CN105808894A - Power transmission line basic mass design drawing method - Google Patents
Power transmission line basic mass design drawing method Download PDFInfo
- Publication number
- CN105808894A CN105808894A CN201610307152.5A CN201610307152A CN105808894A CN 105808894 A CN105808894 A CN 105808894A CN 201610307152 A CN201610307152 A CN 201610307152A CN 105808894 A CN105808894 A CN 105808894A
- Authority
- CN
- China
- Prior art keywords
- module
- input
- basic
- transmission line
- output
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/18—Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/16—Cables, cable trees or wire harnesses
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Analysis (AREA)
- Computational Mathematics (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Programmable Controllers (AREA)
Abstract
The invention discloses a power transmission line basic mass design drawing method. Six kinds of basic forms in common use are subjected to design drawing; an input module uses interface input, automatic input, program curing automatic interaction; a calculation module comprises an insertion basic calculation module, a big board basic calculation module, a digging basic calculation module, a rock basic calculation module, a step basic calculation module and an anchor rod basic calculation module; the drawing output can be realized; an output module digging a DWG drawing module, out text file output and data feedback output. The method has the advantages that a mass input, mass calculation, mass regulation and mass drawing mode is used; the conventional design method is changed; the work efficiency is improved; the calculation step is clear; the middle process is controllable and visible; the basic engineering quantity can be precisely controlled according to practical conditions.
Description
Technical field
The present invention relates to Design of Foundation of Transmission Lines drawing practice, more specifically it is transmission line foundation Batch Design drawing practice.
Background technology
Current domestic work transmission line is heavy, and design form and theory are constantly updated, and win the market, it is necessary to require that we constantly bring forth new ideas, and improve design.And a set of efficiently, accurately design software whole design work is seemed extremely important.Current commercial base software has two weakness: first, single base input, single base can only publish picture, expends substantial amounts of manpower and materials, and largely effect on project progress;Second, specification, regulation etc. are all in continuous renewal, and software for calculation is also required to real-time update, and the updating maintenance of business software is costly, and the time cycle is long, is unfavorable for design objective heavy at present.The basic software of some domestic design institutes exploitation, design custom and pattern often with the court, even lack the design function of novel foundation, therefore in the urgent need to work transmission line basic engineering software that independent research is convenient and practical, and constantly quickly can update according to new criteria, to tackle the current fierce market competition.
Summary of the invention
The purpose of the present invention is in order to overcome the weak point of above-mentioned background technology, and provides a kind of transmission line foundation Batch Design drawing practice, it is possible to the mode of batch input, batch calculating, adjustment in batches and Batch Plot, is greatly improved work efficiency.
To achieve these goals, the technical scheme is that such: include input module, computing module, output module, it is characterized in that: be designed 6 kinds of conventional base forms drawing, described input module adopts interface input, automatic input, program Solidification automatic interaction, described computing module includes inserting basic calculation mould, big plate base computing module, digging foundation computing module, rock foundation computing module, ladder basic calculation module, anchor rod foundation computing module, and drawing output can be realized, described output module includes DWG graphics module, out text exports, data feedback exports.
In such scheme, described input module also includes input error and checks module.
In such scheme, described computing module can carry out reading in data and data process.
In such scheme, described output module can carry out images outputting and data output.
In such scheme, described computing module can carry out the checking computations of single basis, all basis checking computations, single drawing, Batch Plot.
Transmission line foundation Batch Design drawing practice, including following operating procedure:
1. set up and open newly built construction;
2. basic engineering submodule is entered;
3. basic operation: be the input of basic parameter successively, calculate the input of parameter, the checking computations of single basis, batch basis checking computations, single drawing, Batch Plot;
4. the output of result of calculation;
5. the storage of calculation document;
The invention has the beneficial effects as follows: the mode of application batch input, batch calculating, adjustment in batches and Batch Plot, overturn traditional design method, improve work efficiency;Calculation procedure is clear, and pilot process is controlled visible, it is possible to accurately control foundation engineering amount according to practical situation, the margin of safety on basis also can effectively be held, it is ensured that duration, cost saving;Can according to actual transmission line of electricity through area topographic and geologic, the basis of unrestricted choice laminating actual service conditions, substantially zero evolution is accomplished, avoid because improper the caused safety problem of foundation pattern and excavation cause soil erosion, the environmental issue such as vegetation deterioration, and optimize scheme of foundation design, decrease construction investment;The interface of Opening and real-time update function, quickly can update according to specification, the renewal of code, and by interface document (basic role power, basis planning, batch key dimension) and output file (result report, filing data file, basis applicable elements report etc.) standardization, newly built construction repeated labor can be alleviated.
