105811402B
Authority
CN
China
Prior art keywords
power
mrow
load
electric
msub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610163622.5A
Other languages
Chinese (zh)
Other versions
CN105811402A (en
Inventor
曾博
严旭
秦丽娟
林溪桥
韩帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Original Assignee
Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of Guangxi Power Grid Co Ltd filed Critical Electric Power Research Institute of Guangxi Power Grid Co Ltd
Priority to CN201610163622.5A priority Critical patent/CN105811402B/en
Publication of CN105811402A publication Critical patent/CN105811402A/en
Application granted granted Critical
Publication of CN105811402B publication Critical patent/CN105811402B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/007Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources
    • H02J3/0073Arrangements for selectively connecting the load or loads to one or several among a plurality of power lines or power sources for providing alternative feeding paths between load and source when the main path fails, e.g. transformers, busbars
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention belongs to power system electric energy data processing technology field,More particularly to a kind of Electric Load Prediction System and its Forecasting Methodology,Including electric power load control unit,Electric energy acquisition unit,Distribution network automated service unit,Electric power marketing MIS service unit,Transforming plant protecting center cell and power-management centre service unit,The electric power load control unit respectively with electric energy acquisition unit,Distribution network automated service unit,Electric power marketing MIS service unit,Transforming plant protecting center cell and power-management centre service unit are attached,The Forecasting Methodology of the present invention is the collection power consumer information in units of power network line title,Tracking and inquiry,Carry out line load and calculate analyzing and processing,Obtain every circuit short-term load forecasting curve of power distribution network and take the every prediction index for influenceing electric load,The present invention can be to moving reason retrospect and external factor impact evaluation analysis with electric load field wave,Realize the monitoring of electric power power consumption and prediction.

Description

A kind of Electric Load Prediction System and its Forecasting Methodology
Technical field
The invention belongs to power system electric energy data analysis technical field, more particularly to a kind of Electric Load Prediction System And its Forecasting Methodology.
Background technology
Substantial amounts of marketing, metering, operation of power networks data producing level be not high.With the continuous hair of computer information technology Open up, substantial amounts of number is have accumulated in all kinds of operation systems (Marketing Management Information System, metering automation system, scheduling EMS system) According to resource, system can gather and store a large amount of client's information about power, including client properties, client's load characteristic, electricity feature etc., It can not effectively be applied, cause the waste of data resource.The Electricity market analysis to become more meticulous is one Unite engineering, involved data volume is very huge, the intelligent means of Electricity market analysis deficiency, human factor influence compared with It is more.Effective conclusion only can not be obtained by simply calculating with Market Analyst, and its subjectivity will be to a certain degree On have influence on the accuracy of market analysis.If because post personnel change, due to laggard employee experience accumulation in a short time not Foot, can cause the reasonable science of forecast analysis can not be continuous.The complicated economic situation of our times largely increases Judgement difficulty to Power Market Development rule, the change an urgent demand Utilities Electric Co. of economic situation understand power sales in depth Endogenous development change mechanism, and its influence factor and regularity are sought, provide scientific basis for scientific forecasting market future trend.
Electrical Market Forecasting analysis at present lays particular emphasis on overall macroscopic analysis, lacks the analysis to microcosmic market.With market Form constantly produces new change, it is necessary to improve the degree that becomes more meticulous of market analysis, there is provided market internal and external reasonses analysis of Influential Factors, Demand response, electrity market activity tracking, monitoring etc. microcosmic market refinement analytic function, market analysis forecast work often according to Rely power system internal data, have ignored the trace analysis influenceed on external environment.The development of electricity market is by a variety of external The influence of environment, it is economical whether prosperous largely to influence electric power for the larger region of industrial proportion Market development running orbit.Analysis for external economy environment in the past often based on ex-post analysis, can not be instructed not send a telegram here Power develops, and therefore, grid company can clearly cause the major influence factors of turn of the market, therefrom excavate influence electricity market Main industries, main users and the reason of change, accurately hold user, the fluctuation of industry quantity of electricity is fluctuated with regional quantity of electricity Between contact, consider its influence to power network for user and decision-making foundation be provided.
The content of the invention
The purpose of the present invention is the above mentioned problem for solving prior art, there is provided a kind of Electric Load Prediction System and its prediction Method, the present invention collection tracking in real time can be carried out to electric load and power structure solution is analyzed, and judges that electric load fluctuates It is monitored and statistical analysis, realizes the monitoring of electric load, to achieve these goals, the technical solution adopted by the present invention is such as Under:
A kind of Electric Load Prediction System, it is characterised in that:Including electric power load control unit, electric energy acquisition unit, match somebody with somebody Grid automation service unit, Electric power marketing MIS service unit, transforming plant protecting center cell and power-management centre service are single Member, the electric power load control unit respectively with electric energy acquisition unit, distribution automation system service unit, power marketing MIS service units, transforming plant protecting center cell and power-management centre service unit are attached, the electric power load control Unit obtains and calculated respectively power transmission parameter, the transforming plant protecting center list that analyzing and processing electric energy acquisition unit gathers from power network What member output quality of power supply energy consumption parameter, distribution automation system took unit output matches somebody with somebody electrical parameter data, and is power marketing MIS service units provide information on load, and carry out conveying to power-management centre service unit and realize that fault location, diagnosis are reported Accuse, and realize the reports such as Fault Isolation, load transfer, field failure maintenance, the power load of the Electric power marketing MIS service unit Lotus prediction result is transmitted into power-management centre service unit by electric power load control unit is scheduled distribution, the electricity Power marketing MIS service units include electricity consumption subscriber information management module, electric load tracking module, electric power power structure analysis mould Block, electric load early warning module and electric load decision-making module, the electricity consumption subscriber information management module pass sequentially through power load Lotus tracking module, electric power power structure analysis module, electric load early warning module connect with electric load decision-making module.
Preferably, the electric power load control unit connects including embedded Communication processor, network interface card extending controller, UART Mouth circuit, SDRAM memory, clock reference circuit, COM communication controlers, flash storage, LCD display, CAN interface electricity Road and ethernet interface, it is described state embedded Communication processor respectively with ethernet interface, UART interface circuit, SDRAM memory, clock reference circuit, CAN interface circuit, COM communication controlers, flash storage and network interface card extension control Device is connected, and the network interface card extending controller is connected with distribution network automated service unit, the ethernet interface and electric power MIS service units of marketing are connected, and the UART interface circuit is connected with LCD display, the CAN interface circuit and electric energy acquisition Unit connects.