Accompanying drawing explanation
Fig. 1 is module scantling plan of the present invention.
Detailed description of the invention
Describe the invention process situation in detail below in conjunction with accompanying drawing, but they are not intended that limitation of the invention, only for example, simultaneously by illustrating that advantages of the present invention will become clearer from easy to understand.
Transmission line foundation Batch Design drawing practice, as shown in Figure 1, including input module 101, computing module 102, output module 103, it is characterized in that: be designed 6 kinds of conventional base forms drawing, described input module 101 adopts interface to input, automatic input, program Solidification automatic interaction, described computing module 102 includes inserting basic calculation mould, big plate base computing module, digging foundation computing module, rock foundation computing module, ladder basic calculation module, anchor rod foundation computing module, and drawing output can be realized, described output mould 103 pieces includes DWG graphics module, out text exports, data feedback exports.
Input module also includes input error and checks module.
Computing module can carry out reading in data and data process.
Output module can carry out images outputting and data output.
Computing module can carry out the checking computations of single basis, all basis checking computations, single drawing, Batch Plot.
Transmission line foundation Batch Design drawing practice, including following operating procedure:
1. set up and open newly built construction;
2. basic engineering submodule is entered;
3. basic operation: be the input of basic parameter successively, calculate the input of parameter, the checking computations of single basis, batch basis checking computations, single drawing, Batch Plot;
4. the output of result of calculation;
5. the storage of calculation document;
Specifically carry out when writing of software program, following aspect need to be considered:
(1) software primary module: owing to computed in software base form is more, input data information amount is big, report file mutual many, generation between radix also more, computing module is also a lot, for operating accurately, and making user easy to use, software primary module is extremely important.Comprise functional module and have menu module, check report and file module, print and call CAD, EXCEL module and operating system interactive module.These codes can realize the calling of software for calculation, result is checked, the control of forms, printout etc..
(2) computing module: 6 kinds of base forms currently mainly include big plate base, digging foundation, Rock Embed based, anchor rod foundation and slant-insert foundation, ladder basis;Therefore it is 6 core calculations modules when software design.Owing to calculation is different in each computing module, respectively contain submodule several.Such as raw fly ash adopts shearing method to calculate, its module is included in Rock Embed based, beating excavation foundation adopts soil weight method to calculate, and module is included in big plate base, digging foundation, slant-insert foundation, ladder basic calculation module, does respective change according to basis difference.All have its feature and construction itself requirement due to various bases, 6 computing modules are separate, it is ensured that it calculates accuracy.
(3) input/output module: input module comprises and calculates the manual typing of data and automatic input, including active force, foundation outline size, geologic parameter, standard parameter, diagram parameter etc., and control software design and EXCEL mutual.Output module includes calculated description, construction drawing, data feedback, and control software design and CAD mutual.This module comprises several submodule according to function difference.
Unspecified it is prior art.
Claims (6)
1. transmission line foundation Batch Design drawing practice, including input module 101, computing module 102, output module 103, it is characterized in that: be designed 6 kinds of conventional base forms drawing, described input module 101 adopts interface to input, automatic input, program Solidification automatic interaction, described computing module 102 includes inserting basic calculation mould, big plate base computing module, digging foundation computing module, rock foundation computing module, ladder basic calculation module, anchor rod foundation computing module, and drawing output can be realized, described output module 103 includes DWG graphics module, out text exports, data feedback exports.
2. transmission line foundation Batch Design drawing practice according to claim 1, it is characterised in that: described input module 101 also includes input error and checks module.
3. transmission line foundation Batch Design drawing practice according to claim 2, it is characterised in that: described computing module 102 can carry out reading in data and data process.
4. transmission line foundation Batch Design drawing practice according to claim 3, it is characterised in that: described output module 103 can carry out images outputting and data output.