Preferably, the embedded Communication processor by pci bus and network interface card extending controller, flash storage, COM communication controlers are communicated to connect, and the embedded Communication processor is connected by EX buses with CAN interface circuit communication.
Preferably, the distribution automation system takes unit and is used for historical data management, decision implement data acquisition, prison Depending on control, fault location and alarm, sequence of events recording, statistics calculating and the drafting of electric load curve, including at least SCADA Module, distribution geography information module and dsm module.
A kind of Methods of electric load forecasting, it is characterised in that:Comprise the following steps:
Step 1:Power consumer information is collected in units of power network line title, and electricity substantially is obtained from distribution network line Parameter is measured, establishes grid power circuit power load information database, the power consumer information of collection is stored in electricity consumption user letter Cease management module;It is to industry-by-industry classification, sale of electricity classification, spy to whole electricity market power consumer information and classification Determine customer group, specify user to be collected classification analysis, it mainly includes load curve and typical curve and coulometric analysis etc.;
Step 2:Electric load tracking module can be to power load according to the user power utilization amount historical data on distribution network line The unusual action information factor that lotus impacts is monitored, and the factor impacted to electric load information is carried out at seasonal adjustment Reason, to obtain the every prediction index for influenceing electric load;
Step 3:Electric load decision-making module is screened by linear regression model (LRM) to each prediction index, power consumer Power information is tracked and inquired about, and rejects the influence of distribution network line load factor and calendar effect, carries out line load meter Analyzing and processing is calculated, the optimal trend of electric load change is obtained, every circuit short-term load forecasting curve of power distribution network is obtained, to electricity Power distribution network line electricity market in each season in predetermined period is planned and predicted.
Preferably, the seasonal adjustment processing carries out structure change stabilization by X-12-ARIMA seasonal adjustment methods Prediction index data, in order to analyze the feature of electrity market seasonal move and correct estimation and reflect the basic of season power consumption Development trend.Sequence after working process can reflect every profession and trade power consumption Secular Variation Tendency and fluctuating range;
The X-12-ARIMA seasonal adjustment methods model calculation expression is:
In formula (61), ytTrade power consumption amount is represented, λ=1 has corresponded to linear transformation, and λ=0 has corresponded to logarithmic transformation, remaining Smooth variation occurs with λ for conversion, such as in general economic indicator sequence, dtNumber Sequence, Y are removed for onetRepresent actual electricity consumption Amount.
Preferably, the linear regression model (LRM) calculation expression is:
In formula (71), ytTrade power consumption amount is represented, x represents Industrial Cycle index, and r represents the lag period, and c represents constant term, t Represent time, ztRepresent stochastic error.
In summary, the present invention has following remarkable result as a result of above technical scheme, the present invention:
(1), the present invention fully judges the state of development of power load, by the analysis to historical development rule and to present situation Assurance, in time find the leading power consumption index of market development, and on caused by the power load influence give rationally to assess.
(2), the present invention can carry out collection tracking in real time to electric power electricity consumption and power structure solution be analyzed, to power load The cause of fluctuation retrospect of lotus field and external factor impact evaluation analysis, realize the monitoring of electric power power consumption and prediction.
(3), the present invention can in time, comprehensively monitor the fluctuating change situation of power consumption/load, ensure that power equipment is long-term Reliable and stable operation is each electric power power consumption/Power system load data to provide strong, finer support, is electric power Load prediction and monitoring, the continuous data of various kinds of equipment power consumption is transmitted to realize, and save a large amount of human costs and circuit The engineerings such as transformation are into providing decision support
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of present example or technical scheme of the prior art There is the accompanying drawing required in technology description to do simply to introduce, it should be apparent that, drawings in the following description are only the present invention Some examples, to those skilled in the art, can also be attached according to these on the premise of creativeness is not paid Figure obtains other accompanying drawings.
Fig. 1 is a kind of schematic diagram of Electric Load Prediction System of the present invention.
Fig. 2 is a kind of electric power load control unit schematic diagram of Electric Load Prediction System of the present invention.
Fig. 3 is a kind of Analysis And Computation Division reason flow chart of Methods of electric load forecasting of the present invention.
Fig. 4 is a kind of schematic diagram of the Electric power marketing MIS service unit of Electric Load Prediction System of the present invention.
Fig. 5 is a kind of present invention non-general industrial user in January, 2010 of Methods of electric load forecasting in December, 2014 reality Border power consumption curve map.
Fig. 6 is that a kind of non-general industrial user X-12-ARIMA seasonal adjustments program of Methods of electric load forecasting of the present invention is adjusted Electricity needs progress curve figure after whole.
Fig. 7 is a kind of actual use present invention commercial user's in January, 2010 in December, 2014 of Methods of electric load forecasting Electric quantity curve figure.
Fig. 8 is after a kind of commercial user's X-12-ARIMA seasonal adjustments program of Methods of electric load forecasting of the present invention adjusts Electricity needs progress curve figure,
Fig. 9 is a kind of actual use present invention agricultural production in January, 2010 in December, 2014 of Methods of electric load forecasting Electric quantity curve figure.
Figure 10 is a kind of agricultural production X-12-ARIMA seasonal adjustments program adjustment of Methods of electric load forecasting of the present invention Electricity needs progress curve figure afterwards.
Embodiment
Below in conjunction with the accompanying drawing in present example, the technical scheme in the embodiment of the present invention is carried out clear, complete Ground describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Based on hair Embodiment in bright, the every other implementation that those of ordinary skill in the art are obtained under the premise of creative work is not made Example, belongs to the scope of protection of the invention.
1 and Fig. 2 below in conjunction with the accompanying drawings, a kind of Electric Load Prediction System, including electric power load control unit, electric energy acquisition In unit, distribution network automated service unit, Electric power marketing MIS service unit, transforming plant protecting center cell and power scheduling Central server unit, the electric power load control unit respectively with electric energy acquisition unit, distribution automation system service unit, electricity Power marketing MIS service units, transforming plant protecting center cell and power-management centre service unit are attached, the power load Lotus control unit obtains and calculated respectively power transmission parameter, the transforming plant protecting that analyzing and processing electric energy acquisition unit gathers from power network Center cell output quality of power supply energy consumption parameter, distribution automation system take the electrical parameter data of matching somebody with somebody of unit output, and are electricity Power marketing MIS service units provide information on load, and to power-management centre service unit carry out conveying realize fault location, Diagnosis report, and the reports such as Fault Isolation, load transfer, field failure maintenance are realized, the Electric power marketing MIS service unit Load forecast result is transmitted into power-management centre service unit by electric power load control unit and is scheduled distribution; The distribution automation system takes unit and is used for historical data management, decision implement data acquisition, monitoring control, fault location With alarm, sequence of events recording, statistics calculating and the drafting of electric load curve, believe including at least SCADA modules, distribution geography Cease module (GIS) and dsm module (DSM).The Electric power marketing MIS service unit includes electricity consumption subscriber information management Module, electric load tracking module, electric power power structure analysis module, electric load early warning module and electric load decision model Block, the electricity consumption subscriber information management module pass sequentially through electric load tracking module, electric power power structure analysis module, electric power Load warning module connects with electric load decision-making module.
In embodiments of the present invention, as shown in figure 3, the electric power load control unit include embedded Communication processor, Network interface card extending controller, UART interface circuit, SDRAM memory, clock reference circuit, COM communication controlers, Flash storages Device, LCD display, CAN interface circuit and ethernet interface, it is described state embedded Communication processor respectively with ether Netcom Believe interface, UART interface circuit, SDRAM memory, clock reference circuit, CAN interface circuit, COM communication controlers, Flash Memory is connected with network interface card extending controller, and the network interface card extending controller is connected with distribution network automated service unit, described Ethernet interface is connected with Electric power marketing MIS service unit, and the UART interface circuit is connected with LCD display, described CAN interface circuit is connected with electric energy acquisition unit.The embedded Communication processor is controlled by pci bus and network interface card extension Device, flash storage, the communication connection of COM communication controlers, the embedded Communication processor pass through EX buses and CAN interface Circuit communication connects.
In the present invention, the electric energy acquisition unit includes current sensor, voltage sensor or intelligence electricity as shown in Figure 3 Table, electric energy acquisition unit obtains the parameter signals such as accurate voltage electric current from power network and sent to embedded Communication processor, from power network Obtaining the parameters such as accurate voltage electric current includes basic electrical parameter, harmonic voltage electric current, frequency and voltage deviation, imbalance and sequence The parameters such as component, voltage pulsation and flickering, send embedded Communication processor and calculated and analyzed and processed to obtain the negative of power network The data such as lotus curve, voltage, electric current, frequency, power, DC component, harmonic detecting, dead electricity detection, dead electricity power recording.It is described The parameter of transforming plant protecting center cell output includes transmission line equipment parameter, transformer equipment parameter, power capacitor ginseng The parameters such as number, asynchronous machine are used to calculate quality of power supply energy consumption data.The distribution automation system server is based on SCADA System, distribution GIS-Geographic Information System (GIS) and dsm (DSM), according to voltage, power factor, the electricity for obtaining power distribution network