5. the transmission line foundation Batch Design drawing practice according to any claim in claim 1-4, it is characterised in that: described computing module 102 can carry out the checking computations of single basis, all basis checking computations, single drawing, Batch Plot.
6. according to the transmission line foundation Batch Design drawing practice described in claim 5, it is characterised in that include following operating procedure:
1. set up and open newly built construction;
2. basic engineering submodule is entered;
3. basic operation: be the input of basic parameter successively, calculate the input of parameter, the checking computations of single basis, batch basis checking computations, single drawing, Batch Plot;
4. the output of result of calculation;
5. the storage of calculation document.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610307152.5A CN105808894A (en) | 2016-05-11 | 2016-05-11 | Power transmission line basic mass design drawing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610307152.5A CN105808894A (en) | 2016-05-11 | 2016-05-11 | Power transmission line basic mass design drawing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105808894A true CN105808894A (en) | 2016-07-27 |
Family
ID=56456565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610307152.5A Pending CN105808894A (en) | 2016-05-11 | 2016-05-11 | Power transmission line basic mass design drawing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105808894A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111918346A (en) * | 2016-11-04 | 2020-11-10 | 华为技术有限公司 | Communication method, device and related equipment |
CN114626250A (en) * | 2022-04-09 | 2022-06-14 | 黄河勘测规划设计研究院有限公司 | Multi-row parallel pipeline ballast block batch design method |
CN115879886A (en) * | 2022-12-07 | 2023-03-31 | 国网湖北省电力有限公司宜昌供电公司 | Power transmission line assembly type rock anchor rod foundation configuration system and configuration method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20010042457A1 (en) * | 2000-05-19 | 2001-11-22 | Hiroshi Watanabe | Stencil printing machine and method of controlling the same |
JP4462941B2 (en) * | 2004-01-28 | 2010-05-12 | 中国電力株式会社 | Method for supporting the design of a single leg in a transmission line tower, a design method for a single joint, a computer program, a program storage medium |
CN101847855A (en) * | 2010-05-25 | 2010-09-29 | 中国电力工程顾问集团中南电力设计院 | Conductor galloping resistant method of iron towers of overhead power transmission lines |
CN101944204A (en) * | 2010-09-10 | 2011-01-12 | 北京恒华伟业科技股份有限公司 | Geographic information system applied to power system and method for improving display efficiency thereof |
CN102760189A (en) * | 2012-06-19 | 2012-10-31 | 江苏省电力设计院 | Automatic outputting method of electric transmission line house distribution map |
CN103413061A (en) * | 2013-08-28 | 2013-11-27 | 安徽鸿路钢结构(集团)股份有限公司 | Supplementary calculating system module for steel structure engineering quantity |
US20140215930A1 (en) * | 2013-02-05 | 2014-08-07 | Tindall Corporation | Tower assembly and method for assembling tower structure |
CN104091015A (en) * | 2014-07-03 | 2014-10-08 | 王正 | C# sampling method for power transmission line iron tower and related framework |
CN104805860A (en) * | 2015-05-12 | 2015-07-29 | 中国电力工程顾问集团中南电力设计院有限公司 | Inclined column straight-excavating bottom-expanding big board foundation for transmission line |
-
2016
- 2016-05-11 CN CN201610307152.5A patent/CN105808894A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20010042457A1 (en) * | 2000-05-19 | 2001-11-22 | Hiroshi Watanabe | Stencil printing machine and method of controlling the same |
JP4462941B2 (en) * | 2004-01-28 | 2010-05-12 | 中国電力株式会社 | Method for supporting the design of a single leg in a transmission line tower, a design method for a single joint, a computer program, a program storage medium |
CN101847855A (en) * | 2010-05-25 | 2010-09-29 | 中国电力工程顾问集团中南电力设计院 | Conductor galloping resistant method of iron towers of overhead power transmission lines |
CN101944204A (en) * | 2010-09-10 | 2011-01-12 | 北京恒华伟业科技股份有限公司 | Geographic information system applied to power system and method for improving display efficiency thereof |
CN102760189A (en) * | 2012-06-19 | 2012-10-31 | 江苏省电力设计院 | Automatic outputting method of electric transmission line house distribution map |