The parameters such as stream are implemented data acquisition, monitoring control, fault location and alarm, sequence of events recording and statistics and calculated, and then pass through Electric power load control unit carries out conveying to power-management centre service unit and realizes fault location, diagnosis report, and realizes event Phragma is from reports such as the transfer of, load, field failure maintenance.The electric energy acquisition unit, distribution network automated service is single and member becomes The data of power station protection center cell are conveyed into electric power load control unit and carry out calculating processing, single for Electric power marketing MIS service Member provides a variety of electricity/information on loads, and the data that electric power load control unit calculate processing include 3 seconds real time datas, 3 Minute statistical value and different interval statistical value;Wherein, different interval statistical value includes day statistical interval value, all statistical intervals, the moon Statistical interval value, power consumption/load of season statistical interval value and year statistical interval value, year-on-year rate of change, ring are than rate of change etc. Graphic analyses, by the data storage for calculating processing in local flash storage, these power information datas of storage can be led to Cross ethernet interface and transmit to Electric power marketing MIS service unit and analyzed and processed., can by these energy consumption datas of storage The power information data of acquisition is analyzed and processed with being transmitted by ethernet interface to Electric power marketing MIS service unit And load prediction, then taken again by being transmitted by ethernet interface, electric power load control unit to power-management centre Business unit carries out power scheduling and distribution.
As shown in figure 4, the Electric power marketing MIS service unit include electricity consumption subscriber information management module, electric load with Track module, electric power power structure analysis module, electric load early warning module and electric load decision-making module, the electricity consumption user letter Breath management module passes sequentially through electric load tracking module, electric power power structure analysis module, electric load early warning module and electricity Power load decision-making module connects.The electricity consumption subscriber information management module carries out electricity price/electricity bill control, load management to each user Etc. the operation work of business, and relevant user geographical position is inquired about, automatically generate various power supply plans.Power department staff Analysis is predicted to whole electric power power consumption/load by Electric power marketing MIS service unit, first, to power consumer information It is managed, quantitative statisticses and analyzes prediction, and ensures data source integrality and accuracy, secondly, electric load tracking mould Block is used for the influence factor of electric power variation fluctuation and electric power power consumption/load data is tracked and inquired about, and slaps exactly The major influence factors of electric load change are held, electric power power structure analysis module is used to analyze fluctuating, being external for electricity/load Factor fluctuates and power structure (regional electricity/electric structure parsing and industry electricity/load configuration parsing, by various correlations Factor influences such as influence of meteorology, mineral products, factory of enterprise, agricultural production, residential electricity consumption, power plant for self-supply's factor to load), The electric load early warning module provides intelligentized electric load early warning and the change to electric load carried out automatic, regular Monitoring, to obtain the every prediction index for influenceing electric load, prediction index includes load curve, minimum load, maximum load, Average load;Once it was found that there is anomalous variation to send alarm, to relevant staff to prompt.The electric load decision model Block is used to carry out analysis judgement to whole electric load early warning, fluctuating characteristic, generation prediction electric load market trend Report, proposes that corresponding prediction scheme provides flexible, effective electric power power consumption/load Analysis and prediction for power department.
With reference to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a kind of Methods of electric load forecasting, comprise the following steps:
Step 1:Power consumer information is collected in units of power network line title, and electricity substantially is obtained from distribution network line Parameter is measured, establishes grid power circuit power load information database, and obtained from electric energy acquisition unit with power network line Title is that unit collects power consumer information, and the power consumer information of collection is stored in into electricity consumption subscriber information management module, and right Whole electricity market power consumer information and classification be to industry-by-industry classification, sale of electricity classification, particular group, specify User is collected classification analysis, and it mainly includes load curve and typical curve and coulometric analysis etc., and coulometric analysis is to each Individual category of employment, sale of electricity classification, particular group, specified user are analyzed.Day, the moon, season, year etc. different time latitude enter Row electricity, year-on-year rate of change, ring divide than the chart of rate of change etc., and proportion, growth rate, contrast, history ring ratio, client over the years Ranking etc..
Wherein, load curve includes with typical curve:
(a), using day as time dimension, Macro or mass analysis different industries classification, sale of electricity classification, particular group, specified user Daily load curve.
(b) to analyze typical load curve as time dimension in the moon, season.
Step 2:Electric load tracking mould can be to electric load according to the user power utilization amount historical data on distribution network line The unusual action information factor impacted is monitored, and the factor impacted to electric load information is carried out at seasonal adjustment Reason, to obtain the every prediction index for influenceing electric load;Electric load tracking module in the present invention is to electric power variation ripple Dynamic influence factor and electric power power consumption/load data is tracked and inquired about, and the change to electric load carry out from The factor that dynamic, periodic monitoring, electric load information impact carries out seasonal adjustment processing, influences electric load to obtain Every prediction index;The major influence factors of electric load change are grasped exactly, and electric power power structure analysis module is used to divide Analyse fluctuation, external factor fluctuation and power structure (regional electricity/electric structure parsing and the industry electricity/load of electricity/load Structure elucidation, influenceed by various correlative factors such as meteorology, mineral products, factory of enterprise, agricultural production, residential electricity consumption, provide electricity for oneself Influence of the factors such as factory to load).
Step 3:Electric load decision-making module is screened by linear regression model (LRM) to each prediction index, power consumer Power information is tracked and inquired about, and rejects the influence of distribution network line load factor and calendar effect, carries out line load meter Analyzing and processing is calculated, the optimal trend of electric load change is obtained, every circuit short-term load forecasting curve of power distribution network is obtained, to electricity Power distribution network line electricity market in each season in predetermined period is planned and predicted;In order to analyze electrity market season The feature of variation and the basic trend of correct estimation and reflection season power consumption.Electric load decision model in the present invention Block is used to carry out analysis judgement to whole electric load early warning, fluctuating characteristic, by linear regression model (LRM) to each prediction index Screened, generation prediction electric load market trend report, propose that corresponding prediction scheme provides spirit for power department Living, effective electric power power consumption/load Analysis and prediction.
As highly preferred embodiment of the present invention, the seasonal adjustment processing is entered by X-12-ARIMA seasonal adjustment methods The stable prediction index data of row structure change, the sequence after working process can reflect every profession and trade power consumption change in long term Trend and fluctuating range;The X-12-ARIMA seasonal adjustment methods model calculation expression is:
In formula (61), ytTrade power consumption amount is represented, λ=1 has corresponded to linear transformation, and λ=0 has corresponded to logarithmic transformation, remaining Smooth variation occurs with λ for conversion, such as in general economic indicator sequence, dtNumber Sequence, Y are removed for onetRepresent actual electricity consumption Amount.
It is described to remove Number Sequence dtMeet symmetrical change:Symmetrical rate of change C is asked to it firsti(t):
Ci(t)=200 × [di(t)-di(t-1)]/[di(t)+di(t-1)] (62);
In formula (62), when composing indexes take 0 or negative value, or when Index Content is ratio, then when taking the index adjacent The difference at quarter, that is, meet:
Ci(t)=di(t)-di(t-1) (63);
C in formula (63)i(t)、di(t) it is respectively value of i-th of index at the moment.
In embodiments of the present invention, screening is carried out to each prediction index by linear regression and removes exceptional value and calendar effect Answer, obtain the optimal trend of the change of electric load, the linear regression model (LRM) calculation expression is:
In formula (71), ytTrade power consumption amount is represented, x represents Industrial Cycle index, and r represents the lag period, and c represents constant term, t Represent time, ztRepresent stochastic error.
The present invention by taking 2010-2014 Guangxi province main industries electricity consumption initial data as an example, to it is non-it is general industry, business, The electricity consumption of resident living and agricultural production carries out period forecasting, and the data gathered are as shown in table 1, the electricity consumption to being gathered The data that data are carried out after seasonal periodicity adjustment are as shown in table 2.
Table 1:2010-2014 Guangxi province main industries electricity consumption initial data (units:Hundred million kilowatt hours)
Table 2:Data (unit after Guangxi province main industries electricity consumption seasonal adjustment in 2010-2014:Hundred million kilowatt hours)
Fig. 5 be non-general industrial user in January, 2010 in December, 2014 actual power consumption, Fig. 6 is non-general industrial user X- Electricity needs progress curve after the adjustment of 12-ARIMA seasonal adjustments program, comparison diagram 5 and Fig. 6 be to 2010-2014 I, IIth, III, IV is predicted processing season, as we know from the figure the optimal trend of electric load change, can according to change curve Carry out the trend of the electricity needs development of load prediction.
Fig. 7 be commercial user in January, 2010 in December, 2014 actual power consumption, Fig. 8 is commercial user X-12-ARIMA Electricity needs progress curve after the adjustment of seasonal adjustment program, comparison diagram 7 and Fig. 8 be to 2010-2014 I, II, III, IV Four seasons was predicted processing, as we know from the figure the optimal trend of electric load seasonal periodicity change, according to change curve The trend of the electricity needs development of load prediction can be carried out.
Fig. 9 is agricultural production in January, 2010 in December, 2014 actual power consumption, Figure 10 agricultural production X-12-ARIMA seasons Save the electricity needs progress curve after adjustment programme adjustment, comparison diagram 9 and Figure 10 be to 2010-2014 I, II, III, IV Four seasons was predicted processing, as we know from the figure the optimal trend of electric load seasonal periodicity change, according to change curve The trend of the electricity needs development of load prediction can be carried out.
The preferred embodiment of invention is the foregoing is only, is not intended to limit the invention, all spirit in the present invention Within principle, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.