US20140215930A1 (en) * | 2013-02-05 | 2014-08-07 | Tindall Corporation | Tower assembly and method for assembling tower structure |
CN103413061A (en) * | 2013-08-28 | 2013-11-27 | 安徽鸿路钢结构(集团)股份有限公司 | Supplementary calculating system module for steel structure engineering quantity |
CN104091015A (en) * | 2014-07-03 | 2014-10-08 | 王正 | C# sampling method for power transmission line iron tower and related framework |
CN104805860A (en) * | 2015-05-12 | 2015-07-29 | 中国电力工程顾问集团中南电力设计院有限公司 | Inclined column straight-excavating bottom-expanding big board foundation for transmission line |
Non-Patent Citations (3)
Title |
---|
中国电力建设企业协会: "《中国电力建设科技成果(2012年度)上册》", 31 January 2013 * |
杨靖波 等: "《输电线路铁塔导线耦合振动动力特性研究》", 《振动、测试与诊断》 * |
顾明亮 等: "《沿海区段输电线路铁塔及基础腐蚀分析》", 《山西建筑》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111918346A (en) * | 2016-11-04 | 2020-11-10 | 华为技术有限公司 | Communication method, device and related equipment |
CN111918346B (en) * | 2016-11-04 | 2022-02-11 | 华为技术有限公司 | Communication method, device and related equipment |
US11838811B2 (en) | 2016-11-04 | 2023-12-05 | Huawei Technologies Co., Ltd. | Inter-network change method and apparatus, and related device |
CN114626250A (en) * | 2022-04-09 | 2022-06-14 | 黄河勘测规划设计研究院有限公司 | Multi-row parallel pipeline ballast block batch design method |
CN115879886A (en) * | 2022-12-07 | 2023-03-31 | 国网湖北省电力有限公司宜昌供电公司 | Power transmission line assembly type rock anchor rod foundation configuration system and configuration method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107609321B (en) | Continuous beam bridge parametric modeling method based on Revit platform | |
CN109710990B (en) | BIM technology-based roller compacted concrete dam construction progress-cost cooperative control method | |
Cheng et al. | Hydro unit commitment with a head-sensitive reservoir and multiple vibration zones using MILP | |
CN106295078A (en) | A kind of reinforcement detailing computing module system of processing based on BIM technology and method | |
CN106249717B (en) | A kind of control method for coordinating based on actuator saturation multi-agent system modeling | |
Kelly et al. | An energy and carbon life cycle assessment of tidal power case study: The proposed Cardiff–Weston severn barrage scheme | |
CN103530437A (en) | DCS terminal board outlet wire diagram automatic forming method | |
CN105808894A (en) | Power transmission line basic mass design drawing method | |
CN115329448B (en) | BIM-based fabricated building construction cost control method and system | |
CN103617243A (en) | System and method for automatically generating project amount and drawing CAD chart | |
CN103646303A (en) | A flexible management information system used for customizing processes and forms in a ship enterprise | |
Yifei et al. | Research on multidisciplinary optimization design of bridge crane | |
CN111080082B (en) | Power grid planning method suitable for low-carbon power supply development | |
CN108256831A (en) | The method that Engineering documents Management is carried out based on visualization BIM models | |
CN106779476A (en) | A kind of Construction Schedule management platform and method based on BIM IFC technologies | |
CN116127551A (en) | A fine-grained control method for bridge construction progress based on digital twin multi-dimensional model | |
CN112765711A (en) | BIM modeling method for green building simulation calculation | |
CN106383956A (en) | Conversion system and method for civil engineering model data of thermal power plant | |
CN104318030A (en) | Deformation-equivalence based automatic comprehensive deformation modulus calculating method for arch-dam foundations | |
CN110414035A (en) | A kind of design method of marine electrical platform structure rapid Optimum | |
CN104599061A (en) | Method for calculating project amount of road bridge engineering project | |
CN104408251A (en) | Automatic input/output and application method of constructional engineering process loads | |
CN104240044A (en) | Intelligent nuclear power station business process building method and uniform business process handling platform | |
CN116663129B (en) | Intelligent bridge design system and method based on 3DE platform | |
CN115360768B (en) | Power dispatching method, device and storage medium based on muzero and deep reinforcement learning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160727 |
|
RJ01 | Rejection of invention patent application after publication |