Claims (7)

  1. A kind of 1. Electric Load Prediction System, it is characterised in that:Including electric power load control unit, electric energy acquisition unit, distribution Automation service unit, Electric power marketing MIS service unit, transforming plant protecting center cell and power-management centre service are single Member, the electric power load control unit respectively with electric energy acquisition unit, distribution automation system service unit, power marketing MIS service units, transforming plant protecting center cell and power-management centre service unit are attached, the electric power load control Unit obtains and calculated respectively power transmission parameter, the transforming plant protecting center list that analyzing and processing electric energy acquisition unit gathers from power network What member output quality of power supply energy consumption parameter, distribution automation system took unit output matches somebody with somebody electrical parameter data, and is power marketing MIS service units provide information on load, and carry out conveying to power-management centre service unit and realize that fault location, diagnosis are reported Accuse, and realize the reports such as Fault Isolation, load transfer, field failure maintenance, the power load of the Electric power marketing MIS service unit Lotus prediction result is transmitted into power-management centre service unit by electric power load control unit is scheduled distribution, the electricity Power marketing MIS service units include electricity consumption subscriber information management module, electric load tracking module, electric power power structure analysis mould Block, electric load early warning module and electric load decision-making module, the electricity consumption subscriber information management module pass sequentially through power load Lotus tracking module, electric power power structure analysis module, electric load early warning module connect with electric load decision-making module.
  2. A kind of 2. Electric Load Prediction System according to claim 1, it is characterised in that:The electric power load control unit Including embedded Communication processor, network interface card extending controller, UART interface circuit, SDRAM memory, clock reference circuit, COM Communication controler, flash storage, LCD display, CAN interface circuit and ethernet interface, the embedded mailing address Manage device respectively with ethernet interface, UART interface circuit, SDRAM memory, clock reference circuit, CAN interface circuit, COM communication controlers, flash storage connect with network interface card extending controller, and the network interface card extending controller and power distribution network are automatic Change service unit connection, the ethernet interface is connected with Electric power marketing MIS service unit, the UART interface circuit and LCD display is connected, and the CAN interface circuit is connected with electric energy acquisition unit.
  3. A kind of 3. Electric Load Prediction System according to claim 2, it is characterised in that:The embedded Communication processor Communicated to connect by pci bus and network interface card extending controller, flash storage, COM communication controlers, the embedded communication Processor is connected by EX buses with CAN interface circuit communication.
  4. A kind of 4. Electric Load Prediction System according to claim 1, it is characterised in that:The distribution automation system Take unit and be used for historical data management, decision implement data acquisition, monitoring control, fault location and alarm, sequence of events recording, Statistics calculates and the drafting of electric load curve, including at least SCADA modules, distribution geography information module and dsm mould Block.
  5. A kind of 5. Methods of electric load forecasting, it is characterised in that:Comprise the following steps:
    Step 1:Power consumer information is collected in units of power network line title, and basic electricity ginseng is obtained from distribution network line Number, establishes grid power circuit power load information database, and the power consumer information of collection is stored in into electricity consumption user profile pipe Manage module;
    Step 2:Electric load tracking module can be made according to the user power utilization amount historical data on distribution network line to electric load Unusual action information factor into influence is monitored, and the factor impacted to electric load information carries out seasonal adjustment processing, To obtain the every prediction index for influenceing electric load;
    Step 3:Electric load decision-making module is screened by linear regression model (LRM) to each prediction index, the electricity consumption of power consumer Information is tracked and inquired about, and rejects the influence of distribution network line load factor and calendar effect, carries out line load calculating point Analysis is handled, and is obtained the optimal trend of electric load change, is obtained every circuit short-term load forecasting curve of power distribution network, electric power is matched somebody with somebody Power network line electricity market in each season in predetermined period is planned and predicted.
  6. A kind of 6. Methods of electric load forecasting according to claim 5, it is characterised in that:The seasonal adjustment processing is logical Cross X-12-ARIMA seasonal adjustment methods and carry out the stable prediction index data of structure change, the X-12-ARIMA seasonal adjustments Method model calculation expression meets:
    <mrow> <msubsup> <mi>y</mi> <mi>t</mi> <mrow> <mo>(</mo> <mi>&amp;lambda;</mi> <mo>)</mo> </mrow> </msubsup> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>Y</mi> <mi>t</mi> </msub> <mo>/</mo> <msub> <mi>d</mi> <mi>t</mi> </msub> </mrow> </mtd> <mtd> <mrow> <mi>&amp;lambda;</mi> <mo>=</mo> <mn>1</mn> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msup> <mi>&amp;lambda;</mi> <mn>2</mn> </msup> <mo>+</mo> <mo>&amp;lsqb;</mo> <msup> <mrow> <mo>(</mo> <msub> <mi>Y</mi> <mi>t</mi> </msub> <mo>/</mo> <msub> <mi>d</mi> <mi>t</mi> </msub> <mo>)</mo> </mrow> <mi>&amp;lambda;</mi> </msup> <mo>-</mo> <mn>1</mn> <mo>&amp;rsqb;</mo> <mo>/</mo> <mi>&amp;lambda;</mi> </mrow> </mtd> <mtd> <mrow> <mi>&amp;lambda;</mi> <mo>&amp;NotEqual;</mo> <mn>0</mn> <mo>,</mo> <mn>1</mn> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mi>l</mi> <mi>o</mi> <mi>g</mi> <mrow> <mo>(</mo> <msub> <mi>Y</mi> <mi>t</mi> </msub> <mo>/</mo> <msub> <mi>d</mi> <mi>t</mi> </msub> <mo>)</mo> </mrow> </mrow> </mtd> <mtd> <mrow> <mi>&amp;lambda;</mi> <mo>=</mo> <mn>0</mn> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>61</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
    In formula (61), ytRepresent trade power consumption amount, λ=1 corresponded to linear transformation, and λ=0 has corresponded to logarithmic transformation, remaining conversion with Smooth variation, d occur for λtNumber Sequence, Y are removed for onetRepresent actual power consumption.
  7. A kind of 7. Methods of electric load forecasting according to claim 5, it is characterised in that:The linear regression model (LRM) calculates Expression formula is:
    <mrow> <msub> <mi>y</mi> <mi>t</mi> </msub> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>m</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>r</mi> </munderover> <msub> <mi>&amp;alpha;</mi> <mi>m</mi> </msub> <msub> <mi>y</mi> <mrow> <mi>t</mi> <mo>-</mo> <mi>m</mi> </mrow> </msub> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>n</mi> <mo>=</mo> <mn>1</mn> </mrow> <mi>r</mi> </munderover> <msub> <mi>&amp;beta;</mi> <mi>n</mi> </msub> <msub> <mi>x</mi> <mrow> <mi>t</mi> <mo>-</mo> <mi>m</mi> </mrow> </msub> <mo>+</mo> <mi>c</mi> <mo>+</mo> <msub> <mi>z</mi> <mi>t</mi> </msub> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>71</mn> <mo>)</mo> </mrow> <mo>;</mo> </mrow>
    In formula (71), ytTrade power consumption amount is represented, x represents Industrial Cycle index, and r represents the lag period, and c represents constant term, and t is represented Time, ztRepresent stochastic error.
CN201610163622.5A 2016-03-22 2016-03-22 A kind of Electric Load Prediction System and its Forecasting Methodology Active CN105811402B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610163622.5A CN105811402B (en) 2016-03-22 2016-03-22 A kind of Electric Load Prediction System and its Forecasting Methodology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610163622.5A CN105811402B (en) 2016-03-22 2016-03-22 A kind of Electric Load Prediction System and its Forecasting Methodology

Publications (2)

Publication Number Publication Date
CN105811402A CN105811402A (en) 2016-07-27
CN105811402B true CN105811402B (en) 2018-03-06

Family

ID=56453574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610163622.5A Active CN105811402B (en) 2016-03-22 2016-03-22 A kind of Electric Load Prediction System and its Forecasting Methodology

Country Status (1)

Country Link
CN (1) CN105811402B (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786539A (en) * 2016-12-30 2017-05-31 江苏金风科技有限公司 Load data harvester, prediction control device and load monitoring system
CN107067343A (en) * 2017-04-17 2017-08-18 国网浙江省电力公司经济技术研究院 A kind of sale of electricity side operating service management platform based on the marketization
CN107634515A (en) * 2017-08-22 2018-01-26 国网浙江新昌县供电公司 Optimal operation model of tea area based on analysis of power consumption characteristics in tea area
CN107527121A (en) * 2017-09-18 2017-12-29 云南电网有限责任公司信息中心 A kind of method of the information system running status diagnosis prediction of power network
CN109459659A (en) * 2018-11-14 2019-03-12 国网黑龙江省电力有限公司信息通信公司 It is a kind of for predicting the system and method for electric power system fault
CN109782709A (en) * 2018-12-29 2019-05-21 北京航天福道高技术股份有限公司 A kind of data acquisition monitoring system applied to military enterprise
JP7156975B2 (en) 2019-02-26 2022-10-19 三菱重工業株式会社 Management evaluation device, management evaluation method, and program
CN110275052B (en) * 2019-04-26 2022-04-15 国网浙江省电力有限公司衢州供电公司 Intelligent electric energy meter for short-term prediction of user power consumption
CN110705232B (en) * 2019-08-27 2023-04-07 国网山东省电力公司信息通信公司 Method and system for generating service state analysis report of power communication network maintenance influence
CN111314162A (en) * 2019-11-29 2020-06-19 中国电力科学研究院有限公司 A method and system for drive test of power service based on drive tester
CN112116265B (en) * 2020-09-25 2025-03-07 国网上海市电力公司 A method for constructing industry prosperity index driven by power data
CN112232559B (en) * 2020-10-12 2023-06-13 国网江西省电力有限公司信息通信分公司 A short-term forecasting method and device for power regional load
CN112448477A (en) * 2020-11-03 2021-03-05 南京鼎臻自动化科技有限公司 Intelligent monitoring power distribution control system based on Internet of things
CN113283679A (en) * 2021-06-30 2021-08-20 南京理工大学 AI artificial intelligence based power load prediction system
CN113935519A (en) * 2021-09-16 2022-01-14 南方电网数字电网研究院有限公司 An AI-based network source load forecasting data management system
CN114172265A (en) * 2021-11-23 2022-03-11 保定市冀能电力自动化设备有限公司 Comprehensive protection measurement and control system
CN114881254A (en) * 2022-03-17 2022-08-09 广西电网有限责任公司贵港供电局 Electricity Marketing Self-Service System
CN115062869B (en) * 2022-08-04 2022-12-09 国网山东省电力公司东营供电公司 A comprehensive energy scheduling method and system considering carbon emissions
CN116132548B (en) * 2023-02-06 2023-08-15 北京思维实创科技有限公司 A data acquisition method and system for distributed multi-source heterogeneous data
CN116151129A (en) * 2023-04-18 2023-05-23 石家庄科林电气股份有限公司 Power dispatching system fault diagnosis method based on extreme learning machine

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102855525A (en) * 2012-08-16 2013-01-02 中国电力科学研究院 System and method for forecasting and analyzing load of resident user
CN204156611U (en) * 2014-11-15 2015-02-11 国网河南省电力公司开封供电公司 A kind of intelligent distribution network data management and analytical equipment
CN104967123A (en) * 2015-08-03 2015-10-07 苏州健雄职业技术学院 Intermittent energy consumption monitoring device and monitoring method under distribution network

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7274975B2 (en) * 2005-06-06 2007-09-25 Gridpoint, Inc. Optimized energy management system
US9785130B2 (en) * 2014-04-10 2017-10-10 Nec Corporation Decentralized energy management platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102855525A (en) * 2012-08-16 2013-01-02 中国电力科学研究院 System and method for forecasting and analyzing load of resident user
CN204156611U (en) * 2014-11-15 2015-02-11 国网河南省电力公司开封供电公司 A kind of intelligent distribution network data management and analytical equipment
CN104967123A (en) * 2015-08-03 2015-10-07 苏州健雄职业技术学院 Intermittent energy consumption monitoring device and monitoring method under distribution network

Also Published As

Publication number Publication date
CN105811402A (en) 2016-07-27

Similar Documents

Publication Publication Date Title
CN105811402B (en) A kind of Electric Load Prediction System and its Forecasting Methodology
CN113159339B (en) One-area one-index line loss management method and system based on big data
CN106154209B (en) Electrical energy meter fault prediction technique based on decision Tree algorithms
US20040225649A1 (en) Identifying energy drivers in an energy management system
CN106952032A (en) A kind of equipment manufacture big data management system
CN110782153A (en) A modeling method and system for comprehensive energy efficiency evaluation system in enterprise parks
CN110928866A (en) Method and system for line topology verification based on big data analysis of power outage information
CN111191966B (en) A Method for Identifying Unqualified Periods of Distribution Network Voltage Based on Spatiotemporal Characteristics
CN111291076A (en) Abnormal water use monitoring and alarming system based on big data and construction method thereof
CN109165763A (en) A kind of potential complained appraisal procedure and device of 95598 customer service work order
CN117273337A (en) A smart energy meter evaluation method
CN109035062A (en) A kind of client&#39;s electricity charge anomaly analysis and tactful application system
CN118074126B (en) Operation and maintenance monitoring method based on power grid information
CN118094262B (en) A load outlier detection method based on spatial clustering
CN115660225A (en) Electricity load prediction management method and system based on ammeter communication module
Perçuku et al. Big data and time series use in short term load forecasting in power transmission system
CN117728379A (en) Intelligent operation scheduling method for regional power grid
CN118485264A (en) A method for carbon emission accounting and quota allocation in power grid from the perspective of carbon emission trading
CN103501003A (en) Line loss control system
Siddiquee et al. A Data-Driven Framework for Quantifying Demand Response Participation Benefit of Industrial Consumers
CN107862476A (en) A kind of metering table demand computational methods based on data analysis
CN115860983A (en) Smart city gas safety monitoring operation management method and system based on Internet of things
CN112418548B (en) Intelligent workshop management method and system based on artificial intelligence technology
CN113642933A (en) Power distribution station low-voltage diagnosis method and device
CN118798548A (en) Edge-to-edge integrated management platform for distributed energy

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant